Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Geological Disposal”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Used Nuclear Fuel Management in Asia

Used fuel discharged from nuclear reactors are presently stored in wet pools or in dry cask at-reactor and/or away-from- reactor sites. Only a few countries reprocess their civilian used fuel, notably France, Russia, and UK. No country has yet operated a geologic repository to dispose of civilian used fuel or high-level radioactive wastes (HLW). As a result, the management and disposal of used fuel and HLW are viewed as the Achilles' heel of nuclear power. Figure 1 shows the used fuel inventory in the United States (US) and East Asian nuclear power programs. The inventory is estimated based on that in 2010 and the projected growth of nuclear power in these programs to 2020 and 2030. Figure 1 indicates that in 2010, the US had about 63,900 tons of used fuel from light-water reactors (LWR), more than the statutory limit of what was supposed to go into the now-abandoned Yucca Mountain Repository, and accounting for more than 33% of global used LWR fuel total. Currently, about 2,000 tons of used fuel are generated in the existing US LWRs annually. Russia had 25,100 tons of used fuel in 2010. Based on a modest growth of nuclear power, its used fuel inventory is expected to increase to about 31,800 and 38,000 tons by 2020 and 2030, respectively. The nuclear energy programs in East Asia (China, Japan, ROK, and Taiwan) account for 19% of global used LWR fuel inventory in 2010. China's used fuel inventory in 2010 was relatively small at 1,900 tons, but is expected to grow rapidly to {approx}12,400 and {approx}31,000 tons in 2020 and 2030, respectively, based on its expanding nuclear power program (from the current installed capacity of 21.8 GW to {approx}60 and {approx}200 GW in 2020 and 2030, respectively). Besides PWRs, China also operates 2 Candu reactors which each produces roughly 8 times more used fuel in tons than a PWR of the same power. The used Candu fuel inventory would increase from 950 tons in 2010 to 2,850 and 4,750 tons in 2020 and 2030, respectively. Used fuel in Japan, ROK, and Taiwan are US-obligated. Japan's future trends of used fuel inventory are uncertain due to the unknown numbers and timing of the currently-shutdown nuclear power plants that would be allowed for restart, and the uncertain future of Japan's reprocessing at Rokkasho. Under two scenario cases (a no-nuke/no-reprocessing and a 80%-nuke with reprocessing), the Japanese used fuel inventory could be capped from 2020 to 2030 to {approx}21,500 tons for the first case, and to {approx}22,500 tons for the second. The ROK's used PWR fuel inventory would increase from 4,900 tons in 2010 to about 8,800 and 14,000 tons in 2020 and 2030, respectively. Its used Candu fuel inventory would also increase from 5,900 tons in 2010 to about 9,700 and 13,500 tons in 2020 and 2030, respectively. The Taiwan used fuel inventory should be kept at current level as nuclear power is being phase out. Its growth should be modest from 3,000 tons in 2010 to about 4,300 and 5,000 tons in 2020 and 2030, respectively even if the 4. nuclear power station would start and the operation of existing LWRs is extended. Used fuel inventory in other East Asian countries (DPRK, Vietnam, etc.) should be small, if any before 2030.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Drop Analysis of Department of Energy Standard Canister with Fort Saint Vrain SNF

DOE manages over 300 types of SNF, most of which are located at the INL site. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF at the INL site for ?road-ready dry storage?. ?Road-ready dry storage? is a SNF management concept where SNF is packaged into dry and sealed canisters, which are then placed in on-site storage in anticipation of later transportation. The forward-looking goal of the Demonstration is establishing the foundation for a large-scale road-ready dry storage program at the INL site. The Demonstration will first package Fort Saint Vrain SNF currently stored at INL into several DOE Standard Canisters. These Standard Canisters will then be loaded into another commercial transportation or storage containment system (e.g., storage cask or transportation package). The Standard Canister is a class of standardized canisters designed for containing the large variety of DOE-managed SNF during interim storage, transportation and/or disposal at a geological repository. One critical aspect of road-ready dry storage is the ability to license the DOE Standard Canisters and its associated transportation package to 10 CFR 71. Depending on the SNF and transportation strategy, the Standard Canisters may have to maintain structural integrity under normal conditions of transport and hypothetical accident scenarios (i.e., drop events). The Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs. However, no analysis has been completed to support the recent Demonstration. This analysis will consider the Ø0.5 m × 5.1 m Standard Canister under drop scenario(s) considered in previous INL tests and analyses, including the 9 m drop at 80 degree off vertical. However, this analysis will consider the more recent Fort Saint Vrain loading configurations proposed for the Demonstration. This analysis will performed using strain-based acceptance criteria established by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III, Division 3. It will be compared to previous analyses and form the foundation of further formal calculations that will be used to support licensing efforts of the road-ready dry storage system at INL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Approaches to Modeling Coupled Flow and Reaction in a 2-D Cementation Experiment

