Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

SAPHIRE 8 Software Quality Assurance Plan

This Quality Assurance (QA) Plan documents the QA activities that will be managed by the INL related to JCN N6423. The NRC developed the SAPHIRE computer code for performing probabilistic risk assessments (PRAs) using a personal computer (PC) at the Idaho National Laboratory (INL) under Job Code Number (JCN) L1429. SAPHIRE started out as a feasibility study for a PRA code to be run on a desktop personal PC and evolved through several phases into a state-of-the-art PRA code. The developmental activity of SAPHIRE was the result of two concurrent important events: The tremendous expansion of PC software and hardware capability of the 90s and the onset of a risk-informed regulation era.

99 GENERAL AND MISCELLANEOUS↗

SAPHIRE 8 Software Project Plan

This project is being conducted at the request of the DOE and the NRC. The INL has been requested by the NRC to improve and maintain the Systems Analysis Programs for Hands-on Integrated Reliability Evaluation (SAPHIRE) tool set concurrent with the changing needs of the user community as well as staying current with new technologies. Successful completion will be upon NRC approved release of all software and accompanying documentation in a timely fashion. This project will enhance the SAPHIRE tool set for the user community (NRC, Nuclear Power Plant operations, Probabilistic Risk Analysis (PRA) model developers) by providing improved Common Cause Failure (CCF), External Events, Level 2, and Significance Determination Process (SDP) analysis capabilities. The SAPHIRE development team at the Idaho National Laboratory is responsible for successful completion of this project. The project is under the supervision of Curtis L. Smith, PhD, Technical Lead for the SAPHIRE application. All current capabilities from SAPHIRE version 7 will be maintained in SAPHIRE 8. The following additional capabilities will be incorporated: • Incorporation of SPAR models for the SDP interface. • Improved quality assurance activities for PRA calculations of SAPHIRE Version 8. • Continue the current activities for code maintenance, documentation, and user support for the code.

99 GENERAL AND MISCELLANEOUS↗

An Inventory of AI-ready Benchmark Data for US Fires, Heatwaves, and Droughts

Extreme weather events, including fires, heatwaves, and droughts, have significant impacts on earth, environmental, and energy systems. Mechanistic and predictive understanding, as well as probabilistic risk assessment of these extreme weather events, are crucial for detecting, planning for, and responding to these extremes. Records of extreme weather events provide an important data source for understanding present and future extremes, but the existing data needs preprocessing before it can be used for analysis. Moreover, there are many nonstandard metrics defining the levels of severity or impacts of extremes. In this study, we compile a comprehensive benchmark data inventory of extreme weather events, including fires, heatwaves, and droughts. The dataset covers the period from 2001 to 2020 with a daily temporal resolution and a spatial resolution of 0.5°×0.5° (~55km×55km) over the continental United States (CONUS), and a spatial resolution of 1km × 1km over the Pacific Northwest (PNW) region, together with the co-located and relevant meteorological variables. By exploring and summarizing the spatial and temporal patterns of these extremes in various forms of marginal, conditional, and joint probability distributions, we gain a better understanding of the characteristics of climate extremes. The resulting AI/ML-ready data products can be readily applied to ML-based research, fostering and encouraging AI/ML research in the field of extreme weather. This study can contribute significantly to the advancement of extreme weather research, aiding researchers, policymakers, and practitioners in developing improved preparedness and response strategies to protect communities and ecosystems from the adverse impacts of extreme weather events. Usage Notes We presented a long term (2001-2020) and comprehensive data inventory of historical extreme events with daily temporal resolution covering the separate spatial extents of CONUS (0.5°×0.5°) and PNW(1km×1km) for various applications and studies. The dataset with 0.5°×0.5° resolution for CONUS can be used to help build more accurate climate models for the entire CONUS, which can help in understanding long-term climate trends, including changes in the frequency and intensity of extreme events, predicting future extreme events as well as understanding the implications of extreme events on society and the environment. The data can also be applied for risk accessment of the extremes. For example, ML/AI models can be developed to predict wildfire risk or forecast HWs by analyzing historical weather data, and past fires or heateave , allowing for early warnings and risk mitigation strategies. Using this dataset, AI-driven risk assessment models can also be built to identify vulnerable energy and utilities infrastructure, imrpove grid resilience and suggest adaptations to withstand extreme weather events. The high-resolution 1km×1km dataset ove PNW are advantageous for real-time, localized and detailed applications. It can enhance the accuracy of early warning systems for extreme weather events, helping authorities and communities prepare for and respond to disasters more effectively. For example, ML models can be developed to provide localized HW predictions for specific neighborhoods or cities, enabling residents and local emergency services to take targeted actions; the assessment of drought severity in specific communities or watersheds within the PNW can help local authorities manage water resources more effectively.

