Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

The safety improvement of Romanian radioactive waste facilities as an example for human and environmental protection

According to IAEA classification, Romania with two nuclear research centres, with 2 Nuclear Power Units in operation at Cernavoda Town and with 2 new Units envisaged to be in operation soon, can be considered as a country with an average nuclear activity. In Romania there was an extensive interest in management of radioactive wastes generated by the use of nuclear technology in industry and research. Using the most advanced technologies in the mentioned time periods, Romania successfully accomplished to solve all management issues related to radioactive wastes being addressed all safety concerns. Every step of nuclear activity development was accompanied by the suitable waste management facilities. So that, in order to improve the existing treatment and disposal capacities for institutional waste, the existing Radioactive Waste Treatment Facility (STDR) and the National Repository Radioactive Wastes (DNDR) at Baita, Bihor, will be improved to actual requirements on the occasion of VVR-S Research Reactor decommissioning. This activity is in development into the frame of a National funded project related to disposal galleries filling improvement and repository closure for DNDR Baita, Bihor. All improvements will be approved by Environmental Protection Authority and Regulatory Body, being a guaranty of human and environmental protection. Also, in accordance with national specific and international policies and taking into account decommissioning activities related to the present operating NPPs, all necessary measures were considered in order to avoid unnecessary generation of radioactive wastes, to minimize, as much as possible, waste production and accumulation and the necessity to develop optimum solutions for a new repository with the assurance of improved nuclear safety. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites - 2016 Update - 17086

An updated evaluation of removing used or spent nuclear fuel (SNF)2 from 13 shutdown nuclear power reactor sites was conducted during 2016. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites included in the evaluation were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure at the shutdown sites, (3) an evaluation of the near-site transportation infrastructure and transportation experience, including identification of gaps in information, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Updates to the evaluation since 2015 include incorporating spent nuclear fuel data from the GC-859 database; updating of Google Earth imagery; incorporating revisions to transportation certificates of compliance; adding information obtained from site visits to the Pacific Sun Railroad and Camp Pendleton, California; adding rail assessments for Kewaunee, Crystal River, and San Onofre to the evaluation; and adding information obtained from the site visit to Vermont Yankee. As additional sites such as Fort Calhoun, Palisades, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Knowledge Management in the Field of Nuclear Energy - How to Bridge the Gap between Retiring Workforce and Next Generations - 17101

The current phase-out decision of the German Federal Government and the 'Energiewende' - resulting from the Fukushima Daiichi Accident in 2011 - changed the nuclear market significantly. Together with the change in political and social attitude towards nuclear energy since 2002 it has contributed to a decline in technical expertise. This as well as the generation change in the nuclear technology lead to the risk of losing accumulated knowledge and experience which still are essential for the future - not only in Germany but in other countries - even though the focus in Germany will shift from operating to decommissioning, dismantling and radioactive waste management. A long-term strategy in order to preserve technical expertise to solve the forthcoming tasks in Germany was required. This strategy should include e.g. the implementation of technical programs not only for internal training of the staff but also for authorities. Together with authorities TUV NORD developed individual training concepts for a broad range of customers to preserve a transfer of know-how with the state-of-the-art in science and technology and even support international projects, especially in countries with less experience in the nuclear fields. Additionally, special data bases were developed in order to ensure the accessibility of long-term nuclear data storage. Furthermore technical conferences in different fields like decommissioning and radioactive waste disposal were established as an opportunity for knowledge exchange. Based on given examples it is being demonstrated how technical expertise can be preserved even though the field of nuclear energy in Germany has changed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modular Platforms for Advanced Inspection, Locomotion, and Manipulation - 17150