Porosity evolution at reactive interfaces is a key process that governs the evolution and performances of many engineered systems that have important applications in earth and environmental sciences. This is the case, for example, at the interface between cement structures and clays in deep geological nuclear waste disposals. Although in a different transport regime, similar questions arise for permeable reactive barriers used for biogeochemical remediation in surface environments. The COMEDIE project aims at investigating the coupling between transport, hydrodynamics and chemistry when significant variations of porosity occur. The present work focuses on a numerical benchmark used as a design exercise for the future COMEDIE-2D experiment. The use of reactive transport simulation tools like Hytec and Crunch provides predictions of the physico-chemical evolutions that are expected during the future experiments in laboratory. Focus is given in this paper on the evolution during the simulated experiment of precipitate, permeability and porosity fields. A first case is considered in which the porosity is constant. Results obtained with Crunch and Hytec are in relatively good agreement. Differences are attributable to the models of reactive surface area taken into account for dissolution/precipitation processes. Crunch and Hytec simulations taking into account porosity variations are then presented and compared. Results given by the two codes are in qualitative agreement, with differences attributable in part to the models of reactive surface area for dissolution/precipitation processes. As a consequence, the localization of secondary precipitates predicted by Crunch leads to lower local porosities than for predictions obtained by Hytec and thus to a stronger coupling between flow and chemistry. This benchmark highlights the importance of the surface area model employed to describe systems in which strong porosity variations occur as a result of dissolution/precipitation. The simulation of highly non-linear reactive transport systems is also shown to be partly dependent on specific numerical approaches.

54 ENVIRONMENTAL SCIENCES↗

IMPACT OF ELIMINATING MERCURY REMOVAL PRETREATMENT ON THE PERFORMANCE OF A HIGH LEVEL RADIOACTIVE WASTE MELTER OFFGAS SYSTEM

The Defense Waste Processing Facility at the Savannah River Site processes high-level radioactive waste from the processing of nuclear materials that contains dissolved and precipitated metals and radionuclides. Vitrification of this waste into borosilicate glass for ultimate disposal at a geologic repository involves chemically modifying the waste to make it compatible with the glass melter system. Pretreatment steps include removal of excess aluminum by dissolution and washing, and processing with formic and nitric acids to: (1) adjust the reduction-oxidation (redox) potential in the glass melter to reduce radionuclide volatility and improve melt rate; (2) adjust feed rheology; and (3) reduce by steam stripping the amount of mercury that must be processed in the melter. Elimination of formic acid pretreatment has been proposed to eliminate the production of hydrogen in the pretreatment systems; alternative reductants would be used to control redox. However, elimination of formic acid would result in significantly more mercury in the melter feed; the current specification is no more than 0.45 wt%, while the maximum expected prior to pretreatment is about 2.5 wt%. An engineering study has been undertaken to estimate the effects of eliminating mercury removal on the melter offgas system performance. A homogeneous gas-phase oxidation model and an aqueous phase model were developed to study the speciation of mercury in the DWPF melter offgas system. The model was calibrated against available experimental data and then applied to DWPF conditions. The gas-phase model predicted the Hg{sub 2}{sup 2-}/Hg{sup 2+} ratio accurately, but some un-oxidized Hg{sup 0} remained. The aqueous model, with the addition of less than 1 mM Cl{sub 2} showed that this remaining Hg{sup 0} would be oxidized such that the final Hg{sub 2}{sup 2+}/Hg{sup 2+} ratios matched the experimental data. The results of applying the model to DWPF show that due to excessive shortage of chloride, only 6% of the mercury fed is expected to be chlorinated, mostly as Hg{sub 2}Cl{sub 2}, while the remaining mercury would exist either as elemental mercury (90%) or HgO (4%).

