Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Directors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

The NASA Short-term Prediction and Research Transition (SPoRT) Center: A Research to Operations Test Bed

Over the last three years, NASA/MSFC scientists have embarked on an effort to transition unique NASA EOS data/products and research technology to selected NWSEOs in the southeast U.S. This activity, called the Short-term Prediction and - Research Transition (SPoRT) program, supports the NASA Science Mission Directorate and its Earth-Sun System Mission to develop a scientific understanding of the Earth System and its response to natural or human-induced changes that will enable improved prediction capability for climate, weather, and natural hazards. The overarching question related to weather prediction is "How well can weather forecasting duration and reliability be improved by new space-based observations, data assimilation, and modeling?" The transition activity has included the real-time delivery of MODIS data and products to several NWS Forecast Offices. Local NWS FOs have used the MODIS data to complement the coarse resolution GOES data for a number of applications. Specialized products have also been developed and made available to local and remote offices for their weather applications. Data from &e Lightning Mapping Array (LMA) network has been used in severe storm forecasts at several offices in the region. At the regional scale and forecast horizons from 0-1 day, the next generation of high-resolution mesoscale forecast and data assimilation models have been used to provide local offices with unique weather forecasts not otherwise available. The continued use of near red-time infusion of NASA science products into high-resolution mesoscale forecast and decision-making models can be expected to improve the model initialization as well as short-term forecasts. A current focus of SPoRT is to expand collaborations to include contributions from the assimilation of AMSR-E data in the ADASIARPS forecast system (OU), inclusion of MODIS SSTs and AIRS thermodynamic profiles in the WRF, and to extend the distribution of real-time MODIS and AMSR-E data and products to the Florida coastal WFOs. A SPoRT Test bed, together with input from other interagency and university partners, will provide a means and a process to effectively transition ESE observations and technology to NWS operations and decision makers at both the globdnational and regional scales. The transition of emerging experimental products into operations through the SPoRT infrastructure will allow NASA to foster and accelerate the progress of this Science Mission Directorate research strategy over the coming years.

Jedlovec, Gary J.↗

Intern Summary Reports

Topics covered include: Probe Station Antenna Range; LERCIP 2004 Summary; L.E.R.C.I.P. Internship Summary; Hubble Space Telescope Bi-Stem Thermal Shield Analyses; GRABER - the Duct Tape of Space and JIMO Heat Conducting Foam; CDF and PDF Comparison Between Humacao, Puerto Rico and Florida; Development of the On-board Aircraft Network; Development of the Planar Inlet Design and Analysis Process (PINDAP); An Overview of My 2004 Summer Internship [Non-destructive Evaluation]; My Summer Experience as an Administrative Officer Assistant [in the Safety and Assurance Directorate Office]; Programming an Experiment Control System; Reducing the Cation Exchange Capacity of Lithium Clay to Form Better Dispersed; Polymer-Clay Nanocomposites; Feasibility of EB Welded Hastelloy X and Combination of Refractory Metals; My Work in the NASA Glenn History Office and Records Management Office; Education, Technology, and Media: A Peak into My Summer Internship at NASA Glenn Research Center in Cleveland, Ohio; [The Engineering and Technical Services Directorate at the Glenn Research Center]; Drinking Water Database; Design of an EXB Probe; and Texturing Carbon-carbon Composite Radiator Surfaces Utilizing Atomic Oxygen.

Source record↗

My Summer Experience as an Administrative Officer Assistant

The motto of the Safety and Assurance Directorate (SAAD) at NASA Glenn Research Center is "mission success starts with safety." SAAD has the functions of providing reliability, quality assurance, and system safety management to all GRC projects, programs and offices. Product assurance personnel within SAAD supervise the product assurance efforts by contractors on major contracts within GRC. The directorate includes five division offices and the Plum brook Decommissioning Office. SAAD oversees Glenn's Emergency Preparedness Program which handles security, hazmat, and disaster response and supervision.

Jones, Janelle C.↗

Education, Technology, and Media: A Peak into My Summer Internship at NASA Glenn Research Center in Cleveland, Ohio

My name is James Moon and I am a senor at Tennessee State University where my major is Aeronautical and Industrial Technology with a concentration in industrial electronics. I am currently serving my internship in the Engineering and Technical Services Directorate at the Glenn Research Center (GRC). The Engineering and Technical Service Directorate provides the services and infrastructure for the Glenn Research Center to take research concepts to reality. They provide a full range of integrated services including engineering, advanced prototyping and testing, facility management, and information technology for NASA, industry, and academia. Engineering and Technical Services contains the core knowledge in Information Technology (IT). This includes data systems and analysis, inter and intranet based systems design and data security. Including the design and development of embedded real-time sohare applications for flight and supporting ground systems, Engineering and Technical Services provide a wide range of IT services and products specific to the Glenn Research Center research and engineering community.