Robots can provide remote access, manipulation, and inspection capabilities to augment human workers and improve safety in potentially dangerous decommissioning, radioactive waste management, and emergency response operations. However, such activities may require navigating challenging and unstructured environments, such as those with uneven terrain, obstacles, or loose debris. This remains a difficult task, even for modern robots. What's more, a robot's physical design can inhibit it from accessing hard-to-reach areas such as the tight spaces around, underneath, or inside piping and equipment. To address these challenges, we have developed a series of physically robust hardware modules that can be configured into a variety of robot morphologies, specialized to support different operational needs. Each hardware module consists of a number of onboard sensors and a high performance actuator with a series elastic element to sense and control interaction forces for improved locomotion and manipulation. Using this hardware, we have designed several robotic platforms that support the access, manipulation, and inspection requirements of decommissioning and radioactive waste management. To highlight current capabilities and potential opportunities for technological improvement, we present the outcomes from field demonstrations of our modular platforms at the Office of Environmental Management's Science of Safety Portsmouth Gaseous Diffusion Plant Robotics Challenge. Specifically, results include a serpentine robot climbing vertical structures such as pipes, posts, and supports to demonstrate advanced inspection. Additionally, we discuss field trials of a similar modular configuration that yields a highly dexterous manipulator arm and camera system capable of adding manipulation and inspection functionality to existing structures. Results are presented from inspection tasks in which the manipulator is installed on another mobile robotic platform. Finally, we show our hardware modules can be reconfigured into platforms capable of withstanding significant impacts and of alternative means of locomotion, as may be required to cross terrain too challenging for traditional wheeled robots. Results describe the performance of a hexapod robot that uses proprioceptive feedback to locomote in outdoor trials reminiscent of emergency response conditions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Design for a Short-Lived Low- and Intermediate-Level Waste Repository at the Al Tuwaitha Nuclear Center, Baghdad, Iraq - 17189

The European Commission under their Instrument for Nuclear Safety Cooperation (INSC) has initiated a project supporting Iraq's efforts for the safe disposal of short lived low- and intermediate-level radioactive waste (SL-LILW) arising from the decommissioning of Iraqi nuclear installations. The INSC project includes both the development of an initial conceptual level basic design and preliminary safety assessment (PSAR) report and the subsequent detailed engineering design and supporting intermediate safety assessment report (ISAR). The project is being executed by a Consortium led by NUKEM Technologies Engineering Services GmbH and joined by DBE Technology GmbH of Germany; JAVYS a.s. of Slovakia and MCM Environmental Services Ltd of the United Kingdom. The current paper focuses on the development of the conceptual level basic design. In previous decades Iraq had a significant nuclear program which encompassed ten nuclear sites spread out across the country. The largest site was located at the Al-Tuwaitha site near Baghdad where 18 nuclear facilities were located. The facilities suffered significant damage from bombing and subsequent looting during the first Gulf War in 1991. Currently, the Ministry of Science and Technology (MoST) is the radioactive waste management operator in Iraq and also the license holder for the ten Iraqi nuclear sites, all of them heavily damaged. Because of the ongoing security concerns in Iraq MoST has selected the Al Tuwaitha Nuclear Center as the preferred and best suited location for development of an SL-LILW repository. As an initial step in development of the conceptual design various repository design options for the site were examined and assessed. The assessment considered similar facilities that have been implemented internationally. At the conclusion of the assessment and in conjunction with the Iraqi Beneficiaries from MoST, a near-surface vault design was selected for the facility. The design of the facility relies on experience gained from existing low-level waste repositories at Centre de l'Aube in France and the El Cabril solid radioactive waste disposal facility in Spain as well as on more recent experience gained in the design of the Bulgaria National Disposal Facility (NDF) under construction near the Kozloduy Nuclear Power Plant. Similar to these reference designs, the concept for the Al Tuwaitha Disposal Facility (ATDF) will rely on a series of reinforced concrete vaults into which containerised waste will be placed. Each vault will consist of two chambers designed specifically to hold the waste. Central drainage points in each waste chamber will lead to an infiltration water collection system designed to detect any failures in the waste containment. Each disposal vault will be sealed after filling by installation of a reinforced concrete closure slab. Once all of the waste has been disposed of the site will be decommissioned and a multilayer protective cover will be installed over the sealed disposal vaults. The multilayer cover will act to further isolate the waste from the environment by limiting the access of water to the waste. Due in part to the presence of shallow groundwater at the site and to avoid potential damage to the facility by flooding from the nearby Tigris River the concept for the Al Tuwaitha Disposal Facility requires construction of the disposal vaults on a raised platform several meters above ground level. Construction of this platform will be integrated into the conceptual safety design and materials will be selected which further enhance the isolation function of the disposal system by hindering or delaying the release of radionuclides to the environment. The infiltration water collection system, which will be constructed in a specifically designed accessible gallery embedded and fully integrated into the platform, will provide access to inspection points located beneath each disposal chamber. The ATDF when completed will be a further demonstration of the adaptability of the disposal vault concept for use in isolating SL-LILW from the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dounreay Site's Interim End State-Environmental Safety Strategy - 17509

