Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Funding”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

NASA Astrophysics Division Technology Heritage Study

The National Aeronautics and Space Administration’s (NASA) Astrophysics Division (APD) funds and manages missions and studies that seek to broaden our understanding of our place in the universe. These science missions are enabled by technologies developed through APD’s technology development programs. APD has funded approximately seven different technology development programs over the last ten years which support basic research and target varying Technology Readiness Levels (TRLs). The funding has targeted technology for future space flight experiments as well as suborbital science investigations. To understand the overall impact of APD’s investment on astrophysics technology advancement through their grants and contracts, APD engaged The Aerospace Corporation to conduct an independent, comprehensive Astrophysics Technology Heritage Study. The study was conducted in the 2021-2022 timeframe, first focusing priority on infusion of competed grants and general trends, followed by directed grants and further trend analysis and technology characterization. The study included three major components: a grants database, a missions database, and a survey of Principal Investigators (PIs). The study found that APD grants and contracts fund a healthy portfolio of technologies that resulted in an overall 62% infusion rate, as suborbital missions provide ample science and technology maturation and platform transition opportunities. Within the 62% of infused grants, 12% were infused into space missions and another 31% were suborbital. The study also looked at various other characteristics of the grant awards including the organizations they were awarded to and award trends by PI. Technology focus areas and detector types were also investigated, as well as technology platform transitions from on mission environment (e.g., suborbital to space). Additional feedback from PIs was also requested and evaluated including alternative benefits of grants and reasons development did, or did not, succeed.

NASA↗

Nuclear Forensics: A Capability at Risk (Abbreviated Version)

Nuclear forensics is important to our national security. Actions, including provision of appropriate funding, are needed now to sustain and improve the nation's nuclear forensics capabilities. The Department of Homeland Security (DHS), working with cooperating agencies and national laboratories, should plan and implement a sustainable, effective nuclear forensics program. Nuclear forensics is the examination and evaluation of discovered or seized nuclear materials and devices or, in cases of nuclear explosions or radiological dispersals, of detonation signals and post-detonation debris. Nuclear forensic evidence helps law enforcement and intelligence agencies work toward preventing, mitigating, and attributing a nuclear or radiological incident. This report, requested by DHS, the National Nuclear Security Administration, and the Department of Defense, makes recommendations on how to sustain and improve U.S. nuclear forensics capabilities. The United States has developed a nuclear forensics capability that has been demonstrated in real-world incidents of interdicted materials and in exercises of actions required after a nuclear detonation. The committee, however, has concerns about the program and finds that without strong leadership, careful planning, and additional funds, these capabilities will decline. Major areas of concern include: Organization. The responsibility for nuclear forensics is shared by several agencies without central authority and with no consensus on strategic requirements to guide the program. This organizational complexity hampers the program and could prove to be a major hindrance operationally. Sustainability. The nation's current nuclear forensics capabilities are available primarily because the system of laboratories, equipment, and personnel upon which they depend was developed and funded by the nuclear weapons program. However, the weapons program's funds are declining. Workforce and Infrastructure. Personnel skilled in nuclear forensics are too few and are spread too thinly. Some key facilities are in need of replacement because they are old, outdated, and not built to modern environmental, health, and safety standards. Procedures and Tools. Most nuclear forensics techniques were developed to carry out Cold War missions and to satisfy a different, less restrictive set of environmental, health, and safety standards. Some of the equipment also does not reflect today's technical capabilities. The Executive Office of the President established the National Technical Nuclear Forensics Center under the direction of the Secretary of Homeland Security, to coordinate nuclear forensics in the United States. DHS's responsibility can only be carried out with the cooperation and support of the other agencies involved. The committee recommends that DHS and the other cooperating agencies should: 1. Streamline the organizational structure, aligning authority and responsibility; and develop and issue appropriate requirements documents. 2. Issue a coordinated and integrated implementation plan for fulfilling the requirements and sustaining and improving the program's capabilities. This plan would form the basis for the agencies' multi-year program budget requests. 3. Implement a plan to build and maintain an appropriately sized and composed nuclear forensics workforce, ensuring sufficient staffing at the national laboratories and support for university research, training programs, and collaborative relationships among the national laboratories and other organizations. 4. Adapt nuclear forensics to the challenges of real emergency situations, including, for example, conducting more realistic exercises that are unannounced and that challenge regulations and procedures followed in the normal work environment, and implementing lessons learned. The national laboratories should: 5. Optimize procedures and equipment through R&D to meet program requirements. Modeling and simulation should play an increased role in research, development, and planning. The nuclear forensics community should: 6. Develop standards and procedures for nuclear forensics that are rooted in the same underlying principles that have been recommended to guide modern forensic science. DHS and the other cooperating agencies should: 7. Devise and implement a plan that enables access to relevant information in databases including classified and proprietary databases for nuclear forensics missions. The Executive Office of the President and the Department of State, working with the community of nuclear forensics experts, should: 8. Determine the classes of data and methods that are to be shared internationally and explore mechanisms to accomplish that sharing.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Cloud feedback studies with a physics grid