08 HYDROGEN↗

Comparative study of plutonium burning in heavy and light water reactors.

There is interest in the U.S. and world-wide in reducing the burden on geological nuclear fuel disposal sites. In some disposal scenarios, the decay heat loading of the surrounding rock limits the commercial spent fuel capacity of the sites. In the long term (100 to 1,500 years), this decay heat is generated primarily by actinides, particularly {sup 241}Am and {sup 241}Pu. One possible approach to reducing this decay-heat burden would be to reprocess commercial spent nuclear fuel and use intermediate-tier thermal reactors to 'burn' these actinides and other transuranics (plutonium and higher actinides). The viability of this approach is dependent on the detailed changes in chemical and isotopic compositions of actinide-bearing fuels after irradiation in thermal reactor spectra. The intermediate-tier thermal burners could bridge the commercial water-cooled reactors and fast reactors required for ultimate consumption of the transuranics generated in the commercial reactors. This would reduce the number of such fast reactors required to complete the mission of burning transuranics. If thermal systems are to be used for the transmutation mission, it is likely that they would be similar to or are advanced versions of the systems currently used for power generation. In both the U.S. and Canada, light- and heavy-water-cooled thermal reactors are used for power generation in the commercial nuclear sector. About 103 pressurized- and boiling- light water reactors (PWRs and BRWs) are deployed in the U.S. nuclear industry while about 18 CANDU (heavy-water-cooled) reactors are used in the Canadian industry. There are substantial differences between light and heavy water-cooled reactors that might affect transmutation potential. These arise from differences in neutron balance of the reactors, in neutron energy spectra, in operational approaches (e.g., continuous refueling enhancing fuel burnup), and so on. A systematic study has been conducted to compare the transmutation potentials of CANDU and PWR systems using (U,Pu)O{sub 2} mixed oxide fuels. First, we examine and compare the isotopic evolution of plutonium-containing fuel under irradiation in these reactor types to understand the physics processes involved. The core-physics parameters to be compared for these systems are generated using two-dimensional lattice physics models for a single fuel assembly that is representative of the whole-core (e.g., using the linear reactivity model). Results from a parametric study of the discharge burnup as a function of the Pu fraction in the initial heavy metal are presented for each system. The Pu consumption level, minor actinides buildup level, and the masses destroyed per unit energy generation are summarized and compared. In addition, assessment results for a simple plutonium recycling concept in realistic CANDU and PWR cores are presented. In these cases, plutonium from commercial spent PWR fuel will be separated and burned in realistic intermediate thermal burner reactors using (U,Pu)O{sub 2} mixed oxide fuel. The spent fuel from this thermal burner will be separated and the resulting Pu will be burned in a second pass through the thermal burner reactor. The resulting transuranics are assumed to then be burned in a fast burner reactor. The impact of using the spent fuels of these systems on the core performance of the fast burner reactor and the required numbers of the various reactor types will be discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Overview of Requirements for Using Overweight Vehicles to Ship Spent Nuclear Fuel

The U.S. Department of Energy's (DOE's) Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada, considered a range of options for transportation. In evaluating the impacts of the mostly-legal weight truck scenario, DOE assumed that some shipments would use overweight trucks. The use of overweight trucks is also considered in the Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada, issued for public comment in Fall 2007. With the exception of permit requirements and operating restrictions, the vehicles for overweight shipments would be similar to legal-weight truck shipments but might weigh as much as 52,200 kilograms (115,000 pounds). The use of overweight trucks was determined to be acceptable for the Office of Civilian Radioactive Waste Management (OCRWM) Program because the payload is not divisible and the packaging alone may make shipments overweight. Overweight truck shipments are common, and states routinely issue overweight permits, some for vehicles with a gross vehicle weight up to 58,500 kilograms (129,000 pounds). This paper will present an overview of state overweight truck permitting policies and national and regional approaches to promote safety and uniformity. In conclusion: Overweight truck shipments are made routinely by carriers throughout the country. State permits are obtained by the carriers or by companies that provide permitting services to the carriers. While varying state permit restrictions may add complexity to OCRWM's planning activities, the well-established experience of commercial carriers and efforts to bring uniformity to the permitting process should allow the overweight shipment of SNF to be a viable option. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