The Dounreay nuclear licensed site, located in Caithness on the north coast of Scotland, was the United Kingdom's (UK) site for Fast Reactor research and development. The Dounreay facilities are now being decommissioned and the site restored in accordance with UK Government policy to manage civil nuclear liabilities. This site closure and environmental restoration programme is to achieve levels of residual radiological and chemical contamination sufficiently low that the site will be safe for future use. This document sets out the Environmental Safety Strategy for the site remediation and closure programme, which will follow completion of facility decommissioning and demolition. The document summarises the contractual definition of the Dounreay site end states and also the associated regulatory regimes. An overview of the approach and processes for achieving the Interim End State (IES) are provided, along with consideration of how Dounreay will demonstrate that the IES has been achieved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Solutions To Solve Complex Radioactive Waste Management Problems In The U.S. - 2017 Richard S. Hodes, M.D. Honor Lecture Award - 17609

Ever since Wilhelm Roentgen, Henri Becquerel, and Marie Curie discovered x-rays, radioactivity, and radium, respectively, at the turn of the nineteenth century, nuclear technologies have continued to evolve and significantly enrich the quality of life for mankind. The evolution of such technologies has enabled our society to diagnose medical illnesses without the need for invasive surgeries, treat cancers, conduct research, develop new kinds of pharmaceuticals, preserve our food supply, and generate over 20% of our nation's electricity from commercial nuclear power plants. While these life-changing technologies have significantly enriched our quality of life and advanced our understanding of the sciences, they also generate radioactive waste that must be managed responsibly in a manner that protects public health. Over the past several decades, decision makers have developed a patchwork of policies to safely manage radioactive wastes-policies that are not necessarily based on the risk posed to public health, but more often on the origins of the waste and the manner in which they are defined in federal legislation. However, in the past several years, much progress has been made to better risk-inform the practices of managing Low-Level Radioactive Waste (LLW) in the United States. In 2012, the nation's first regional commercial facility for disposing of Class A, B, and C LLW since the U.S. Congress enacted the Low-Level Radioactive Waste Policy Act of 1980, as amended in 1985, was opened in Andrews County, Texas. Since then, other innovative LLW management solutions have emerged, ranging from cost-effective disposal options for wastes with very low levels of radioactivity to depleted uranium, and perhaps ultimately, for waste exceeding the concentration-based limits for Class C LLW (i.e., Greater Than Class C LLW) as specified in Title 10 of the Code of Federal Regulations (CFR), chap. 61.55. Most recently, a license application for a consolidated interim storage facility for Spent Nuclear Fuel (SNF) is currently under review by the U.S. Nuclear Regulatory Commission (NRC). Should the NRC approve the license application, SNF currently located at 12 shutdown and decommissioned nuclear reactors could be placed into interim storage in Texas. Approval of this license application would facilitate the complete decommissioning of nuclear power plants, returning them to green-fields, and allowing the local communities to re-purpose the lands for further economic development. Over the next decade, many of these waste management challenges that once seemed insurmountable may soon be transformed into a reality. As will be discussed at the award lecture, achieving such possibilities clearly aligns with the vision of creating innovative radioactive waste management solutions for our nation that were championed by the late physician and statesman, Dr. Richard S. Hodes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The U.S. DOE-EM international program - 15026

