Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PV generation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Influence of Diffuse and Ground-Reflected Irradiance on the Spectral Modeling of Solar Reference Cells

Thermal Energy Storage (TES) is a key component for solar thermal applications to bridge the gap between the demand for thermal energy and the supply of solar energy, whose availability depends on the time of day and season. Thus, cost-effective packed-bed thermal containers filled with a solid storage medium have been proposed for high-temperature sensible heat storage as materials are abundant and relatively cheap. Thus, it is necessary to investigate their performance and temperature profiles during the charge-discharge cycle. Several models are available for this purpose. Typically, the more detailed a model, the greater the computational effort required to solve it, and hence a time-efficient model is needed to prevent excessively long computation times for long-term analysis. At the more basic level, the common Hughes E-NTU model and the less realistic simplified Infinite-NTU model are very important for their less time and computational effort. In this paper, the appropriateness of employing the Infinite-NTU model was evaluated to investigate the performance of a typical and scalable rock-bed TES as a case study. The results presented provide a methodology to quickly test the validity of the model and predict the temperature profile for the case under study. Accordingly, such simple charge-discharge cycle thermal performance predictions are important to plan, design, and rapidly deploy a reliable and economical solar thermal system for the supply of valuable heat to high-temperature demanding applications of power generation and industrial processes as part of a rapid shift towards non-polluting renewable energy. Keywords: Solar Thermal, TES, Packed-bed, NTU model, Temperature profile

PV modeling↗

Expanding Solar Research and Generation for a Bright Energy Future (Final Technical Report)

This project supported the construction of an outdoor solar research facility for the primary purpose of characterizing panel and system lifetimes in the northern New England climate which features cold winters and warm, humid summers. The facility is designed to be integrated into future efforts to explore the impacts of the New England climate on energy storage and grid integration, as well as methods to mitigate factors like snow and dust coverage in the industrial and agricultural environment of the Intervale farming community and the McNeil wood-fired power generating station. It will provide year-round renewable energy research opportunities for faculty and students. As renewable energy generation and storage have become research priorities for UVM, for the state of Vermont, and for the United States as a whole, this facility will benefit the public on a broad range of scales.

14 SOLAR ENERGY↗

Distributed Solar and Storage Adoption Modeling

The National Renewable Energy Laboratory (NREL) is analyzing the rapidly increasing role of energy storage in the electrical grid through 2050 through its Storage Futures Study. In one phase of the study, NREL used the laboratory's Distributed Generation Market (dGen) model to examine the various future distributed storage capacity adoption scenarios, results, and implications.

agent-based modeling↗

Analysis of Supply Chain Challenges in the U.S. Solar Industry: Focus on Build America, Buy America Act and Inverter Supply Issues

The United States (U.S.) solar industry has been undergoing significant transformation, driven largely by meeting U.S. climate goals while simultaneously maintaining national security. At the forefront of this movement is the Inflation Reduction Act (IRA) and the Build America, Buy America (BABA) Act. The IRA has driven investment in clean energy generation deployments while the BABA Act, enacted under Division G, Title IX of the Infrastructure Investment and Jobs Act (IIJA) establishes domestic content procurement preference for all federal financial assistance obligated for infrastructure projects. While these pieces of legislation aim to reduce reliance on foreign-made solar components and increase domestic production, the sector continues to face notable supply chain challenges. These are particularly pronounced with inverters, a critical component in solar photovoltaic (PV) systems. This report explores the current state of these supply chain challenges, with a specific focus on the impact of the BABA requirements and the associated complexities in inverter manufacturing and supply.

14 SOLAR ENERGY↗

First estimation of high-resolution solar photovoltaic resource maps over China with Fengyun-4A satellite and machine learning

Fengyun-4A (FY-4A), which is the latest-generation Chinese geostationary meteorological satellite, measures solar reflection and thermal emission with high temporal, spatial, and spectral resolutions. It is expected to be highly beneficial for solar resource assessment and forecasting in China. This study is the first to estimate, using FY-4A and a random forest model, the global horizontal irradiance (GHI) at a 4-km–15-min spatio-temporal resolution over China, as a means to arrive at a solar photovoltaic (PV) resource map. In terms of GHI estimates, the root mean square error and mean bias error between hourly measured and retrieved values are 147.02 (35.2%), –5.64 W/m 2 (–1.4%), respectively, whereas the values of daily estimates are 29.20 (18.0%), –2.97 W/m 2 (–1.3%). The retrieval accuracy is found much better for instances with solar zenith angles smaller than 60°. Relatively larger errors are found at locations in the Sichuan Basin and northeastern China, which can be attributed to bright surfaces and/or strong cloud transients. With the retrieved irradiance, PV resource is derived through a physical model chain. The annual mean PV resource map suggests that, over most of the west areas, the annual mean effective irradiance exceeds 1700 kWh/m 2 , with the highest value found in Tibet (around 2000 kWh/m 2 per annum). Eastern China has an annual effective irradiance of only 1300–1500 kWh/m 2 . In conclusion, the region with poorest solar resource is the Sichuan Basin (less than 1100 kWh/m 2 per annum).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Exploring Secondary Markets to Improve Circularity: A Comparative Case Study of Photovoltaics and Hard-Disk Drives