Lin, Xinming↗

Predicting peak day and peak hour of electricity demand with ensemble machine learning

Battery energy storage systems can be used for peak demand reduction in power systems, leading to significant economic benefits. Two practical challenges are 1) accurately determining the peak load days and hours and 2) quantifying and reducing uncertainties associated with the forecast in probabilistic risk measures for dispatch decision-making. In this study, we develop a supervised machine learning approach to generate 1) the probability of the next operation day containing the peak hour of the month and 2) the probability of an hour to be the peak hour of the day. Guidance is provided on preparation and augmentation of data as well as selection of machine learning models and decision-making thresholds. The proposed approach is applied to the Duke Energy Progress system and successfully captures 69 peak days out of 72 testing months with a 3% exceedance probability threshold. On 90% of the peak days, the actual peak hour is among the 2 h with the highest probabilities.

25 ENERGY STORAGE↗

Protecting intellectual property in space; Proceedings of the Aerospace Computer Security Conference, McLean, VA, March 20, 1985

The primary purpose of the Aerospace Computer Security Conference was to bring together people and organizations which have a common interest in protecting intellectual property generated in space. Operational concerns are discussed, taking into account security implications of the space station information system, Space Shuttle security policies and programs, potential uses of probabilistic risk assessment techniques for space station development, key considerations in contingency planning for secure space flight ground control centers, a systematic method for evaluating security requirements compliance, and security engineering of secure ground stations. Subjects related to security technologies are also explored, giving attention to processing requirements of secure C3/I and battle management systems and the development of the Gemini trusted multiple microcomputer base, the Restricted Access Processor system as a security guard designed to protect classified information, and observations on local area network security.

Source record↗

Information and problem report usage in system saftey engineering division

Five basic problems or question areas are examined. They are as follows: (1) Evaluate adequacy of current problem/performance data base; (2) Evaluate methods of performing trend analysis; (3) Methods and sources of data for probabilistic risk assessment; and (4) How is risk assessment documentation upgraded and/or updated. The fifth problem was to provide recommendations for each of the above four areas.

Morrissey, Stephen J.↗

An Earth Entry Vehicle For Returning Samples From Mars

The driving requirement for design of a Mars Sample return mission is assuring containment of the returned samples. The impact of this requirement on developmental costs, mass allocation, and design approach of the Earth Entry Vehicle is significant. A simple Earth entry vehicle is described which can meet these requirements and safely transport the Mars Sample Return mission's sample through the Earth's atmosphere to a recoverable location on the surface. Detailed analysis and test are combined with probabilistic risk assessment to design this entirely passive concept that circumvents the potential failure modes of a parachute terminal descent system. The design also possesses features that mitigate other risks during the entry, descent, landing and recovery phases. The results of a full-scale drop test are summarized.