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of the environmental cleanup legacy resulting from the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program, supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. The primary objective of the International Program is to work closely with the various technical program offices within EM (e.g., tank waste and nuclear materials management, groundwater and soil remediation, deactivation and decommissioning) to identify collaborative opportunities related to innovative technologies, as well as best management practices, that support successful completion of the EM mission. This objective is directly aligned with the current DOE Strategic Plan 2014 - 2018, issued in April 2014. In mid-fiscal year (FY) 2014, the International Program awarded several collaborative projects for work scope spanning waste management, tank waste management, groundwater and soil remediation, deactivation and decommissioning (D and D), disposal operations, and nuclear materials disposition initiatives to nine foreign organizations. These projects include both technical and non-technical activities, with opportunities for continuation into FY 2015 and beyond. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project acceleration through the application of innovation on the pile fuel storage pond at Sellafield - 15060

The Pile Fuel Storage Pond (PFSP) at Sellafield was built between 1948 and 1950 to receive, store and de-can fuel and isotopes from the Windscale Piles. Since closure of the Piles in 1957, the facility has been used to store materials from the UK nuclear programme. The pond has built up a large inventory of miscellaneous items and pond sludge, which combine to create a challenging nuclear clean up job. To enable clean up, the operator required a capability to encapsulate the pond sludge for long term storage, the operator initiated a project. Applying conventional project delivery processes resulted in an unacceptable cost and schedule for provision of this capability. To address this issue, the project to deliver the plant was restarted with a study to look at the selection of process routing for the sludge. In the decision making processes for this study increased weighting was given to innovative re-use of existing facilities and speed of deployment. Innovation was also applied to the study process to enable early option selection where this was clearly of benefit. This focus on innovation produced the first significant improvement for the project with the scheme selected offering a 30% reduction in baseline cost and schedule. The focus on schedule acceleration was carried through into the early design phases of the new project. In the concept stage process simplification was achieved through functional analysis of the plant combined with a drive to utilise technology and learning from other industries. This resulted in a plant concept which could be delivered more quickly than the baseline schedule with a high level of confidence. Once the main benefits associated with innovation of the plant concept had been achieved focus was switched to how the project was to be delivered. The project looked at where delivery in the nuclear environment tended to be complex and time consuming. Focusing on these areas and learning from other industries led to significant innovation in delivery processes, with particular success in the rigorous application of value transition point analysis and minimisation of onsite works. The combination of innovative design and delivery processes led to a further reduction in the project baseline cost and schedule. Application of engineering innovation, focused on engineering simplification and challenge of the engineering norms, reduced the cost of the project by English Pound 50 m (65%) and reduced the schedule for delivery by over 3 years. The project has been recognised as an exemplar of how to apply the 'decommissioning mind-set', which is the cultural change being targeted by Sellafield Ltd to deliver the decommissioning of its high hazard facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low and intermediate level short lived waste disposal in France: improving confidence - 15254

Thanks to the significant reduction of waste production and according to forecasts derived from the French National Inventory of Radioactive Materials and Waste issued by Andra, Centre de l'Aube disposal facility should be able to accommodate low and intermediate level short lived waste generated by all presently operated or decided nuclear facilities in France. The facility could then be operated till 2050-2060. Andra has to maintain the facility up to date and to adapt it to meet waste generators needs, in particular needs related to decommissioning works. Its safety is assessed by periodical safety review and confirmed by an environmental monitoring program. Safety also relies on an acceptance process that takes benefit from 20 years of experience and must now be adapted to the management of decommissioning waste. Confidence by local communities is maintained through a permanent dialogue. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of polymers for the emergency damage control and remediation at nuclear and chemical industry sites - 15259

From the standpoint of possible accidents and the following complex emergency damage control the nuclear and chemical industry sites are of the primary concern. Among the possible causes of accidents and emergency situations are technological and waste solution spills. Polymers can be used for this problem resolution and the spilled solutions could be effectively isolated. The apparent advantage of polymer materials is the possibility of solidifying solutions with rather high acidity and high salt bearing. To date the situations with the RW storage tank decommissioning in Russia and in the United States have much in common: the lack of the waste management strategy developed at the initial stage of production, the end of the storage tank lifetime. Development of the in-situ solidification technique for the mobile (liquid) components of heterogeneous waste will provide a good option to contain the radio nuclides within the storage site boundaries. The presented work was aimed at the search for the simple engineering decisions that would provide the waste immobilization in case of the accidental liquid spills. The application of polymers for the purpose indicated would allow in case of emergency to reduce the radioactive aerosol concentration in the air and prevent the distribution of aerosols on the premises and in the environment. Another promising area of the polymer application could be the technical challenges associated with the decommissioning of NPPs and other objects and facilities including the large volume LRW storage tanks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The development and initial testing of the Ice Pig cleaning method for nuclear reprocessing plants - 15363

