Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Hydro”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

The Modeling of Synfuel Production Process: ASPEN Model of FT production with electricity demand provided at LWR scale

Synfuels, or electro-fuels (e-fuels) have the unique potential to significantly reduce greenhouse gas (GHG) emissions across the transportation sector. This is especially true for applications with substantial payloads and daily miles traveled, such as long-haul heavy-duty vehicles, rail locomotives, marine vessels and aviation aircrafts that are challenging to directly electrify via battery or fuel cell powertrain technologies. Synfuels, or electro-diesel/electro-jet fuels, have similar properties with the incumbent petroleum fuels, compatible with current infrastructure but have much lower GHG emissions relative to the petroleum counterpart, because they utilize waste carbon dioxide (CO2) streams and green hydrogen (H2) sourced from electrolysis. To achieve substantial reductions in GHG emissions, electricity sources must be zero carbon or near-zero carbon, which is the case with solar, wind, hydro and nuclear power. Compared to the intermittency of solar, wind and hydro, nuclear energy provides a steady energy source. In addition, it’s advantageous for nuclear power to produce synfuels because it provides not only near-zero carbon electricity to displace grid electricity, but also near-zero carbon steam to displace carbon-intensive natural gas combustion for steam generation. The availability of electricity and steam also enables more efficient green hydrogen production by using high-temperature electrolysis. In this work, Argonne National Laboratory (ANL) models a synfuel production process via the Fischer- Tropsch (FT) reaction by using nuclear power to provide electricity and steam. In 2021, using ASPEN Plus software, ANL established a detailed process model of a stand-alone FT production facility, assuming feedstocks of pure CO2 and H2. This stand-alone model can be expanded to integrate H2 production from nuclear power via low-temperature and high-temperature electrolysis at light-water reactor (LWR) scale. This report summarizes the stand-alone ASPEN Plus model results with a detailed mass and energy analysis. Our modeled facility produces 351 MT/day (130,000 gal/day) of FT fuel (a mixture of naphtha, jet fuel, and diesel) by converting 223 MT/day of H2 and 2,387 MT/day of CO2. The FT fuel production energy efficiency is 58% and the carbon conversion efficiency (from CO2 to FT fuel) is 46%. The production of green hydrogen requires 390–470 MWe of electricity, which is compared with the capacity of an LWR plant. For the stand-alone FT process, the detailed energy demand (electricity and heat) is summarized in the table below. Based on the energy supply source and the required temperature, potential insertion points of nuclear energy are identified. Based on the potential nuclear energy utilization, this report discusses potential modification options for expanding the system boundary to integrate nuclear power use, for example on-site hydrogen production via water electrolysis. Modeling of the integrated system is conducted by closely working with ANL and Idaho National Laboratory (INL) collaborators to harmonize design parameters of nuclear plants and the FT production process.

Zang, Guiyan↗

Production of coal-based fuels and value-added products: coal to liquids using petroleum refinery streams

We are studying several processes that utilize coal, coal-derived materials, or biomass in existing refining facilities. A major emphasis is the production of a coal-based replacement for JP-8 jet fuel. This fuel is very similar to Jet A and jet A-1 in commercial variation, so this work has significant carry-over into the private sector. We have been focusing on three processes that would be retrofitted into a refinery: (1) coal tar/refinery stream blending and hydro-treatment; (2) coal extraction using refinery streams followed by hydro-treatment; and (3) co-coking of coal blended with refinery streams. 4 figs., 5 tabs.

01 COAL, LIGNITE, AND PEAT↗

Radio-Ecological Conditions of Groundwater in the Area of Uranium Mining and Milling Facility - 13525

