Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Partners”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Hawaiʻi Urban Development: Mapping Urban Infrastructure and Linkages to Wastewater Impacts across Hawaiʻi

Coastal ecosystems and human health across the Hawaiʻian islands are under threat from cesspools and other unpermitted wastewater infrastructure. Cesspools, or home sewage systems that hold wastewater effluent in porous concrete containers underground, discharge raw, untreated sewage directly into waterways. In fact, it is estimated that approximately 88,000 cesspools release 55 million gallons of raw sewage into Hawaiʻi’s waterways each day. Our partners, The Nature Conservancy, Hawaiʻi Regional Office (TNC) and University of Hawaiʻi, Mānoa (UHM), are heavily involved with the implementation and impact of Act 125, which was passed in 2017 by Hawaiʻi State Legislature to help combat these effects. This requires the conversion of cesspools to be upgraded and either converted to approved onsite disposal systems or connected to a sewer system so that the wastewater may be treated and to avoid leaching into the groundwater. Thus, identifying and locating cesspool and other unpermitted wastewater infrastructure is key to state and partner goals. Utilizing NASA Earth observations including Landsat 7 Enhanced Thematic Mapper Plus (ETM+), Landsat 8 Operational Land Imager (OLI), and Landsat 9 OLI-2 imagery, as well as pre-classified Sentinel-2 Multispectral Instrument (MSI) imagery in Esri’s Living Atlas, our team showcased the various perspectives that wastewater pollution research can use to assist in identifying and tracking urban development and concrete condition. This process was demonstrated by utilizing supervised object-based classification models, calculating various urban indices, and finding building size estimates to calculate effluent levels. Additionally, providing our partners with a GIS Methodology that can be built on to reach their future needs.

urban classification↗

A Call To Action To Engage The Community To Meet The Challenges That Must Be Tackled To Make Electrified Aircraft Propulsion Real

Technology risk reduction is essential, as it is necessary to demonstrate the potential of Electrified Aircraft Propulsion (EAP). However, more is needed for implementation. The industry is leading EAP by developing a diverse community of novel vehicles from short-haul, small, urban-focused electric vertical takeoff and landing (eVTOL) to regional air mobility (RAM) and hybrid-electric, single-aisle transport category airplanes. There are a variety of novel EAP technologies for each of these novel vehicles. And the industry is not only looking at novel technology to advance the state of the art. Instead, the industry is looking to certify these novel aircraft through their regulatory authorities, such as the US Federal Aviation Administration (FAA), the European Union Aviation Safety Authority (EASA), Transport Canada Civil Aviation (TCCA), and Brazil’s Agência Nacional de Aviação Civil (National Civil Aviation Agency, ANAC), as well as other regulatory authorities. The NASA Electrified Powertrain Flight Demonstration (EPFD) project has partnered with two industry partners to advance integrated MW-class powertrain system technology demonstration that includes an assessment of their regulatory and standards gaps in their technology. The EPFD has conducted a generic regulatory gap analysis of hybrid electric engines that aligns with the industry partners’ efforts. The EPFD regulations and standards team is integrated into the industry standards community. The international industry standards community is wrestling with critical key challenges to certification. While some certification elements are proprietary, several technology elements cut across company propriety in aircraft engines (US 14 CFR Part 33 and EASA CS-E, regulations that only reflect reciprocating and turbine engines). The approach that several of these regulatory authorities have taken is to collaborate to address their challenges. The Certification Management Team (CMT) consists of the EASA, FAA, TCCA, and ANAC, and they have begun to address common questions, such as the Loss of Power Control (LOPC) for electric engines. They have reached out to the standards community to seek answers. The industry standards development organizations (SDO) have also looked ahead to address current regulations and standards gaps. The ASTM has built key committees in its ASTM F44 General Aviation Committee and F39 Aircraft Systems Committee. The SAE has established the E-40 Electric Propulsion and AE-10 High Voltage committees.