There are numerous situations throughout the nuclear industry where it would be advantageous to clean out enclosed systems, e.g. ducts and pipes, to remove sediments and radioactive contamination. However, conventional flushing methods result in the production of significant volumes of contaminated liquor. The wall Shear achieved with water flushing is insufficient to remove and carry dense deposits often found in nuclear facilities. Conventional mechanical pigs can be propelled through the duct by application of a driving medium such as compressed air or water. These are able to achieve very high wall shears, but can also get physically stuck where there is variation in the pipe / duct diameter or small radius bends. The field of application is best suited to straight constant diameter systems with no discontinuities such as Tee pieces, valves and in-pipe instrumentation. Driven by the desire to clean and displace radioactive materials from complex topology ducts and pipes, without the risk of having conventional pigs becoming lodged in a plant and coupled with the need to minimize effluent volumes, the UK Nuclear Industry led by Sellafield Limited (on behalf of the UK Nuclear Decommissioning Authority), has worked to demonstrate and underpin the use of the ice pigging technology for the nuclear industry. It is found that high ice fraction slurries flow as viscous liquids that exhibit a number of mechanical properties that offer much higher shear rates. The 'Ice Pig' exerts shear rates on pipe walls which are typically 1000 times greater than those achieved with water flowing at the same velocity. The 'Ice Pig' is able to negotiate almost any topology, flow through pipe networks of vastly differing diameter, through heat exchangers and in-line instrumentation etc. Experimental data and operational experience from other industries demonstrates that whilst there is high shear, the 'Ice Pig' does not damage the surface of the pipe wall. A further attractive characteristic of the 'Ice Pig' is that it eventually melts rendering it a simple effluent for processing by downstream processes. Due to the special nature of ice slurry, its unique rheological and physical characteristics, together with the complementary underpinning experimental work undertaken by Sellafield Limited enables the Ice Pigging process to move from an 'interesting' technology to one suitable for use by the nuclear industry for operations, Post Operational Clean Out (POCO) and decommissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating commercially available remote systems to address current D and D challenges - 15399

Many current D and D challenges across the DOE complex require some form of remote handling expertise and equipment. For example, high visibility projects such as Building 324 D and D and the recovery of wastes from the Alpha-Caissons and the 618 10-11 caissons at Hanford all require the development and application of advanced remote systems. Additionally although alternate solutions and options are being sought, robotic/remote systems will likely be required for completion of D and D at Savannah River Site's Building 235-F, at the West Valley Demonstration Project and many other DOE facilities that are scheduled for D and D. Similar systems are also needed to support the UK cleanup program on projects such as the decommissioning of the Pile Fuel Cladding Silo. As a result, there are a significant number of R and D and Technology Development projects underway in order to address the growing need for remote systems in D and D. In addition to these significant R and D efforts, there are also numerous remote systems in use in multiple applications in both nuclear and non-nuclear industries and the use of remote systems at the Fukushima Daiichi plant has been extensive in the past 12-24 months. In many cases, the systems developed are customized for their given application but there are also multiple systems in use which could be applied to the worldwide D and D challenge either directly or with some minor adaptation. During FY14, the Office of D and D and Facility Engineering (EM13) funded a review/assessment of the current state-of-the-art of robotics and remote technologies in order to generate a baseline of what is available, what has been used where and for what applications and what has been successful and what hasn't. Where possible, the assessment was extended to identify remote systems that have been used in non-nuclear industries but which, with limited modification, may have application in the nuclear industry. The work also included a review of the most recent publicly available TBuRD (Technical Baseline and Underpinning R and D) activities being undertaken by the UK NDA and their Site Licensed Companies (SLCs) in the area of remote systems in order to compile a searchable database of both available, commercial-off-the-shelf (COTS) remote systems and developing technologies. Other suitably qualified organizations in the US and the UK (such as UK National Nuclear Laboratory, SRNL, PNNL ORNL, OC Robotics and others) were also engaged to identify other ongoing technology development efforts which may be of interest and benefit to the decommissioning community. In all, of the order of 500 remote systems were identified and cataloged in both hard copy and as a searchable database. These systems were categorized in terms of their main application e.g. manipulator, wheeled land-based platform, track land-based platform, water-based platform, air-based platform, end effectors, sensor, crawler etc to clearly demonstrate the depth and breadth of available systems in each category. In addition, single page summaries of each system were produced and used, in a workshop setting, to identify technologies which, when integrated with other currently-available technologies, could provide a workable system to address existing needs. An initial workshop was held with CH2 Washington Idaho (CWI) and DOE Idaho in August 2014 to explore how the available systems could be integrated to address current and future D and D needs at that site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Licensing of the national repository for LILW waste in Bulgaria - 15609