Moon, James↗

Opportunities for NASA Aerospace Related Funding and Collaboration

This presentation describes the different opportunities that NASA offers for effective collaboration with Academia and Industry. In particular, the presentation includes a general overview of opportunities such as SBIRs, STTRs, Educational Programs and NASA Research Announcements. A general description of forthcoming competitive opportunities under the Exploration Systems Mission Directorate (ESMD) as well as the Science Mission Directorate (SMD) are also provided.

Miranda, Felix A.↗

STS-114: Discovery Day 8 Mission Status Briefing

Paul Hill, STS 114 Lead Shuttle Flight Director, David Wolf, Extravehicular Activity (EVA) Branch Chief, JSC from the Astronaut Office, and Kelly Beck, STS-114 Team 4 Flight Director are seen on the 8th day of the Space Shuttle Discovery Mission. Paul Hill presents and explains charts of the Gap Fillers that Steve Robinson will be pulling off during his EVA. The charts include: 1) Protruding Gap Fillers; 2) Starboard Worksite Access; 3) Protruding Chine Gap Filler; 4) Port Gap Filler Space Shuttle Remote Manipulator System (SSRMS) Position; and 5) Port Gap Filler Close-up View. Kelly Beck talks about how the plan for the gap fillers were arranged, and presents the tools and techniques that Steve Robinson will be using during the EVA. David Wolf demonstrates how the EVA will be performed using forceps and a hacksaw to remove the gap fillers. The presentation ends with a question and answer period from the news media.

Source record↗

STS-114: Discovery Day 9 Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director, Mark Ferring, STS-114 Lead ISS Flight Director and Cindy Begley, STS-114 Lead EVA Officer is shown during this 9th day of the Space Shuttle Mission to the International Space Station. Paul Hill talks about the status of the transfers of critical items to the International Space Station and transfers back from the International Space Station into the Multi-Purpose Logistics Module (MPLM). Hill also presents footage of the crew cabin blanket survey procedure. Mark Ferring talks in detail about the primary International Space Station task on the External Stowage Platform (ESP). The status of the external stowage platform installation, removal of grapple fixture, gap filler removal task, and Materials International Space Station Experiment (MISSE) 5 payload installation is discussed by Cindy Begley. She also presents footage of Steve Robinson's spacewalk before the gap filler task and during the removal of the gap filler. The Capture of ESP-2 is also presented. The presentation ends with a question and answer period from the news media

Source record↗

STS-114: Discovery Day 9 Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director; Mark Ferring, Lead ISS Flight Director; Cindy Begley, STS-114 Lead EVA Officer were present. Paul reported on the general accomplishments of the mission for the day: the transfer to two stations are complete, transfers back from station into logistics module into the mid-deck are about 75 % complete and definitely in schedule to finish the next day, everything with the external video cam and the RGMC return are complete. He noted that all crews are doing great by all means. Paul also gave a detailed explanation with supporting video clips regarding concern for Eileen's side of window. Mark and Cindy both gave technical details on Mission Specialists Steven Robinson and Souichi Noguchi's extravehicular activities (EVA). News media focused most of their questions on extravehicular activities.

Source record↗

STS-114: Discovery L-1 Countdown Status Briefing STS-114/Discovery L-2 Countdown Status Briefing

Bruce Buckingham from NASA Public Affairs introduces Jeff Spaulding, NASA Test Director and Kathy Winters, Shuttle Weather Officer in this L-2 countdown status briefing. Spaulding gives the Space Shuttle launch countdown status before lift-off on July 26th. He expresses that vehicle launch and ground systems are performing well and that there are no significant issues in preparation for the launch. The crew arrival time to the launching pad and the launch window for Discovery is also discussed. He ends his countdown status by expressing that the Discovery Orbiter is the safest Shuttle to date. Kathy Winters gives her weather forecast for the launch day. She presents a satellite picture of tropical storm Franklin and charts showing the STS-114 Tanking Forecast, Launch Forecast, Solid Rocket Booster (SRB) recovery, Continental United States (CONUS) launch, Transoceanic Abort Landing (TAL) launch, 24 and 48 Hour Delay, CONUS 24 and 48 hour delay, and TAL 24 and 48 hr delay. Questions from the news media about the mood of the test engineers as launch day is approached are answered. Jessica Rye from NASA Public Affairs introduces Pete Nikolento, NASA Test Director; Scott Higgenbotham, STS-114 Payload Mission Manager; and Kathy Winters, Space Shuttle Weather Officer in this L-1 Countdown Status Briefing. Nikolento expresses that the completion of the main engine system check-outs and servicing of on-board fuel-cell reactants have been completed. He also talks about pad closeouts and external cryogenic loads prior to launch. Scott Higgenbotham gives the payload status and Kathy Winters talks about her weather forecast for launch. Questions about the ecosensors, TAL sites, weather forecast and thoughts about return to flight are addressed.