German research and development for high level waste in light of the new site selection process - 15516

The German government decided 50 years ago, that radioactive waste is to be disposed of in Deep Geologic Repositories, preferably in a salt rock formation. Soon after, in 1967, research in the Asse salt mine was initiated. Since then substantial progress has been achieved in the development of the radioactive waste disposal programme in Germany. For a geologic repository for High Level Waste in salt a reference concept has been developed, which represented the radioactive waste management processes from transport of High Level Waste and Spent Nuclear Fuel to an interim storage site, waste conditioning and repackaging for disposal, to emplacement of the waste packages. The feasibility of the reference concept has been proven by demonstration tests for all relevant equipment: a pilot conditioning plant has been built as well as the main equipment for the entire transport chain including the shaft transport and emplacement technologies for heavy loads fulfilling strict requirements for nuclear and mining safety. Also the backfilling technology has been optimised for the purposes of a repository for radioactive waste. Finally, tests have been performed to verify thermo-mechanical models for the host rock. The demonstration tests have been performed to an extent which even would allow immediate licensing of the repository and the employed equipment. The Research and Development work was completed by further optimisation of the reference concept. Construction and operation of deep geologic repositories for low and intermediate level radioactive wastes in Germany benefited from the above mentioned but also stimulated the knowledge and experience build-up for the repositories for High Level Waste. Despite the well progressed work for a deep geologic repository in salt R and D work in Germany for already a long time also considered other host rock formations. While work for crystalline rock mainly consisted of relatively small contributions to international research projects due to the limited occurrence of suitable sites in Germany, projects and developments for repositories in clay formations have had an increasing contribution to the overall Research and Development work for radioactive waste repositories in Germany. In July 2013 a new site selection act was put into force, which set the initiating conditions for the German programme on radioactive waste management. Principally, a process was initiated to search for a site for a deep geologic repository for High Level Waste independent from earlier decisions. This means that a site shall be determined without predetermination by earlier decisions. Nevertheless, to enable a sound decision for a site selection it is necessary to be able draw back on the knowledge and experience from earlier activities. Otherwise, tedious learning processes would have to be experienced again. Since efforts to open up a site selection process again grew since the late 1990's projects had been implemented timely to capture existing knowledge. The paper at hand describes the achievements of R and D activities in Germany, the change of radioactive waste management policy and the endeavours to maintain the achievements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of Yucca Mountain Disposal Criticality Studies

The U.S. Department of Energy (DOE), Office of Civilian Radioactive Waste Management, submitted a license application for construction authorization of a deep geologic repository at Yucca Mountain, Nevada, in June of 2008. The license application is currently under review by the U.S. Nuclear Regulatory Commission. However,on March 3, 2010 the DOE filed a motion requesting withdrawal of the license application. With the withdrawal request and the development of the Blue Ribbon Commission to seek alternative strategies for disposing of spent fuel, the status of the proposed repository at Yucca Mountain is uncertain. What is certain is that spent nuclear fuel (SNF) will continue to be generated and some long-lived components of the SNF will eventually need a disposition path(s). Strategies for the back end of the fuel cycle will continue to be developed and need to include the insights from the experience gained during the development of the Yucca Mountain license application. Detailed studies were performed and considerable progress was made in many key areas in terms of increased understanding of relevant phenomena and issues regarding geologic disposal of SNF. This paper reviews selected technical studies performed in support of the disposal criticality analysis licensing basis and the use of burnup credit. Topics include assembly misload analysis, isotopic and criticality validation, commercial reactor critical analyses, loading curves, alternative waste package and criticality control studies, radial burnup data and effects, and implementation of a conservative application model in the criticality probabilistic evaluation as well as other information that is applicable to operations regarding spent fuel outside the reactor. This paper summarizes the work and significant accomplishments in these areas and provides a resource for future, related activities.

