Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

NREL and Clemson University Drivetrain Test Facility Collaboration: Cooperative Research and Development Final Report, CRADA Number CRD-13-509

The National Renewable Energy Laboratory (NREL) and Clemson University have a mutual interest in collaborating in the development of wind turbine drivetrain testing facilities and grid simulators. NREL and Clemson University will work together to share resources and experiences in the development of future wind energy test facilities and capabilities. The CRADA includes sharing of facility topologies and capabilities, modeling efforts, commissioning plans, test protocols, infrastructure cost data, test plans, pro forma contracting instruments, and safe operating strategies. Further, NREL and Clemson University will exchange staff for training and development purposes, including collaborative participation in commissioning and customer testing. DOE has provided NREL with over 10 years of support in developing custom facilities and capabilities to enable testing of full-scale integrated wind turbine drivetrain systems in accordance with the needs of the US wind industry. NREL currently operates a 2.5MW dynamometer and is in the processes of building a 5MW dynamometer and a grid simulator (referred to as a 'Controllable Grid Interface' or CGI). Clemson University is currently building a drivetrain testing facility with two dynamometers, 7.5 MW and 15 MW, and 15 MW Hardware in the loop grid simulator.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of Wellhead Safety Zone Criteria for Underground Gas Storage Facilities

Underground natural gas storage facilities are a vital part of the US national infrastructure. However, the concept of hazard zones from fires and explosions at these facilities is not nearly as well defined as it is for natural gas transmission pipelines. This report will take a well-established criterion for pipeline hazard zones (the pipeline impact radius or PIR) and and adapt it to underground gas storage facilities. The new safety area predicted for an underground gas storage facility will be called the wellhead safety zone or WSZ. Comparisons will be made between the resulting WSZ formula and the observed damage zone from known accidents at gas storage facilities.

03 NATURAL GAS↗

Mu*STAR ADSR Fuel Conversion Facility Evaluation and Cost Analysis

The purpose of the reported effort is the development of a conceptual process for conversion of used nuclear fuel (UNF) from light water reactors (LWRs) to a fluoride salt form to facilitate its use for power generation in a Mu*STAR Accelerator-driven Subcritical Reactor (ADSR). This document evaluates potential processes for converting UNF into a fluoride salt, evaluates the costs/benefits of using enriched lithium in the carrier salt, and analyzes comparable costs of similar facilities to make a rough order of magnitude estimate for the cost to design, construct, and commission a Mu*STAR ADSR fuel conversion facility. This document also makes a high-level comparison of the Mu*STAR ADSR fuel cycle with other important fuel cycles. The results of the cost analysis show that the Mu*STAR ADSR fuel conversion facility will cost more than $100M, possibly up to around $1B, to design and construct. The cost will depend on the size of the hot cell required, which will depend on the processing options chosen for converting the UNF to a molten salt. Operations and maintenance of the facility will be on the order of $10M per year. The design, fabrication, and installation of the remote process equipment to support the fuel conversion will be an additional cost of more than $50M. Cost surveys of Department of Energy hot cell designs and previous Department of Energy hot cell construction suggest that the cost variance may be large, and the risk of escalating costs may be high in the regulation-mandated atmosphere of nuclear facility design and construction. The molten salt for the Mu*STAR ADSR contains all of the nonvolatile isotopes in the UNF, and there is never a separation of the plutonium from the fission products. This makes this conversion process much more proliferation resistant than the reprocessing options used for other closed fuel cycles. When normalized to the amount of electricity produced, the Mu*STAR ADSR fuel cycle’s expected cost might be less than any reprocessing fuel cycle and possibly less than the once-through cycle now used. Simulations show that once the conversion to fluoride is made, that up to seven times as much energy can be extracted from the UNF than was produced by the LWR while making it [Bowman, 2010]. Using once-only, on-site conversion to fluoride means no mining, no enrichment, no manufacturing of fuel rods, and no transportation costs. Typically, the UNF was produced over a 40-year period in an LWR; it can potentially be used for 280 years in Mu*STAR, producing the same power as the LWR did, ultimately requiring disposal of approximately the same volume of material as the LWR generated. Mu*STAR burns most of the higher actinides, which could reduce both the cost of disposal and significantly reduce the longevity of its radiotoxicity. Mu*STAR ADSR’s ability to demonstrate unique and valuable peripheral benefits are additional arguments for this technology, including (1) turning UNF into a valuable commodity (thus, its disposal will not be such an immediate problem, so continued operation of existing LWRs will be more acceptable); (2) burning fissile or fertile fuel including excess weapons-grade plutonium in subcritical mode; and (3) providing high-temperature process heat to convert natural gas to synthetic diesel fuel, water to hydrogen, or for other process-heat applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Primary System Test Facility Review

