SAGE III on ISS: Mission Update and Science Milestone Results and Future Plans

The Stratospheric Aerosol and Gas Experiment III on the International Space Station (SAGE III/ISS) has been collecting data on the stratosphere almost continuously for 4 years since the first light milestone was achieved on March 17, 2017. In that time, the SAGE III/ISS data products have withstood robust assessments both internal and external, using comparisons to data sets both in-situ and spaceborne, and incorporated improvements into the retrieval algorithm and the science data products themselves. With the new v5.2 release of the SAGE III/ISS science data product algorithm, improvements made to the aerosol and water vapor products have produced better correlations with both MLS and balloonsonde data. At this 4-year milestone, we will look back on the last 4 years of data collection highlighting SAGE III/ISS ozone and aerosol data from 2017-2020 in a 6-minute video highlighting the SAGE III mission. An overview of mission operations and the challenges of operating a science mission on the ISS will highlight lessons learned and the mission science objectives completed during the first three years of the mission. The future goals for the SAGE III/ISS mission, as we continue operations and science collection, will round out the presentation.

Marilee M Roell↗

A Recursive Multi-step Machine Learning Approach for Airport Configuration Prediction

Airport configuration selection is a complex decision-making process that involves several operational and human factors. In this paper we propose a novel recursive multi-step machine learning (ML) approach to predict airport configuration. The multi-step approach guarantees stability of the predicted configuration by taking as input the configuration predicted at the previous time step. The features of the proposed model include weather data, future arrival and departure counts and current configuration. Due to the importance of arrival and departure counts in predicting the airport configuration, arrival counts are calculated using landing time predictions selected from physics-based landing time predictions available in FAA System Wide Information Management data feeds for each flight. The selection rules were developed and refined to select the most accurate time for different phases of flight. The proposed model predicts the airport configurations up to 6 hours ahead. In this paper we show the predictive performance of the proposed model for six major US airports, including Charlotte Douglas International Airport (CLT), Dallas/Fort Worth International Airport (DFW), John F. Kennedy International Airport (JFK), Newark Liberty International Airport (EWR), LaGuardia Airport (LGA) and Dallas Love Field Airport (DAL). We trained and evaluated models on 2019 and 2020 data in order to study the effect of the pandemic and how changes in traffic patterns affected the performance of the proposed model. Results are compared with a baseline assuming no airport configuration changes. In our results for DFW, we obtained a prediction accuracy of 89.3% for 3 hours ahead prediction, and 82.8% for 6 hours ahead when applied on 2019 data.

machine learning↗

A Recursive Multi-step Machine Learning Approach for Airport Configuration Prediction

Airport configuration selection is a complex decision-making process that involves several operational and human factors. In this paper we propose a novel recursive multi-step machine learning (ML) approach to predict airport configuration. The multi-step approach guarantees stability of the predicted configuration by taking as input the configuration predicted at the previous time step. The features of the proposed model include weather data, future arrival and departure counts and current configuration. Due to the importance of arrival and departure counts in predicting the airport configuration, arrival counts are calculated using landing time predictions selected from physics-based landing time predictions available in FAA System Wide Information Management data feeds for each flight. The selection rules were developed and refined to select the most accurate time for different phases of flight. The proposed model predicts the airport configurations up to 6 hours ahead. In this paper we show the predictive performance of the proposed model for six major US airports, including Charlotte Douglas International Airport (CLT), Dallas/Fort Worth International Airport (DFW), John F. Kennedy International Airport (JFK), Newark Liberty International Airport (EWR), LaGuardia Airport (LGA) and Dallas Love Field Airport (DAL). We trained and evaluated models on 2019 and 2020 data in order to study the effect of the pandemic and how changes in traffic patterns affected the performance of the proposed model. Results are compared with a baseline assuming no airport configuration changes. In our results for DFW, we obtained a prediction accuracy of 89.3% for 3 hours ahead prediction, and 82.8% for 6 hours ahead when applied on 2019 data.