Scaglione, John M↗

Spent Nuclear Fuel Management and Disposal in Finland - Status and Lessons Learned at the End of 2015 - 16507

In November 2015 the Finnish Government approved and the Parliament ratified Posiva's 2012 License Application for Construction of a mined, deep geological repository for the spent nuclear fuel (SNF) at the Olkiluoto site in the Eurajoki municipality based upon recommendations provided by the Finnish Radiation Safety Authority (STUK), international expert groups and long-standing local support. The preceding siting process began in 1983 and it included disposal-concept selection (KBS-3V), 'consent-based' site selection and large-scale in-situ tests conducted in an underground research laboratory, the ONKALO, situated ∼440 m below the mean Sea level immediately adjacent to the planned repository at the Olkiluoto site. At the end of 2015, the Finnish SNF repository is projected to open in 2024 as the first of its kind. Four related lessons learned in Finland during the past 30 years are: 1. The selection of potentially-suitable sites for geological disposal of SNF proved to be more difficult and more time consuming than initially envisioned. 2. The siting of nuclear facilities has evolved from being mainly a radionuclide containment and isolation challenge to becoming a critical moving-target, socio-political challenge governing progress with majority local acceptance being a fundamental imperative. 3. Public and political acceptance and support are strongly linked to the competency, credibility and transparency of the involved organisations and the maturity/pedigree of the proposed disposal concept. 4. Timely sharing lessons learned and conducting selective collaborations with other countries proved to be successful keys to timely and cost-effectively obtain and maintain public and political acceptance and support. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computational scheme for burnup credit applied to long term waste disposal - 14448

The application of burnup credit (BUC) to criticality safety evaluations (CSE) of geological repositories for long term disposal of spent nuclear fuel (SNF) is under consideration in Switzerland. Therefore, in collaboration with the national waste management organization, PSI is conducting research towards the development of a BUC methodology tailored for Swiss specific applications. As part of this research, a computational sequence from the in-core burnup phase, through the interim storage, until final disposal is being established. The tools selected for this methodology, referred to as BUCSS-R (Burnup Credit System for Swiss reactors and Repositories), are CASMO for the in-core fuel depletion, the decay module of SERPENT for the decay calculations, and MCNP for the criticality calculations. In connection to BUCSS-R, a computational interface to validated reference core models of the Swiss reactors is being developed. The purpose is to apply reconstructed depletion histories based on real core operation conditions with CASMO assembly calculations, to transfer the pin wise nuclide compositions at discharge to the subsequent SERPENT decay calculations, and afterwards to the final MCNP criticality calculations. An objective of this paper is to present the elements of the BUCSS-R methodology, and to show a first application to so-called bounding analyses of a preliminary Swiss disposal canister design loaded with fuel assembly types operated in a Swiss PWR reactor. The rationale for these bounding analyses is that before starting the integration of methodologies for bias and uncertainty quantifications, the span of the k-eff variation between fresh and burnt fuel loadings should first be quantified in a realistic manner. The obtained results are reported in this paper together with studies performed in order to evaluate the effects from burnup levels and nuclides credit at flooded conditions on the k-eff values. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities for the Multi Recycling of Used MOX Fuel in the US - 12122