Each year renewable energy generation increases notably with solar panel installations, but these panels have a limited lifespan and will produce between 2 and 4 million metric tons of waste by 2040. Similarly, there are currently between 20 to 70 million hard-disk drives (HDDs) reaching end-of-life (EOL) annually. The circular economy (CE) strives to recycle and reuse materials that are rare and expensive to obtain, minimizing waste. However, studying the potential circularity of photovoltaics (PV) and HDDs requires various data, for instance, on the maturity of the secondhand markets. In this context, the objective of the present study is to identify the current state of secondhand PV and HDD markets. After conducting a literature review, an automated data collection process was set up for that purpose. The analysis of the literature and collected data assess the maturity of the secondhand PV modules and HDDs markets and highlight differences between them.

agent-based modelling↗

Solar Resource and Infrastructure Assessment for the Town of Blandford

This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar +: Clean Energy Strategies for the Sunshine State (Final Technical Report (FTR) of the Florida Alliance for Accelerating Solar and Storage Technology Readiness (FAASSTeR))

This reports on a four-year effort to provide foundational research, analysis, strategies and assistance to help Florida, and other states that might learn from this work, to grow solar energy in conjunction with other distributed energy resources by addressing and overcoming existing barriers, and in way that delivers increased value. The start of this effort coincided with an inflection point of sorts into a new dawn for solar energy in Florida, where the Sunshine state’s national ranking in total installed solar, according to the Solar Energy Industries Association (SEIA), has rose from 13th to 4th. Florida has now become the national leader in annual utility-scale solar growth as dozens of large plants have come online. Also, during this time, Florida utilities have expressed a strong and growing interest in understanding the role of energy storage and how to best plan for and deploy this unique resource as part of strategies to grow solar. The utility-scale solar growth experienced has been fueled by the economics of solar cost-parity with natural gas combined cycle plants and Florida Public Service Commission’s (PSC) approval of cost-recovery for the Investor-Owned Utilities (IOU’s), primarily through the Solar Base Rate Adjustment (SoBRA) mechanism. This has led to gigawatts (GW’s) of rate-based solar capacity additions over several years, along with fairly significant amounts of energy storage. Meanwhile, municipal electric utilities, which, collectively, are the third largest source of power in the state, have been increasing solar considerably through power purchase agreements (PPA’s) and are on track to have close to 1 GW of grid-connected solar by 2024. Florida’s municipal utilities and the Florida Municipal Electric Association (FMEA) have been key partners in the Florida Alliance for Accelerating Solar and Storage Technology Readiness (FAASSTeR), formed to carry out this effort. The six largest of these have been Core Team utilities, engaging throughout the project in weekly calls, discussions, and project direction, participating in and hosting workshops and benefiting from technical assistance in several areas.

14 SOLAR ENERGY↗

Life after 30 years - a PV system in Colorado

The PV system consisted of 155 monocrystalline Si Arco M53 panels, installed in 1987. 80 were installed on a fixed tilt rack, and 75 on 5 separate dual-axis passive trackers. The system was decommissioned in 2017 due a campus re-design and building expansion at the Platte River Power Authority (PPRA) site. Prior to decommissioning a site visit established the following failure type observations: EVA browning (100%), cracked cells (60%), and cracked wires or grommets (9%, or more if replacements were made selectively on cracked parts). EVA browning is typical in modules of this vintage, whereas the occurrence of so many cracked cells is surprising and is likely weather-related. The fairly frequent occurrence of cracked wires and grommets serves as a reminder that accelerated testing of these components is important for goals of low-cost 50-year energy generation. In smaller numbers, thermal effects (7%), bent frames (1%), and cell corrosion (<1%) were observed. A sample of 20 modules was selected and brought to NREL for in-depth characterization. Because baseline measurements were not available using the nameplate rating, which can be inaccurate, revealed a mean module sample degradation of 0.7 %/year. Sporadic production data during the 30 years determined a system degradation rate closer to 1.2 %/year. Subsequently, four of these modules were re-mounted outdoors at NREL and are now approaching a total lifetime of 34 years.

durability↗

Data on temporal complementarity of hybrid renewable energy systems [SWR-23-09]