machine learning↗

Telerobotic control of a mobile coordinated robotic server, executive summary

This interim report continues with the research effort on advanced adaptive controls for space robotics systems. In particular, previous results developed by the principle investigator and his research team centered around fuzzy logic control (FLC) in which the lack of knowledge of the robotic system as well as the uncertainties of the environment are compensated for by a rule base structure which interacts with varying degrees of belief of control action using system measurements. An on-line adaptive algorithm was developed using a single parameter tuning scheme. In the effort presented, the methodology is further developed to include on-line scaling factor tuning and self-learning control as well as extended to the multi-input, multi-output (MIMO) case. Classical fuzzy logic control requires tuning input scale factors off-line through trial and error techniques. This is time-consuming and cannot adapt to new changes in the process. The new adaptive FLC includes a self-tuning scheme for choosing the scaling factors on-line. Further the rule base in classical FLC is usually produced by soliciting knowledge from human operators as to what is good control action for given circumstances. This usually requires full knowledge and experience of the process and operating conditions, which limits applicability. A self-learning scheme is developed which adaptively forms the rule base with very limited knowledge of the process. Finally, a MIMO method is presented employing optimization techniques. This is required for application to space robotics in which several degrees-of-freedom links are commonly used. Simulation examples are presented for terminal control - typical of robotic problems in which a desired terminal point is to be reached for each link. Future activities will be to implement the MIMO adaptive FLC on an INTEL microcontroller-based circuit and to test the algorithm on a robotic system at the Mars Mission Research Center at North Carolina State University.

Lee, Gordon↗

Operating a Crewed Spacecraft in the Age of Commercial Space Using Private/Government Partnership

Fifty years after humans completed a large-scale United States government-funded and government-engineered effort of landing humans on the moon, human spaceflight has entered a new paradigm. Private companies are now investing their own money and taking on an ever-increasing role in human spaceflight, in partnership with the U.S. government. This paper will describe the development of one of these partnerships through the lens of its mission operations team. As part of the Commercial Crew Program (CCP), NASA selected Boeing’s CST-100 Starliner as one of the next generation of crewed vehicles. Boeing opted to partner with the US Government for their Starliner operations by contracting with NASA’s Mission Control teams in the Flight Operations Directorate (FOD) at the Johnson Space Center to create its own Mission Operations (MO) flight controllers. Partnering with FOD provided benefits to both Boeing and NASA while also creating new challenges. MO brought over 60 years of crewed spaceflight experience and infrastructure to Boeing’s new program. Within certain legal constraints, MO was able to work closely and efficiently with their FOD counterparts who were performing both integration duties and, under the auspices of the CCP, insight of the contractors, in this case Boeing. Involvement of NASA as the Boeing operations agent did lead to what management deemed a ‘healthy tension’ within FOD, challenging old processes and often creating better, more robust teamwork. Successful development of the framework and boundaries of both the legal aspects and the oversight tensions has been one of the keys to developing a successful corporate/government partnership. Due to the highly automated nature of the Starliner, the MO organization was designed to be much smaller than previous NASA’s flight control teams for past programs. NASA has learned through the decades that spacecraft design and operations need to be as flexible and forgiving as possible. NASA’s Commercial Crew Program was established to sponsor corporate development of economical vehicles that could get humans to and from low Earth orbit. These companies, of course, need to meet contractual obligations in providing a safe means of transporting astronauts to the International Space Station (ISS), but also need to do so in a manner that leads to the venture resulting in a profit at the same time. Through MO’s involvement in the development of this spaceflight paradigm shift, there are ample lessons to be conveyed to future teams and programs working to develop similar missions.

Robert C Dempsey↗

Operating a Crewed Spacecraft in the Age of Commercial Space Using Private/Government Partnership

Fifty years after humans completed a large-scale United States government-funded and government-engineered effort of landing humans on the moon, human spaceflight has entered a new paradigm. Private companies are now investing their own money and taking on an ever-increasing role in human spaceflight, in partnership with the U.S. government. This paper will describe the development of one of these partnerships through the lens of its mission operations team. As part of the Commercial Crew Program (CCP), NASA selected Boeing’s CST-100 Starliner as one of the next generation of crewed vehicles. Boeing opted to partner with the US Government for their Starliner operations by contracting with NASA’s Mission Control teams in the Flight Operations Directorate (FOD) at the Johnson Space Center to create its own Mission Operations (MO) flight controllers. Partnering with FOD provided benefits to both Boeing and NASA while also creating new challenges. MO brought over 60 years of crewed spaceflight experience and infrastructure to Boeing’s new program. Within certain legal constraints, MO was able to work closely and efficiently with their FOD counterparts who were performing both integration duties and, under the auspices of the CCP, insight of the contractors, in this case Boeing. Involvement of NASA as the Boeing operations agent did lead to what management deemed a ‘healthy tension’ within FOD, challenging old processes and often creating better, more robust teamwork. Successful development of the framework and boundaries of both the legal aspects and the oversight tensions has been one of the keys to developing a successful corporate/government partnership. Due to the highly automated nature of the Starliner, the MO organization was designed to be much smaller than previous NASA’s flight control teams for past programs. NASA has learned through the decades that spacecraft design and operations need to be as flexible and forgiving as possible. NASA’s Commercial Crew Program was established to sponsor corporate development of economical vehicles that could get humans to and from low Earth orbit. These companies, of course, need to meet contractual obligations in providing a safe means of transporting astronauts to the International Space Station (ISS), but also need to do so in a manner that leads to the venture resulting in a profit at the same time. Through MO’s involvement in the development of this spaceflight paradigm shift, there are ample lessons to be conveyed to future teams and programs working to develop similar missions.