Over the last 50 years the US has accumulated an inventory of used nuclear fuel (UNF) in the region of 64,000 metric tons in 2010, and adds an additional 2,200 metric tons each year from the current fleet of 104 Light Water Reactors. This paper considers a fuel cycle option that would be available for a future pilot U.S. recycling plant that could take advantage of the unique opportunities offered by the age and size of the large U.S. UNF inventory. For the purpose of this scenario, recycling of UNF must use the available reactor infrastructure, currently LWR's, and the main product of recycling is considered to be plutonium (Pu), recycled into MOX fuel for use in these reactors. Use of MOX fuels must provide the service (burn-up) expected by the reactor operator, with the required level of safety. To do so, the fissile material concentration (Pu-239, Pu-241) in the MOX must be high enough to maintain criticality, while, in current recycle facilities, the Pu-238 content has to be kept low enough to prevent excessive heat load, neutron emission, and neutron capture during recycle operations. In most countries, used MOX fuel (MOX UNF) is typically stored after one irradiation in an LWR, pending the development of the GEN IV reactors, since it is considered difficult to directly reuse the recycled MOX fuel in LWRs due to the degraded Pu fissile isotopic composition. In the US, it is possible to blend MOX UNF with LEUOx UNF from the large inventory, using the oldest UNF first. Blending at the ratio of about one MOX UNF assembly with 15 LEUOx UNF assemblies, would achieve a fissile plutonium concentration sufficient for reirradiation in new MOX fuel. The Pu-238 yield in the new fuel will be sufficiently low to meet current fuel fabrication standards. Therefore, it should be possible in the context of the US, for discharged MOX fuel to be recycled back into LWR's, using only technologies already industrially deployed worldwide. Building on that possibility, two scenarios are assessed where current US inventory is treated; Pu recycled in LWR MOX fuels, and used MOX fuels themselves are treated in a continuous partitioning-transmutation mode (case 2a) or until the whole current UNF inventory (64,000 MT in 2010) has been treated followed by disposal of the MOX UNF to a geologic repository (case 2b). In the recycling scenario, two cases (2a and 2b) are considered. Benefits achieved are compared with the once through scenario (case 1) where UNF in the current US inventory are disposed directly to a geologic repository. For each scenario, the heat load and radioactivity of the high activity wastes disposed to a geologic repository are calculated and the savings in natural resources quantified, and compared with the once-through fuel cycle. Assuming an initial pilot recycling facility with a capacity of 800 metric tons a year of heavy metal begins operation in 2030, ∼8 metric tons per year of Pu is recovered from the LEUOx UNF inventory, and is used to produce fresh MOX fuels. At a later time, additional treatment and recycling capacities are assumed to begin operation, to accommodate blending and recycling of used MOX Pu, up to 2,400 MT/yr treatment capacity to enable processing UNF slightly faster than the rate of generation. Results of this scenario analysis study show the flexibility of the recycling scenarios so that Pu is managed in a way that avoids accumulating used MOX fuels. If at some future date, the decision is made to dispose of the MOX UNF to a geologic repository (case 2b), the scenario is neutral to final repository heat load in comparison to the direct disposal of all UNF (case 1), while diminishing use of natural uranium, enrichment, UNF accumulation, and the volume of HLW. Further recycling of Pu at the end of the scenario (case 2a) would exhibit further benefits. As expected, Pu-241 and Am-241 are the source of long term HLW heat load and Am-241 and Np-237 are the source of long term radiotoxicity. When advanced technology is available, introduction of minor actinide recycling, in addition to Pu recycling, by the end of this scenario, or sooner, would have a major impact on final repository heat load and long term radiotoxicity of the HLW. This scenario is also compatible with a gradual introduction of a small number of FR's for Pu management. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Outcomes of the full scale seal experiment: a seal industrial prototype for the Cigeo project - 15207

The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the French HLW and IL-LLW Deep Geological Repository Project (aka Cigeo) development, to demonstrate the technical feasibility and check the performance of the seals which will be constructed in the shafts, ramps, drifts and disposal vaults, at time of Cigeo underground facilities progressive closure. The FSS experimental objectives, principles and rationale were presented at WM'2013 (Paper 1306): FSS is a technological demonstrator built on surface, inside a concrete made horizontal drift model (also called the 'test box'). FSS is part of the European DOPAS (Demonstration of Plugs and Seals) [2] project, under the umbrella of the Implementing Geological Disposal - Technology Platform (IGD-TP) [3] project. FSS construction activities started in July 2012 and were completed in September 2014. The construction compliance assessment work activities are now ongoing (and will be continued until mid-2015). This paper presents the construction and monitoring story of the FSS components, starting with the construction of a first containment wall based on a low pH self-compacting concrete (SCC), followed by the swelling clay core backfilling sequence and finishing with the erection of a second containment wall based on a low pH shotcrete. The FSS experiment also enabled to qualify the commissioning methods applicable to an industrial sealing work at time of underground operations in the Repository. These commissioning methods are described and the results discussed. The equipment and methods used for the purpose of seal component construction and monitoring are presented. The physical characteristics obtained for each component of the seal are detailed and the compliance of measured values with the initial requirements is commented. The post-mortem work planned (e.g. coring and wire sawing of low pH concrete containment walls, use of penetrometer for the swelling clay core...) is also explained. FSS is a first of a kind experiment, by its size, by the technical choices made. The first technical outcomes were presented to the French Nuclear Authority and to its Technical Support Organization. The successful implementation of the work carried out in the FSS drift model was positively assessed by the evaluators and deemed representative of the real underground conditions (industrial feasibility is proven). This article concludes with a critical analysis of the methods and equipment used, of the results obtained and provides some perspectives of improvement for the construction of the first Cigeo industrial prototype seals scheduled around 2030 in ramps and horizontal drifts (provided the Cigeo construction is authorized in late 2020, and following the licensing request filing scheduled in late 2017). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of DOE-Managed Waste Repository Safety Assessment Information Needs