Manmade chemical and radioactive contamination of groundwater is one of damaging effects of the uranium mining and milling facilities. Groundwater contamination is of special importance for the area of Priargun Production Mining and Chemical Association, JSC 'PPMCA', because groundwater is the only source of drinking water. The paper describes natural conditions of the site, provides information on changes of near-surface area since the beginning of the company, illustrates the main trends of contaminators migration and assesses manmade impact on the quality and mode of near-surface and ground waters. The paper also provides the results of chemical and radioactive measurements in groundwater at various distances from the sources of manmade contamination to the drinking water supply areas. We show that development of deposits, mine water discharge, leakages from tailing dams and cinder storage facility changed general hydro-chemical balance of the area, contributed to new (overlaid) aureoles and flows of scattering paragenetic uranium elements, which are much smaller in comparison with natural ones. However, increasing flow of groundwater stream at the mouth of Sukhoi Urulyungui due to technological water infiltration, mixing of natural water with filtration streams from industrial reservoirs and sites, containing elevated (relative to natural background) levels of sulfate-, hydro-carbonate and carbonate- ions, led to the development and moving of the uranium contamination aureole from the undeveloped field 'Polevoye' to the water inlet area. The aureole front crossed the southern border of water inlet of drinking purpose. The qualitative composition of groundwater, especially in the southern part of water inlet, steadily changes for the worse. The current Russian intervention levels of gross alpha activity and of some natural radionuclides including {sup 222}Rn are in excess in drinking water; regulations for fluorine and manganese concentrations are also in excess. Possible ways to improve the situation are considered. (authors)

54 ENVIRONMENTAL SCIENCES↗

A Study Of Geological Disposal Facility (GDF) Ageing Phenomena In Bentonite - 17605

Since the 1950's, the UK's nuclear activity in energy, defence and medicine has led to the accumulation of a large amount of higher activity radioactive waste (HAW). Most of nuclear waste arises in a wide variety of physical and chemical forms with different radioisotopes and loadings. Due to complexity in HAW, it is imperative that there be a rigorous management system that ensures population and environmental safety over extended periods. The concept of Deep Geological Disposal of waste in a stable geological formation is, nowadays, an internationally accepted solution as the surest and the most viable long term method for management. Any future Geological Disposal Facility (GDF) will comprise, among other artificial and natural engineered barriers, a barrier immediately around the waste containers compounded by a sealing material. The long-term stability of a GDF will be determined by the design and construction of the engineered barriers, and the mechanical, hydraulic and geochemical interactions that may happen between the different engineered components as a result of combined processes such as the heat produced by radioactive decay and the ion water composition of the surrounding host rock. Bentonite clay has been selected as the most promising buffer and backfill material in many disposal programmes because of its swelling capacity, low permeability, plasticity and cation exchange capacity. In the nuclear scope, bentonite testing at different scale-lengths (laboratory and field scale) has been performed and implemented in order to examine the thermo-hydro-mechanical (THM) and thermo-hydro-geochemical (THG) processes that may happen in the engineered barriers and geological settings associated with a GDF. Two major European field scale tests have been performed to better understand bentonite performance and behaviour immediately after HAW emplacements. The Full-Scale Engineered Barriers Experiment (FEBEX) at the Grimsel Test Sit (Switzerland) and the Alternative Buffer Material (ABM) Project at the Aespoe Hard Rock Laboratory (Sweden). The Febex Experiment was a pilot project designed for 'field research' of HAW repository hosted in crystalline rock where surrogate HAW canisters were placed horizontally in drifts, surrounded by compacted blocks of bentonite, sealed by a concrete plug and maintaining a constant canister surface temperature of 100 deg. C. After five years of operation, a partial dismantling was carried out in 2002. Heater processes occurring in the surrounding bentonite. The dismantling of the heater no. 2 (after 18 years of operation) started in late 2014 and is planned to be finished at the end of 2016 (termed FEBEX-DP). The FEBEX Project utilised bentonite from the Cortijo de Archidona deposit (Almeria, Spain). This 'Febex' bentonite is sourced from calcium-magnesium montmorillonite with good properties in relation to swelling capacity, permeability, adsorption capacity, and thermal conductivity. The ABM Project is a large-scale programme that has been running since 2006. The programme is designed to study a suite of possible buffer materials and correlate the physical and chemical properties of eleven different types of bentonites to their fundamental mineralogical properties. The ABM test consists in three 'packages' containing a central heater tube surrounded by different pre-compacted bentonite blocks and instrumentation. Each 'package' was installed in separate boreholes. The target temperature for the surface of the heated tubes in contact with the bentonite was 130 deg. C. Both FEBEX and ABM test the bentonite was saturated with water percolating from surrounding host rock (FEBEX and ABM) and also via artificial supply systems (ABM), being the water itself acting as a long term corrosion agent. For both experiments and emerging interest is in the interaction of bentonite with metallic components, under geological disposal conditions are not considered to be thermodynamically stable and hence arising corrosion products could interact with the buffer. These interactions depend on various factors such as the redox potential, temperature, pH, solute concentration and buffer material characteristics. During the operational phases of the FEBEX and ABM and after its 'closure' a significant volume of air was found to be retained in the bentonite. Under these conditions a period of initial aerobic corrosion by the air in the bentonite barrier would have occurred followed by establishment of anaerobic corrosion would be the dominant process ongoing. The anaerobic corrosion began when the bentonite became water saturated. Under these conditions, the water acted as the major oxidant. The present project focuses on the characterization of samples arising from the FEBEX and ABM Projects as well as performing additional independent experiments designed to complement these prior studies. Characterization will focus mainly on corrosion related alteration combined with thermal effects. Through detailed sample characterization, the intention is to achieve a greater knowledge regarding the changes to the bentonite under the experimental conditions to which it was exposed, and plausible alterations in its THM and THG properties occurring during the experiment due to blended effects of temperature,water content, engineering structural components and solutes are also to be measured. The fulfilment of a large-scale 'in-situ' test is intricate, time-consuming and with an abundance of external variables that are not always well controlled. For this reason, the University of Bristol is performing a series of well constrained time-resolved laboratory tests which bentonite is being subjected to different possible scenarios that may happen whilst in a HAW repository. In virtue of this experiment, the UoB aims to understand the illitisation and cementation process and their effects on bentonite safety properties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OpenFAST Modeling of the T-Omega Wind Floating Offshore Wind Turbine System