Radioactive waste arises from the operation and decommissioning of the Bulgarian nuclear power plants and from other sources in research, medical applications and industry. The need for building the National Disposal Facility (NDF) is recognized by the Bulgarian government, and described and justified in the Environment Impact Assessment Decision. The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is endeavoring to build a near-surface repository for short-lived low and intermediate level radioactive waste (SL-LILW). The European Union finances the establishment of the NDF through the Kozloduy International Decommissioning Support Fund. The Bulgarian government has defined the NDF as a Project of National Importance. At the conclusion of an international tendering process, SERAW awarded the contract for development of the NDF design, including Intermediate Safety Analysis Report (ISAR), to the Consortium of Westinghouse Electric Spain S.A.U, DBE Technology GmbH of Germany, and ENRESA, the Spanish National Waste Management Agency. Two Bulgarian companies also participate in the project as subcontractors;KK-Project and EQE-Bulgaria. The project 'Technical Design and ISAR Preparation for the National Disposal Facility at Bulgaria' is identified within SERAW as 'R-Project 5'. Since obtaining SERAW's approval for the preferred repository design variant, R Project 5 has focused on the development of the Technical Design and on preparation of the ISAR, which demonstrates the safety and suitability of the proposed NDF design. The Consortium submitted to SERAW the Technical Design for revision on March 2013. SERAW's experts immediately started the review of the design. In addition, SERAW invited independent, highly qualified Bulgarian experts and scientists to participate in the review. In November 2013, SERAW approved the Technical Design. The Consortium submitted the Intermediate Safety Analysis Report to SERAW for review following a similar process in July 2014. Both documents were meanwhile handed over to the appropriate Bulgarian licensing authorities. SERAW's goal is to receive a license for construction of the NDF in early 2015. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RCRA closure at the Connecticut Yankee atomic power company Haddam neck plant - 15655

From 1968 through 1996 Connecticut Yankee Atomic Power Company (CYAPCO) operated the Haddam Neck Plant (HNP) at 362 Injun Hollow Road, East Hampton, Connecticut. In 1980 CYAPCO applied to be a permitted generator and storage facility for hazardous waste and was issued a Resource Conservation and Recovery Act (RCRA) Part A Treatment, Storage, and Disposal Facility Permit. During the operational period, the HNP produced more than 110 billion kilowatt-hours of energy. In 1996, CYAPCO decided to close and decommission the HNP. Decommissioning activities began in 1998 and were successfully completed in 2007 in accordance with Nuclear Regulatory Commission (NRC) regulations and the CYAPCO License Termination Plan. As part of the closure process for the HNP, closure of the RCRA permit under the RCRA Corrective Action Program (CAP) was required. From 2002 through 2007, under the RCRA CAP, CYAPCO completed investigations and remediation work to address environmental impacts resulting from chemical usage at the HNP. The RCRA CAP was conducted under the regulatory authority of the United States Environmental Protection Agency (USEPA) and the Connecticut Department of Energy and Environmental Protection (CTDEEP). In the fall of 2014, the RCRA closure process was completed, and CYAPCO, with concurrence from USEPA, was issued a Letter of Completion from the CTDEEP signifying completion of the RCRA closure process. The paper discusses the RCRA closure process completed at the HNP, including the investigation, remediation, groundwater monitoring, and closure activities completed to achieve closure of the HNP under the RCRA requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removing of Core Constructions of the MR and RFT Reactors in NRC 'Kurchatov Institute' - 16054

