Results for “Process design and operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Microgrid Resource

Brief microgrid resource brochure describing the concept of a microgrid, its components, and operation. The value of a microgrid, important considerations for microgrid development, and microgrid challenges and potential solutions are described, followed by a gantt chart describing the microgrid design process.

Energy and Environment Directorate↗

A Hybrid Reinforcement Learning-MPC Approach for Distribution System Critical Load Restoration

This paper proposes a hybrid control approach for distribution system critical load restoration, combining deep reinforcement learning (RL) and model predictive control (MPC) aiming at maximizing total restored load following an extreme event. RL determines a policy for quantifying operating reserve requirements, thereby hedging against uncertainty, while MPC models grid operations incorporating RL policy actions (i.e., reserve requirements), renewable (wind and solar) power predictions, and load demand forecasts. We formulate the reserve requirement determination problem as a sequential decision-making problem based on the Markov Decision Process (MDP) and design an RL learning environment based on the OpenAI Gym framework and MPC simulation. The RL agent reward and MPC objective function aim to maximize and monotonically increase total restored load and minimize load shedding and renewable power curtailment. The RL algorithm is trained offline using a historical forecast of renewable generation and load demand. The method is tested using a modified IEEE 13-bus distribution test feeder containing wind turbine, photovoltaic, microturbine, and battery. Case studies demonstrated that the proposed method outperforms other policies with static operating reserves.

distribution system↗

Hydropower Biological Evaluation Toolset Best Practice Guide

Field studies using live fish are necessary for the evaluation of turbine biological performance, but they cannot determine the specific hydraulic conditions or physical stresses experienced by the fish, the locations where deleterious conditions occur, or the specific causes of the biological response. Using the Sensor Fish (SF) sensing technology, this deficiency can be overcome because the SF can be released independently or concurrently with live fish directly into operating infrastructure, and it takes high-frequency measurements of hydraulic conditions such as pressure, acceleration, and rotation acting on a body in situ during downstream passage. The Hydropower Biological Evaluation Tools (HBET; Hou et al. 2018) software package, developed by Pacific Northwest National Laboratory (PNNL), is designed to assemble, organize, and process data collected by the PNNL-developed SF and by live fish. HBET was developed specifically to design SF field studies, process the raw data, and analyze the processed data efficiently and scientifically. Its objectives are to facilitate SF studies focused on characterizing hydraulic conditions and to apply SF data for evaluating the impacts on fish from passage through hydro-structures. HBET allows users to design new studies, analyze data, perform statistical analyses, and evaluate predicted biological responses. It can be used by researchers, turbine designers, hydropower operators, and regulators to evaluate hydro-structures to enhance environmental sustainability in a cost-effective manner.

13 HYDRO ENERGY↗

The waterSHED Model: User Guide

The ideal design and operation of small hydropower plants is a complex optimization problem with economic, social, and environmental objectives. The waterSHED (Water Allocation Tool Enabling Rapid Small Hydropower Environmental Design) model is a user-friendly tool that allows hydropower stakeholders to model the trade-offs among these objectives using the Standard Modular Hydropower (SMH) framework. The SMH framework employs modular technologies that can be represented as blackbox objects and combined within a river to create a hydropower facility. For a given site, the waterSHED model aims to determine which modules should be placed in a facility and how those modules should be operated. This user guide describes how to use the graphical user interface and related functionalities. This document also summarizes the background research and mathematical formulations that are explained indepth in the accompanying doctoral dissertation. This model is an early step toward a new hydropower design process that employs standardization and modularity to reduce costs, development timelines, and challenges regarding social and environmental mitigation measures for low-head, small hydropower development. The waterSHED model is a Python application that will require the ability to download a GitHub repository, import the necessary packages, and run a set of Python script files using an integrated development environment. The script produces a graphical user interface to coordinate inputs, simulate operation, and visualize results, so no coding experience is needed once the script is running. Additionally, the waterSHED Workbook is a Microsoft Excel file that works with the Python script to facilitate data entry

13 HYDRO ENERGY↗

A propagation-based fault detection and discrimination method and the optimization of sensor deployment