To reduce the cost of offshore wind energy through a more efficient design of the floating support structure, T-Omega Wind developed a novel lightweight and shallow-draft platform concept that aims to achieve a wave-following behavior without resonance amplification. The rotor and generator are carried by four tower legs with each leg supported by a shallow-draft float at the base. In preparation for a more detailed analysis, a coupled aero-hydro-elastic model of the proposed concept is developed in OpenFAST. The detailed modeling approach is presented, including a novel application of the SubDyn substructure dynamics module of OpenFAST to approximate the loads on the axle tube at the tower top from the rotor hub bearings. Preliminary results obtained with the OpenFAST model by rigidifying the substructure and blades indicate that the original sizing of the design can lead to large hub acceleration in the axial/surge and pitch directions due to platform-pitch motion. The high axial acceleration also potentially leads to large bending moments in the four tower legs. To address these issues, an updated design is developed with, among other changes, increased float spacing at the tower base and improved shear-transmitting geometry of the tower legs. The new design suggests significantly reduced extreme hub accelerations under the same conditions even with structural flexibility and will be further analyzed in the future through full aero-hydro-servo-elastic simulations.

ENGINEERING,WIND ENERGY↗

OpenFAST Modeling of the T-Omega Wind Floating Offshore Wind Turbine System: Preprint

To reduce the cost of offshore wind energy through a more efficient design of the floating support structure, T-Omega Wind developed a novel lightweight and shallow-draft platform concept that aims to achieve a wave-following behavior without resonance amplification. The rotor and generator are carried by four tower legs with each leg supported by a shallow-draft float at the base. In preparation for a more detailed analysis, a coupled aero-hydro-elastic model of the proposed concept is developed in OpenFAST. The detailed modeling approach is presented, including a novel application of the SubDyn substructure dynamics module of OpenFAST to approximate the loads on the axle tube at the tower top from the rotor hub bearings. Preliminary results obtained with the OpenFAST model by rigidifying the substructure and blades indicate that the original sizing of the design can lead to large hub acceleration in the axial/surge direction and in the pitch direction due to platform-pitch motion. The high hub acceleration also potentially leads to large bending moments in the four tower legs. To address the issue identified, an updated design is developed with, among other changes, increased float spacing at the tower base and improved geometry of the tower legs. The new design suggests significantly reduced extreme platform pitch angles under the same conditions and will be further analyzed in the future through full aero-hydro-servo-elastic simulations.

