Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report

A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses.

99 GENERAL AND MISCELLANEOUS↗

Coordination of data relay satellite support

Interoperability as it relates to NASDA and ESA plans to implement S-band services compatible with that provided by TDRSS is discussed. The administrative and operational prerequisites for interoperability are introduced with attention given to coordination before and during the mission, and orbital slot planning. Areas for future technical discussions include a more detailed definition of the RF signal structures for achieving a coordinated S-band service and the examination of schemes (such as baseband cooling) which minimize interference while permitting the joint use of the S-band and promoting interoperability.

Sobieski, S.↗

Development of evaluation models of manpower needs for dismantling the dry conversion process-related equipment in uranium refining and conversion plant (URCP)

Evaluation models for determining the manpower needs for dismantling various types of equipment in uranium refining and conversion plant (URCP) have been developed. The models are widely applicable to other uranium handling facilities. Additionally, a simplified model was developed for easily and accurately calculating the manpower needs for dismantling dry conversion process-related equipment (DP equipment). It is important to evaluate beforehand project management data such as manpower needs to prepare an optimized decommissioning plan and implement effective dismantling activity. The Japan Atomic Energy Agency (JAEA) has developed the project management data evaluation system for dismantling activities (PRODIA code), which can generate project management data using evaluation models. For preparing an optimized decommissioning plan, these evaluation models should be established based on the type of nuclear facility and actual dismantling data. In URCP, the dry conversion process of reprocessed uranium and others was operated until 1999, and the equipment related to the main process was dismantled from 2008 to 2011. Actual data such as manpower for dismantling were collected during the dismantling activities, and evaluation models were developed using the collected actual data on the basis of equipment classification considering the characteristics of uranium handling facility. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Proposed Evaluation Framework for New and Emerging Low Embodied-Carbon Concrete Technologies

New opportunities for carbon reductions in buildings create a strong need for a common framework and method for those who design, build and influence construction to evaluate lifecycle carbon reductions from design decisions and technology choices. These opportunities include a wide range of low-embodied-carbon concrete materials being rapidly developed and introduced to the market. How to evaluate these newer materials and technologies has become critical for both public- and private-sector actors seeking to decarbonize building constructions by leveraging the Infrastructure Investment and Jobs Act (IIJA) and Inflation Reduction Act (IRA) funds. We propose an evaluation framework to assess the lifecycle carbon reductions from adoption of these technologies, including a subset of key “must have” (1) technical criteria (embodied carbon level, technology development stage); (2) market criteria (market size, scalability); and (3) financial criteria (cost of technology implementation compared to businessas-usual) from a range of options. We discuss how to use the framework and illustrate it using a “heatmap,” rating score and short case study of a promising technology. We also propose a plan to implement this framework that includes (1) standardized measurement and validation methods for verifying emission reductions from these technologies, and (2) avenues to implement real world demonstrations. We conclude with recommendations for next steps on framework refinement and commercialization strategy development.

Singh, Reshma↗

Advanced Energy Retrofit Guide (AERG): Practical Ways to Improve Energy Performance; Healthcare Facilities (Book)

The Advanced Energy Retrofit Guide for Healthcare Facilities is part of a series of retrofit guides commissioned by the U.S. Department of Energy. By presenting general project planning guidance as well as detailed descriptions and financial payback metrics for the most important and relevant energy efficiency measures (EEMs), the guides provide a practical roadmap for effectively planning and implementing performance improvements in existing buildings. The Advanced Energy Retrofit Guides (AERGs) are intended to address key segments of the U.S. commercial building stock: retail stores, office buildings, K-12 schools, grocery stores, and healthcare facilities. The guides' general project planning considerations are applicable nationwide; the energy and cost savings estimates for recommended EEMs were developed based on energy simulations and cost estimates for an example hospital tailored to five distinct climate regions. These results can be extrapolated to other U.S. climate zones. Analysis is presented for individual EEMs, and for packages of recommended EEMs for two project types: existing building commissioning projects that apply low-cost and no-cost measures, and whole-building retrofits involving more capital-intensive measures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

End-to-end differentiable digital twin for the IOTA/FAST facility

As the design complexity of modern accelerators grows, there is more interest in using controllable-fidelity simulations that have fast execution time or can yield additional insights about accelerator state. One notable example of additional information are gradients of physical observables with respect to design parameters produced by differentiable simulations. The IOTA/FAST facility has recently begun a program to implement and experimentally validate an end-to-end digital twin to serve as a virtual accelerator test stand, allowing for rapid prototyping of new software and experiments with minimal beam time costs. In this contribution we will discuss our plans and progress. Specifically, we will cover the selection and benchmarking of both physics and ML codes for linac and ring simulation, the development of generic interfaces between surrogate and physics-based sections, and presenting the control interface as either a deterministic event loop or a fully asynchronous EPICS soft input/output controller. We will also discuss challenges in model calibration and uncertainty quantification, as well as future plans to implement larger proton accelerators like PIPII and Booster.