Mitcheltree, R.↗

Earth Entry Vehicle for Mars Sample Return

The driving requirement for design of a Mars Sample return mission is assuring containment of the returned samples. The impact of this requirement on developmental costs, mass allocation, and design approach of the Earth Entry Vehicle is significant. A simple Earth entry vehicle is described which can meet these requirements and safely transport the Mars Sample Return mission's sample through the Earth's atmosphere to a recoverable location on the surface. Detailed analysis and test are combined with probabilistic risk assessment to design this entirely passive concept that circumvents the potential failure modes of a parachute terminal descent system. The design also possesses features that mitigate other risks during the entry, descent, landing and recovery phases. The results of a full-scale drop test are summarized.

Mitcheltree, R. A.↗

An Overview of PRA with Applications to Aerospace Systems

Probabilistic Risk Assessment (PRA) is a systematic process for evaluating the probabilities and consequences of undesirable events that can occur in a process or system along with providing a measure of the uncertainty associated with these probability estimates. In the past it was looked at with suspicion by many at NASA, perhaps because of bad experiences with unsuccessful quantitative methods during the Apollo era, but since the Challenger accident NASA has mandated that it be used, and it has been very successful. With NASA's new "faster, better, cheaper" philosophy, it is vital that a tool be in place that can help to achieve these goals in the reliability area. This paper describes the history of PRA, gives examples of its aerospace applications to date, and gives suggestions for how it can be used in the future, both for space shuttle upgrades and for totally new technologies such as the Second Generation Reusable Launch Vehicle.

Sharon E. Navard↗

The Use of Probabilistic Methods to Evaluate the Systems Impact of Component Design Improvements on Large Turbofan Engines

Probabilistic Structural Analysis (PSA) is now commonly used for predicting the distribution of time/cycles to failure of turbine blades and other engine components. These distributions are typically based on fatigue/fracture and creep failure modes of these components. Additionally, reliability analysis is used for taking test data related to particular failure modes and calculating failure rate distributions of electronic and electromechanical components. How can these individual failure time distributions of structural, electronic and electromechanical component failure modes be effectively combined into a top level model for overall system evaluation of component upgrades, changes in maintenance intervals, or line replaceable unit (LRU) redesign? This paper shows an example of how various probabilistic failure predictions for turbine engine components can be evaluated and combined to show their effect on overall engine performance. A generic model of a turbofan engine was modeled using various Probabilistic Risk Assessment (PRA) tools (Quantitative Risk Assessment Software (QRAS) etc.). Hypothetical PSA results for a number of structural components along with mitigation factors that would restrict the failure mode from propagating to a Loss of Mission (LOM) failure were used in the models. The output of this program includes an overall failure distribution for LOM of the system. The rank and contribution to the overall Mission Success (MS) is also given for each failure mode and each subsystem. This application methodology demonstrates the effectiveness of PRA for assessing the performance of large turbine engines. Additionally, the effects of system changes and upgrades, the application of different maintenance intervals, inclusion of new sensor detection of faults and other upgrades were evaluated in determining overall turbine engine reliability.

Packard, Michael H.↗

Space Shuttle Main Engine Implications for the Abort-to-Orbit Off-the-Pad Study

In 2001, the Space Shuttle Main Engine (SSME) project office was contacted by the Space Shuttle Ascent Guidance, Navigation, and Control group to provide the engine perspective for an Abort-to-Orbit (ATO) study. The purpose of the AT0 Off-the-Pad study was to determine the feasibility of eliminating the Return to Launch Site and Transatlantic abort modes by using a five-segment solid rocket booster and throttling the remaining SSMEs to a higher power level. This would enable all abort modes to be Abort-to-Orbit. The SSME project office at Marshall Space Flight Center collaborated with MSFC's Space Transportation Directorate and Rocketdyne Propulsion and Power to provide the AT0 Off-the-Pad study with the analysis required. Power levels at 109%, 1 11% and 1 13% of rated power level were studied as well as mixture ratio decreases down to 5.85. SSME was to evaluate and define the technical and programmatic impacts to certify the SSME to these abort power levels. The SSME systems analysis group performed a steady state analysis using the SSME power balance model to determine if there were any technical issues associated with higher power level, low mixture ratio operation. Based on each power level/mixture ratio combination, an engine certification plan was created and a preliminary probabilistic risk assessment was performed. The results showed favorable results for higher power 1evel/lower mixture ratio SSME operation. In nearly all performance and redline parameters, the traded engine operation was encompassed by nominal engine performance of a prior engine configuration.