FOWT↗

Directional Drilling Technology for HLW Disposal - Outline of System and its Application - 16078

During high-level waste (HLW) disposal site selection, borehole measurement and logging to investigate the hydro-geological and geo-mechanical conditions of the host rocks is a very important way to examine the potential of the disposal candidates. In Japan, attention is being given to Neogene soft sedimentary rock as the host rock for HLW disposal. In particular, the soft sedimentary rock in coastal areas is thought to be one of the best candidates, because there is little driving force from underground water. Directional drilling is supposed to be efficient under limited topographic and geological conditions, and the Central Research Institute of Electric Power Industry (CRIEPI) has been conducting a project on directional drilling and logging/measurement technologies since 2000. Basic directional drilling system was developed and the system was applied to the Neogene normal sedimentary rock at the Hokushin area of the Horonobe town in Hokkaido. The borehole was drilled to the 700 m long and the applicability of the system was confirmed until 2004. A basic directional drilling system was developed, and the system was applied to the Neogene normal sedimentary rock in the Hokushin area, in the town of Horonobe in Hokkaido. A 700-m borehole was drilled, and the applicability of the system was confirmed in 2004. After conducting a seismic reflection survey for the Omagari fault distribution at the Kami-Horonobe area in the town of Horonobe, a drilling site was selected, and a borehole trace was planned to perpendicularly intersect the fault zone in 2005. Considering the planned trace, a 1000-m-long borehole was drilled to a depth of 450 m. From 750 m to the bottom (1000 m), the borehole was horizontal. The total core recovery was 99.8%, even though it was drilled in the fault zone. The geological, hydrological, geo-mechanical, geophysical, and geochemical data were collected using borehole logging/measurement/survey and core logging/measurement/analysis, and the Omagari fault was characterized. After conducting all the work in the borehole, a steel pipe was inserted into the borehole to case the wall. Open hole sections for monitoring were constructed considering the hydro-geological conditions throughout the hole. Then, the monitoring system was inserted and set up to obtain the initial conditions of the groundwater pressure and chemistry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermo-Hydraulic-Mechanical Modelling of the Full-Scale Emplacement (FE) Experiment at the Mont Terri Rock Laboratory - 16490

The Full-Scale Emplacement Experiment at the Mont Terri underground research laboratory is a heater test carried out in a gallery constructed in Opalinus Clay. The aim of the experiment is both to develop emplacement procedures for radioactive waste canisters and their surrounding backfill as well as understanding the thermo-hydro-mechanical effects of disposing of radioactive waste on the engineering materials and the host rock. Coupled thermo-hydro-mechanical models have been used to aid planning of the locations of sensors, to inform decisions on the schedule for turning on the heaters as well as to make predictions of the temperatures and water pressures in the bentonite and the Opalinus Clay. The FE Experiment was preceded by a number of other experiments at the Mont Terri laboratory at smaller scales, but with similar materials, which provided crucial input to the models and gave confidence in the general process understanding. Blind predictions were made prior to turning on the heaters, of the temperature and relative humidity in the bentonite surrounding the heaters. The comparison between the blind predictions and early data from the experiment show that knowledge gained from smaller scale experiments on similar materials has enabled good blind predictions to be made and gives confidence that temperature in the experiment is unlikely to rise to a level that could damage the sensors. It also demonstrates that the thermal properties of the disposal system are understood well enough to produce reliable estimates of temperature in the backfill. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Accessory for Cleaning the Inside of the Machine Tool Cavity