Source record↗

STS-114: Discovery Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director and Wayne Hale, Space Shuttle Deputy Program Director is shown during this mission status briefing. Hill talks about the first 24 hours of the Space Shuttle Discovery in orbit. He expresses that he has acquired data from the launch through imagery and hand held photographs of the external tank. Hale answers questions from the news media about how the engineers may be managing this data and if there is an overwhelming amount of data. Live downlink television pictures from the end-effectors camera on the Robotic Arm as it has completed its reberthing of the Orbiter Boom Sensor System (OBSS) are shown.

Source record↗

High-Temperature Hybrid Rotor Support System Developed

The Army Research Laboratory Vehicle Technology Directorate and the NASA Glenn Research Center demonstrated a unique high-speed, high-temperature rotor support system in September 2003. Advanced turbomachinery is on its way to surpassing the capabilities of rolling-element bearings and conventional dampers. To meet these demands, gas turbine engines of the future will demand increased efficiency and thrust-to-weight ratio, and reduced specific fuel consumption and noise. The more-electric engine replaces oil-lubricated bearings, dampers, gears, and seals with electrical devices. One such device is the magnetic bearing. The Vehicle Technology Directorate and Glenn have demonstrated the operation of a radial magnetic bearing in combination with a hydrostatic bearing at 1000 F at 31,000 rpm (2.3 MDN1). This unique combination takes advantage of a high-temperature rub surface in the event of electrical power loss or sudden overloads. The hydrostatic bearings allow load sharing with the magnetic bearing. The magnetic-hydrostatic bearing combination eliminates wear and high contact stress from sudden acceleration of the rolling-element bearings and overheating. The magnetic bearing enables high damping, adaptive vibration control, and precise rotor positioning, diagnostics, and health monitoring. A model of the test facility used at Glenn for this technology demonstration is shown. A high-temperature heteropolar radial magnetic bearing is located at the center of gravity of the test rotor. There is a 0.022-in. radial air gap between the rotor and stator. Two rub surface hydrostatic bearings were placed on either side of the magnetic bearing. The rotor is supported by a 0.002-in. hydrostatic air film and the magnetic field. The prototype active magnetic bearing cost $24,000 to design and fabricate and a set of four high temperature, rub-surface, hydrostatic bearings cost $28,000. This work was funded by the Turbine-Based Combined Cycle program.

Montague, Gerald T.↗

NASA Glenn's Engine Components Research Lab, Cell 2B, Reactivated to Support the U.S. Army Research Laboratory T700 Engine Test

The U.S. Army Vehicle Technology Directorate at the NASA Glenn Research Center has been directed by their parent command, the U.S. Army Research Laboratory (ARL), to demonstrate active stall technology in a turboshaft engine as the next step in transitioning this technology to the Army and aerospace industry. Therefore, the Vehicle Technology Directorate requested the reactivation of Glenn's Engine Components Research Lab, Cell 2B, (ECRL 2B). They wanted to test a T700 engine that had been used previously for turboshaft engine research as a partnership between the Army and NASA on small turbine engine research. ECRL 2B had been placed in standby mode in 1997. Glenn's Testing Division initiated reactivation in May 2002 to support the new research effort, and they completed reactivation and improvements in September 2003.

Beltran, Luis R.↗

Milestones Achieved for the Fluids and Combustion Facility

In 2004, President Bush outlined a new space exploration vision for NASA. The exploration programs will seek profound answers to questions of our origins, whether life exists beyond Earth, and how we could live in other worlds. In response, research projects from NASA s Fluid Physics Research Program were moved into the Exploration Systems Mission Directorate and realigned to support the major milestones of this directorate. A new goal of this research is to obtain an understanding of the physical phenomena that are important in the design of the many space-based and ground-based fluids systems that utilize multiphase flow, such as life support, propulsion, and power systems.