Schoffstoll, Dayna L.↗

PSRP Approach to PRA

There have been two scenarios in which the Payload Safety Review Panel (PSRP) has considered a Probabilistic Risk Assessment (PRA) a viable tool. For use in considering trade-offs during the initial design. When in a waiver condition to explain rationale for acceptance. The PSRP would consider the use of PRA in other applications where credible.

Stewart, Christine↗

Knowledge Representation Standards and Interchange Formats for Causal Graphs

In many domains, automated reasoning tools must represent graphs of causally linked events. These include fault-tree analysis, probabilistic risk assessment (PRA), planning, procedures, medical reasoning about disease progression, and functional architectures. Each of these fields has its own requirements for the representation of causation, events, actors and conditions. The representations include ontologies of function and cause, data dictionaries for causal dependency, failure and hazard, and interchange formats between some existing tools. In none of the domains has a generally accepted interchange format emerged. The paper makes progress towards interoperability across the wide range of causal analysis methodologies. We survey existing practice and emerging interchange formats in each of these fields. Setting forth a set of terms and concepts that are broadly shared across the domains, we examine the several ways in which current practice represents them. Some phenomena are difficult to represent or to analyze in several domains. These include mode transitions, reachability analysis, positive and negative feedback loops, conditions correlated but not causally linked and bimodal probability distributions. We work through examples and contrast the differing methods for addressing them. We detail recent work in knowledge interchange formats for causal trees in aerospace analysis applications in early design, safety and reliability. Several examples are discussed, with a particular focus on reachability analysis and mode transitions. We generalize the aerospace analysis work across the several other domains. We also recommend features and capabilities for the next generation of causal knowledge representation standards.

Throop, David R.↗

Design for Reliability and Safety Approach for the New NASA Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program intended for sending crew and cargo to the international Space Station (ISS), to the moon, and beyond. This program is called Constellation. As part of the Constellation program, NASA is developing new launch vehicles aimed at significantly increase safety and reliability, reduce the cost of accessing space, and provide a growth path for manned space exploration. Achieving these goals requires a rigorous process that addresses reliability, safety, and cost upfront and throughout all the phases of the life cycle of the program. This paper discusses the "Design for Reliability and Safety" approach for the NASA new launch vehicles, the ARES I and ARES V. Specifically, the paper addresses the use of an integrated probabilistic functional analysis to support the design analysis cycle and a probabilistic risk assessment (PRA) to support the preliminary design and beyond.

Safie, Fayssal M.↗

Designing a Composable Geometric Toolkit for Versatility in Applications to Simulation Development

Conceived and implemented through the development of probabilistic risk assessment simulations for Project Constellation, the Geometric Toolkit allows users to create, analyze, and visualize relationships between geometric shapes in three-space using the MATLAB computing environment. The key output of the toolkit is an analysis of how emanations from one "source" geometry (e.g., a leak in a pipe) will affect another "target" geometry (e.g., another heat-sensitive component). It can import computer-aided design (CAD) depictions of a system to be analyzed, allowing the user to reliably and easily represent components within the design and determine the relationships between them, ultimately supporting more technical or physics-based simulations that use the toolkit. We opted to develop a variety of modular, interconnecting software tools to extend the scope of the toolkit, providing the capability to support a range of applications. This concept of simulation composability allows specially-developed tools to be reused by assembling them in various combinations. As a result, the concepts described here and implemented in this toolkit have a wide range of applications outside the domain of risk assessment. To that end, the Geometric Toolkit has been evaluated for use in other unrelated applications due to the advantages provided by its underlying design.