This project was funded by DOE in 2007 but work was initially delayed, first because a senior investigator on the original project (Stephen Thomas) took another position, and subsequently because the PI changed institutions, leaving UCLA in the summer of 2008 to join the MPI-M in Hamburg Germany. The project was moved to the MPI-M with the help of DOE staff, and after negotiating numerous logistical and administrative hurdles the project started in April 2010. Due to differences in funding the project funding was able to support roughly three person years, and our institution also agreed to supplement the support to fund the main postdoc for a third year. Due to the change of institutions, and considerable development in dynamical cores since the initiation of the project it was decided to work through the ideas using the new ICON dynamical core. The ICON dynamical core is based on a icosahedral grid and serves a prototype for dynamical cores that are being developed in a number of institutions, including at NCAR (the so called MPAS model) for a future version of the Community Earth System Model. The advantage of using ICON for these purposes is that the the ICON dynamical core is relatively stable, and is built on a hierarchical concept that naturally adapts itself to the proposed experimental strategy. Using ICON also allows the project to benefit from staff at the institute who have helped develop ICON, thus bring the main ideas more rapidly to fruition. However, because of the on-going development in the very core of the model and other issues related to pre and post processing, the project did not end in the expected manner. Although the plans in the proposed project has been achieved, to run the heterogeneous multiscale model at global scale requires very heavy computing resources which was not expected. We have found some encouraging results using the available resources on a smaller domain and we plan to investigate them further on a larger scale in near future.

54 ENVIRONMENTAL SCIENCES↗

The Secret Life of Quarks: National Computational Infrastructure for Lattice Gauge Theory

The objective of this grant was to develop algorithms and software for the numerical study of quantum chromodynamics (QCD) and of quantum field theories of interest for the understanding of physical phenomena that go beyond the standard model of high energy physics. Thirteen institutions were involved in this effort. The roles of the University of California, Santa Barbara in the project were to supply overall leadership and coordination, and to administer travel funds for participants at institutions that did not receive direct funding from the DOE. The purposes of these trips were to enable collaborative research on algorithms and software, and to report on algorithm and software development, and on scientific results obtained from it, at scientific meetings. These funds were also used to support travel by the Santa Barbara Principal Investigator in support of the project, and by co-Principal Investigators at institutions not receiving DOE funding. A total of 126 trips were supported.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Strengthening Retrofit Markets for Comprehensive Savings in Multifamily Buildings (Interim Final Report)