Industrial processes can be affected by faults having a serious impact on operation when not promptly detected and diagnosed. Here in this paper, a propagation-based fault detection and discrimination(PFDD) method is proposed to develop a strategy for fault diagnosis while in the design phase of a system. The PFDD method constructs the system model using the Integrated System Fault Analysis(ISFA) technique. Based on the system model, the propagation of hardware and software faults are simulated qualitatively. Given the results of the simulation, the process by which a fault propagates can be characterized using the qualitative features of system variables including the deviation of the system variables from their expected values, the variation of the system variables over time, and the order in which each variable is influenced during the propagation of the fault. The strategy by which a fault can be detected and discriminated is defined using those features. The PFDD method supports the detection and discrimination of faults in both steady states and transient states. Based on the PFDD method, the optimization of sensor deployment in a system is discussed. A brute force algorithm is developed to examine the system’s capability at diagnosing faults and the cost of sensor deployment for all possible configurations of sensors. The optimal sensor deployment strategy can be derived accordingly. However, the brute force method is only applicable to small-scale systems due to its high computational cost. A genetic algorithm is used to optimize sensor deployment in large-scale systems. The PFDD and sensor deployment optimization methods are applied to the Experimental Breeder Reactor II (EBR-II) for verification.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Innovative Approaches to the Decommissioning of a Redundant Plutonium Processing Facility - 20147

At Sellafield, in the North West of the United Kingdom (UK), there are a number of redundant plutonium processing facilities. Over the past three decades several decommissioning strategies have been deployed to clean up these redundant facilities. Whilst there have been many successes previously reported, there remain many challenges. As previously presented at WM2017 (Paper Ref 17081) some of these challenges have recently been addressed through a new approach which introduced a number of innovations. The purpose of these innovations is to seek ways to significantly reduce risks to both decommissioning personnel and the environment by minimising the extent of physical 'hands on' decommissioning activities and by simplifying the waste production process. This paper provides an update on the progress of these innovations since 2017. Additionally, the paper also provides details of the new decommissioning technologies which have been introduced over the past 2 years to enable the most challenging aspects of the redundant plutonium processing facility to be decommissioned. These new decommissioning technologies address challenges associated with the preparation of process vessels and pipework to enable their safe in-situ size reduction by remote means: - New decommissioning techniques have been introduced to allow penetrations to be remotely cut into process vessels and pipework to provide a means of accessing and controlling the venting of any potential hydrogen gas present. - Additionally, a new large scale bespoke remote diamond wire cutting machine has been designed and manufactured to enable the process vessels to be size reduced in situ. Both of these new cutting technologies have involved collaborative working with specialist equipment suppliers including extensive development, trialling demonstration and commissioning prior to bringing the equipment into operational service. Several years of work have now culminated in reaching the final stages of decommissioning of the redundant plutonium processing facility with decommissioning of the final process vessels now underway and completion expected by the end of 2019. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bipolar Membranes with an Electrospun 3D Junction

Freestanding bipolar membranes (BPMs) with an entirely new and transformative morphology were fabricated and characterized. The key disruptive design element was a water-splitting/water-generation junction layer of finite thickness composed of interwoven and interlocking electrospun anion-exchange polymer (AEP) fibers and cation-exchange polymer (CEP) fibers. Methods were developed to sandwich the 3D junction layer between two pre-formed dense AEP and CEP films., with the closure of all interfiber voids, where the processing steps are easily incorporated into a commercial roll-to-roll membrane manufacturing scheme. A series of membranes were made using different polymers and junction layers to identify the optimum morphology and composition for water-splitting and water-generation applications. For water splitting, the 3D junction BPMs worked remarkably well with operating current densities at/above 1.0 A/cm2 (10X greater than commercial BPMs) at a transmembrane voltage drop of only 1.1 V. In water generation mode, the 3D junction BPMs operated at 0.5 A/cm2, a world-record current density. The membranes were found to exhibit outstanding durability and can be manufactured at scale for low cost. The high operating current densities and stable long-term operation are due to the 3D junction layer design, where there is a high interfacial area for water splitting or water generation reactions and where the interlocking fibers prevent delamination of the outer films. These new BPMs are ideal candidate materials for both existing water-splitting electrodialysis separations and new electrochemical processes, such as large-scale direct air capture of CO 2 , reactors for CO 2 reduction, self-hydrating fuel cells, and redox flow batteries.

30 DIRECT ENERGY CONVERSION↗

Empirically-calibrated H100 node power models for accurate AI training energy estimation

Accurately quantifying the energy use of artificial intelligence (AI) training is critical for infrastructure planning, carbon accounting, and sustainable data center operation, but few studies have directly measured the power consumption of production workloads on contemporary hardware. By combining empirical measurements from Brookhaven National Laboratory during AI training on 8-graphics-processing-unit H100 systems with open-source benchmarking data, we develop statistical models relating computational intensity to node-level power consumption. We measure the gap between manufacturer-rated thermal design power (TDP) and actual power demand during AI training. Our analysis reveals that even computationally intensive workloads operate at only 76% of the 10.2 kW TDP rating. Our architecture-specific model, calibrated to floating-point operations, predicts energy consumption with 11.4% mean absolute percentage error, significantly outperforming TDP-based approaches (27%–37% error). We identified distinct power signatures between transformer and convolutional neural network architectures, with transformers showing characteristic fluctuations that may impact grid stability. These results provide a measurement-grounded basis for improving AI training energy estimates, enabling more reliable infrastructure sizing, cost projections, and environmental impact assessments.