The best way to extend the life of a metalworking fluid (MWF) is to make sure the machine tool and MWF delivery system are properly cleaned at least once per year. The dilemma the MWF manager is faced with is: How does one clean the machine tool and the MWF system on a large machine tool with an enclosure in a timely manner without impacting production schedules? Remember the walls and roof of the machine enclosure are coated with a film of dried contaminated MWF that must also be removed. If not removed, the deposits on these surfaces can recontaminate the fresh charge of MWF. I have found a product that with this revised procedure helps to shorten the machine tool down time involved with machine cleaning. (1) Discuss with your MWF supplier if they have a machine cleaning product that can be used with your current water based MWF during normal machining operations. Most MWF manufacturers have a machine cleaner that can be used at a lower concentration (1-2% vs. 5%) and can be used while still making production parts for a short period of time (usually 24-48 hours). (2) Make sure this machine cleaner is compatible with the work-piece material you are machining into product. Most cleaners are compatible with ferrous alloys. Because of the increased alkalinity of the fluid you might experience staining if you are machining copper or aluminum alloys. (3) Remove the chips from the chips pans and fluid channels. (4) During off shift hours circulate the MWF using a new product marketed by Rego-Fix called a 'Hydroball'. This device has a 5/8 inch diameter straight shank which allows it to be installed in any collet or solid quick change tool holder. It has multiple nozzles so that the user can control the spray pattern generated when the MWF is circulated. It allows the user to utilize the high pressure, through spindle MWF delivery capability of your machine tool for cleaning purposes. The high pressure MWF system can now be effectively used for cleaning purposes. This will also work with standard pressure system but you must reduce the number of nozzles utilized. By combining the movement of the machine axis around the operating envelope and the MWF circulation you can do a reasonably effective job of washing the inside of the machine tool operating cavity. Way covers will be moved and surfaces exposed because of axis movement. Spray direction will change to better wash fixtures and machine tool components. Deposits will start to breakdown and be washed into the machine tool sump. Since the cycle will run four or more hours it can be done with a weaker cleaning solution. The distributor states that the unit can be rotated up to 50 RPM. When running it has the same effect as the washing rotor inside of your home dishwasher. Inside the cavity on a machining center there is a lot of splash. During normal operations, MWF deposits buildup on the walls and roof of the enclosures. If these deposits (containing bacteria, mold and other contaminants) are not removed they will inoculate the fresh charge of MWF when they are resaturated. When you clean the inside of machine tool cavity, time is spent removing these deposits on the walls and roof of the enclosure. Getting to these surfaces is very difficult usually requiring that a member of the cleaning crew get inside the machine tool to reach them. The Hydro ball is effective in distributing the cleaning solution on all surfaces of the enclosure under high pressure. The only negative we have found is you get to find all the gaps and leaks in your machine tool enclosure. By running the hydro ball with the machine cleaner enriched MWF during off shift (4-8 hours) you can effectively remove these deposits and buildups on the internal surfaces of the cavity of the machine tool and wash them down into the sump. You also clean the internal components of the MWF system without interrupting normal scheduled work. (5) Pump out the spent MWF. You will have found that most of the deposits have been washed from the internal surfaces of the enclosure. For extremely dirty machines you might have to refill the machine tool with the normal machine cleaner mix. You will find that even heavy deposits will break down quicker because of this pre-wash cycle. (6) Rinse the machine cavity. (7) Clean the walls, bottom and screens in the MWF reservoir. The use of this tool and the dilute machine cleaner reduced the cleaning time considerately without affecting production schedules. (8) Refill with MWF and resume normal operations. What we like about this system is we can schedule these light cleanings just before a scheduled fluid change. Add the cleaner to the mix and run the Hydroball on second shift. The spent fluid is pumped out on third shift and the machine refilled. The machine tool with a fresh charge of MWF is ready for first shift without interrupting production schedules. We get better life from our MWFs and the machinists are happier about the condition of their machines.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimization of Archimedes Screw for Use in Hydroelectric Projects

In 2017, the Department of Energy’s (DOE) Water Power Technologies Office (WPTO) made federal funding available to several awardees to investigate and provide innovative technological solutions to reduce capital costs of installed hydroelectric facilities at non-powered dam’s (NPD’s) across the United States, while maintaining a high level of efficiency. Awardees were to develop specific technologies that showed promise of reducing installed capital cost (ICC) by at least 20% over a given baseline and maintain a water-to-wire efficiency of at least 80% at head levels of 50 feet or less and flows of 1000 cubic feet per second (cfs) or less. Canyon Hydro (Canyon) was selected as an awardee for this funding and worked to refine the implementation of the Archimedes screw turbine for use at these site conditions. Canyon and its project partners analyzed several dam inventory datasets to determine the most common head and flow range of current NPD’s in order to best select design conditions for a turbine that would perform successfully at common heads and flows. Computational Fluid Dynamic (CFD) analyses were conducted after site conditions had been selected to optimize the turbine geometry for efficiency. Through this effort we were able to estimate water-to-wire efficiency over a range of flows. Equipment design focused on concepts of modularity and pre-fabricated construction. These methodologies were used where possible to reduce costly on-site construction and shorten deployment timelines. Cost modeling was conducted with input from industry experts in general construction, pre-fabricated concrete construction, and composite fabrication. As a hydroelectric turbine manufacturer of 35 years, Canyon drew upon its own knowledge base in steel fabrication, water-to-wire component specification and ancillary systems to develop the remaining cost matrix for the project. As a result of these efforts, Canyon was able to present findings that indicated a modular Archimedes screw turbine system could be designed that reduced ICC by 23.9% and maintain a maximum water-to-wire efficiency of 82.3%, meeting the goals of the project.