In frame of the FTP 'Providing nuclear and radiation safety of Russia in 2008 and for the period till 2015' works of a decommissioning of the MR and RFT research reactors are carried out in National Research Center 'Kurchatov Institute'. Within these works, the equipment of 9 loop-back facilities of the MR reactor was dismantled. In the conditions, which are most approached to natural, one researched a heat, hydrodynamic and strength characteristics of elements of cores and the capital equipment of the majority of power reactors at these facilities. In 2014-2015 dismantle of core constructions of the MR reactor was carried out and dismantle of a graphite laying of the RFT reactor is begun. The beryllium blocks, which were constructional elements of the core, and the graphite blocks playing a reactor reflector role were also taken, packed into cases or containers and removed: part on an accumulative platform, and part are placed in storage of high level radioactive waste of the Center for decay and further sending for long storage. Works were performed by remote controlled mechanisms, control of their performance was exercised by means of remote diagnostics: Gammavizor, the scanning spectrometer systems. The following methods and the organizational principles were applied to providing of radiation safety of these works: - the constant radiation control including individual control of a dose of external radiation, control of volume activity of radionuclides in air, annual control of internal radiation doses of the personnel; - dust suppression and fixing of radioactive contamination by dispersion of polymeric structures; - carrying out decontamination on a shift basis rooms with use of detergents; - use of the remote controlled mechanisms equipped with hydraulic scissors, nippers, application of the diamond are sharp that allowed to perform the majority of technological operations remotely, using 'cold' methods of fragmentation; - development on each type of works of the operation project and schedules. As a result, of works of 2011-2014 of the decommissioning of the MR and RFT research reactors more than 630 t of the equipment were dismantled. From them more than 455 t of radioactive waste was. The total activity of radwaste exceeded 300.0 GBq. From the pool of the reactor, about 160 channels of loop-back installations and near 230 beryllium and graphite are taken, fragmented and packed. The total activity on radionuclides {sup 60}Co and {sup 137}Cs of them was near 55 TBq. From the territory of the center about 2550 m{sup 3} of firm and 4600 m{sup 3} of liquid radwaste are removed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Retrieval, Disruption and Processing of Legacy Nuclear Waste - 16179