Energy efficiency is vitally important in Maine. Nearly 70% of Maine households rely on fuel oil as their primary energy source for home heating, a higher share than in any other state. Coupled with the state's long, cold winters, Maine's dependence on oil renders homeowners particularly vulnerable to fluctuating fuel costs. With $\$$4.5 million in seed funding from the Energy Department's Better Buildings Neighborhood Program, the Governor's Energy Office (GEO), through Efficiency Maine Trust (the Trust), is spurring Maine landlords to lower their monthly energy bills and improve comfort for their tenants during the state's cold winter months and increasingly warmer summers. Maine's aging multifamily housing stock can be expensive to heat and costly to maintain. It is not unusual to find buildings with little or no insulation, drafty windows, and significant air leaks, making them ideal candidates for energy efficiency upgrades. Maine modeled its Multifamily Efficiency Program (MEP) after the state's highly successful Home Energy Savings Program (HESP) for single-family homes. HESP provided cash incentives and financing opportunities to owners of one-to four-unit structures, which resulted in thousands of energy assessments and whole-house energy upgrades in 225 communities. Maine's new MEP multifamily energy efficiency upgrade and weatherization initiative focuses on small to medium-sized (i.e., five to 20 units) apartment buildings. The program's energy efficiency upgrades will provide at least 20% energy savings for each upgraded multifamily unit. The Trust’s MEP relies on a network of approved program partners who help move projects through the pipeline from assessment to upgrade. MEP has two components: benchmarking and development of an Energy Reduction Plan (ERP). Using the ENERGY STAR® Portfolio Manager benchmarking tool, MEP provides an assessment of current energy usage in the building, establishes a baseline for future energy efficiency improvements, and enables tracking and monitoring of future energy usage at the building— all at no cost to the building owner. The ERP is developed by a program partner using either the Trust’s approved modeling or prescriptive tools; it provides detailed information about the current energy related conditions in the building and recommends energy efficiency, health, and safety improvements. The Trust's delivery contractor provides quality assurance and controls throughout the process. Through this effort, MEP's goal is to establish a self-sustaining, market-driven program, demonstrating the value of energy efficiency to other building owners. The increasing value of properties across the state will help incentivize these owners to continue upgrades after the grant period has ended. Targeting urban areas in Maine with dense clusters of multifamily units—such as Portland, Lewiston- Auburn, Bangor, and Augusta—MEP engaged a variety of stakeholder groups early on to design its multifamily program. Through direct emails and its website, program officials invited lending institutions, building professionals, engineering firms, equipment distributors, and local property owners associations to attend open meetings around the state to learn about the goals of the multifamily program and to help define its parameters. These meetings helped program administrators understand the diversity of the customer base: some owners are individuals with a single building, while other owners are groups of people or management companies with an entire portfolio of multifamily buildings. The diversity of the customer base notwithstanding, owners see MEP as an opportunity to make gains in their respective properties. Consistently high turnouts at stakeholder meetings fueled greater customer interest as awareness of the program spread through word of mouth. The program also gained traction by utilizing the program partner networks and building on the legacy of the Trust’s successful HESP for single-family residences. MEP offers significant incentives for building owners to participate in the upgrade program. Wholebuilding benchmarking services are available to most multifamily housing buildings free of charge. The service provides the building owner with an assessment of the building's current energy efficiency as compared to other multifamily buildings on a national scale, establishes a baseline to measure future improvements, and enables owners to track monthly energy consumption using the ENERGY STAR Portfolio Manager. Once the benchmarking process is complete, the program links building owners with approved program partners (e.g., energy professionals, home performance contractors) to identify and implement specific energy-saving opportunities in the building. Program partners can also provide project quotes with estimated financing incentives and payback period calculations that enable building owners to make informed decisions. What's more, the Trust provides two financial incentives for successful completion of program milestones. The first is a per-unit incentive for completion of an approved ERP (i.e., $\$$100 per unit if a prescriptive path is followed, and $\$$200 per unit for a modeled ERP). Upon final inspection of the installed project scope of work, an incentive of $\$$1,400 per unit or 50% of installed cost—whichever is less—is paid. The Trust originally established a $\$$1 million loan-loss reserve fund (LLRF) to further enhance financing opportunities for qualified multifamily building owners. This funding mechanism was designed to connect building owners with lenders that retain the mortgages for their properties and encourages the lenders to offer financing for energy efficiency improvements. However, there has been no interest in the LLRF and therefore the LLRF has been reduced. Ultimately, MEP plans to build an online tool for building owners to assess opportunities to make upgrades in their multifamily units. The tool will include a performance rating system to provide a way for building owners to more easily understand energy use in their building, and how it could be improved with energy efficiency upgrades. Prospective tenants will also be able to use the rating system to make informed decisions about where to rent. Furthermore, the rating can be incorporated into real estate listings as a way for prospective home buyers and the real estate financial community to evaluate a home's operating costs. The Trust’s MEP has identified the state's most experienced energy professionals, vendors, suppliers, and contractors that install energy efficiency equipment in the multifamily sector to be qualified program partners. To be eligible for partnership, energy assessment professionals and contractors are required to have demonstrated experience in the multifamily sector and hold associated professional certifications, such as Building Operator Certification (BOC), Certified Energy Manager (CEM), Professional Engineer (PE), or Building Performance Institute (BPI) Multifamily Building Analyst. Widespread program interest has enabled the Trust to redirect funds that might otherwise be needed for program promotion to building capacity through contractor training. In addition to boosting professional training and certification opportunities, MEP teaches its partners how to market the multifamily program to prospective multifamily homeowners.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Research Projects Agency-Energy Annual Report for FY2013