Idaho National Laboratory (INL) is designing a Dynamic Energy Transport and Integration Laboratory (DETAIL) to demonstrate the operation of an integrated energy system as part of supporting research and development needs for the DOE Office of Nuclear Energy Integrated Energy Systems (IES) Program. DETAIL will demonstrate real-time integration with the electrical grid, renewable energy inputs, thermal and electrical energy storage, and energy delivery to an end user. A Thermal Energy Distribution System (TEDS) is being constructed within the DETAIL facility to demonstrate the operation of integrated energy system heat transfer components, thermal energy storage, distribution systems, and instrumentation and control (I&C), which will allow the facility to emulate the distribution of thermal energy to the generation of electrical power, and/or producing non-electrical commodities (e.g., hydrogen). As is the case for other subsystems within DETAIL, TEDS is designed to operate either independently or as a part of an integrated system to demonstrate the operation of integrated components, develop and validate thermal energy transport models and control systems, and study thermal energy inertia and energy storage. In an effort to completely understand how TEDS will integrate with operational plants, data from tests previously run at existing integral system test facilities (IST) will be used to drive the TEDS heater. Alternatively, a real-time data connection would allow steam conditions at the IST to drive the TEDS heater at the same time as having TEDS conditions provide feedback to the IST in terms of steam demand and/or pressure. This integrated testing approach will assess the ability of TEDS to operate during all plant conditions. Three existing integral system test facilities have been reviewed to determine their suitability for demonstrating TEDS capabilities when integrated within the DETAIL. This report summarizes the capabilities of each IST facility and any challenges that must be overcome to meet the operational needs of TEDS and DETAIL.

25 ENERGY STORAGE↗

Northstar Technology Transfer and Facility Development Work Package FY19 Summary Report

Northstar is rapidly advancing toward a Mo99 production facility. This will be a demonstration and technology development or proof-of-concept facility comprised of 1 target station. The target will be 2 sided, irradiated by 2 rhodotrons. Diagrams of the facility are included in this report. LANL has provided support in FY19 on many components and systems toward the realization of this facility. Besides providing the documentation and lessons learned from years of concept development and tests of targets and other subsystems, specific development work was provided in a number of areas, including bulk and local shielding, target insertion and removal, facility layout, and target holder development. These will be discussed in some detail.

43 PARTICLE ACCELERATORS↗

How To Maintain Effective IAEA Safeguards While Reducing Facility Impact

For almost twenty years, inspectors from the International Atomic Energy Agency have been visiting the K-Area Material Storage facility at the Savannah River Site where excess plutonium has been placed under IAEA safeguards as part of the United States Volunatary Offer Agreement. During that time, the mission of K-Area Complex has expanded from storage of nuclear matieral to glovebox operations in support of the National Nuclear Security Administration’s Plutonium Disposition program. With this change in mission, it is becoming increasingly challenging to manage facility staff radiation exposure and operating activities during the IAEA’s annual Physcial Inventory Verifications (PIV). This study has identified both near-term and long-term recommendations for IAEA monitoring protocols that would allow the IAEA to maintain effective safeguards of the material while decreasing the impact to the facility. A statisitical analysis has shown that reducing the number of containers measured during an annual PIV from 12 to 4 still ensures a high level of confidence in the confidence while reducing the inspector time in the facility amd with a corresponding significant reduction in personnel radiation exposure. A modified installation pattern of Remotely Monitored Sealing Arrays (RMSAs) is also proposed utilizing only the outer rows of arrays of stored material containers in the Stack Area (SA). The modified RMSA placement will provide equivalent protection, while significantly reducing personnel radiological exposure, manpower requirements and associated costs. With advances in technology, there are additional potential options in containment/surveillance and continuity of knowledge that would allow the agency to be outside of the facility during PIV measurements and have confidence in the accuracy and authencitity of the results.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Physical Security Model Development of an Electrochemical Facility