The UK National Nuclear Laboratory (NNL) is currently undertaking, in conjunction with Sellafield Ltd, a series of high profile trials of robotic equipment on a full scale test facility at their Workington Laboratory in England. These trials are designed to underpin and substantiate the processes proposed for the remote retrieval, disruption and processing of legacy Miscellaneous Beta Gamma Waste (MBGW) from a number of different donor plants on the Sellafield site, including some of the older fuel storage ponds and storage silos. These processes will be conducted inside the new Box Encapsulation Plant (BEP) which is due to be commissioned at Sellafield by 2020. These processes will subsequently enable Sellafield Ltd to safely recover legacy Intermediate Level Waste (ILW) from the older storage facilities on site and process it into a safer form which is more suitable for long term storage and then ultimately final disposal in a Geological Disposal Facility. As part of this legacy waste processing within the BEP plant, MBGW waste items will have to be remotely removed from a variety of different types of import skips. This waste will then be transferred, using robots, into the export container, which is a 3 m{sup 3} box liner, where the processed waste will be flood grouted to produce an encapsulated waste package. As part of this processing, any MBGW items consisting of sealed containers will have to be remotely disrupted before being grout encapsulated. This disruption is in order to (a) release any trapped liquors or gases from the containers and (b) ensure full grout infiltration of the container contents, thus minimising the amount of free liquors and voids within the final waste product. The NNL are conducting this technical work to confirm the viability of the proposed concept, processes and equipment. The developed solution consists of a linear layout of processing equipment with a pair of heavy duty, standard industrial, 'commercially off the shelf' (COTS) robots positioned around a Waste Handling Table. These robots have a 500 kg payload capacity and are operated remotely to handle all of the various types of MBGW waste, including the heavy and bulky items. The robots can be operated in manual tele-operation mode as well as pre-programmed automatic mode and have a range of primary and secondary tooling in order to perform the waste processing and disruption tasks as well as undertake general house-keeping and cleaning duties within the cell. The main tools include two types of hydraulic grab for the main waste recovery and handling tasks and a hydraulic shear for the waste disruption activities, but a number of other tools have also been designed and built for ancillary activities, such as a set of general purpose gripper jaws, drilling tool, bolt removal tool, pump tool, spray tool and a number of different housekeeping tools etc. The robot trials were started in November 2014, and have attracted a significant degree of high level stakeholder interest, including the UK Nuclear Decommissioning Authority (NDA), Office for Nuclear Regulation (ONR), Environment Agency (EA) and Radioactive Waste Management Limited (RWML) witnessing a number of the critical demonstration trials. Robots of the type selected are readily available, robust, reliable and easy to use. The trials have been very successful in proving the retrieval, processing and disruption operations, reducing the burden in the legacy waste facilities. Utilising robots to perform these tasks will lower the probability of producing non-compliant waste packages. In addition the robots can increase the consolidation of incoming waste skips into outgoing 3 m{sup 3} box liners, significantly increasing packing efficiencies and reducing the overall number of export containers produced thus lowering the decommissioning and waste storage/disposal costs. The trials have also enabled an assessment of the optimum way to operate the robots, as well as their reliability and maintainability issues. Engineering work associated with recovering failed robots and removing them from a typical Sellafield plant environment and then subsequently replacing them with functioning robots has also been undertaken and further work is now planned. The success of the trials, completed safely to a very challenging timescale, has enabled the use of robots in BEP to be endorsed as a viable option by the key stakeholders. Following a robust decision making process, this was a clear cut decision. The technical development and testing of the robot technology is currently continuing in order to investigate areas such as robot reliability, failure recoveries, human factors, ease of waste identification, optimisation of throughput rates, nuclearisation modifications etc. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Survey and Remediation Project at the DOE Bannister Site - 16280

The Department of Energy Kansas City office has operated the Bannister site with a variety of contractors since the late 1940's. This facility has had a number of missions, some of which included using natural and depleted uranium. In order to prepare for the demolition of the site, ANTECH was contracted to perform radiometric surveys of the areas where these uranium operations took place. In the process of performing these surveys, areas with low levels of fixed radioactive contamination were identified; ANTECH then remediated these areas using a variety of techniques. In all areas surveyed, the only radioactive contaminant of interest was uranium and members of its decay chain. In no cases were other radionuclides found. The detection equipment used for the surveys included a Ludlum model 239- 1F Floor Monitor, a Ludlum 2360 Alpha Beta Data Logger Scaler/Ratemeter, and an ORTEC IDM-200-V High Purity Germanium Detector. The Ludlum instruments were used for bulk surveys and the ORTEC instrument was used to determine an accurate radioactive background spectra and subsequent spectra for areas where radioactive contamination was identified. Contamination was located on concrete floors and columns, cinder block walls, steel beams, inside ductwork and in floor drain piping. After these areas were identified, a number of methods were used to remove the contamination for disposal including scabbling, core drilling and wholesale removal. Extensive use of Pentek scabbling equipment on the concrete sections proved to be very effective at removing the contaminated layer. Upon completion, the waste materials were consolidated and packaged in a strong tight sea land container and shipped to the Energy Solutions waste facility in Utah. The completed work at the Bannister site serves as an example and demonstration of an effective and comprehensive decommissioning project. It involved the integration of a variety of decommissioning activities all executed and managed by a single contractor. These included radiometric measurement surveying using a variety of detection technologies to identify and locate uranium contamination, decontamination and removal of low level radioactive waste including some deconstruction activities and finally the management of low level radioactive waste including packaging, consignment and shipping of waste to a remediation site. The effective and efficient identification and removal of radioactive contamination at the Bannister site has contributed to the overall goal of returning the site to unrestricted use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