This report presents a summary of the activities of the Advanced Research Projects Agency-Energy (ARPA-E) during Fiscal Year 2013 (FY2013). In FY2013, ARPA-E issued funding solicitations and selected projects for three new programs covering a broad array of energy technologies, including: $36 million to develop transformational energy storage technologies for electric vehicles; $32 million to develop cost-effective, energy-efficient manufacturing techniques for processing and recycling lightweight metals; and $34 million to develop transformational biological technologies to convert natural gas to liquids for transportation fuels. ARPA-E announced two additional funding opportunities in FY2013 with project selections that were ultimately announced in FY2014. These programs include $27 million to develop next-generation power switching devices that improve energy efficiency in a wide range of applications – including new lighting technologies, computer power supplies, industrial motor drives, and automobiles – and $30 million to advance solar energy beyond current photovoltaic (PV) and concentrated solar power (CSP) technologies. Altogether, technologies funded through these five programs have the potential to transform the way we generate, use, and store energy. In September 2013, ARPA-E also began utilizing Innovative Development in Energy-Related Applied Science (OPEN IDEAS), a rolling open solicitation that will allow ARPA-E to quickly support innovative applied energy research that has the potential to lead to new focused programs. In addition to these new programs, ARPA-E hosted the fourth annual Energy Innovation Summit from February 25-27, 2013. The Summit brought together leaders from academia, government, and business to discuss the foremost energy issues, showcase the latest technology innovations, and cultivate relationships to help advance cutting-edge technologies to market. The event drew over 2,200 attendees from 49 states and 26 countries and featured over 150 speakers and keynote addresses. At the Summit, ARPA-E recognized several preliminary indicators of likely project success, including that 17 projects had attracted over $450 million in private sector follow-on funding after ARPA-E's initial investment of approximately $70 million. Finally, ARPA-E continued to focus on providing awardees with practical training and critical business information as part of the Agency's Technology-to-Market program. This support equips projects with a clear understanding of market needs to guide technical development and help projects succeed.

Martin, C.↗

The Potosi Reservoir Model 2014

As a part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon Sandstone as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois State Geological Survey (ISGS) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from this project as well as two other separately funded projects: the United States Department of Energy-funded Illinois Basin – Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium (MGSC) in Macon County, Illinois, and the Illinois Industrial Carbon Capture and Sequestration (IL-ICCS) project funded through the American Recovery and Reinvestment Act.