Newkirk, Alex C↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Production Through Simulation: Using Simulation Technologies to Create and Evaluate Nuclear Fuel Fabrication Facility Designs

This project explores how physics-based and discrete-event simulation technologies can be jointly employed to model a suite of nuclear fuel fabrication facility designs with variable radiological environments, optimize their design to lower operational costs subject to a set of design constraints, and evaluate their performance. Initially, three variants of U-20Pu-10Zr metallic nuclear fuel in three specific geometric configurations are modeled and studied across more than 50 physics simulations in nuclear physics software packages SCALE and Monte Carlo N-Particle Transport (MCNP6.2). From these tests, values for effective dose rate and criticality are recorded for each of the nine alloy-geometry configurations. These values are then incorporated into discrete-event models of fuel fabrication in the simulation program ExtendSim Pro 10 as process attributes. This allows one to track the dose to facility personnel as fuel is fabricated, dually enabling us to evaluate the safety of a given facility design in terms of absorbed dose per worker per year and to craft operational guidelines that adhere to federal and local safety regulations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Thermal Instability in the Manufacturing of Wind Turbine Blade Spar Caps

As wind turbine blades continue to scale in length and total mass, the acceptability of traditional approaches for the engineering of processes to build these products has reached a limit. The continued need to reduce the levelized cost of energy (LCOE) drives manufacturing cycle times lower and the net mass of critical components challenges even the most experienced fabricators to meet the quality requirements for safe operating performance over the 25-year design life of the blade. In trying to reduce cycle time for key components of wind turbines, manufacturers discovered occasional buckling of fibers in wind turbine blade spar caps. The cause of the buckling was unknown. The goal of this project was to show that a comprehensive simulation, which considered all of the physics of the VARTM process, could identify the cause of the fiber buckling in spar caps that has been observed during the manufacturing process. Ultimately, the simulation determined the manufacturing process and parameters could lead to significant compressive stresses in the fibers eventually causing buckling. Simulation results suggest that the stress introduced from friction is the largest source of compressive stress in the fibers, the stress from the weight of gravity is significant but secondary, and the compressive stress from cure shrinkage does not play a significant role in the buckling of fibers. This report provides details of the testing and simulation methodology used to identify the cause of the fiber buckling.

17 WIND ENERGY↗

High-performance photonic transformers for DC voltage conversion

Abstract Direct current (DC) converters play an essential role in electronic circuits. Conventional high-efficiency DC voltage converters, especially step-up type, rely on switching operation, where energy is periodically stored within and released from inductors and/or capacitors connected in a variety of circuit topologies. Since these energy storage components, especially inductors, are fundamentally difficult to scale down, miniaturization of switching converters proves challenging. Furthermore, the resulting switching currents produce significant electromagnetic noise. To overcome the limitations of switching converters, photonic transformers, where voltage conversion is achieved through light emission and detection processes, have been demonstrated. However, the demonstrated efficiency is significantly below that of the switching converter. Here we perform a detailed balance analysis and show that with a monolithically integrated design that enables efficient photon transport, the photonic transformer can operate with a near-unity conversion efficiency and high voltage conversion ratio. We validate the theory with a transformer constructed with off-the-shelf discrete components. Our experiment showcases near noiseless operation and a voltage conversion ratio that is significantly higher than obtained in previous photonic transformers. Our findings point to the possibility of a high-performance optical solution to miniaturizing DC power converters and improving the electromagnetic compatibility and quality of electrical power.

42 ENGINEERING↗

Nuclear Safety [Vol. 37, No. 1, January-March 1996]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 1 A Decision Support System for Maintenance Management of a Boiling-Water Reactor Power Plant, J. H. Shen, A. Ray, and S. Levine; ACCIDENT ANALYSIS: 12 On Prediction of the Ignition Potential of Uranium Metal and Hydride, M. Epstein, W. Luangdilok, M. G. Plys, and H. K. Fauske; 26 An Overview of the Primary Parameters and Methods for Determining Condensation Heat Transfer to Containment Structures, J. Green and K. Almenas; DESIGN FEATURES: 49 Modem Tornado Design of Nuclear and Other Potentially Hazardous Facilities, J. D. Stevenson and Y. Zaho; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 73 1994 Accident Sequence Precursor Program Results, R. J. Belles, J. W. Cletcher, D. A. Coplnger, B. W. Dolan, J. W. Minarick, and P. D. O'Reilly; ANNOUNCEMENTS: 93 American Institute of Chemical Engineers (AlChE) Spring 1997 National Meeting; 94 European Safety and Reliability Association International Conference on Safety and Reliability ESREL ’97; 95 Criticality Safety Challenges in the Next Decade; 96 21st International Symposium on the Scientific Basis for Nuclear Waste Management; 84 The Authors; 88 Letter to the Editor; 90 Indexes to Nuclear Safety, Volume 36.

