Control System Plans for SNS Upgrade Projects

The Spallation Neutron Source at Oak Ridge National Laboratory is planning two major upgrades to the facility. The Proton Power Upgrade project, currently underway, will double the machine power from 1.4 to 2.8 MW by adding seven additional cryomodules and associated equipment. The Second Target Station project, currently in conceptual design, will construct a new target station effectively doubling the potential scientific output of the facility. This paper discusses the control system upgrades required to integrate these projects into the existing EPICS based control systems used for the machine and neutron instrument beamlines. While much of the control system can be replicated from existing solutions, some systems require new hardware and software. Operating two target stations simultaneously will require a new run permit system to safely manage beam delivery.

Hartman, Steven↗

Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

Smith, Janice F.↗

Ask Pete, software planning and estimation through project characterization

Ask Pete, was developed by NASA to provide a tool for integrating the estimation and planning activities for a software development effort. It incorporates COCOMO II estimating with NASA's software development practices and IV&V criteria to characterize a project. This characterization is then used to generate estimates and tailored planning documents.

Project characterization↗

Collaborative Arrival Planning: Data Sharing and User Preference Tools

Air traffic growth and air carrier economic pressures have motivated efforts to increase the flexibility of the air traffic management process and change the relationship between the air traffic control service provider and the system user. One of the most visible of these efforts is the U.S. government/industry "free flight" initiative, in which the service provider concentrates on safety and cross-airline fairness, and the user on their business objectives and operating preferences, including selecting their own path and speed in real-time. In the terminal arrival phase of flight, severe restrictions and rigid control are currently placed on system users, typically without regard for individual user operational preferences. Airborne delays applied to arriving aircraft into capacity constrained airports are imposed on a first-come, first-serve basis, and thus do not allow the system user to plan for or prioritize late arrivals, or to economically optimize their arrival sequence. A central tenant of the free-flight operating paradigm is collaboration between service providers and users in reaching air traffic management decisions. Such collaboration would be particularly beneficial to an airline's "hub" operation, where off-schedule arrival aircraft are a consistent problem, as they cause serious air-port ramp difficulties, rippling airline scheduling effects, and result in large economic inefficiencies. Greater collaboration can also lead to increased airport capacity and decrease the severity of over-capacity rush periods. In the NASA Collaborative Arrival Planning (CAP) project, both independent exchange of real-time data between the service provider and system user and collaborative decision support tools are addressed. Data exchange of real-time arrival scheduling, airspace management, and air carrier fleet data between the FAA service provider and an air carrier is being conducted and evaluated. Collaborative arrival decision support tools to allow intra-airline arrival preferences are being developed and simulated. The CAP project is part of and leveraged from the NASA/FAA Center TRACON Automation System (CTAS), a fielded set of decision support tools that provide computer generated advisories for both enroute and terminal area controllers to manage and control arrival traffic more efficiently. In this paper, the NASA Collaborative Arrival Planning project is outlined and recent results detailed, including the real-time use of CTAS arrival scheduling data by a major air carrier and simulations of tactical and strategic user preference decision support tools.

Zelenka, Richard E.↗

NASA Global Hawk: Project Overview and Future Plans

The National Aeronautics and Space Administration (NASA) Global Hawk Project became operational in 2009 and began support of Earth science in 2010. Thus far, the NASA Global Hawk has completed three Earth science campaigns and preparations are under way for two extensive multi-year campaigns. One of the most desired performance capabilities of the Global Hawk aircraft is very long endurance: the Global Hawk aircraft can remain airborne longer than almost all other jet-powered aircraft currently flying, and longer than all other aircraft available for airborne science use. This paper describes the NASA Global Hawk system, payload accommodations, concept of operations, and the scientific data-gathering campaigns.

Naftel, J. Chris↗

Modular space station phase B extension program master plan

The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

Munsey, E. H.↗

Influence of a perspective cockpit traffic display format on pilot avoidance maneuvers

Perspective projections of cockpit displays of traffic information (CDTI) on CRTs to present vertical separation information to airline pilots were examined. The perspective projection was compared with plan view projections of the same air traffic situations. Comparison of the pilots' avoidance maneuvers made when using the perspective display with those made while using more the conventional plan view display showed that pilots maneuvered somewhat earlier with perspective displays. With the perspective display, they maneuvered more frequently in the vertical dimension. The bias to maneuver horizontally probably reflected the poorer presentation of vertical separation on previously used plan view traffic displays. The avoidance decisions made by pilots using both perspective and plan view displays shows fewer unsuccessful maneuvers and fewer maneuvers producing spacing violations with the perspective format.

Ellis, S. R.↗

NACA documents database project

The plan to get all the National Advisory Committee on Aeronautics (NACA) collection online, with quality records, led to the NACA Documents Data base Project. The project has a two fold purpose: (1) to develop the definitive bibliography of NACA produced and/or held documents; and (2) to make that bibliography and the associated documents available to the aerospace community. This study supports the first objective by providing an analysis of the NACA collection and its bibliographic records, and supports the second objective by defining the NACA archive and recommending methodologies for meeting the project objectives.