Nuclear facilities in the U.S. and around the world face increasing challenges in meeting evolving physical security requirements while keeping costs reasonable. The addition of security features after a facility has been designed and without attention to optimization (the approach of the past) can easily lead to cost overruns. Instead, security should be considered at the beginning of the design process in order to provide robust, yet efficient physical security designs. The purpose of this work is to demonstrate how modeling and simulation can be used to optimize the design of physical protection systems. A suite of tools, including Scribe3D and Blender, were used to model a generic electrochemical reprocessing facility. Physical protection elements such as sensors, portal monitors, barriers, and guard forces were added to the model based on best practices for physical security. Two theft scenarios (an outsider attack and insider diversion) as well as a sabotage scenario were examined in order to optimize the security design. Security metrics are presented. This work fits into a larger Virtual Facility Distributed Test Bed 2020 Milestone in the Material Protection, Accounting, and Control Technologies (MPACT) program through the Department of Energy (DOE). The purpose of the milestone is to demonstrate how a series of experimental and modeling capabilities across the DOE complex provide the capabilities to demonstrate complete Safeguards and Security by Design (SSBD) for nuclear facilities.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Data Science and Computation for Rapid and Dynamic Compression Experiment Workflows at Experimental Facilities, September 8-11, 2020. Workshop Report

The application of high pressure to materials has enabled discoveries in scientific fields such as planetary science, materials science, and materials synthesis. Recent advances in X-ray user light sources and other facilities, co-location and integration of user facilities with high-pressure drivers, availability of high-performance computing (HPC) platforms, and the development of new data science techniques have created opportunities for, and challenges in, advancing data analytics for rapid and dynamic compression experiments. To address these challenges, harness the emerging technology now available, and expedite scientific discovery, Los Alamos National Laboratory (LANL) hosted a virtual workshop entitled “Data Science and Computation for Rapid and Dynamic Compression Workflows at Experimental Facilities” from September 8 to 11, 2020. The workshop included 95 registered scientists and analytics experts from 15 universities, 9 United States (US) national laboratories, 5 US and European X-ray light sources, neutron sources such as the Los Alamos Neutron Science Center (LANSCE), other big science facilities such as the National Ignition Facility (NIF), and an industry representative. The workshop included 31 invited talks and 4 lightning talks by students and postdocs.

36 MATERIALS SCIENCE↗

FEST: Facility Energy Saving and Securing Technology Using Multi-Source Data: (Milestone 2 Report)

This project aims to demonstrate three technologies developed in-house at LLNL and University of Michigan-Dearborn (UMD), at a military site, including i) Grid Data Crossing (called GriD-Xing) for increasing smart meter data usability, ii) Facility Energy Optimization (called Facility E-GO) for improving facility energy efficiency in both operation and planning perspectives, and iii) Co-simulation tool (called Co-Sim) for enhancing smart meter and energy facility networks resilience and security. In this report, Millstone 2 - Integration A: Integrate GriD-Xing and facility optimization tools is documented.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Atmospheric Radiation Measurement (ARM) User Facility 2020 Decadal Vision

The Atmospheric Radiation Measurement (ARM) user facility was established in 1989 by the U.S Department of Energy (DOE) Office of Biological and Environmental Research (BER) to provide an observational basis for studying the Earth’s climate. ARM began collecting observations in 1992 and was designated a user facility in 2003. The facility includes a network of extensively instrumented long-term fixed-location observatories and mobile facilities. The ARM facility also includes an aerial component to augment these ground-based measurements. Because of the diversity of in situ and remotely obtained observations, ARM’s data management infrastructure is designed to collect, process, and deliver data to the research community.

54 ENVIRONMENTAL SCIENCES↗

US Muon Workshop 2021: A road map for a future Muon Facility

The workshop title “US Muon Workshop 2021: A road map for a future Muon Facility” was held virtually on February 1-2, 2021. The workshop aimed to bring together world experts in muon spectroscopy (µSR) and other techniques along with interested stakeholders to evaluate the scientific need to construct a new µSR facility in the United States (US). The more than 200 participants highlighted several key scientific areas for µSR research, including quantum materials, hydrogen chemistry, and battery materials, and how each area could benefit from a new, high flux pulsed muon source. Experts also discussed aspects of the µSR technique, such as low-energy µSR, novel software developments, alongside beam and detector technologies, that could enable revolutionary advances in µSR at a next-generation facility. The workshop concluded with discussion of a concept being developed for a new µSR facility at the Spallation Neutron Source (SNS) of Oak Ridge National Laboratory (ORNL). That novel design concept was first envisioned by many of the same µSR experts at a workshop held previously at ORNL in 2016. The participants expressed that the current design had the potential to be a world-leading µSR facility, and strongly encouraged the principal investigators to continue their work in order to refine the concept and determine instrument parameters that would enable new scientific opportunities.