These datasets describe multiple facets of the temporal complementarity of co-located hybrid renewable energy systems throughout the United States. Several metrics characterizing the complementarity of generation profiles are provided on an annual and monthly basis (for both hourly and daily aggregations). These generation profiles are underpinned by hourly resource data (e.g., the WIND Toolkit and National Solar Radiation Database (NSRDB)) spanning the multi-year period 2007-2013. The data include complementarity results for greater than 1.76 million individual locations within the continental United States (CONUS). The data are intended to accompany two publications on the topic of temporal complementarity: 1) Harrison-Atlas, Dylan, Caitlin Murphy, Anna Schleifer, and Nicholas Grue. "Temporal complementarity and value of wind-PV hybrid systems across the United States." Renewable Energy 201 (2022): 111-123, doi:10.1016/j.renene.2022.10.060; and 2) Murphy, Caitlin, Harrison-Atlas, Dylan, Nicholas Grue, Vahan Gevorgian, Juan Gallego-Calderon, Shiloh Elliot and Thomas Mosier. “A Resource Assessment for FlexPower”. NREL Technical Report.

Harrison-Atlas, Dylan↗

A Case Study about Energy and Cost Impacts for Different Community Scenarios Using a Community-Scale Building Energy Modeling Tool

The United States building sector consumed approximately 75% of electricity in 2019. By implementing renewable energy technologies and control strategies into buildings, future buildings will serve as energy generators as well as consumers. To accommodate this transition, communications among buildings and between buildings and the grid could provide more possibilities to optimize the energy performance of buildings. This paper develops a community-scale building energy model tool and conducts a case study adopting behind-the-meter distributed energy resources, sharing energy in different buildings, and using different electricity tariff structures. Three scenarios are studied: (1) electricity only supplied by the grid, (2) photovoltaic (PV) panels installed on and available to some but not all buildings, and (3) a connected community. To consider the impacts of locations and energy tariffs, this paper selects four cities and three electricity tariffs to evaluate the energy and cost performances of these three scenarios. The results show that the PV panels in Scenario 2 reduce 25% to 33% of the community-level electricity consumption and 20% to 30% of the community-level electricity cost compared with Scenario 1 in all studied locations and energy tariffs. By considering power management in the connected community (Scenario 3), the electricity consumption and cost can be further reduced by 6% to 7% and 5% to 11%, respectively, compared with Scenario 2.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Potential Impact of Offshore Wind Energy on a Future Power System in the U.S. Northeast

This study aims to understand and quantify the potential impact of offshore wind on a future electricity system in the U.S. Northeast. In this analysis, a detailed representation of the Northeast power system is adopted, using a generation portfolio for 2024 paired with offshore wind nameplate capacities of 0 gigawatts (GW), 2 GW, and 7 GW. The analysis identifies points of offshore wind interconnection in the ISO-New England and New York Independent System Operator control areas and uses hourly wind profiles from the Wind Integration National Dataset Toolkit. Hourly simulations of the 2024 power system operations show an ability to accommodate the prescribed offshore wind capacities by adapting the system's generation dispatch. Curtailment levels of offshore wind range between 4% and 5%. Offshore wind generation displaces primarily natural-gas combined-cycle generation; however, requires increased flexibility from combined cycles through more frequent start-ups. The number of hours with transmission congestion increases because of offshore wind injection, with varying impact on a subregional level. Offshore wind's capacity credit was found to be 14.5%-28.3% and is lower than estimated in other large-scale power system studies, in part because this study considered a different weather year and a power system representation with higher shares of solar PV and onshore wind. The reliability contribution of resources is a topic area identified for more research and collaboration. The 7-GW scenario shows a reduction in locational marginal price of 11%, with production cost savings of up to 18% compared to the 0-GW scenario.

17 WIND ENERGY↗

Organizational Influence on Supply Chain for Digital Energy Infrastructure: Business Models, and Policy Landscape

Significant investment is driving the essential modernization and digitization of U.S. energy infrastructure, but the United States faces a key challenge in this grid transformation: our renewable and clean energy supply chains have limited capacity to source necessary digital assets through U.S. or allied sources. Batteries and their associated power electronic interfaces are key components to delivering clean and more resilient energy delivery, providing much-needed fast ramping, emergency discharge, generation, and operations support to the electric grid. These services have grown to be invaluable over the past 10 years and will soon be an irreplaceable component of energy delivery. While there have been significant strides to move supply chains for raw and critical materials to U.S. and allied nations, the control and power electronic industry has lagged, in part because of lower cost margins. For example, the United States now has growing capacity to manufacture solar photovoltaic (PV) panels, but 90% of the inverters—which are essential to the conversion of DC to AC for grid connection and controls—are made in or source parts from the People’s Republic of China (PRC). While a global supply chain is beneficial for many economic and supply diversification reasons, presence of foreign entities of concern (FEOC) in a dominant role in this supply chain brings additional concerns for national security of infrastructure. The BESS relationship and new clean energy have features that warrant discussions and additional focus on impact for technology security, given their critical role. This review considers the impact and solutions for complex business and policy landscapes in clean energy supply chain, and the benefit trade-offs, focusing on the Battery Energy Storage System case study, and its complex organizational relationships across both the US, Allied countries and Foreign Entities of Concern. While many examples in this paper are presented on PRC focused manufacture, this could apply to any potentially adversarial relationship