Standards↗

NASA’s Approach to Lunar Communication and Navigation: Artemis and Beyond

NASA’s Space Communications and Navigation (SCaN) program is developing a support structure of networks, partners, and technologies to provide communication, position, navigation, and timing services at the Moon. In this paper, we describe the progress and status of these diverse efforts and the ways in which they will be used during NASA’s crewed lunar exploration program, Artemis. We provide an update on developments at NASA which are targeted to cislunar space, including the Orion Artemis II Optical Communications System (O2O) demonstration mission, planned Lunar Exploration Ground Sites (LEGS) that will offer a dedicated Direct to Earth (DTE) capability servicing the cislunar region, and a recently released RFP for commercial Lunar Communications Relay and Navigation Services as well as Direct to Earth communications capabilities. We also describe the current status and key role of the LunaNet Interoperability Specification (LNIS), a collaborative standards framework developed by NASA, international partner agencies, and commercial stakeholders. A common thread, weaving these efforts together, is the support of commercial enterprises that can meet the Artemis challenge. Together, these projects and activities will enable safe, robust, and reliable communications and position, navigation, and timing (PNT) services for both crewed and uncrewed missions across cislunar space. SCaN and NASA, with our partners, are helping to build the foundation for a long term, sustainable human presence at the Moon –one that will set the stage for similar efforts at Mars.

LunaNet↗

Use of the SPoRT Stoplight Product to Support NWS Decision Support Services

The National Weather Service Forecast Offices (NWSFOs) use many weather tools and observational datasets to provide support for critical decision-making by core partners such as public safety officials, emergency managers, and first responders. These core partners who need weather decision support services (DSS) for outdoor events require up-to-the-minute weather information to ensure the safety and protection of attendees and workers. Storms and lightning, potentially deadly, pose a significant threat during outdoor events and are among the weather phenomena frequently cited as a DSS requirement. According to the National Lightning Safety Council, from 2014 up to August 2024, lightning resulted in 222 fatalities in the U.S. For outdoor events with hundreds to thousands of attendees, having the right tools to detect and monitor lightning activity is of utmost importance to protect lives. Common guidelines for lightning safety include moving inside a substantial structure at the first sight of threatening skies or the first sound of thunder, and waiting 30 minutes after the last lightning flash or thunder before returning outside. Using this guidance as a framework, scientists at the NASA Short-term Prediction Research and Transition (SPoRT) center have developed the Geostationary Lightning Mapper (GLM) Stoplight tool. This experimental tool uses the GLM Flash Extent Density imagery to display the location and recency of lightning flashes. To simplify interpretation, these lightning pixels are color-coded in 10-minute bins, ranging from red (lightning detected 0 to 10 minutes ago) to yellow (10 to 20 minutes ago) to green (20 to 30 minutes ago). The Stoplight tool also allows users to place markers at the location of outdoor events with range rings around the location to help in assessing the location and relative age of lightning flashes near and upstream of the event. The goal is to help NWS forecasters provide core partners with the necessary information to make the best decisions possible. While the Stoplight tool is experimental, forecasters at NWSFO Raleigh, NC, have periodically used the Stoplight guidance to evaluate its utility within NWS DSS. This presentation will discuss how the Stoplight tool was successfully used for DSS for four outdoor events in central NC in 2023 and 2024. Future improvements to this tool, including the addition of AI applications and the merging of ground-based lightning data with GLM data, will be reviewed.

Gail Hartfield↗

Exploring Cost-Effective, High Performance Residential Retrofits for Affordable Housing in the Hot Humid Climate

In 2009, a Department of Energy Building America team led by the Florida Solar Energy Center began working with partners to find cost-effective paths for improving the energy performance of existing homes in the hot humid climate. A test-in energy audit and energy use modeling of the partner's proposed renovation package was performed for 41 affordable and middle income foreclosed homes in Florida and Alabama. HERS1 Indices ranged from 92 to 184 with modeled energy savings ranging from 3% to 50% (average of 26%). Analyses and recommendations were discussed with partners to encourage more efficient retrofits, highlight health and safety issues, and gather feedback on incremental cost of high performance measures. Ten completed renovations have modeled energy savings ranging from 9% to 48% (average 31%.) This paper presents the project's process including our findings thus far and highlights of the first home to meet the target HERS Index of 70.