05 NUCLEAR FUELS↗

Ten questions concerning occupant-centric control and operations

Occupant-Centric Control and Operation (OCC) represents a transformative approach to building management, integrating sensing of indoor environmental quality, occupant presence, and occupant-building interactions. These data are then utilized to optimize both operational efficiency and occupant comfort. This paper summarizes the findings from the IEA-EBC Annex 79 research program's subtask on real world implementations of OCC during the past 5 years. First, in Q1 and Q2, we provide a definition and categorization of OCC. Q3 addresses the role of building operators for OCC, while Q4 describes the implications for designers. Then, Q5 and Q6 discuss the role and possibilities of OCC for load flexibility, and for pandemic induced paradigm shifts in the built environment, respectively. In Q7, we provide a taxonomy and selection process of OCC, while Q8 details real world implementation case studies. Finally, Q9 explains the limits of OCC, and Q10 provides a vision for future research opportunities. Furthermore, our findings offer valuable insights for researchers, practitioners, and policy makers, contributing to the ongoing discourse on the future of building operations management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Computational Analysis of the Effect of Structured Packing Design on Absorption Column Hydrodynamics for Post-Combustion Carbon Capture Applications

Solvent based post-combustion carbon capture technologies have a potential for reducing carbon emissions from fossil-fuel-fired power plants and industrial sources where CO2 emissions are inherently harder to mitigate, such as steel or cement industries. A prominent technology to achieve this is by retrofitting absorption columns to the existing infrastructure. While these systems have been among the less costly alternatives for carbon capture, they still impose a considerable energy penalty to the operation of power plants or industrial facilities. The optimization of CO2 capture rate in solvent-based absorption process is complex as it depends on several factors including CO2 solubility, solvent reaction kinetics and temperature effects on the solubility, reaction rates, surface tension, and thermophysical properties of the solvent and the flue gas. The overall heat and mass transfer also depends on the hydrodynamics, which in turn, is affected by the packing geometry. In the current work, we systematically quantify the effects the design of the structured packing has on the column hydrodynamics, by performing detailed CFD simulations for different geometrical configurations and operating conditions. We then obtain relationships between the key hydrodynamic metrics, such as liquid holdup, interfacial area, wetted area, and pressure drop to the parameters defining the packing geometries and identify new more effective packing designs for the given operating conditions.

Shah, Yash Girish↗

High performance heat exchangers for next generation hybrid cooler (CRADA NFE-19-07891 Final Report)

The evaporative cooling process has been successfully deployed in multiple energy conversion processes such as power generation, process cooling, heating, ventilation & cooling (HVAC), and commercial and industrial refrigeration. The heat exchanger is a very common yet extremely critical component of such systems. The device is important since the performance of the overall cooling system heavily relies on the thermal-hydraulic efficiency of the heat exchanger. The possible wet operation as evaporative cooling heat exchanger complicates the issue. Indeed, based on the hybrid nature of operation (fully dry, partially wet, fully wet) the efficiency can vary significantly and can cause performance variation for the whole system. Understanding the importance of the issue, Oak Ridge National Laboratory (Contractor) and Baltimore Aircoil Company (Participant) propose an activity focused on the analysis of the existing heat exchanger technology used in air and evaporative cooling processes and design, development and demonstration of a novel heat exchanger design based on porous materials. The potential candidates include metallic wire meshes and metal foams carefully designed for the proposed application. Prior research has indicated that these materials have great potential for deployment in thermal systems, particularly heat sinks and heat exchangers. It is expected that the successful completion of the project will lead to novel heat exchanger technology for hybrid systems (capable of dry and wet operation) by exploring newly emerging materials and their potential for heat transfer application. The overall goal is to develop a next generation heat exchanger technology which can be deployed in evaporative cooling systems. The impact of the such development is significant since, it will not only make the overall system highly efficient but will also, reduce the total refrigerant charge in the heat exchanger, a critical aspect for the deployment of refrigerants with lower Global Warming Potential (GWP).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