Smith, Ruth S.↗

U328 Electrical Reliability Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL’s) Project Management Office (PMO) is planning to install an underground electrical duct bank at the 3200 block of the Livermore Site (project). The proposed project will include a new electrical substation and feeders, demolition and replacement of the U328C utility building with a new structure to the west, re-routing of utilities, and update of the parking lot. This Sampling and Analysis Plan (SAP) outlines the procedures to collect and evaluate environmental samples for disposition of the excavated soil during the project and geotechnical samples for pavement design. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2022), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) process (EPA, 2006). In addition to the environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection and evaluation of the geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

An Approach to Data Management Planning for Protected Data Projects

This report describes what is required in a data management plan for data that needs to be protected in some fashion. Here we provide an overview of what a data manager should consider, including the data ingestion and various extract-transform-load processes, metadata considerations and documentation, to what might need to be accounted for in the event of data loss. In addition, this report includes two appendices: forms that, when filled out, make the user compliant with DOE data management requirements as well as additional requirements for handling protected data at ORNL.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Geolocated dataset of Chinese overseas development finance

China is now the world's largest source of bilateral development finance and will likely continue to play a prominent role in sovereign lending through its multi-billion-dollar Belt and Road Initiative. This paper introduces major methodological enhancements in tracking this finance: the use of an original application programming interface (API) to gathers news in multiple languages; double verification of every record to ensure every finance commitment has been formalized; and visual geo-location to trace the precise footprint of every project. The resulting dataset enables economic, environmental, and social analyses with high-precision spatial accuracy, as well as spatiotemporal monitoring by project stakeholders and enhanced planning by project managers. It covers the years 2008-2019 to enable analysis before and after the announcement of the Belt and Road Initiative. It includes 862 finance commitments, 669 of which have geographic location, to 94 countries across the world.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CalWave Design for PacWave - Preliminary Design Phase - Risk Management Plan

The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan assesses potential risks of CalWave's technology and accompanying processes and describes the risk mitigation strategies for the project.

16 TIDAL AND WAVE POWER↗

Bat Surveys of Retired Facilitiies Scheduled for Demolition by Washington Closure Hanford

This project was conducted to evaluate buildings and facilities remaining in the Washington Closure Hanford (WCH) deactivation, decontamination, decommissioning, and demolition schedule for bat roost sites. The project began in spring of 2009 and was concluded in spring of 2011. A total of 196 buildings and facilities were evaluated for the presence of bat roosting sites. The schedule for the project was prioritized to accommodate the demolition schedule. As the surveys were completed, the results were provided to the project managers to facilitate planning and project completion. The surveys took place in the 300 Area, 400 Area, 100-H, 100-D, 100-N, and 100-B/C Area. This report is the culmination of all the bat surveys and summarizes the findings by area and includes recommended mitigation actions where bat roosts were found.

100 Area↗

National Solar Jobs Accelerator (Final Technical Report (FTR))

The aptitudes and experiences gained through military service—such as dynamic leadership, teamwork and critical thinking skills, technical specialization, and a mission-completion work ethic—make veterans exceptional candidates for a wide range of solar energy careers. The solar industry offers a highly collaborative and purpose-driven work environment that resonates with service members and veterans looking to rise to their next challenge, and solar employers are eager to tap into this valuable talent pool. From October 2019 - February 2023, The National Solar Jobs Accelerator (publicly the Solar Ready Vets Network TM (SRV Network; SRVN)) enhanced and streamlined options for military service members and veterans to pursue solar training, certification, and employment, while advancing solar employers’ efforts and capacity to invest in military talent as part of a long-term workforce development strategy. The SRVN was led by the Interstate Renewable Energy Council (IREC) in partnership with the Solar Energy Industries Association (SEIA), the US Chamber of Commerce Foundation’s Hiring Our Heroes program (HOH) and the North American Board of Certified Energy Practitioners (NABCEP). Through several direct-impact and indirect, high-impact capacity building initiatives aligned with six key objectives, the SRV Network strengthened solar career pathways, and promoted increased representation of military talent across all levels and sectors of the solar workforce. A work-based learning Corporate Fellowship model connected transitioning service members with on-the-job experience in leadership roles with solar employers nationwide. The project advanced broader veteran recruitment and talent development by expanding GI Bill eligibility and streamlining veterans’ pathways for solar training and credentialing, supported direct connections to jobs with top solar employers, and led coordination among key education and industry partners to advance registered apprenticeships aligned with solar career pathways. To ensure that the project best served the needs of all stakeholders, an Advisory Committee of military-connected solar professionals, solar employers, and training providers met biannually to guide project activities and sustainability plans. The project team engaged the broader “SRV Network” (comprised of over 2,000 veterans, employers and training organizations) through regular newsletters and targeted outreach to share resources, hiring fairs, webinars, and other opportunities for engagement. The work done under this award builds on the previous iterations of the Department of Energy’s Solar Ready Vets ® program. As the solar industry continues to grow rapidly over the next decade, the military community will continue to be a highly valuable source of talent. The relationships established and work accomplished through this project will have an enduring positive impact well beyond the funding period.

14 SOLAR ENERGY↗