Comparing NASA and ESA Cost Estimating Methods for Human Missions to Mars

To compare working methodologies between the cost engineering functions in NASA Marshall Space Flight Center (MSFC) and ESA European Space Research and Technology Centre (ESTEC), as well as to set-up cost engineering capabilities for future manned Mars projects and other studies which involve similar subsystem technologies in MSFC and ESTEC, a demonstration cost estimate exercise was organized. This exercise was a direct way of enhancing not only cooperation between agencies but also both agencies commitment to credible cost analyses. Cost engineers in MSFC and ESTEC independently prepared life-cycle cost estimates for a reference human Mars project and subsequently compared the results and estimate methods in detail. As a non-sensitive, public domain reference case for human Mars projects, the Mars Direct concept was chosen. In this paper the results of the exercise are shown; the differences and similarities in estimate methodologies, philosophies, and databases between MSFC and ESTEC, as well as the estimate results for the Mars Direct concept. The most significant differences are explained and possible estimate improvements identified. In addition, the Mars Direct plan and the extensive cost breakdown structure jointly set-up by MSFC and ESTEC for this concept are presented. It was found that NASA applied estimate models mainly based on historic Apollo and Space Shuttle cost data, taking into account the changes in technology since then. ESA used models mostly based on European satellite and launcher cost data, taking into account the higher equipment and testing standards for human space flight. Most of NASA's and ESA s estimates for the Mars Direct case are comparable, but there are some important, consistent differences in the estimates for: 1) Large Structures and Thermal Control subsystems; 2) System Level Management, Engineering, Product Assurance and Assembly, Integration and Test/Verification activities; 3) Mission Control; 4) Space Agency Program Level activities.

Hunt, Charles D.↗

Parametric Cost Analysis: A Design Function

Parametric cost analysis uses equations to map measurable system attributes into cost. The measures of the system attributes are called metrics. The equations are called cost estimating relationships (CER's), and are obtained by the analysis of cost and technical metric data of products analogous to those to be estimated. Examples of system metrics include mass, power, failure_rate, mean_time_to_repair, energy _consumed, payload_to_orbit, pointing_accuracy, manufacturing_complexity, number_of_fasteners, and percent_of_electronics_weight. The basic assumption is that a measurable relationship exists between system attributes and the cost of the system. If a function exists, the attributes are cost drivers. Candidates for metrics include system requirement metrics and engineering process metrics. Requirements are constraints on the engineering process. From optimization theory we know that any active constraint generates cost by not permitting full optimization of the objective. Thus, requirements are cost drivers. Engineering processes reflect a projection of the requirements onto the corporate culture, engineering technology, and system technology. Engineering processes are an indirect measure of the requirements and, hence, are cost drivers.

Dean, Edwin B.↗

Air Force Reusable Booster System: A Quick-look, Design Focused Modeling and Cost Analysis Study

This paper presents a method and an initial analysis of the costs of a reusable booster system (RBS) as envisioned by the US Department of Defense (DoD) and numerous initiatives that form the concept of Operationally Responsive Space (ORS). This paper leverages the knowledge gained from decades of experience with the semi-reusable NASA Space Shuttle to understand how the costs of a military next generation semi-reusable space transport might behave in the real world - and how it might be made as affordable as desired. The NASA Space Shuttle had a semi-expendable booster, that being the reusable Solid Rocket MotorslBoosters (SRMlSRB) and the expendable cryogenic External Tank (ET), with a reusable cargo and crew capable orbiter. This paper will explore DoD concepts that invert this architectural arrangement, using a reusable booster plane that flies back to base soon after launch, with the in-space elements of the launch system being the expendable portions. Cost estimating in the earliest stages of any potential, large scale program has limited usefulness. As a result, the emphasis here is on developing an approach, a structure, and the basic concepts that could continue to be matured as the program gains knowledge. Where cost estimates are provided, these results by necessity carry many caveats and assumptions, and this analysis becomes more about ways in which drivers of costs for diverse scenarios can be better understood. The paper is informed throughout with a design-for-cost philosophy whereby the design and technology features of the proposed RBS (who and what, the "architecture") are taken as linked at the hip to a desire to perform a certain mission (where and when), and together these inform the cost, responsiveness, performance and sustainability (how) of the system. Concepts for developing, acquiring, producing or operating the system will be shown for their inextricable relationship to the "architecture" of the system, and how these too relate to costs. Design and technology features bear special relevance to early program research and development directions. Given the uncertainties involved in both their actual performance promise and their relation to costs of operational systems, this later relationship is also given special attention.