Smith, Valerie↗

The Potosi Reservoir Model 2013c, Property Modeling Update

As part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from this project as well as two other separately funded projects: the US DOE-funded Illinois Basin–Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium (MGSC) in Macon County, Illinois, and the Illinois Industrial Carbon Capture and Sequestration (ICCS) project funded through the American Recovery and Reinvestment Act. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the Verification Well #1 (VW1) and the Injection Well (CCS1), structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for Potosi Formation. The intention was for 2.2 million tons per annum (2 million tonnes per annum [MTPA]) of CO2 to be injected for 20 years. In the Task Error! Reference source not found., the 2010 Potosi heterogeneous model (referred to as the "Potosi Dynamic Model 2010") was re-run using a new injection scenario of 3.5 million tons per annum (3.2 MTPA) for 30 years. The extent of the Potosi Dynamic Model 2010, however, appeared too small for the new injection target. The models size was insufficient to accommodate the evolution of the plume. The new model, Potosi Dynamic Model 2013a, was built by extending the Potosi Dynamic Model 2010 grid to 30 by 30 mi (48 by 48 km), while preserving all property modeling workflows and layering. This model was retained as the base case. In the preceding Task [1], the Potosi reservoir model was updated to take into account the new data from the Verification Well #2 (VW2) which was drilled in 2012. The porosity and permeability modeling was revised to take into account the log data from the new well. Revisions of the 2010 modeling assumptions were also done on relative permeability, capillary pressures, formation water salinity, and the maximum allowable well bottomhole pressure. Dynamic simulations were run using the injection target of 3.5 million tons per annum (3.2 MTPA) for 30 years. This dynamic model was named Potosi Dynamic Model 2013b. In this Task, a new property modeling workflow was applied, where seismic inversion data guided the porosity mapping and geobody extraction. The static reservoir model was fully guided by PorosityCube interpretations and derivations coupled with petrophysical logs from three wells. The two main assumptions are: porosity features in the PorosityCube that correlate with lost circulation zones represent vugular zones, and that these vugular zones are laterally continuous. Extrapolation was done carefully to populate the vugular facies and their corresponding properties outside the seismic footprint up to the boundary of the 30 by 30 mi (48 by 48 km) model. Dynamic simulations were also run using the injection target of 3.5 million tons per annum (3.2 MTPA) for 30 years. This new dynamic model was named Potosi Dynamic Model 2013c. Reservoir simulation with the latest model gives a cumulative injection of 43 million tons (39 MT) in 30 years with a single well, which corresponds to 40% of the injection target. The injection rate is approx. 3.2 MTPA in the first six months as the well is injecting into the surrounding vugs, and declines rapidly to 1.8 million tons per annum (1.6 MTPA) in year 3 once the surrounding vugs are full and the CO2 start to reach the matrix. After, the injection rate declines gradually to 1.2 million tons per annum (1.1 MTPA) in year 18 and stays constant. This implies that a minimum of three (3) wells could be required in the Potosi to reach the injection target. The injectivity evaluated in this Task was higher compared to the preceding Task, since the current facies modeling (guided by the porosity map from the seismic inversion) indicated a higher density of vugs within the vugular zones. 5 As the CO2 follows the paths where vugs interconnection exists, a reasonably large and irregular plume extent was created. After 30 years of injection, the plume extends 13.7 mi (22 km) in E-W and 9.7 mi (16 km) in N-S directions. After injection finishes, the plume continues to migrate laterally, mainly driven by the remaining pressure gradient. After 60 years post-injection, the plume extends 14.2 mi (22.8 km) in E-W and 10 mi (16 km) in N-S directions, and remains constant as the remaining pressure gradient has become very low. Should the targeted cumulative injection of 106 million tons (96 MT) be achieved; a much larger plume extent could be expected. The increase of reservoir pressure at the end of injection is approximately 1,200 psia (8,274 kPa) around the injector and gradually decreases away from the well. The reservoir pressure increase is less than 10 psia (69 kPa) beyond 14 mi (23 km) away from injector. Should the targeted cumulative injection of 106 million tons (96 MT) be achieved; a much larger areal pressure increase could be expected. The reservoir pressure declines rapidly during the first 30 years post injection and the initial reservoir pressure is nearly restored after 100 years post-injection. The present evaluation is mainly associated with uncertainty on the vugs permeability and interconnectivity. The use of porosity mapping from seismic inversion might have reduced the uncertainty on the lateral vugs body distributions. However, major uncertainties on the Potosi vugs permeability remains. Therefore, injection test and pressure interference test among the wells could be considered to evaluate the local vugs permeability, extent, and interconnectivity. Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. Data acquisitions to characterize the fracture pressure gradient, the formation water properties, the relative permeability, and the capillary pressure could also be considered in order to allow a more rigorous evaluation of the Potosi storage performance. A simulation using several injectors could also be considered to determine the required number of wells and appropriate spacing to achieve the injection target while taking into account the pressure interference.