25 - ENERGY STORAGE↗

The roles of learning mechanisms in services: Evidence from US residential solar installations

Non-hardware costs are majority of the cost of producing solar photovoltaic (PV) electricity. Here we use matched data on patents and over 125,000 residential PV installations to estimate the effects of three learning mechanisms in reducing PV costs: learning by doing, searching, and interacting. While previous work in this area has focused predominantly on learning by doing, we find that learning by searching and interacting are also significant mechanisms to facilitate non-hardware cost reductions. Including these two mechanisms reduces the effect of learning by doing in explaining non-hardware cost reductions by 43%. Our results suggest that prior work may overemphasize the role of learning by doing and the policies that help generate learning by doing. Analysis of the supplier-network between installers and their suppliers shows that concentrated supplier networks are associated with lower non-hardware costs, although there are key differences between installer-panel and installer-inverter manufacturer networks. An important implication is that policies for reducing non-hardware costs need to take a more complete view of how different learning mechanisms engender cost reductions. They should particularly consider the important role of learning in supplier networks in cost reductions—an effect that until now has largely been missing in analyses of solar non-hardware costs.

14 SOLAR ENERGY↗

Multi-Timescale Integrated Dynamics and Scheduling for Solar (MIDAS-Solar) (Final Technical Report)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power systems operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) - are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power system steady-state and dynamic performance. This project helps meet and exceed the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for power grid planning and operation. We have developed a temporally comprehensive, closed-loop simulation model, named Multi-timescale Integrated Dynamics and Scheduling (MIDAS), that seamlessly simulates power system operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). For schedules with very high levels of inverter-based resources (IBRs), up to and including 100%, the stability of grid controls has been evaluated through electromagnetic transient (EMT) simulations and power-hardware-in-the-loop (PHIL) simulations of key transient events at key schedule points. Specifically, MIDAS provides: 1) a closed-loop simulation framework for simulating timescales from economic scheduling to dynamic stability analysis; 2) machine learning-based stability assessment; 3) EMT modeling and analysis for large-scale power systems; 4) MIDAS PHIL test bed. We worked with Hawaii Electric Companies to apply the MIDAS study framework to a Maui grid study. The entire island's transmission system was modeled in detail - from a yearly scheduling model, to a second-level frequency dynamic model, down to a sub-second-scale EMT model to address critical stability issues. The project demonstrated how MIDAS can help system planners and operators assess system reliability and stability while the power grid is marching toward a high-renewable, high-IBR future. In this Maui grid study, we found that 100% instantaneous IBR operation is achievable in EMT simulation and PHIL testing, and grid planners and operators might need new analysis/simulation tools to assess grid reliability and stability in the scheduling stage. MIDAS will bring Maui and other systems closer to 100% clean and stable energy futures. (In this study, we examined transient stability. Other topics necessary for 100% IBR operation, such as protection and resource adequacy, were not examined.)

100% Renewables↗

Solar Resource and Infrastructure Assessment for the Town of Wendell

This report is a solar resource and infrastructure assessment for the town of Wendell, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Wendell. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Wendell are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. It appears that National Grid is planning an upgrade to the Wendell Depot substation, which might then allow in-process projects are to proceed, and potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Westhampton

This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

DuraMAT FY 2022 Annual Report: Towards Predicting Lifetime

The Durable Module Materials Consortium (DuraMAT) launched in November 2016 with five years of funding from the U.S. Department of Energy s (DOE's) Solar Energy Technologies Office (SETO). The program renewed in 2022 for an additional 6 years. DuraMAT is a multi-lab consortium led by the National Renewable Energy Laboratory, with Sandia National Laboratories (Sandia) and Lawrence Berkeley National Laboratory (LBNL) as core research labs. DuraMAT's overarching goal is to accelerate a sustainable, just, and equitable transition to zero-carbon electricity generation by 2035. We work in partnership with our 22-member industry advisory board and the technical management team at SETO. DuraMAT transitioned from our first five-year program into a new six-year program in 2022. It was a very busy year; DuraMAT wrapped up projects from DuraMAT 1 and kicked off new laboratory-led projects for DuraMAT 2. This transition brings new goals and a renewed focus on accelerating the energy transition by improving photovoltaic (PV) module reliability.

accelerated stress testing↗