Robert C. Dempsey↗

Operating a Crewed Spacecraft in the Age of Commercial Space Using Private/Government Partnership

Fifty years after humans completed a large-scale United States government-funded and government-engineered effort of landing humans on the moon, human spaceflight has entered a new paradigm. Private companies are now investing their own money and taking on an ever-increasing role in human spaceflight, in partnership with the U.S. government. This paper will describe the development of one of these partnerships through the lens of its mission operations team. As part of the Commercial Crew Program (CCP), NASA selected Boeing’s CST-100 Starliner as one of the next generation of crewed vehicles. Boeing opted to partner with the US Government for their Starliner operations by contracting with NASA’s Mission Control teams in the Flight Operations Directorate (FOD) at the Johnson Space Center to create its own Mission Operations (MO) flight controllers. Partnering with FOD provided benefits to both Boeing and NASA while also creating new challenges. MO brought over 60 years of crewed spaceflight experience and infrastructure to Boeing’s new program. Within certain legal constraints, MO was able to work closely and efficiently with their FOD counterparts who were performing both integration duties and, under the auspices of the CCP, insight of the contractors, in this case Boeing. Involvement of NASA as the Boeing operations agent did lead to what management deemed a ‘healthy tension’ within FOD, challenging old processes and often creating better, more robust teamwork. Successful development of the framework and boundaries of both the legal aspects and the oversight tensions has been one of the keys to developing a successful corporate/government partnership. Due to the highly automated nature of the Starliner, the MO organization was designed to be much smaller than previous NASA’s flight control teams for past programs. NASA has learned through the decades that spacecraft design and operations need to be as flexible and forgiving as possible. NASA’s Commercial Crew Program was established to sponsor corporate development of economical vehicles that could get humans to and from low Earth orbit. These companies, of course, need to meet contractual obligations in providing a safe means of transporting astronauts to the International Space Station (ISS), but also need to do so in a manner that leads to the venture resulting in a profit at the same time. Through MO’s involvement in the development of this spaceflight paradigm shift, there are ample lessons to be conveyed to future teams and programs working to develop similar missions.

Robert C. Dempsey↗

The Global Ecosystem Dynamics Investigation (GEDI) Lidar Laser Transmitter

The Global Ecosystems Dynamics Investigation (GEDI) Lidar, is an Earth Science remote sensing instrument aboard the International Space Station (ISS) and the Japanese Experiment Module (JEM). Its core mission is to measure the global carbon balance of Earth's forests by using a set of three solid state laser transmitters in a multibeam waveform capture lidar technique. GEDI's laser transmitters and precision optical system transmits over 3.4 million laser pulses to the Earth every hour, each pulse producing an individual 3-D biomass column measurement. To enable a successful two-year mission, the lasers had to be reliable, highly repeatable in performance with each measurement power cycle, and designed with minimal part count for reduced manufacture complexity and cost. These transmitters are in-house products; developed, constructed, qualified, and fully integrated into the GEDI instrument at NASA's Goddard Space Flight Center. We will present the lasers' path from initial design to flight operation, with emphasis on the major milestones, critical issues, and lessons learned. Full credit goes to the excellent team effort that led to the successful commissioning and initiation of full-time science operations in March 2019.