Zapata, Edgar↗

Data Service Provider Cost Estimation Tool

The Data Service Provider Cost Estimation Tool (CET) and Comparables Database (CDB) package provides to NASA s Earth Science Enterprise (ESE) the ability to estimate the full range of year-by-year lifecycle cost estimates for the implementation and operation of data service providers required by ESE to support its science and applications programs. The CET can make estimates dealing with staffing costs, supplies, facility costs, network services, hardware and maintenance, commercial off-the-shelf (COTS) software licenses, software development and sustaining engineering, and the changes in costs that result from changes in workload. Data Service Providers may be stand-alone or embedded in flight projects, field campaigns, research or applications projects, or other activities. The CET and CDB package employs a cost-estimation-by-analogy approach. It is based on a new, general data service provider reference model that provides a framework for construction of a database by describing existing data service providers that are analogs (or comparables) to planned, new ESE data service providers. The CET implements the staff effort and cost estimation algorithms that access the CDB and generates the lifecycle cost estimate for a new data services provider. This data creates a common basis for an ESE proposal evaluator for considering projected data service provider costs.

Fontaine, Kathy↗

The Economics of NASA Mission Cost Reserves

Increases in NASA mission costs are well-noted but not well-understood, and there is little evidence that they are decreasing in frequency or amount over time. The need to control spending has led to analysis of the causes and magnitude of historical mission overruns, and many program control efforts are being implemented to attempt to prevent or mitigate the problem (NPR 7120). However, cost overruns have not abated, and while some direct causes of increased spending may be obvious (requirements creep, launch delays, directed changes, etc.), the underlying impetus to spend past the original budget may be more subtle. Gaining better insight into the causes of cost overruns will help NASA and its contracting organizations to avoid .them. This paper hypothesizes that one cause of NASA mission cost overruns is that the availability of reserves gives project team members an incentive to make decisions and behave in ways that increase costs. We theorize that the presence of reserves is a contributing factor to cost overruns because it causes organizations to use their funds less efficiently or to control spending less effectively. We draw a comparison to the insurance industry concept of moral hazard, the phenomenon that the presence of insurance causes insureds to have more frequent and higher insurance losses, and we attempt to apply actuarial techniques to quantifY the increase in the expected cost of a mission due to the availability of reserves. We create a theoretical model of reserve spending motivation by defining a variable ReserveSpending as a function of total reserves. This function has a positive slope; for every dollar of reserves available, there is a positive probability of spending it. Finally, the function should be concave down; the probability of spending each incremental dollar of reserves decreases progressively. We test the model against available NASA CADRe data by examining missions with reserve dollars initially available and testing whether they are more likely to spend those dollars, and whether larger levels of reserves lead to higher cost overruns. Finally, we address the question of how to prevent reserves from increasing mission spending without increasing cost risk to projects budgeted without any reserves. Is there a "sweet spot"? How can we derive the maximum benefit associated with risk reduction from reserves while minimizing the effects of reserve spending motivation?

Whitley, Sally↗

Concepts for Life Cycle Cost Control Required to Achieve Space Transportation Affordability and Sustainability