The U.S. DOE evaluated the need for disposing of only DOE-Managed high-level-waste (HLW, which includes DOE-managed spent nuclear fuel [SNF] in this report) in a geologic repository by using the Nuclear Waste Policy Act 1982 (NWPA, as amended) and stated (DOE, 2015) “A geologic repository for permanent disposal of Defense HLW could be sited, licensed, constructed, and operated more quickly than a Common NWPA Repository and would provide valuable experience to reduce the cost of a future repository and the time needed to develop it.” Based in part on that report, the President of the United States issued a memorandum stating that such a repository was required (see website with content at https://www.whitehouse.gov/the-press-office/2015/03/24/presidential-memorandum-disposal-defensehigh-level-radioactive-waste-se). This furthered the recommendation from DOE (2014) to “…begin implementation of a phased, adaptive, and consent-based strategy with development of a separate mined repository for some DOE-managed HLW and cooler DOE-managed SNF, potentially including some portion of the inventory of naval SNF.” The work in this report summarizes the status of activities within the Used Fuel Disposition Campaign (UFDC) to begin assessing the information needs for evaluating the safety of such a repository, considering both the waste forms being disposed and the repository concepts being considered. This report is milestone M3FT-15SN0824011 performed under the UFDC work package FT-15SN082401 to provide a status of the progress made towards this objective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Model Testing Related to SDU 6 Drainwell Observations

From its inception in the early 1950s through the end of the Cold War in the early 1990s, the Savannah River Site (SRS) produced nuclear materials for national defense in five reactors. Additionally, irradiated reactor fuel and target tubes were dissolved in nitric acid to recover plutonium and uranium using the PUREX (Plutonium Uranium Reduction EXtraction) process. Liquid waste from these chemical separations processes was then stored onsite in 51 underground tanks. Eight waste storage tanks have been operationally closed (i.e. cleaned and grouted) and the remaining tanks hold a mixture of liquids, insoluble solids, and precipitated salts (SRMC-LWP-2022-00001), the latter generated by evaporating water from the liquid waste. Waste is currently being retrieved from tanks and separated into 1) high-radioactivity, low-volume, and 2) low-radioactivity, high-volume components, principally through the Salt Waste Processing Facility (SWPF) (SRMC-LWP-2023-00001). The former waste stream is vitrified in the Defense Waste Processing Facility (DWPF), stored onsite, and destined for offsite disposal in a deep geologic repository. The latter stream is mixed with dry cementitious materials in the Saltstone Production Facility (SPF) and the wet slurry placed in onsite Saltstone Disposal Units (SDUs) within the Saltstone Disposal Facility (SDF), where it hardens into a cement waste form termed saltstone. A low-infiltration surface cover system will be placed over the SDF at closure, where SDUs will then be in the subsurface post-closure (SRR-CWDA-2019-00001).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Status and Plans - 2012 - 12049