Coyle, D. Barry↗

Landslide Likelihood Prediction using Machine Learning Algorithms

The supply of electricity via power plants is criticalto the operation of many critical infrastructure systems in mod-ern society. Natural hazards can disrupt the power supply, causepower outages that can halt economic growth, and impede emer-gency response until power is restored. The proposed work aimsto predict the landslides likelihood in these critical infrastructurelocations in the Northeastern USA using integrated databases ofexplanatory variables and machine learning algorithms. First,data related to landslides are obtained and merged, includingtopographic, soil moisture, and precipitation-related data. Fiveregression algorithms, namely: Random Forest, Extreme Gradi-ent Boosting (XGBoost), K-Nearest Neighbor regression (KNN),Linear Support Vector Regressor (SVR), and Linear regression,are utilized to predict the landslide probability and evaluatedon the dataset. The accuracy of the models is assessed by usingstatistical metrics such as mean absolute error (MAE), meansquared error (MSE), and root mean squared error (RMSE).The study results show that Random Forest outperformed othermodels with the mutual information feature selection method.It achieved an MSE of 0.0011 with mutual information-basedfeature selection and an MSE of 0.00157 without feature selection.KNN regressor outperformed the other models with an MSEof 0.00139 with correlation-based information selection. Theproposed landslide identification model with Random Forestalgorithm shows outstanding robustness and great potential intackling the landslide likelihood prediction by employing MLalgorithms.

Vasundhara Acharya↗

Leveraging Human Performance Data to Change the Narrative that People are the Safety Problem

The study of errors and failure has a long and productive history in the behavioral sciences. By studying how systems fail, we rule out various mechanisms for how those systems might work, thereby refining our theories of how they actually work. Human performance, however, includes more than errors; human performance comprises both failures and successes. A systematic bias to collect and analyze data only on error affects the decisions we make as a community by promoting the narrative that “people are the safety problem.” This narrative manifests in both obvious and subtle ways in the design of systems intended for human use. When the only safety data that are available are about human failure, then “data-driven” designs can only consider that humans fail. Changing this narrative will depend on new data and new ways to examine data – specifically, data on the processes by which human create and contribute to safety. An alternate narrative is that people represent a primary source of safety, through their capability to anticipate, monitor for, respond to, and learn from expected and unexpected change. This presentation will describe research efforts to expand the range of safety-relevant events to include not just rare safety failures but frequent safety successes. These efforts include use of data from both operations and simulations to develop methods and metrics for learning from structured observation, self-report, and system data.

Jon Holbrook↗

Balancing Training Techniques for Flight Controller Certification

Training of ground control teams has been a difficult task in space operations. There are several intangible skills that must be learned to become the steely eyed men and women of mission control who respond to spacecraft failures that can lead to loss of vehicle or crew if handled improperly. And as difficult as training is, it can also be costly. Every day, month or year an operator is in training, is a day that not only they are being trained without direct benefit to the organization, but potentially an instructor or mentor is also being paid for hours spent assisting them. Therefore, optimization of the training flow is highly desired. Recently the Expedition Division (DI) at Johnson Space Flight Center has recreated their training flows for the purpose of both moving to an operator/specialist/instructor hierarchy and to address past inefficiencies in the training flow. This paper will discuss the types of training DI is utilizing in their new flows, and the balance that has been struck between the ideal learning environments and realistic constraints. Specifically, the past training flow for the ISS Attitude Determination and Control Officer will be presented, including drawbacks that were encountered. Then the new training flow will be discussed and how a new approach utilizes more training methods and teaching techniques. We will look at how DI has integrated classes, workshops, checkouts, module reviews, scenarios, OJT, paper sims, Mini Sims, and finally Integrated Sims to balance the cost and timing of training a new flight controller.

Gosling, Christina↗

A reinforcement learning-based architecture for fuzzy logic control

This paper introduces a new method for learning to refine a rule-based fuzzy logic controller. A reinforcement learning technique is used in conjunction with a multilayer neural network model of a fuzzy controller. The approximate reasoning based intelligent control (ARIC) architecture proposed here learns by updating its prediction of the physical system's behavior and fine tunes a control knowledge base. Its theory is related to Sutton's temporal difference (TD) method. Because ARIC has the advantage of using the control knowledge of an experienced operator and fine tuning it through the process of learning, it learns faster than systems that train networks from scratch. The approach is applied to a cart-pole balancing system.

Berenji, Hamid R.↗

Mars Exploration Rover Operations with the Science Activity Planner

The Science Activity Planner (SAP) is the primary science operations tool for the Mars Exploration Rover mission and NASA's Software of the Year for 2004. SAP utilizes a variety of visualization and planning capabilities to enable the mission operations team to direct the activities of the Spirit and Opportunity rovers. This paper outlines some of the challenging requirements that drove the design of SAP and discusses lessons learned from the development and use of SAP in mission operations.

ground systems↗

Understanding the Space Shuttle Main Engine Hydraulic Actuation System and Reviewing Its Evolution

The complex engine start and thrust control requirements of the Space Shuttle Main Engine (SSME) require unique valve, actuator and control system hardware. The Hydraulic Actuation System (HAS) was designed, developed, and now operates to meet tight engine control requirement limits to assure safe, reliable and correct engine thrust at all times. The actuator is designed to be fail safe and fail operate in the areas where redundancy is important. The HAS has an additional pneumatic operating capability that insures a safe sequential closure of all actuators and propellant valves in the event of the loss of hydraulic system pressure or loss of electrical closed loop control of the actuator. The objective of this paper is to provide a complete description of the actuator s internal operating system, along with its interaction with all SSME system interfaces. Additionally the paper addresses the challenges, problems identified, and corrected, and lessons learned, during the course of the almost 35 years of engine operation.