Cost control must be implemented through the establishment of requirements and controlled continually by managing to these requirements. Cost control of the non-recurring side of life cycle cost has traditionally been implemented in both commercial and government programs. The government uses the budget process to implement this control. The commercial approach is to use a similar process of allocating the non-recurring cost to major elements of the program. This type of control generally manages through a work breakdown structure (WBS) by defining the major elements of the program. If the cost control is to be applied across the entire program life cycle cost (LCC), the approach must be addressed very differently. A functional breakdown structure (FBS) is defined and recommended. Use of a FBS provides the visibifity to allow the choice of an integrated solution reducing the cost of providing many different elements of like function. The different functional solutions that drive the hardware logistics, quantity of documentation, operational labor, reliability and maintainability balance, and total integration of the entire system from DDT&E through the life of the program must be fully defined, compared, and final decisions made among these competing solutions. The major drivers of recurring cost have been identified and are presented and discussed. The LCC requirements must be established and flowed down to provide control of LCC. This LCC control will require a structured rigid process similar to the one traditionally used to control weight/performance for space transportation systems throughout the entire program. It has been demonstrated over the last 30 years that without a firm requirement and methodically structured cost control, it is unlikely that affordable and sustainable space transportation system LCC will be achieved.

Rhodes, Russel E.↗

The Future Impact of Much Lower Launch Cost

For decades, the high cost of space launch has been the greatest limiting factor on the nu ber and size of space missions. Recently commercial rockets have reduced launch cost to about one-twentieth of the space shuttle cost. This provides opportunities for a matching reduction in the cost of space systems and more and more massive missions. High launch costs greatly increase the cost of developing space systems, since the need to reduce mass forces the use of light materials, high packaging densities, and fragile structures that are difficult to manufacture and test. Lower launch costs allow the use of more robust and well tested off-the-shelf systems. Increased mass can be used to increase single string reliability and also to provide spares and redundancy. A crewed mission can benefit from lower launch costs by using mass to provide more accepted fully hydrated food, additional hygiene water, laundry, radiation shielding, and even artificial gravity. The crew can be made healthier, safer, more comfortable, and more productive. Lower launch cost makes every space activity easier, whether it is science, human exploration, commercial including communications, weather, surveillance, and geo-positioning services, or the defense of similar military services. Most of the solar system is empty space, with the energy of the sun’s radiation passing through to the cold of deep space. The missing mass needed to support human activities is now much easier to provide.

Jones, Harry W.↗

Comparing Low-Cost Sensors with Ground-Based and Airborne In-Situ and Column Observations of NO2 and HCHO during the FRAPPE Field Campaign in Colorado, USA

Even in the presence of more reliable air quality tools, low-cost sensors have the benefit of recording data on highly localized spatial and temporal scales, allowing for multiple measurements within a single satellite pixel and on pixel boundaries. However, they are less accurate than their regulatory-grade counterparts, requiring regular co-locations with accepted instruments to ensure their validity. Thus, the addition of low-cost sensors to a field campaign – where reference-grade air quality instruments are abundant – not only provides ample opportunities for low-cost sensor co-location and calibration, but also allows the low-cost instruments to be used for sub-pixel validation, covering more surface area than the regulatory instruments alone with a network of sensors. During the summer of 2014, our low-cost sensor network was deployed during the Front Range Air Pollution and Photochemistry Experiment (FRAPPÉ) campaign conducted to sample the composition of air at and above ground level in northeastern Colorado, USA. The low-cost sensor platform included a suite of gas-phase sensors, notably NO2 and two generalized volatile organic compound (VOC) sensors, which were leveraged together to quantify speciated hydrocarbons such as formaldehyde. These key pollutants were chosen for their impacts on human health and climate change, as well as their inclusion on the TEMPO satellite launching this year. Airborne campaign measurements included slant column optical observations of formaldehyde (HCHO), nitrogen dioxide (NO2), and ozone (O3). Myriad additional in-situ instruments described chemical composition up to approximately 5 km above surface level. Ground-based instrumentation included both stationary and mobile regulatory-grade instruments, which were used for sensor calibration. Machine learning techniques such as artificial neural networks (ANNs) were used to match the low-cost signals to that of the reference-grade instruments. Here, we compare calibrated low-cost sensor data collected at ground level in a variety of locations along Colorado’s Front Range to various data sources from the FRAPPÉ campaign to better understand how well airborne and regulatory ground-based measurements can be extrapolated to other locations. Further, as the slant column measurements act as satellite simulators, we explore how low-cost instruments can be used for satellite validation purposes. Comparisons among these different data types also have important implications in data fusion.