Adushita, Yasmin↗

Motor Fuel Excise Taxes

A new report from the National Renewable Energy Laboratory (NREL) explores the role of alternative fuels and energy efficient vehicles in motor fuel taxes. Throughout the United States, it is common practice for federal, state, and local governments to tax motor fuels on a per gallon basis to fund construction and maintenance of our transportation infrastructure. In recent years, however, expenses have outpaced revenues creating substantial funding shortfalls that have required supplemental funding sources. While rising infrastructure costs and the decreasing purchasing power of the gas tax are significant factors contributing to the shortfall, the increased use of alternative fuels and more stringent fuel economy standards are also exacerbating revenue shortfalls. The current dynamic places vehicle efficiency and petroleum use reduction polices at direct odds with policies promoting robust transportation infrastructure. Understanding the energy, transportation, and environmental tradeoffs of motor fuel tax policies can be complicated, but recent experiences at the state level are helping policymakers align their energy and environmental priorities with highway funding requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sensors of world’s largest digital camera snap first 3,200-megapixel images at SLAC

Vera C. Rubin Observatory will conduct the 10-year Legacy Survey of Space and Time (LSST), which will collect 60 petabytes of data to address some of the most pressing questions about the structure and evolution of the universe and the objects in it. LSST is designed to address four science areas: Understanding Dark Matter and Dark Energy Hazardous Asteroids and the Remote Solar System The Transient Optical Sky The Formation and Structure of the Milky Way Vera C. Rubin Observatory is a federal project jointly funded by the National Science Foundation and the Department of Energy Office of Science, with early construction funding received from private donations through the LSST Corporation. The NSF-funded LSST (now Rubin Observatory) Project Office for construction was established as an operating center under the management of the Association of Universities for Research in Astronomy (AURA). The DOE-funded effort to build the Rubin Observatory LSST Camera (LSSTCam) is managed by SLAC.

79 ASTRONOMY AND ASTROPHYSICS↗

HTGR Simulation Methods & International Collaborations

ART-GCR “Methods” activity is split between Experimental Validation data from the ANL NSTF and OSU HTTF (next three presentations). HTGR core simulation (this presentation). International collaboration within OECD Generation-IV (Gen-IV) and USA/Japan bi-lateral agreements (this presentation) HTGR Simulation Methods No new NE-52 funding for HTGR Methods support in FY20; ~$200K FY19 carry-over funds only. Consists of international code-to-code benchmarks (IAEA CRP on HTGR UAM and OECD/NEA MHTGR-350) and refinement of a few-group Pebble Bed Reactor (PBR) cross section (XS) generation methodology. Funding will be requested in FY21 to produce the final reports for the two benchmarks and continue the development of the PBR XS generation methodology. Additional (non-ART) HTGR-related support work at INL NEAMS: HTR-Application work package at INL Create a benchmark for the pebble shuffling and depletion algorithms being developed for NEAMS Griffin code. iFOA award with X-Energy: Develop independent Monte Carlo model of Xe-100 design. Independent design confirmatory analysis of Xe-100 design using NEAMS tools Griffin and Pronghorn. Support X-Energy design team to use their own legacy design tools (VSOP99 and MGT). Support NEAMS Griffin and Pronghorn development team for the iFOA needs (received $50K additional funding for required development).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ARPA-E Impacts: A Sample of Project Outcomes, Volume III