Kuklev, N. [Fermilab]↗

EC Transmission Line Risk Identification and Mitigation Analysis

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements); (2) Underperformance of prototype, first unit, or production components during testing; (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FY17 Strategic Themes.

I am pleased to present this summary of the FY17 Division 1000 Science and Technology Strategic Plan. As this plan represents a continuation of the work we started last year, the four strategic themes (Mission Engagement, Bold Outcomes, Collaborative Environment, and Safety Imperative) remain the same, along with many of the goals. You will see most of the changes in the actions listed for each goal: We completed some actions, modified others, and added a few new ones. As I’ve stated previously, this is not a strategy to be pursued in tension with the Laboratory strategic plan. The Division 1000 strategic plan is intended to chart our course as we strive to contribute our very best in service of the greater Laboratory strategy. I welcome your feedback and look forward to our dialogue about these strategic themes. Please join me as we move forward to implement the plan in the coming months.

99 GENERAL AND MISCELLANEOUS↗

Data sharing report characterization of population 7: Personal protective equipment, dry active waste, and miscellaneous debris, surveillance and maintenance project Oak Ridge National Laboratory Oak Ridge, Tennessee

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested that ORAU plan and implement a sampling and analysis campaign targeting certain URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing to determine a final pathway for disposal. Population 7 (POP 7) consists of 56 containers of aged, low-level and potentially mixed S&M waste that has been staged in various locations around ORNL. Several of these POP 7 containers primarily contain personal protective equipment (PPE) and dry active waste (DAW), but may contain other miscellaneous debris. This data sharing report addresses the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) specified waste in a 13-container subpopulation (including eight steel boxes, three 55-gal drums, one sealand, and one intermodal) that lacked sufficient characterization data for possible disposal at the Environmental Management Waste Management Facility (EMWMF) using the approved Waste Lot (WL) 108.1 profile.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing the Implementation of an SDM at Sandia and LLNL

This report assesses the proposed implementation of a Scientific Data Management system that could be co-developed by LLNL and SNL and installed at each lab. In the current view, the systems would not be connected to each other. This report examines the different collaboration possibilities and status of planning and implementation of the teams at LLNL and SNL. The report uses identified requirements from previous work that has been done and documented in [1]. In that work, a set of simulation data management requirements was developed during a series of meetings, starting from requirements developed by Sandia Laboratory. These requirements are expected to evolve, and it is recommended that these requirements be revisited and updated for the following reasons: 1- Advancement in the computing hardware and software which leads to more processing power and better data movement speeds. 2- Advancement in computer algorithms which creates opportunities for better data management and analysis. 3- The need to expand and add to the capabilities of the SDM tools due to advancement in the applications software and due to new requirements by the scientific community. This report builds upon the experience from the work that has been done by some of the team members and the current SDM development efforts at LLNL and Sandia.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Automated Ride Hailing - Status, Projections, and Critical Safety Review

Automated ride-hailing services, commonly known as 'robo-taxis' are beginning to proliferate and scale. Currently they are available in four major US cities with another 10 cities planning their implementation in the near future. In the US, automated ride-hailing services are dominated by a single provider, with announcements from several competitors of service offerings by end of calendar year 2025. Internationally, only three companies are currently in commercial operations, with many more planned. The scaling of robo-taxi services appears to be the leading application of automated vehicles (AVs), and provides evidence of their anticipated safety in comparison to conventional vehicles. This presentation will provide an overview of the status of deployments of fully operational AVs in ride-hailing services, projections of the number of trips, vehicles, and vehicle miles traveled for the immediate future, and a critical review of the safety data that has been reported, both in the US as well as internationally.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The National Aerospace Initiative (NAI): Technologies For Responsive Space Access