14 SOLAR ENERGY↗

Community Assessment Tool for Public Health Emergencies Including Pandemic Influenza

The Community Assessment Tool (CAT) for Public Health Emergencies Including Pandemic Influenza (hereafter referred to as the CAT) was developed as a result of feedback received from several communities. These communities participated in workshops focused on influenza pandemic planning and response. The 2008 through 2011 workshops were sponsored by the Centers for Disease Control and Prevention (CDC). Feedback during those workshops indicated the need for a tool that a community can use to assess its readiness for a disaster—readiness from a total healthcare perspective, not just hospitals, but the whole healthcare system. The CAT intends to do just that—help strengthen existing preparedness plans by allowing the healthcare system and other agencies to work together during an influenza pandemic. It helps reveal each core agency partners' (sectors) capabilities and resources, and highlights cases of the same vendors being used for resource supplies (e.g., personal protective equipment [PPE] and oxygen) by the partners (e.g., public health departments, clinics, or hospitals). The CAT also addresses gaps in the community's capabilities or potential shortages in resources. While the purpose of the CAT is to further prepare the community for an influenza pandemic, its framework is an extension of the traditional all-hazards approach to planning and preparedness. As such, the information gathered by the tool is useful in preparation for most widespread public health emergencies. This tool is primarily intended for use by those involved in healthcare emergency preparedness (e.g., community planners, community disaster preparedness coordinators, 9-1-1 directors, hospital emergency preparedness coordinators). It is divided into sections based on the core agency partners, which may be involved in the community's influenza pandemic influenza response.

99 GENERAL AND MISCELLANEOUS↗

Advanced Test Reactor National Scientific User Facility: Addressing advanced nuclear materials research

The Advanced Test Reactor National Scientific User Facility (ATR NSUF), based at the Idaho National Laboratory in the United States, is supporting Department of Energy and industry research efforts to ensure the properties of materials in light water reactors are well understood. The ATR NSUF is providing this support through three main efforts: establishing unique infrastructure necessary to conduct research on highly radioactive materials, conducting research in conjunction with industry partners on life extension relevant topics, and providing training courses to encourage more U.S. researchers to understand and address LWR materials issues. In 2010 and 2011, several advanced instruments with capability focused on resolving nuclear material performance issues through analysis on the micro (10-6 m) to atomic (10-10 m) scales were installed primarily at the Center for Advanced Energy Studies (CAES) in Idaho Falls, Idaho. These instruments included a local electrode atom probe (LEAP), a field-emission gun scanning transmission electron microscope (FEG-STEM), a focused ion beam (FIB) system, a Raman spectrometer, and an nanoindentor/atomic force microscope. Ongoing capability enhancements intended to support industry efforts include completion of two shielded, irradiation assisted stress corrosion cracking (IASCC) test loops, the first of which will come online in early calendar year 2013, a pressurized and controlled chemistry water loop for the ATR center flux trap, and a dedicated facility intended to house post irradiation examination equipment. In addition to capability enhancements at the main site in Idaho, the ATR NSUF also welcomed two new partner facilities in 2011 and two new partner facilities in 2012; the Oak Ridge National Laboratory, High Flux Isotope Reactor (HFIR) and associated hot cells and the University California Berkeley capabilities in irradiated materials analysis were added in 2011. In 2012, Purdue University’s Interaction of Materials with Particles and Components Testing (IMPACT) facility and the Pacific Northwest Nuclear Laboratory (PNNL) Radiochemistry Processing Laboratory (RPL) and PIE facilities were added. The ATR NSUF annually hosts a weeklong event called User’s Week in which students and faculty from universities as well as other interested parties from regulatory agencies or industry convene in Idaho Falls, Idaho to see presentations from ATR NSUF staff as well as select researchers from the materials research field. User’s week provides an overview of current materials research topics of interest and an opportunity for young researchers to understand the process of performing work through ATR NSUF. Additionally, to increase the number of researchers engaged in LWR materials issues, a series of workshops are in progress to introduce research staff to stress corrosion cracking, zirconium alloy degradation, and uranium dioxide degradation during in-reactor use.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over a three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document