Gati, Frank G.↗

Remote Sensing for Farmers and Flood Watching

The Applied Sciences Directorate, part of NASA s Science Mission Directorate, makes use of the Agency s remote-sensing capabilities to acquire detailed information about our home planet. It uses this information for a variety of purposes, ranging from increasing agricultural efficiency to protecting homeland security. Sensors fly over areas of interest to detect and record information that sometimes is not even visible from the ground with the human eye. Scientists analyze these data for a variety of purposes and make maps of the areas. These maps are often used to answer questions about the environment, weather, natural resources, community growth, and natural disasters.

Source record↗

Verification and Validation of NASA-Supported Enhancements to PECAD's Decision Support Tools

The NASA Applied Sciences Directorate (ASD), part of the Earth-Sun System Division of NASA's Science Mission Directorate, has partnered with the U.S. Department of Agriculture (USDA) to enhance decision support in the area of agricultural efficiency-an application of national importance. The ASD integrated the results of NASA Earth science research into USDA decision support tools employed by the USDA Foreign Agricultural Service (FAS) Production Estimates and Crop Assessment Division (PECAD), which supports national decision making by gathering, analyzing, and disseminating global crop intelligence. Verification and validation of the following enhancements are summarized: 1) Near-real-time Moderate Resolution Imaging Spectroradiometer (MODIS) products through PECAD's MODIS Image Gallery; 2) MODIS Normalized Difference Vegetation Index (NDVI) time series data through the USDA-FAS MODIS NDVI Database; and 3) Jason-1 and TOPEX/Poseidon lake level estimates through PECAD's Global Reservoir and Lake Monitor. Where possible, each enhanced product was characterized for accuracy, timeliness, and coverage, and the characterized performance was compared to PECAD operational requirements. The MODIS Image Gallery and the GRLM are more mature and have achieved a semi-operational status, whereas the USDA-FAS MODIS NDVI Database is still evolving and should be considered

McKellipo, Rodney↗

STS-1: Columbia Briefings

A video presentation on an update of the STS-1 Columbia Shuttle is shown. Hugh Harris is the moderator. He introduces Don Phillips, Chief STS Test OPS, who presents the status of the vehicle. Terry William, Chief of Mechanical Systems, discusses the debonding of the panels. A question and answer period from the news media is shown. The various topics of discussion from the news media include: 1) Repair of thermal tiles; 2) Launch dates; and 3) Landing and launch sites and 4) Low pressure/high pressure tanking tests. An audio presentation is given of questions from NASA Marshall Space Flight Center and NASA Washington. On March 12, 1981, another STS-1 Columbia update is shown. Bob Schick, Shuttle Test Director, and Bob Sieck, Flight Project Engineer answers questions about the actual repair time of the panels and a very detailed description of the three areas of debonding is presented. A brief launch date statement from Dr. Allen Lovelace, Acting NASA Administrator is given and John Lardley, Shuttle Associate Director, discusses the flight readiness review.

Source record↗

STS-121/Discovery: Mission Status Briefing

Tony Ceccacci (Space Shuttle Flight Director) discussed the following activities: starboard survey, two space rendezvous, nose cap survey, timelines. Rick LaBrode (International Space Station Flight Director) discussed the following activities: preparation for Shuttle Docking, leak checks, pressurization checks, final configuration for cameras, setting up the internal wireless information system, accelerometers, etc. Then the floor was open to questions from the press.

Source record↗

STS-121: Discovery Mission Overview Briefing

Tony Ceccacci, Lead STS-121 Space Shuttle Flight director, and Rick LaBrode, Lead STS-121 ULF 1.1 International Space Station Flight Director, are shown in this STS-121 Discovery mission overview. Ceccacci begins with an overview of the mission and gives the mission goals. He also presents various slides of the STS-121 payload that includes: 1) Orbiter Docking System; 2) Integrated Cargo Carrier (ICC); 3) Multipurpose Logistics Module (MPLM); 4) TPS Sample Box Assembly; 5) Shuttle Remote Manipulator System (SRMS); and 6) Orbiter Boom Sensor System (OBSS). He shows a video presentation on the various processes involved in the inspections of the Orbiter that include: 1) Unberthing OBSS; 2) Starboard wing leading edge survey; 3) Wing leading edge passes; 4) Nose cap surveys; 5) Port side surveys; and 6) Docking with the International Space Station. Ceccacci ends his presentation with discussing the work performed from flight day 1 to flight day 14. Rick LaBrode begins with discussing the on-orbit status of the Expedition 13 crew. He then presents a video of the MPLM installation, forward hatch of MPLM, resupply stowage platform, resupply stowage racks, and Oxygen Generator System (OGS) rack. Questions are answered from the media.

Source record↗