The Secretary of Defense has set new goals for the Department of Defense (DOD) to transform our nation's military forces. The Director for Defense Research and Engineering (DDR&E) has responded to this challenge by defining and sponsoring a transformational initiative in Science and Technology (S&T) - the National Aerospace Initiative (NAI) - which will have a fundamental impact on our nation's military capabilities and on the aerospace industry in general. The NAI is planned as a joint effort among the tri-services, DOD agencies and National Aeronautics and Space Administration (NASA). It is comprised of three major focus areas or pillars: 1) High Speed Hypersonics (HSH), 2) Space Access (SA), and 3) Space Technology (ST). This paper addresses the Space Access pillar. The NAI-SA team has employed a unique approach to identifying critical technologies and demonstrations for satisfying both military and civilian space access capabilities needed in the future. For planning and implementation purposes the NAI-SA is divided into five technology subsystem areas: Airframe, Propulsion, Flight Subsystems, Operations and Payloads. Detailed technology roadmaps were developed under each subsystem area using a time-phased, goal oriented approach that provides critical space access capabilities in a timely manner and involves subsystem ground and flight demonstrations. This S&T plan addresses near-term (2009), mid-term (2016), and long-term (2025) goals and objectives for space access. In addition, system engineering and integration approach was used to make sure that the plan addresses the requirements of the end users. This paper describes in some detail the technologies in NAI-Space Access pillar. Some areas of emphasis are: high temperature materials, thermal protection systems, long life, lightweight, highly efficient airframes, metallic and composite cryotanks, advanced liquid rocket engines, integrated vehicle health monitoring and management, highly operable systems and payloads. Implementation strategies for NAI are also described.

Culbertson, Andrew↗

NASA's Radioisotope Power Systems - Plans

NASA's Radioisotope Power Systems (RPS) Program continues to plan and implement content to enable planetary exploration where such systems could be needed, and to prepare more advanced RPS technology for possible infusion into future power systems. The 2014-2015 period saw significant changes, and strong progress. Achievements of near-term objectives have enabled definition of a clear path forward in which payoffs from research investments and other sustaining efforts can be applied. The future implementation path is expected to yield a higher-performing thermoelectric generator design, a more isotope-fuel efficient system concept design, and a robust RPS infrastructure maintained effectively within both NASA and the Department of Energy. This paper describes recent work with an eye towards the future plans that result from these achievements.

Program↗

Formal Approach For Resilient Reachability based on End-System Route Agility

The deterministic nature of existing routing protocols has resulted into an ossified Internet with static and predictable network routes. This gives persistent attackers (e.g. eavesdroppers and DDoS attackers) plenty of time to study the network and identify the vulnerable links (critical) to plan a devastating and stealthy attack. Recently, route mutation approaches have been proposed to address such issues. However, these approaches incur significantly high overhead and depend upon the availability of disjoint routes in the network, which inherently limit their use for mission critical services. To cope with these issues, we extend the current routing architecture to consider end-hosts as routing elements, and present a formal method based agile defense mechanism to increase resiliency of the existing cyber infrastructure. The major contributions of this paper include: (1) formalization of efficient and resilient End to End (E2E) reachability problem as a constraint satisfaction problem, which identifies the potential end-hosts to reach a destination while satisfying resilience and QoS constraints, (2) design and implementation of a novel decentralized End Point Route Mutation (EPRM) protocol, and (3) design and implementation of planning algorithm to minimize the overlap between multiple flows, for the sake of maximizing the agility in the system. Our implementation and evaluation validates the correctness, effectiveness and scalability of the proposed approach.

Rauf, Usman↗

Data sharing report characterization of the surveillance and maintenance project miscellaneous process inventory waste items Oak Ridge National Laboratory, Oak Ridge, TN

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, to provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a sampling and analysis campaign to target certain items associated with URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing for final disposal. This waste was generated during processing, surveillance, and maintenance activities associated with the facilities identified in the process knowledge (PK) provided in Appendix A. A list of items for sampling and analysis were generated from a subset of materials identified in the WHP populations (POPs) 4, 5, 6, 7, and 8, plus a small number of items not explicitly addressed by the WHP. Specifically, UCOR S&M project personnel identified 62 miscellaneous waste items that would require some level of evaluation to identify the appropriate pathway for disposal. These items are highly diverse, relative to origin; composition; physical description; contamination level; data requirements; and the presumed treatment, storage, and disposal facility (TSDF). Because of this diversity, ORAU developed a structured approach to address item-specific data requirements necessary for acceptance in a presumed TSDF that includes the Environmental Management Waste Management Facility (EMWMF)—using the approved Waste Lot (WL) 108.1 profile—the Y-12 Sanitary Landfill (SLF) if appropriate; EnergySolutions Clive; and the Nevada National Security Site (NNSS) (ORAU 2013b). Finally, the evaluation of these wastes was more suited to a judgmental sampling approach rather than a statistical design, meaning data were collected for each individual item, thereby providing information for item-byitem disposition decisions. ORAU prepared a sampling and analysis plan (SAP) that outlined data collection strategies, methodologies, and analytical guidelines and requirements necessary for characterizing targeted items (ORAU 2013b). The SAP described an approach to collect samples that allowed evaluation as to whether or not the waste would be eligible for disposal at the EMWMF. If the waste was determined not to be eligible for EMWMF disposal, then there would be adequate information collected that would allow the waste to be profiled for one of the alternate TSDFs listed above.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of flowsheet change to minimize hydrogen and ammonia generation during chemical processing of high level waste in the Defense Waste Processing Facility