Kristen Okorn↗

Gaussian Process Regression Method for Costing SmallSat Bus Capabilities

NASA is responding to the growing interest in, andcapabilities of, small satellites for science applications with an increasingnumber and frequency of Announcements of Opportunityfor small satellite space missions. Estimating the probabilitythat these mission concepts will fit within the small cost capsof these opportunities is largely driven by the probability thatone of the burgeoning number of small satellite providers will beable to meet the payload’s accommodation requirements withinthe budget for the spacecraft. JPL has collected a databasecontaining technical specifications and cost of commerciallyavailable Smallsat buses across various vendors. The primarypurpose of the database is for use in JPL’s Team X architecturestudies to inform cost estimates of a spacecraft bus which fitsthe customer’s technical requirements for their payload andmission. Customer needs are often unique and don’t alignperfectly with an off-the-shelf commercial spacecraft bus, whichmotivates the need to develop a cost model across the continuoustechnical parameter space.Al’s Bus Cost Distribution Estimator (ABCDE) uses Gaussianprocess regression (GPR) to predict commercial Smallsat spacecraftbus cost based on a subset of a customer’s technicalrequirements (payload mass, payload power, delta V, pointingcontrol, and downlink rate). GPR is implemented in ABCDE asa Bayesian method which fits an implied multivariate regressionon the technical parameters and uses kriging to intentionally“overfit” the residuals. Overfitting the residuals allows costestimates to collapse in uncertainty closer to the data pointswhile maintaining larger uncertainty intervals in regions of parameterspace with fewer data records. The data used to fit thismodel is sensitive and represents cost estimates for off-the-shelfcommercial buses. GPR simultaneously protects the sensitivityof the database and uses the sparse nature of the database toaccount for uncertainty in cost in a useful way. For a givenset of customer technical requirements, the tool provides a costestimate distribution, the percentiles of which can be interpretedas a confidence level of finding a commercial bus under a specifiedcost cap. ABCDE dramatically pushes the boundaries ofspacecraft cost estimation models due to its Bayesian methodology(accounting for the maximum uncertainty in the underlyingregression), the mathematically advanced kriging methodology,and the novelty of its application in Team X architecture tradestudies.

Austin, Alex↗

Optimal Shielding Design For Minimum Materials Cost or Mass - Paper 128

Material costs dominate some shielding design problems. This is certainly the case for manned nuclear power space applications for which shielding is essential and the cost of launching by rocket from Earth is high. In such situations or in those where shielding volume or mass is constrained, it is important to optimize the design. Although trial and error synthesis methods may succeed, a more systematic approach is warranted. Design automation may also potentially reduce engineering costs. The objective is to automate the design of optimal radiation shielding to meet specified attenuation requirements given a menu of allowed shielding materials, their properties and their delivered costs per unit volume. The cost-optimal design is one which, at each location in the shield, chooses the menu material minimizing a particular functional of forward and adjoint angular fluxes plus material cost. Thus a Boltzmann forward and adjoint angular flux solver with additional calculations can evaluate whether a shield design is optimal or whether improvements are possible. An iterative algorithm based on approximated optimality is proposed to solve for the optimal shield design and numerical experiments with it are discussed. The future use of 3D Boltzmann solvers will allow extending results to shaped shield designs in which material is not wasted to maintain unneeded spherical symmetry. The largest cost savings of automated optimal design of shielding is expected to be for applications involving nuclear powered manned space missions where the required shielding attenuation of radiation and costs are both large. However, less exotic applications such as the shielding of radiation facilities on Earth could also benefit from optimal shielding design, and automation of the design process may reduce engineering costs. (author)