13 HYDRO ENERGY↗

Impact of Quaternary-Pumped Storage Hydropower on Frequency Response of U.S. Western Interconnection with High Renewable Penetrations: Preprint

As renewable penetration increases in the United States, maintaining stability and reliability of low-inertia power grid by providing sufficient frequency control capability becomes a challenge. Advanced pumped storage hydro technologies (APSH) will be expected to play an important role for future grid as not only an energy supplier, but also as an ancillary services provider. This paper studies the impact of using quaternary pumped storage hydropower (Q-PSH), as one of the newly proposed APSH technology, to provide primary frequency response. To quantify the impact of Q-PSH on frequency response of the U.S. Western Interconnection, a user-defined dynamic model of Q-PSH is developed on the GE Positive Sequence Load Flow (PSLF) platform and is implemented in a set of detailed U.S. Western Electricity Coordination Council (WECC) planning cases in which renewable penetration levels are 20%, 40%, 60% and 80%. Simulation results show that Q-PSH can help improve frequency nadir and settling frequency comparing to the conventional PSH.

frequency response↗

Tidal frequencies and quasiperiodic subsurface water level variations dominate redox dynamics in a salt marsh system

Salt marshes are hotspots of nutrient processing en route to sensitive coastal environments. Whilst our understanding of these systems has improved over the years, we still have limited knowledge of the spatiotemporal variability of critical biogeochemical drivers within salt marshes. Sea-level rise will continue to force change on salt marsh functioning, highlighting the urgency of filling this knowledge gap. Our study was conducted in a central California estuary experiencing extensive marsh drowning and relative sea-level rise, making it a model system for such an investigation. Here we instrumented three marsh positions subjected to different degrees of tidal inundation (6.7%, 8.9%, and 11.2% of the time for the upper, middle, and lower marsh positions, respectively), providing locations with varied biogeochemical characteristics and hydrological interactions at the site. We continuously monitored redox potential (Eh) at depths of 0.1, 0.3, and 0.5 m, subsurface water levels (WL), and temperature at 0.7 m depth at each marsh position. To understand how drivers of subsurface biogeochemical processes fluctuate across tidal cycles, we used wavelet analyses to explain the interactions between Eh and WL. We found that tidal forcing significantly affects key drivers of biogeochemical processes by imparting controls on Eh variability, likely driving subsurface hydro-biogeochemistry of the salt marsh. Wavelet coherence showed that the Eh-WL relationship is nonlinear, and their lead–lag relationship is variable. We found that precipitation events perturb Eh at depth over timescales of hours, even though WL shows relatively minimal change during events. Furthermore, this work highlights the importance of high frequency in situ measurements, such as Eh, to help explain factors that govern subsurface biogeochemistry and hydrological processes in salt marshes.

54 ENVIRONMENTAL SCIENCES↗

Using energy storage systems to extend the life of hydropower plants

Despite their advantages, distributed energy resources (DERs) bring inherent uncertainty and variability into the landscape of modern power systems. As DER penetration grows, conventional generators like hydropower plants have to respond more often to arrest the imbalance in the net load. Hydropower turbines provide their best operational performance with minimal wear and tear when operating at regions of maximum efficiency. However, the current needs for hydropower plants require them to operate under varying load conditions and thus sub-optimal operating points leading to additional stress. To relieve the hydropower plants, this paper proposes a hybridization strategy where a hydropower unit is paired with an energy storage system (ESS) to increase operational flexibility and mitigate damage to the hydro plant. Models are developed to represent the operation of the hybrid system, quantify degradation, and assess economic benefits. Moreover, an innovative controller disaggregates the market dispatch signal into separate control setpoints for the ESS and hydropower unit. In case studies performed on a real-world hydropower facility, it was found that the ESS-based hybridization can extend the life of the hydropower plant by 5% on average. Notably, the economic benefits from reduced maintenance and deferred investment are estimated to be around $3.6 million.