01 COAL, LIGNITE, AND PEAT↗

Expert Connections Empower Bankable Solar Projects

The International Solar Alliance (ISA) formed in 2015 to serve as a collaborative platform for increasing solar energy technology deployment worldwide. Currently, the ISA includes more than 65 signatory countries that are working with global partners to improve their access to affordable and reliable clean energy. In support of ISA member countries, the U.S. Department of Energy and the Australian Government's Department of Environment and Energy selected the Clean Energy Solutions Center (Solutions Center) to help mobilize private investment in solar technologies associated with this global effort. The Solutions Center is partnering with ISA selected partners to provide a range of technical assistance services, training programs, and other capacity building resources. The U.S. Department of Energy's National Renewable Energy Laboratory serves as the operating agent for the Clean Energy Solutions Center. The International Solar Alliance is Headquartered in India where the National Institute of Solar Energy serves as interim Secretariat.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Expert System to Assist Researchers with Nuclear Materials Experiment Design

The Nuclear Science User Facilities (NSUF) was created in 2007 to open National Laboratory capabilities to university, laboratory, and industry researchers. Originally founded at the Idaho National Laboratory (INL), NSUF leveraged excess capacity in the Advanced Test Reactor (ATR) and the Hot Fuel Examination Facility (HFEF) hot cells. In the eleven years since its inception, the NSUF has expanded to include most of the capabilities at the Idaho National Laboratory as well as twenty external ‘partner’ facilities. The inclusion of the partner facilities makes the NSUF the first distributed user facility, a ‘laboratory without walls.’ This paper will present recent developments in CoMET, including how the databases interconnect to create a powerful tool for NSUF users and how the Wizard is expected to change the workflow for NSUF users, staff, and partner facilities. The paper will conclude with some remarks of how CoMET demonstrates the feasibility of a broader integration of nuclear information and tools, paving the way for further collaboration and innovation following the NuKIT paradigm.

07 ISOTOPE AND RADIATION SOURCES↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗

Integration of CO2 Electrolysis with Microbial Syngas Upgrading to Rewire the Carbon Economy

This project has worked towards demonstrating and understanding the conversion of waste CO2 into value added fuels and chemicals. If successful, our proposed technology will incentivize CO2 capture and can add carbon efficiency to biorefineries. We have integrated two conversion technologies to demonstrate a novel approach of combining electrolytic CO2 reduction with biocatalytic CO upgrading. Industrial partners 3M and Dioxide Materials have recently demonstrated electrolytic conversion of CO2 and water to syngas using inexpensive renewable energy. Concurrently, supporting partner Lanzatech has demonstrated industrial scale CO fermentation using steel mill waste CO as a substrate. This presentation will highlight the investment BETO has made to establish a CO2 electrolysis test station and CO fermentation at NREL. We will also discuss the process of increasing the size of the electrolyzers to meet fermentation needs, along with the investigation into the affect CO2 concentration and contaminates have on electrolyzer efficiency, lifetime, and specificity. Additionally, we have begun to examine the downstream impact of electrolyzer off-gas CO:H2 ratios have on the metabolism of C. autoethanologen. Experimental results along input from our industrial partners have led to a baseline techno-economic and life cycle analyses. These results enabled the identification of key cost drivers and carbon intensity of the process. We have used these metrics to identify technology gaps to iteratively inform the process optimization and potential deployment siting to achieve economically viable, sustainable conversion of biopower-derived flue gases to fuels and chemical intermediates.

bioenergy↗

Accelerating Optimal Integration of Energy Efficiency Strategies with Industrialized Modular Construction: Preprint

