Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCUREMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Prototype residential solar-energy system

Complete solar-energy domestic-hot-water system for single-family residences is described in brochure. It contains data on procurement, installation, operation, and maintainance of system in residential or light commercial buildings. Appendix includes vendor brochures for major system components. Drawings, tables, and graphs complement text.

Source record↗

Extended performance solar electric propulsion thrust system study. Volume 1: Executive summary

Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed. Confirmation testing and analysis of thruster and power-processing components were performed, and the feasibility of satisfying extended performance requirements was verified. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined. Results are presented.

Poeschel, R. L.↗

Study to develop improved fire resistant aircraft passenger seat materials, phase 1

The procurement and testing of a wide range of candidate materials is reported. Improved fire resistant nonmetallic materials were subjected to tests to evaluate their thermal characteristics, such as burn, smoke generation, heat release rate and toxicity. In addition, candidate materials were evaluated for mechanical, physical and aesthetic properties. Other properties considered included safety, comfort, durability and maintainability. The fiscal year 1977 and the projected 1980 cost data were obtained for aircraft seat materials.

Trabold, E. L.↗

Letter to Don Fuqua on space shuttle commitment, 12 April 1977

NASA budget committments for the Space Shuttle program are delineated, estimating $6.816 billion (FY 1978 dollars) for the design, development, test and evaluation phase of operations. Current estimates for refurbishment of Orbiters 101 and 102 and procurement of Orbiters 103, 104, and 105 amount to $1.988 billion. Ground support equipment costs are estimated to be an additional $432 million.

Fletcher, J. C.↗

The 26-meter S-X Conversion Project

The 26-meter S-X conversion project provides for the conversion of an existing 26-meter S-band subnet to a 34-meter S- and X-band subnet. The subnet chosen for conversion consists of the following stations: DSS 12 near Barstow, DSS 44 in Australia, and DSS 62 in Spain. The main subsystems effected by this project are the antenna mechanical, antenna microwave, and receiver-exciter. In addition to these, there are many project-related electronic equipments that have been added to the existing station equipment. The major subsystems are essentially through the design stage with the antenna mechanical subsystem completed through detail design with procurement in process.

Lobb, V. B.↗

Guidelines for the selection and application of tantalum electrolytic capacitors in highly reliable equipment

Guidelines are given for the selection and application of three types of tantalum electrolytic capacitors in current use in the design of electrical and electronic circuits for space flight missions. In addition, the guidelines supplement requirements of existing military specifications used in the procurement of capacitors. A need exists for these guidelines to assist designers in preventing some of the recurring, serious problems experienced with tantalum electrolytic capacitors in the recent past. The three types of capacitors covered by these guidelines are; solid, wet foil, and tantalum cased wet slug.

Holladay, A. M.↗

SESAME/Environmental Research Laboratories

The Environmental Research Laboratories (ERL) have been designated as the basic research group of the National Oceanic and Atmospheric Administration (NOAA). ERL performs an integrated program of research and research services directed toward understanding the geophysical environment, protecting the environment, and improving the forecasting ability of NOAA. Twenty-four laboratories located throughout the United States comprise ERL. The Project SESAME (Severe Environmental Storms and Mesoscale Experiment) Planning Office is a project office within ERL. SESAME is conceived as a joint effort involving NOAA, NASA, NSF, and the atmospheric science community to lay the foundation for improved prediction of severe convective storms. The scientific plan for SESAME includes a phased buildup of analysis, modeling, instrumentation development and procurement, and limited-scale observational activities.

Source record↗

Extended performance solar electric propulsion thrust system study. Volume 3: Tradeoff studies of alternate thrust system configurations

Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. Emphasis was placed on relatively high power missions. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed in sufficient detail for comparing mass, efficiency, reliability, structure, and thermal characteristics. Confirmation testing and analysis of thruster and power-processing components were performed. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined.