As the Advanced Research Projects Agency-Energy (ARPA-E) enters its ninth year of funding transformative R&D in energy technology, we are proud to present the third compilation booklet of project impact sheets. This booklet provides a glimpse into the diverse and sophisticated research portfolio of advanced energy technologies that will enable the United States to tackle our most pressing energy challenges. The projects in this booklet illustrate a wide range of impacts—from scientific breakthroughs to products in the marketplace. Statistical measures help demonstrate the achievements of ARPA-E funded projects at different stages of innovation. Since 2009, ARPA-E has provided approximately $1.8 billion in R&D funding for more than 660 potentially transformational energy technology projects. As of February 2018, ARPA-E project teams have published 1,724 peer-reviewed journal articles that have been cited 42,535 times, and have been awarded 245 patents by the U.S. Patent and Trademark Office. Moreover, 71 ARPA-E project teams have formed new companies, 127 have partnered with another government agency to continue their technology development, and 149 teams have together raised more than $2.9 billion in reported funding from the private sector to bring their technologies to market. Another way to understand the Agency’s success is through the specific scientific and engineering challenges that ARPA-E project teams have overcome. To provide greater insight into ARPA-E’s project successes, this booklet documents the opportunities and challenges project teams have faced in technologies related to energy efficiency, energy storage, and transportation. The booklet also includes a review of ARPA-E’s power electronics portfolio. We expect that ARPA-E’s project teams will continue to demonstrate impact, and that, as a result, we will continue to publish their successes. Please share this report with your colleagues—we hope to encourage innovative scientists and engineers to continue to engage us with their ideas and consider joining our team.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Importance of Chemical Research to the U.S. Economy

Chemistry plays a pivotal role in the strength of the U.S. economy and the advancement of humankind. Chemists' achievements include life-saving pharmaceuticals, advanced energy solutions, improved agricultural productivity, and novel materials used in products from clothing to electronic devices. The many sectors reliant on the U.S. chemical economy account for about 25% of the U.S. GDP and support 4.1 million U.S. jobs. However, a new and evolving chemistry landscape requires changes with regard to funding, training, and a focus on integrating sustainability into manufacturing, product usage, and product disposal. This report identifies strategies and options for research investments that will support U.S. leadership while considering environmental sustainability and developing a diverse chemical economy workforce with equitable opportunities for all chemistry talent. The report recommends that funding agencies and philanthropic organizations who support the chemical sciences fund as large a breadth of fundamental research projects as possible. Chemical industry and their partners at universities, scientific research institutions, and national laboratories should align the objectives of fundamental research to directly assist with new practices toward environmental stewardship, sustainability, and clean energy. Additionally, the report recommends that funding agencies make substantial investment toward education research to enable innovative ways of teaching about emerging concepts, tools and technologies.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Back to the FutureGen?

After years of political wrangling, Democrats may green-light the experimental clean coal power plants. The article relates how the project came to be curtailed, how Senator Dick Durbin managed to protect $134 million in funding for FutureGen in Mattoon, and how once Obama was in office a $2 billion line item to fund a 'near zero emissions power plant(s)' was placed in the Senate version of the Stimulus Bill. The final version of the legislation cut the funding to $1 billion for 'fossil energy research and development'. In December 2008 the FutureGen Alliance and the City of Mattoon spent $6.5 billion to purchase the plants eventual 440 acre site. A report by the Government Accountability Office (GAO) said that Bush's inaction may have set back clean coal technology in the US by as much as a decade. If additional funding comes through construction of the plant could start in 2010. 1 fig., 1 photo.

01 COAL, LIGNITE, AND PEAT↗

Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Making a Lasting Impression: Recovery Act Reporting At Hanford - 12528

The award of American Recovery and Reinvestment Act funding came with an unprecedented request for transparency to showcase to the American public how the stimulus funding was being put to work to achieve the goals put forth by the U.S. Government. At the U.S. Department of Energy Hanford Site, this request manifested in a contract requirement to provide weekly narrative, photos and video to highlight Recovery Act-funded projects. For DOE contractor CH2M HILL Plateau Remediation Company (CH2M HILL), the largest recipient of Hanford's funding, the reporting mechanism evolved into a communications tool for documenting the highly technical cleanup, then effectively sharing that story with the DOE and its varying stakeholder audiences. The report set the groundwork for building a streaming narrative of week-by-week progress. With the end of the Recovery Act, CH2M HILL is applying lessons learned from this stringent, transparent reporting process to its long-term reporting and communications of the progress being made in nuclear decommissioning at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning costs - some international perspectives and initiatives. Presentation for Panel discussion. Session No. 024: 'Getting a Handle on Decommissioning Costs - a Global Perspective'