The National Renewable Energy Laboratory's (NREL's) Industrialized Construction Innovation team first introduced the Industrialized Construction Assessment Framework to achieve affordable, net-zero energy (NZE) modular multifamily buildings in the 2020 ACEEE paper "Integrating Energy Efficiency Strategies with Industrialized Construction for our Clean Energy Future." Since then, NREL has continued to drive the ambitious plan to accelerate optimal integration of energy efficiency strategies during industrialized construction with little or no additional cost, labor, and production time. This follow-on paper introduces the Energy in Modular (EMOD) buildings method and presents NREL's research efforts over the last two years in collaboration with industry, including affordable housing partners. NREL has developed an idealized NZE modular multifamily building design that incorporates five energy efficiency strategies well suited for industrialized construction in factories: (1) envelope thermal control, (2) envelope infiltration control, (3) mechanical, electrical, and plumbing systems, (4) smart controls, and (5) solar plus storage. This paper highlights results from leveraging design for manufacturing and assembly principles, testing, and validation pilots with factory partners; demonstrating pod prototypes in test stand at NREL; and performing simulations. Overall, these research efforts address barriers to whole-building system integration, such as poor installation quality of thermal and air barriers; lack of unitized systems for space conditioning, energy recovery and ventilation, and water heating; problematic on-site installation, commissioning, and configuration of controls; and lack of cost-effective integration for grid-friendly design and emerging technologies. Conclusively, the paper delineates next steps for future work with NREL's partners toward developing a transformational pathway for our clean energy future.

affordable housing↗

Lessons Learned for Rapid Decarbonization Of Power Sectors: Key Messages for Energy Ministers

This report covers key lessons learned for the rapid decarbonization of power systems, emphasizing best practices in planning, building, and operating power systems. This report is the result of a collaborative effort among various Clean Energy Ministerial (CEM) workstreams and partner initiatives: 21st Century Power Partnership (21CPP); Carbon Capture, Utilization and Storage (CCUS); Global Power System Transformation Consortium (G-PST), a partner to CEM; Industrial Deep Decarbonization Initiative (IDDI); International Energy Agency Digital Demand-Driven Electricity Networks Initiative (IEA 3DEN), a partner to CEM; International Smart Grid Action Network (ISGAN); Long Term Scenarios for the Energy Transition (LTES); Nuclear Innovation: Clean Energy Future (NICE Future); Super-Efficient Equipment and Appliance Deployment (SEAD). The contents are not intended to be comprehensive of all power sector topics, and there may be overlap between content in each section due to the nature of this first-of-its-kind collaborative effort to deliver unified messaging on power sector decarbonization to energy ministers. This work is intended to complement other work at the Clean Energy Ministerial and offers options for consideration, not specific policy recommendations.

21CPP↗

Transforming Energy Through Sustainable Mobility: Expanding Low-Carbon Transportation R&D Solutions

As the nation's premier laboratory for cutting-edge transportation decarbonization research and development solutions, the National Renewable Energy Laboratory (NREL) pioneers the creation and deployment of sustainable mobility technologies and strategies, with a focus on slashing transportation sector greenhouse gas emissions and combatting climate change. Trucks, planes, cargo ships, and other difficult-to-decarbonize vehicles are part of this essential transition for the transportation sector, which is currently the nation's largest source of the greenhouse gas emissions. NREL provides the scientific building blocks needed to spur innovation through multifaceted analysis, research, and engineering. This work acts as a catalyst to help industry bring affordable, high-performance, energy-efficient, and low-emission modes of transport and related infrastructure to market sooner. Our researchers collaborate closely with academic, government, and industry partners to design better batteries, drivetrains, and engines. They develop technologies for high-power charging, thermal management, energy storage, and power electronics. They are also reimagining fuels and combustion while creating sustainable lightweight materials. Unbiased expert guidance - backed by credible data and analysis, tools, and scientific rigor - empowers partners to make informed decisions about sustainable transportation. NREL recognizes that communities with limited mobility options face reduced access to employment opportunities, health care, and education, lowering overall quality of life. Alongside partners, NREL experts are creating transportation solutions that meet community-identified needs and increase mobility equity in historically underserved and overburdened communities. Rather than providing a one-size-fits-all solution, we take an interdisciplinary approach to mobility equity that considers the needs and challenges of diverse groups, maximizing benefits at the individual, community, and societal levels.

ADVANCED PROPULSION SYSTEMS↗

Method for making substituted furan compound embodiments and derivatives thereof

Disclosed herein are embodiments of a method for making substituted furan compounds using bioderived coupling partners and a heterogeneous catalyst. In particular disclosed embodiments, the method comprises coupling a furan compound with the coupling partner (e.g., an aliphatic or heteroaliphatic coupling partner) in the presence of the heterogeneous catalyst to provide the substituted furan compound.