The Waste Isolation Pilot Plant (WIPP), a deep geologic repository for safe disposal of long-lived transuranic radioactive waste related to the nation's defense, is completing its 12. year of operations. WIPP's mission includes coordination of all Department of Energy (DOE) sites to prepare, package and characterize transuranic (TRU) waste for final shipment and emplacement in WIPP. Five of the 10 disposal panels planned have been filled and sealed from ventilation. Additional small quantity sites have been de-inventoried by consolidating their waste through the certified characterization line at the Idaho National Laboratory (INL). New emplacement methods for RH waste in shielded containers are being considered for disposal by WIPP's regulatory authorities. A new large Type B shipping package, was added to the WIPP transportation fleet, and facility modifications to the WIPP waste unloading and emplacement processes for large containers were completed in 2011. Shipments from the Savannah River site in these new large rectangular packages began in August 2011. Licensing efforts are proceeding for a new criticality control over-pack container that will allow almost twice the fissile content to be shipped than previously. This will reduce the number and cost of shipments of Special Nuclear Material (SNM) declared as waste. Modifications to WIPP regulatory requirements for the disposal footprint and disposal unit closure systems are in progress. These, and other developments, make for exciting times at WIPP. This paper provides an up-to-date look at the many aspects of America's only deep geologic long-lived radioactive waste repository, which is completing its 12. year of operations. A record year of safe and compliant shipments to WIPP tops the list of accomplishments in 2011. Four more small quantity sites were de-inventoried by consolidating their waste through the certified characterization line at INL in 2011. A new Type B shipping package, the TRUPACT-III has been added to the transportation fleet, and large waste boxes are being shipped from SRS without the need for repackaging. New emplacement methods for remote-handled waste in shielded containers are undergoing regulatory review. WIPP plans to license a new criticality control payload container that will allow almost twice the fissile content to be shipped than previously, thereby reducing the number and cost of shipments of SNM declared as waste. Other regulatory modifications planned in 2012 include approval of a design change that would replace the disposal concept for panels 9 and 10 from using the common access drifts (the 'mains') with a new footprint south of panels 4 and 5. DOE also plans to change the panel closure design set forth in its certification by EPA and the HWFP by the NMED. The panel closure design change will be a rule making under EPA's procedures and a class 3 permit modification request under NMED procedures. Plans for achieving 90% of legacy TRU waste retrieval and emplacement in WIPP by 2015 have been developed. Key to the success of this so-called 90/15 plan is adequate funding, both for WIPP operations, as well as for TRU retrieval programs at the generator sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing the Tools for Geologic Repository Monitoring - Andra's Monitoring R and D Program - 12045

The French Safety Guide recommends that Andra develop a monitoring program to be implemented during repository construction and conducted until (and possibly after) closure, in order to confirm expected behavior and enhance knowledge of relevant processes. To achieve this, Andra has developed an overall monitoring strategy and identified specific technical objectives to inform disposal process management on evolutions relevant to both the long term safety and reversible, pre-closure management of the repository. Andra has launched an ambitious R and D program to ensure that reliable, durable, metrologically qualified and tested monitoring systems will be available at the time of repository construction in order to respond to monitoring objectives. After four years of a specific R and D program, first observations are described and recommendations are proposed. The results derived from 4 years of Andra's R and D program allow three main observations to be shared. First, while other industries also invest in monitoring equipment, their obvious emphasis will always be on their specific requirements and needs, thus often only providing a partial match with repository requirements. Examples can be found for all available sensors, which are generally not resistant to radiation. Second, the very close scrutiny anticipated for the geologic disposal process is likely to place an unprecedented emphasis on the quality of monitoring results. It therefore seems important to emphasize specific developments with an aim at providing metrologically qualified systems. Third, adapting existing technology to specific repository needs, and providing adequate proof of their worth, is a lengthy process. In conclusion, it therefore seems prudent to plan ahead and to invest wisely in the adequate development of those monitoring tools that will likely be needed in the repository to respond to the implementers' and regulators' requirements, including those agreed and developed to respond to potential stakeholder expectations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary risk benefit assessment for nuclear waste disposal in space

This paper describes the recent work of the authors on the evaluation of health risk benefits of space disposal of nuclear waste. The paper describes a risk model approach that has been developed to estimate the non-recoverable, cumulative, expected radionuclide release to the earth's biosphere for different options of nuclear waste disposal in space. Risk estimates for the disposal of nuclear waste in a mined geologic repository and the short- and long-term risk estimates for space disposal were developed. The results showed that the preliminary estimates of space disposal risks are low, even with the estimated uncertainty bounds. If calculated release risks for mined geologic repositories remain as low as given by the U.S. DOE, and U.S. EPA requirements continue to be met, then no additional space disposal study effort in the U.S. is warranted at this time. If risks perceived by the public are significant in the acceptance of mined geologic repositories, then consideration of space disposal as a complement to the mined geologic repository is warranted.

Rice, E. E.↗