Hawthorne, E. I.↗

Design data brochure: SIMS prototype system 2

Information is provided on the design and performance of the IBM SIMS Prototype System 2, solar domestic hot water system, for single family residences. The document provides sufficient data to permit procurement, installation, operation, and maintenance by qualified architectural engineers or contractors.

Source record↗

TRAN*STAR 2 evaluation for NOAA data buoy office, part A

The capability of the TRAN*STAR 2 receiver equipment utilizing the U.S. Navy Navigation Satellite System to provide reliable position locations with reasonable accuracy and frequency was evaluated. Two receivers, an antenna, and a test set were procured, and position fix data collected at NSTL from a fixed known location during the months of May and June. The data were processed through a computer program and analyzed. The results of the evaluation are summarized.

Source record↗

JAN transistor and diode characterization test program: JANTX diode 1N759A

The necessary data to create a new class of specifications was the objective of this characterization program. Sample selection was made according to the following criteria: (1) manufacturer or qualified distributor; (2) two vendors; and (3) two date codes. The general guidelines for procurement were two QPL vendors, JAN or JANTX, and two manufacturing lots, 27 from each lot. All data were acquired with three digit accuracy. The data processing and calculation of statistical parameters were performed by the Tektronix computer system using 4 digit display.

Takeda, H.↗

Design data brochure: SIMS prototype system 3

A closed hydronic solar system is reported for space and hot water heating. Design, performance, and hardware specifications are presented sufficient for architectural engineers and contractors to procure, install, operate, and maintain a similar solar application.

Source record↗

Evaluation of a near-infrared photomultiplier

A high performance near infrared sensitive photomultiplier tube was procured and evaluated with emphasis on those characteristics affecting its use over the very large amplitude range of signals encountered by an airborne lidar intended for mapping the distribution of stratospheric aerosols. A cathode quantum efficiency of 4.3 percent at 1.06 micrometer wavelength and a background count of less than 10,000 per second were realized. It is recommended that the tube be stored and operated at a temperature near -20 C, or cooler. Performance was found acceptable for the application in both pulse counting and analog modes, but careful design, probably including dynamic gain control, will be required to effectively utilize both modes on the same lidar shot.

Evans, W. E.↗

Application of a cost/performance measurement system on a research aircraft project

The fundamentals of the cost/performance management system used in the procurement of two tilt rotor aircraft for a joint NASA/Army research project are discussed. The contractor's reporting system and the GPO's analyses are examined. The use of this type of reporting system is assessed. Recommendations concerning the use of like systems on future projects are included.

Diehl, J. J.↗

Geothermal systems

Several tasks of JPL related to geothermal energy are discussed. The major task is the procurement and test and evaluation of a helical screw drive (wellhead unit). A general review of geothermal energy systems is given. The presentation focuses attention on geothermal reservoirs in California, with graphs and charts to support the discussion. Included are discussions on cost analysis, systems maintenance, and a comparison of geothermal and conventional heating and cooling systems.

Mohl, C.↗

Preliminary design activities for solar heating and cooling systems

Information on the development of solar heating and cooling systems is presented. The major emphasis is placed on program organization, system size definition, site identification, system approaches, heat pump and equipment design, collector procurement, and other preliminary design activities.

Source record↗

Stationary diesel engines for use with generators to supply electric power

The procurement of stationary diesel engines for on-site generation of electric power deals with technical criteria and policy relating to federal agency, not electrical components of diesel-generator sets or for the design of electric-power generating plants or their air-pollution or noise control equipment.

Source record↗

CAD/CAM data management needs, requirements and options

The requirements for a data management system in support of technical or scientific applications and possible courses of action were reviewed. Specific requirements were evolved while working towards higher level integration impacting all phases of the current design process and through examination of commercially marketed systems and related data base research. Arguments are proposed for varied approaches in implementing data base systems ranging from no action necessary to immediate procurement of an existing data base management system.

Lopatka, R. S.↗