Moore, Cameron↗

Department of Energy Office of Legacy Management Progress on Defense-Related Uranium Mines Program - 18119

The Defense-Related Uranium Mines (DRUM) Program provides the structure and basis for the US Department of Energy Office of Legacy Management (LM) to manage the verification and validation (V and V) of defense-related uranium mines (mines) that provided ore to the Atomic Energy Commission from 1947 to 1970. V and V activities are conducted to fully understand the scope of potential problems posed by these mines by determining their location, reclamation or remediation status, and potential impacts to public safety, human health, and the environment. Land management agencies have limited resources and have generally not conducted comprehensive inventories of abandoned uranium mines, thus adding to the need to undertake this program. LM has entered into memoranda of understanding (MOUs) with the US Bureau of Land Management (BLM) and US Forest Service (USFS) to facilitate a better understanding of the scope of the problem posed by these mines. Currently, LM has executed MOUs with the BLM state offices in Colorado, New Mexico, Utah, and Wyoming and the USFS Rocky Mountain Region, which includes the national forests in Colorado, Wyoming, and South Dakota. This collaborative effort with partner agencies has led LM to develop a V and V Work Plan that describes the numerous activities and types of data to be collected at the mines. V and V activities verify actual mine location, collect coordinates of mining-related features, collect radiological data and soil samples, identify potential physical safety hazards, prioritize mines using a risk-based screening approach, and report the information to partner agencies. The partner agencies may use the reports to assess priorities and determine if any further action is warranted. The DRUM Program goals are to: - Improve data quality and content in the LM national inventory of abandoned uranium mines; - Conduct site-specific reconnaissance at mines for data verification and validation; - Exchange mine information with other federal agencies and state governments to help address mines presenting the greatest risks; - Develop reports for each mine that will contain a risk scoring assessment to help each agency develop priorities. The preliminary risk screening methodology was based on a joint effort between LM and BLM to develop factors that would be based on field observations, field data, and laboratory data using a multiple-lines-of-evidence approach. The multiple-lines-of-evidence assessment allows land managers the opportunity and flexibility to query specific criteria and make rankings based on specific priorities. The risk screening for each mine is based on evaluating the primary hazards of physical safety and risks to human health and several modifying factors that include accessibility and ecological/environmental risks. Gamma radiation scans are performed across the disturbed area of the mine, and soil samples are taken from waste rock piles and drainages, when applicable. This paper presents the results of performing inventory, environmental sampling, and risk ranking along with other accomplishments and lessons learned during the initial year of V and V activities and reporting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Current and Future Impacts of the AECOM Early Career Technical Exchange - 18497

As the average age of the engineering workforce approaches retirement, early career professionals are hired to supplement the decreasing workforce. Their transition is challenging to implement because new hires typically lack the experience that DOE's nuclear waste facilities have come to rely on. AECOM-partnered corporations have developed the Early Career Professionals Technology Exchange (ECPTE) program to facilitate new hire transitions. This program includes semi-annual workshops that develop both soft and technical skills through extensive networking opportunities, technical presentations, facility tours, and workshop preparation. Early career participants develop reliable peer networks that support their technical collaboration. AECOM's Facility Area Coordination Team (FACT) supports the program by participating during their workshops, which are been scheduled to coincide with ECPTE workshops, allowing early career professionals the opportunity to network with management and technical experts in addition to peers. Early career professionals conduct technical presentations on topics associated with their facilities and projects, developing technical communication skills utilized in professional settings. Early career leadership at the hosting facility prepares tours of local projects for interested attendees. By attending these presentations and tours, attendees gain an understanding of facilities and projects in the U. S. Department of Energy nuclear complex. Since the initiation of the ECPTE, an increasing number of AECOM-partnered corporations have begun to participate in the program. Based on participant interviews and program reviews, this paper discusses the expanding ECPTE program and its impacts on the participants, the facility, and the AECOM-partnered corporations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