61 RADIATION PROTECTION AND DOSIMETRY↗

A Bottom-Up Cost Estimation Tool for Nuclear Microreactors

The rising interest in nuclear microreactors has highlighted the need for comprehensive technoeconomic assessments. However, the scarcity of publicly available designs and cost data has posed significant challenges. To address this issue, the Microreactor Optimization Using Simulation and Economics (MOUSE) tool is developed. MOUSE is a tool that integrates nuclear microreactor design with reactor economics. The design calculations encompass core simulations using the OpenMC Monte Carlo Particle Transport Code [romano2015], along with simplified balance of plant calculations. On the economic side, MOUSE provides detailed bottom-up cost estimates, calculating both the total capital cost and the levelized cost of energy for first-of-a-kind and nth-of-a-kind microreactors. The cost estimation correlations are developed using data from the MARVEL project and additional literature sources. MOUSE has released as an open-source tool on GitHub (MOUSE Tool). By combining design calculations with cost equations, MOUSE enables users to evaluate the impact of various technological consideration, advanced moderators, design changes, material/fuel changes, and geometry modifications—as well as economic parameters like interest rates and construction duration. This comprehensive framework can guide stakeholders towards technological solutions that enhance microreactor competitiveness. Additionally, powered by the WATTS toolkit [romano2022], MOUSE supports optimization studies, parametric analyses, and uncertainty calculations/propagation. Currently, preconceptual designs of three microreactor types are included in MOUSE: a liquid metal thermal microreactor (LTMR), gas cooled TRISO-fueled microreactor (GCMR) and heat-pipe TRISO fueled microreactor (HPMR). To showcase its ability, MOUSE was used to conduct detailed bottom-up cost estimates for the first of a kind (FOAK) and Nth of a kind (NOAK) of the following microreactors • A 20MWt LTMR that is built on the ongoing MARVEL demonstration at Idaho National Laboratory (INL) • A 15 MWt GCMR that was designed to be more representative of the typical commercial microreactor • A 7 MWt HPMR that was built on previous work (Choi 2024) The The reader should note that these three designs and corresponding cost estimates are examples to demonstrate the MOUSE capability. The designs are pre-conceptual, the reactor designs were not optimized, and the cost estimates were developed with incomplete information. Additionally, stakeholders might be interested in a variety of designs that may differ from the examples provided in this report. The MOUSE tool can also be used to study how design choices affect economics. To demonstrate its capability, MOUSE was used conduct parametric studies such as examining the economic impact of the reflector's material and thickness, the moderator's booster material and dimensions, fuel composition and enrichment, core size, and power level. Several insights were gained from these parametric studies.

Hanna, Botros↗

Floating Photovoltaic System Cost Benchmark: Q1 2021 Installations on Artificial Water Bodies

In this report, we conduct a bottom-up analysis of the installed costs for FPV systems deployed on artificial water bodies under average site conditions (wind load of about 40 m/s, snow load of 20 psf, water depth of 50 m, water level variation of 10 m, and swell height of 1 m). We estimate an installed system cost premium of $\$0.26$/WDC (25%) for 10-MWDC fixed-tilt FPV systems, compared with ground-mounted, fixed-tilt PV installed over bare ground. Higher structural costs related to the floats and anchoring system are the largest contributors to this premium. Currently, site investigation costs are also higher for FPV because of the additional effort needed to plan and design these more complex installations. Our preliminary sensitivity analysis shows that the installed cost of FPV systems is most sensitive to float costs, wind and snow loading, and module efficiency. FPV deployment is in an early stage, and additional experience, best practice development, and new configurations and technologies could help reduce the costs of FPV systems over time.

14 SOLAR ENERGY↗

In Search of the Economic Sustainability of Hadron Therapy: The Real Cost of Setting Up and Operating a Hadron Facility

Purpose: To determine the treatment cost and required reimbursement for a new hadron therapy facility, considering different technical solutions and financing methods. Methods and Materials: The 3 technical solutions analyzed are a carbon only (COC), proton only (POC), and combined (CC) center, each operating 2 treatment rooms and assumed to function at full capacity. A business model defines the required reimbursement and analyzes the financial implications of setting up a facility over time; activity-based costing (ABC) calculates the treatment costs per type of patient for a center in a steady state of operation. Both models compare a private, full-cost approach with public sponsoring, only taking into account operational costs. Results: Yearly operational costs range between €10.0M (M = million) for a publicly sponsored POC to €24.8M for a CC with private financing. Disregarding inflation, the average treatment cost calculated with ABC (COC: €29,450; POC: €46,342; CC: €46,443 for private financing; respectively €16,059, €28,296, and €23,956 for public sponsoring) is slightly lower than the required reimbursement based on the business model (between €51,200 in a privately funded POC and €18,400 in COC with public sponsoring). Reimbursement for privately financed centers is very sensitive to a delay in commissioning and to the interest rate. Higher throughput and hypofractionation have a positive impact on the treatment costs. Conclusions: Both calculation methods are valid and complementary. The financially most attractive option of a publicly sponsored COC should be balanced to the clinical necessities and the sociopolitical context.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Cost estimation of balance of plant equipment scale up for proton exchange membrane water electrolyzer systems