13 HYDRO ENERGY↗

Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.

13 HYDRO ENERGY↗

Enhancing Local Grid Resilience with Small Hydropower Hybrids: Proving the concept through demonstration, simulation, and analysis with Idaho Falls Power

Large hydropower, connected to the transmission system and typically possessing significant ability to balance grid frequency, has long been central to black start plans in regions where it is present. Small hydropower possesses most of the attributes required for black start but is often connected to distribution or sub-transmission systems and has less ability to balance grid frequency. Integrating energy storage such as batteries or ultracapacitors increases the combined asset’s ability to balance frequency. This asset integration enables a bottom-up grid restoration paradigm in which critical electric loads on the local distribution system can be powered even when the regional transmission system is down. This report presents a field demonstration conducted with Idaho Falls Power that proved this concept. The contribution of energy storage in restoring the small hydro-dominated distribution grid and its operational sensitivity across different control settings are further analyzed using high-fidelity simulations. Readers will learn about technical details on the field demonstration setup, energy storage contribution to black start, detailed simulation steps of islanded distribution grid restoration, and usage of field demonstration measurements for transient model refinements. Collectively this report points to a great opportunity for small hydropower to enhance resilience of local electric grids.

13 HYDRO ENERGY↗

Prefabricated Standard Modular Hydropower Installations for Low-cost Small Hydropower

The goal of the present project was to investigate the potential savings in greenfield hydropower project costs across sites having vastly different characteristics. Littoral Power Systems, Inc. (LPS) undertook the project described herein to explore the promise of Standard Modular Hydropower (SMH) to transform the processes of site identification, conceptual design, detailed design, and construction planning to support low- cost, environmentally attractive development of small hydropower facilities at new stream- reaches. This report includes descriptions of the work to develop these processes, the resulting facility designs achieved using these processes and the projected economics. Installation cost estimates for the resulting conceptual greenfield facility design at two different locations come in at $\$3,419$/kW for Balcony Falls and $\$2,124$/kW for LPS 566. The installation time from site preparation to commissioning-ready is estimated to be 58 weeks for the conceptual facility at Balcony Falls and 42 weeks for the conceptual facility at LPS 566. A real challenge to any hydropower facility – not only the two cases studied here – is that environmental and social conditions can change, and as such, the facility may be required to change. The h-Modulor modules connect uniquely and are structurally independent, enabling site configurations to be changed on the fly, as needed. These results show that LPS's h-Modulor SMH approach delivers an attractive balance between efficiency, economics, and environmental sustainability for small hydro greenfield sites.

13 HYDRO ENERGY↗

Existing Methods for Grid Strength Assessment and Role of Hydropower in Future Grids

The power system is undergoing rapid evolution with increasing penetration of inverter-based resources (IBRs), large loads, microgrids, and power electronic devices. Ensuring reliable and stable operation of the modern power grid is a multi-faceted challenge that requires detailed understanding of this complex system. Dynamic stability is a major concern in maintaining the security of power grids as the generation mixes and large loads transitions to include high shares of power electronic devices. The operation of IBRs in regions with low system strength and higher grid impedances has been found to be the main reason behind many of the power system instabilities that manifest themselves in various types of oscillations and interactions that, if not properly addressed and damped, can jeopardize the reliable operation of the power system. Weak grid conditions compound such stability problems, particularly when many IBRs operate in proximity to and connect to weak power grids. Therefore, it is important to assess grid strength for planning, integration and operation of IBRs for a given power system. In this report, we aim to understand and classify existing methodologies for grid strength assessment, along with their limitations and future needs. Further, we aim to utilize the huge untapped potential in utilizing hydro energy resources in addressing some of the pertinent challenges of grid strength and reliable operation of modern power systems. Hydropower, historically valued for its flexibility and dispatchability, now faces new constraints due to reduced share of synchronous machines in the generation mix and seasonal variability of available water resources. Yet, these same plants present untapped potential beyond energy generation - notably, as providers of critical grid services. This report explores how hydropower plants, particularly through operation as synchronous condensers, can play a pivotal role in strengthening the grid amid evolving system dynamics.

13 HYDRO ENERGY↗

Hoopa Valley Small Scale Hydroelectric Feasibility Project

This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

13 HYDRO ENERGY↗