McWade, Robert J.↗

Link monitor and control operator assistant: A prototype demonstrating semiautomated monitor and control

This article describes the approach, results, and lessons learned from an applied research project demonstrating how artificial intelligence (AI) technology can be used to improve Deep Space Network operations. Configuring antenna and associated equipment necessary to support a communications link is a time-consuming process. The time spent configuring the equipment is essentially overhead and results in reduced time for actual mission support operations. The NASA Office of Space Communications (Code O) and the NASA Office of Advanced Concepts and Technology (Code C) jointly funded an applied research project to investigate technologies which can be used to reduce configuration time. This resulted in the development and application of AI-based automated operations technology in a prototype system, the Link Monitor and Control Operator Assistant (LMC OA). The LMC OA was tested over the course of three months in a parallel experimental mode on very long baseline interferometry (VLBI) operations at the Goldstone Deep Space Communications Center. The tests demonstrated a 44 percent reduction in pre-calibration time for a VLBI pass on the 70-m antenna. Currently, this technology is being developed further under Research and Technology Operating Plan (RTOP)-72 to demonstrate the applicability of the technology to operations in the entire Deep Space Network.

Lee, L. F.↗

How To Train Your Dragon (and Vice Versa) – Human Spaceflight Research and The First Commercial Crews

The International Space Station has been an orbiting laboratory for human spaceflight research for over 20 years. NASA’s human research implementation teams have worked to develop, refine, and execute pre-, in-, and post-flight sessions to collect critical research data that will enable future spaceflight missions. The teams have worked closely with the spaceflight vehicle teams, including those for Soyuz and the now retired Space Shuttle vehicles, to successfully conduct this research. As NASA has transitioned to commercial vehicles for transport of crews to the ISS, the implementation teams have expanded their scope to include the SpaceX and upcoming Boeing vehicles. This session will focus on the unique implementation needs for the first available commercial platform, SpaceX. We will identify implementation adjustments made to accommodate the SpaceX Dragon system, including crew training and preflight baseline data collection, inflight operations tied to landing, and postflight planning and crew testing, as well as offer lessons learned from the past three SpaceX long-duration crew missions. Representatives from the Flight Operations Directorate, including the Astronaut Office and the vehicle recovery team, will also provide their perspectives on this new system, and how it affects their work with the human research community. A panel discussion with dedicated time for Q&A will follow.

Pasha Morshedi↗

NASA/MOD Operations Impacts from Shuttle Program

Operations plays a pivotal role in the success of any human spaceflight program. This paper will highlight some of the core tenets of spaceflight operations from a systems perspective and use several examples from the Space Shuttle Program to highlight where the success and safety of a mission can hinge upon the preparedness and competency of the operations team. Further, awareness of the types of operations scenarios and impacts that can arise during human crewed space missions can help inform design and mission planning decisions long before a vehicle gets into orbit. A strong operations team is crucial to the development of future programs; capturing the lessons learned from the successes and failures of a past program will allow for safer, more efficient, and better designed programs in the future. No matter how well a vehicle is designed and constructed, there are always unexpected events or failures that occur during space flight missions. Preparation, training, real-time execution, and troubleshooting are skills and values of the Mission Operations Directorate (MOD) flight controller; these operational standards have proven invaluable to the Space Shuttle Program. Understanding and mastery of these same skills will be required of any operations team as technology advances and new vehicles are developed. This paper will focus on individual Space Shuttle mission case studies where specific operational skills, techniques, and preparedness allowed for mission safety and success. It will detail the events leading up to the scenario or failure, how the operations team identified and dealt with the failure and its downstream impacts. The various options for real-time troubleshooting will be discussed along with the operations team final recommendation, execution, and outcome. Finally, the lessons learned will be summarized along with an explanation of how these lessons were used to improve the operational preparedness of future flight control teams.

Fitzpatrick, Michael↗

Integrated planning and scheduling for Earth science data processing

Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.