Reed, Gregory S.↗

Estimating the Reliability of a Soyuz Spacecraft Mission

Once the US Space Shuttle retires in 2010, the Russian Soyuz Launcher and Soyuz Spacecraft will comprise the only means for crew transportation to and from the International Space Station (ISS). The U.S. Government and NASA have contracted for crew transportation services to the ISS with Russia. The resulting implications for the US space program including issues such as astronaut safety must be carefully considered. Are the astronauts and cosmonauts safer on the Soyuz than the Space Shuttle system? Is the Soyuz launch system more robust than the Space Shuttle? Is it safer to continue to fly the 30 year old Shuttle fleet for crew transportation and cargo resupply than the Soyuz? Should we extend the life of the Shuttle Program? How does the development of the Orion/Ares crew transportation system affect these decisions? The Soyuz launcher has been in operation for over 40 years. There have been only two loss of life incidents and two loss of mission incidents. Given that the most recent incident took place in 1983, how do we determine current reliability of the system? Do failures of unmanned Soyuz rockets impact the reliability of the currently operational man-rated launcher? Does the Soyuz exhibit characteristics that demonstrate reliability growth and how would that be reflected in future estimates of success? NASA s next manned rocket and spacecraft development project is currently underway. Though the projects ultimate goal is to return to the Moon and then to Mars, the launch vehicle and spacecraft s first mission will be for crew transportation to and from the ISS. The reliability targets are currently several times higher than the Shuttle and possibly even the Soyuz. Can these targets be compared to the reliability of the Soyuz to determine whether they are realistic and achievable? To help answer these questions this paper will explore how to estimate the reliability of the Soyuz Launcher/Spacecraft system, compare it to the Space Shuttle, and its potential impacts for the future of manned spaceflight. Specifically it will look at estimating the Loss of Mission (LOM) probability using historical data, reliability growth, and Probabilistic Risk Assessment techniques

Lutomski, Michael G.↗

JSC Safety and Mission Assurance Data Analysis Overview

These slides describe the data analysis methods that are used to determine inputs for probabilistic risk models supporting the Space Shuttle Program. Other applications can follow a similar path probably using different data sources. Statistical approaches are different and not addressed here. Topics included here: 1) Prior Distribution; 2) Likelihood Data; 3) Bayesian Updating; and 4) Uncertainty and Error. Note: This is a high-level discussion and is not intended to be a tutorial.

Roelant, Henk↗

Estimating the Loss of Crew and Loss of Mission for Crew Spacecraft

Once the US Space Shuttle retires in 2011, the Russian Soyuz Launcher and Soyuz Spacecraft will comprise the only means for crew transportation to and from the International Space Station (ISS). The U.S. Government and NASA have contracted for crew transportation services to the ISS with Russia. The resulting implications for the US space program including issues such as astronaut safety must be carefully considered. Are the astronauts and cosmonauts safer on the Soyuz than the Space Shuttle system? Is the Soyuz launch system more robust than the Space Shuttle? The Soyuz launcher has been in operation for over 40 years. There have been only two loss of life incidents and two loss of mission incidents. Given that the most recent incident took place in 1983, how do we determine current reliability of the system? Do failures of unmanned Soyuz rockets impact the reliability of the currently operational man-rated launcher? Does the Soyuz exhibit characteristics that demonstrate reliability growth and how would that be reflected in future estimates of success? NASA s next manned rocket and spacecraft development project will have to meet the Agency Threshold requirements set forth by NASA. The reliability targets are currently several times higher than the Shuttle and possibly even the Soyuz. Can these targets be compared to the reliability of the Soyuz to determine whether they are realistic and achievable? To help answer these questions this paper will explore how to estimate the reliability of the Soyuz Launcher/Spacecraft system, compare it to the Space Shuttle, and its potential impacts for the future of manned spaceflight. Specifically it will look at estimating the Loss of Crew (LOC) and Loss of Mission (LOM) probability using historical data, reliability growth, and Probabilistic Risk Assessment techniques used to generate these numbers.

Lutomski, Michael G.↗