36 MATERIALS SCIENCE↗

Collaborative Computing Support for Analysis Facilities Exploiting Software as Infrastructure Techniques

Prior to the public release of Kubernetes it was difficult to conduct joint development of elaborate analysis facilities due to the highly non-homogeneous nature of hardware and network topology across compute facilities. However, since the advent of systems like Kubernetes and OpenShift, which provide declarative interfaces for building fault-tolerant and self-healing deployments of networked software, it is possible for multiple institutes to collaborate more effectively since resource details are abstracted away through various forms of hardware and software virtualization. In this whitepaper we will outline the development of two analysis facilities: "Coffea-casa" at University of Nebraska Lincoln and the "Elastic Analysis Facility" at Fermilab, and how utilizing platform abstraction has improved the development of common software for each of these facilities, and future development plans made possible by this methodology.

97 MATHEMATICS AND COMPUTING↗

Monte Carlo Simulations in Support of NorthStar Irradiation Facility Commissioning Procedure

NorthStar Medical Radioisotopes LLC is constructing an irradiation facility at which electron accelerators will induce photo-transmutation (i.e., neutron knockout) of molybdenum-100 (Mo-100) to produce medically useful Mo-99. The facility will house two high-intensity electron RhodotronTM accelerators developed by IBA Industrial. The nominal power of each Rhodotron is 125kW at 40 MeV beam energy. The production target is made of metallic molybdenum enriched with Mo-100 isotope. It will be irradiated by electron beams and will itself play a role in electron conversion to intense X-rays. A full description of the NorthStar target as well as the concept of radiation shielding of the facility can be found in our previous report. The NorthStar irradiation facility is under commissioning now. The goal of the present work is to support the commissioning process by: (1) Studying residual radiation and activation to minimize personnel exposure and inform radiation waste management; (2) Using computational fluid dynamics (CFD) of the irradiated target to ensure the facility design is safe and reliable; and (3) Helping to determine radiation protection requirements during operation. Monte Carlo simulations are used for the analyses. Most of the results are presented as 3D arrays representing spatial distribution of values across simulated geometries: radiation energy depositions, ambient doses, residual isotopes accumulated, and residual doses.

07 ISOTOPE AND RADIATION SOURCES↗

Compounding Risks from Natural Phenomena Hazards at U.S. Department of Energy Facilities

U.S. Department of Energy (DOE) facilities are exposed to adverse effects of natural phenomena hazards (NPHs). While the DOE Standard (STD) 1020-2016 provides criteria and guidance for assessing these effects, certain gaps exist, particularly related to combinations of NPHs that can compound the risk to DOE facility assets. This report describes a methodology to systematically consider compounding NPHs, identified gaps in DOE-STD-1020-2016, and recommends ways to update the standard. At any given DOE facility, NPH effects depend on the site-specific hydrometeorologic and geoseismic conditions. Therefore, compounding NPHs should be determined using site-specific assessments. DOE facility assets generally are assessed using site-specific NPHs with the assessment usually limited to the DOE site extents. However, an inventory analysis of a selected DOE facility also revealed that some assets may have off-site dependencies. These dependencies may be part of threat pathways that can lead to on-site asset failures because of off-site effects of the same NPHs that also affect the DOE site. These threat pathways usually are not accounted for in traditional NPH analyses. The report also describes the effects of duration of NPH effects. Duration of disruption, particularly for off-site dependencies can lead to on-site asset failures, disruption of evacuation roadways, and consequent human health and safety effects. Finally, the report recommends some considerations for updating DOE-STD-1020-2016 to include explicit consideration of compounding NPHs.