Testing was completed to develop a chemical processing flowsheet for the Defense Waste Processing Facility (DWPF), designed to vitrify and stabilize high level radioactive waste. DWPF processing uses a reducing acid (formic acid) and an oxidizing acid (nitric acid) to rheologically thin the slurry and complete the necessary acid base and reduction reactions (primarily mercury and manganese). Formic acid reduces mercuric oxide to elemental mercury, allowing the mercury to be removed during the boiling phase of processing through steam stripping. In runs with active catalysts, formic acid can decompose to hydrogen and nitrate can be reduced to ammonia, both flammable gases, due to rhodium and ruthenium catalysis. Replacement of formic acid with glycolic acid eliminates the generation of rhodium- and ruthenium-catalyzed hydrogen and ammonia. In addition, mercury reduction is still effective with glycolic acid. Hydrogen, ammonia and mercury are discussed in the body of the report. Ten abbreviated tests were completed to develop the operating window for implementation of the flowsheet and determine the impact of changes in acid stoichiometry and the blend of nitric and glycolic acid as it impacts various processing variables over a wide processing region. Three full-length 4-L lab-scale simulations demonstrated the viability of the flowsheet under planned operating conditions. The flowsheet is planned for implementation in early 2017.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Situating Green Infrastructure in Context: A Framework for Adaptive Socio‐Hydrology in Cities

Abstract Management of urban hydrologic processes using green infrastructure (GI) has largely focused on storm water management. Thus, design and implementation of GI usually rely on physical site characteristics and local rainfall patterns, and do not typically account for human or social dimensions. This traditional approach leads to highly centralized storm water management in a disconnected urban landscape and can deemphasize additional benefits that GI offers, such as increased property value, greenspace aesthetics, heat island amelioration, carbon sequestration, and habitat for biodiversity. We propose the Framework for Adaptive Socio‐Hydrology (FrASH) in which GI planning and implementation moves from a purely hydrology‐driven perspective to an integrated sociohydrological approach. This allows for an iterative, multifaceted decision‐making process that would enable a network of stakeholders to collaboratively set a dynamic, context‐guided project plan for the installation of GI, rather than a “one‐size‐fits‐all” installation. We explain how different sectors (e.g., governance, nongovernmental organizations, communities, academia, and industry) can create a connected network of organizations that work toward a common goal. Through a graphical Chambered Nautilus model, FrASH is experimentally applied to contrasting GI case studies and shows that this multistakeholder, connected, decentralized network with a coevolving decision‐making project plan results in enhanced multifunctionality, potentially allowing for the management of resilience in urban systems at multiple scales.

Schifman, L. A.↗

Moderate Resolution Imaging Spectrometer (MODIS) design evolution and associated development and verification of data product efforts

The Moderate Resolution Imaging Spectrometer (MODIS) is a key observing facility to be flown on the Earth Observing System (EOS). The facility is composed of two instruments called MODIS-N (nadir) and MODIS-T (tilt). The MODIS-N is being built under contract to NASA by the Santa Barbara Research Center. The MODIS-T is being fabricated by the Engineering Directorate at the Goddard Space Flight Center. The MODIS Science Team has defined nearly 40 biogeophysical data products for studies of the ocean and land surface and properties of the atmosphere including clouds that can be expected to be produced from the MODIS instruments shortly after the launch of EOS. The ocean, land, atmosphere, and calibration groups of the MODIS Science Team are now proceeding to plan and implement the operations and facilities involving the analysis of data from existing spaceborne, airborne, and in-situ sensors required to develop and validate the algorithms that will produce the geophysical data products. These algorithm development and validation efforts will be accomplished wherever possible within the context of existing or planned national and international experiments or programs such as those in the World Climate Research Program.

Salomonson, Vincent V.↗