Financing for decommissioning: Are the cost estimates valid? Are the financing arrangements suitable? Are the fund management systems appropriate? Cost estimates are estimated, analysed and updated on a regular basis, but cost comparisons are not straight-forward. There is an incomplete understanding of variability between estimates. Multiple internal and external factors impact estimates: Institutional, legal and policy, purpose, Strategies and plans, overall context, Facility characteristics and history Contingencies and risk, Limited actual cost data. The financing arrangements: there exists a range of systems in place for the implementation of Funding Policy and Strategy, but there are Considerable variations in: Calculating funding requirements, contributions/provisions, Allocating risks and requirements for securities Managing funds and accounting, adjusting the system, Managing disbursements, Reporting and supervision. All cost estimates for future decommissioning activities include considerable uncertainties. These uncertainties will gradually diminish with growing experience from current and planned projects. Different costing methods have different data requirements. Their reliability depends on the extent to which various data are available and applicable to the specific case being considered. Independent of the assessment method, some uncertainty is inevitable in all estimates of future costs. Analysis of the costing method may be useful in order to locate the key uncertainties in each specific estimate. NEA's Decommissioning Cost Estimation Group (DCEG) was Created in 2008 to foster the exchange of information and experience. It Aims to enhance the credibility, reliability, and auditability of the cost estimation process. It Helps define international good practices in decommissioning cost estimation. However, some major challenges remain. Weaknesses in: Understanding relations between estimates and actual costs, Lack of relevant cost data, sharing data. How might be addressed: Improved sharing of cost data, Systematic analyses of estimates and actual costs, Developing benchmarking approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Construction of a Post-Irradiated Fuel Examination Shielded Enclosure Facility

The U.S. Department of Energy (DOE) has committed to provide funding to the Idaho National Laboratory (INL) for new post-irradiation examination (PIE) equipment in support of advanced fuels development. This equipment will allow researchers at the INL to accurately characterize the behavior of experimental test fuels after they are removed from an experimental reactor also located at the INL. The accurate and detailed characterization of the fuel from the reactor, when used in conjunction with computer modeling, will allow DOE to more quickly understand the behavior of the fuel and to guide further development activities consistent with the missions of the INL and DOE. Due to the highly radioactive nature of the specimen samples that will be prepared and analyzed by the PIE equipment, shielded enclosures are required. The shielded cells will be located in the existing Analytical Laboratory (AL) basement (Rooms B-50 and B-51) at the INL Material and Fuels Complex (MFC). AL Rooms B-50 and B-51 will be modified to establish an area where sample containment and shielding will be provided for the analysis of radioactive fuels and materials while providing adequate protection for personnel and the environment. The area is comprised of three separate shielded cells for PIE instrumentation. Each cell contains an atmosphere interface enclosure (AIE) for contamination containment. The shielding will provide a work area consistent with the as-low-as-reasonably-achievable (ALARA) concept, assuming a source term of 10 samples in each of the three shielded areas. Source strength is assumed to be a maximum of 3 Ci at 0.75 MeV gamma for each sample. Each instrument listed below will be installed in an individual shielded enclosure: Shielded electron probe micro-analyzer (EPMA) Focused ion beam instrument (FIB) Micro-scale x-ray diffractometer (MXRD). The project is designed and expected to be built incrementally as funds are allocated. The initial phase will be to fund the construction activities, which will include facility modifications and construction of one shielded enclosure. Follow-up activities will be to construct two additional shielded enclosures to complete the suite of three separate but connected remote operated examination areas. Equipment purchases are to be capital procurement spread out over several years on a funded schedule. This paper discusses safety and operational considerations given during the conceptual design phase of the project. The paper considers such things as project material at risk (MAR), new processes and equipment, potential hazards, and the major modification evaluation process to determine if a preliminary Documented Safety Analysis (PDSA) is required. As part of that process, an evaluation was made of the potential hazards with the new project compared to the existing and historical work and associated hazards in the affected facility.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