42 ENGINEERING↗

Neutron Source Facility of the National Science Center “Kharkiv Institute of Physics and Technology” at Kharkiv, Ukraine

Argonne National Laboratory developed, designed, and supported the construction of a state-of-the-art Neutron Source Facility (NSF) at the Kharkov Institute of Physics and Technology (KIPT) in Kharkov Ukraine, under the U.S. DOE NNSA Russian Research Reactor Fuel Return (RRRFR) program. Ukraine approved the return of all highly enriched uranium in the country to Russia prior to the 2012 Nuclear Security Summit in return for the RRRFR program to fund the development, the design, and the construction of the NSF. The facility is designed to produce medical isotopes, train nuclear professionals, support the Ukrainian nuclear industry, and provide experimental capabilities for performing reactor physics, materials, and basic science research. The NSF was successfully started and operated in August 2021. The NSF is the first facility of this type in the world, and it will be used to understand the physics of driven systems for energy production and the disposal of spent nuclear fuels. The NSF consists of a subcritical assembly using low enriched uranium (LEU) fuel driven with an electron accelerator. The NSF target design utilizes tungsten or natural uranium for producing neutrons through photonuclear reactions using 100-MeV electrons. The accelerator power is 100 KW, which produces 3x10 14 neutrons per second from the uranium target. The subcritical assembly is designed to obtain the highest possible neutron flux intensity with an effective neutron multiplication factor of less than 0.98. Passive safety, reliability, and environmental considerations were included in the NSF design. The NSF utilization study shows that this neutron source has the capability of producing different medical isotopes. Several horizontal neutron channels are incorporated for performing applied and basic research. The NSF is configured to accommodate future design upgrades and new missions. The facility design was approved by the Ukraine Academy of Sciences before starting the NSF construction. The construction, the equipment installation, and the operation of the different systems of the NSF were completed and approved by the Ukrainian regulators. In July 2020, the State Nuclear Regulatory Inspectorate of Ukraine (SNRIU) issued a license for the physical startup of the NSF. The construction of facility was completed in early 2021.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Status of the Top Plate and Anticryostat for High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are building a new High Field Vertical Magnet Test Facility (HFVMTF) for testing superconducting cables in high magnetic field. This facility will be located at Fermilab and will have a capability similar to EDIPO at PSI and FRESCA2 at CERN. The background magnetic field of 15T in HFVMTF will be produced by a magnet pro-vided by LBNL. The HFVMTF is jointly funded by the US DOE Offices of Science, High Energy Physics, and Fusion Energy Sciences. As a primary use it will be superconducting cable test facility, in high magnetic fields and wide range of temperatures. Complementary, this facility will be used to test high-field super-conducting magnet models and demonstrators, including hybrid magnets, produced by the US Magnet Development Program (MDP). The paper describes the status of Top Plates Assembly and Sample Insert Anticryostat, which will be a main interface component between cable test mode and magnet test mode at this facility.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Procurement Options for Low Temperature Geothermal Technologies at Federal Facilities

Federal agencies are moving towards more efficient and resilient facilities by increasingly implementing energy projects in an effort to meet federally mandated goals, agency needs, and administration priorities. Low temperature geothermal technologies, which include geothermal heat pumps (GHP) and district heating systems, can contribute to meeting these goals. These technologies provide facilities with heating and cooling while reducing facility energy use and improving resilience. However, in order to implement these solutions, federal facilities must identify and execute a strategy for the procurement of these technologies. Federal facilities have successfully completed energy efficiency projects using a variety of procurement options. The purpose of this document is to provide federal agencies with a comprehensive overview of the procurement options available for low temperature geothermal technologies and other energy efficiency projects. The procurement options discussed include third-party financing mechanisms such as energy saving performance contracts (ESPCs), ESPC energy sales agreements (ESPC ESAs), and utility energy service contracts (UESCs), as well as dedicated funds in the form of federal grants and appropriated funds.

15 GEOTHERMAL ENERGY↗

A High-level Design for Bidirectional Data Streaming to High-Performance Computing Systems from External Science Facilities

Cutting-edge science is increasingly data-driven due to the emergence of scientific machine learning models that can guide scientists toward fruitful areas of exploration. Experimental science facilities such as light and neutron sources, particle colliders, and radio astronomy telescopes are also producing raw measurement data at rates that exceed available data storage and computing capacity at those facilities. As a result, scientific workflows are being developed that concurrently couple experiments at science facilities with high-performance computing (HPC) facilities to enable analysis of experimental data while the experiment is ongoing, and where analysis results are potentially fed back to the experiment for use in experimental control and/or steering in a time-sensitive manner. Our goal is to design, prototype, and deploy a new capability for the Oak Ridge Leadership Computing Facility (OLCF) that enables such workflows through support for bidirectional, memory-based streaming of data from external experiments into and out of OLCF HPC systems. This high-level design document describes the related work and motivating use cases that inform our understanding of the technical requirements for this capability, and describes a proposed architectural solution that meets these requirements and our plans for demonstrating the capability.

97 MATHEMATICS AND COMPUTING↗