Water electrolyzers that use electricity to split water into hydrogen and oxygen could be a key technology for increasing hydrogen supply to meet expanded and emerging market applications, although currently the capital costs of these electrolyzers are high. Here we examine cost reductions that might be achieved by scaling up proton exchange membrane (PEM) electrolyzer systems and leveraging economies of scale through balance of plant (BOP) components for system sizes between 1 MW and 1 GW. We estimate BOP equipment capital costs of about $\$$848/kW at 1 MW, potentially decreasing to $\$$87/kW at 1 GW (2022-dollar year basis) with most of the cost reduction happening as systems scale from 1 MW to 100 MW. We find that BOP subsystems hydrogen drying and water knockout benefited the most from economies-of-scale cost reductions, and piping, instrumentation, and housing and power electronics were less impacted. These cost reductions from economies of scale could be more significant than estimated cost reductions from manufacturing scale-up reported in literature. These results add to the knowledge base that could guide optimal system designs that balance process scale-up with plant modularization and numbering-up. We also estimate that scaling up BOP could potentially lower the levelized cost of hydrogen (LCOH) by $\$$1.7-$\$$4.6/kg, depending on the scale-up magnitude and the plant capacity factor.

08 HYDROGEN↗

Greenhouse gas emission reduction and cost from the United States biofuels mandate

The United States biofuel mandate might be the largest operating program to reduce greenhouse gas (GHG) emissions. Our paper uses regulatory information about abatement and compliance cost estimates to measure the greenhouse gas abatement cost curve of the mandate. Historical compliance costs per unit of biofuel appear readily available, yet findings here show that using these data along with observed biofuel quantities biases biofuel mandate abatement cost estimates upward. Unbiased estimation requires that related biofuel mandate costs and emissions are estimated along with associated market effects, including on fuel use, using an economic model. Moreover, this approach relates greenhouse gas abatement to the implications for crop prices and land use, taking account of interactions within the crop sector. Results show that the United States biofuel mandate causes up to 20 million metric tons of carbon dioxide equivalent abatement for compliance costs that are equivalent to carbon prices ranging up to $20 per ton, with a large part coming from reductions in petroleum product use as the mandate encourages substitution to biofuels. Abatement costs are reduced if ethanol is made at new facilities with fewer emissions or if petroleum output expansion causes greater emissions than the historical average. Results also indicate that GHG abatement via the mandate is initially costly due to the nature of biofuel demand, there can be a trade-off between corn price increase and GHG reduction, and the increase in total area planted to crops in the U.S. is less important than the reallocation of land among crops.

09 BIOMASS FUELS↗

Pricing landfill externalities: Emissions and disamenity costs in Cape Town, South Africa

Highlights: > The paper estimates landfill externalities associated with emissions, disamenities and transport. > Transport externalities vary from 24.22 to 31.42 Rands per tonne. > Costs of emissions (estimated using benefits transfer) vary from 0.07 to 28.91 Rands per tonne. > Disamenities (estimated using hedonic pricing) vary from 0.00 to 57.46 Rands per tonne. > Overall, external costs for urban landfills exceed those of a regional landfill. - Abstract: The external (environmental and social) costs of landfilling (e.g. emissions to air, soil and water; and 'disamenities' such as odours and pests) are difficult to quantify in monetary terms, and are therefore not generally reflected in waste disposal charges or taken into account in decision making regarding waste management options. This results in a bias against alternatives such as recycling, which may be more expensive than landfilling from a purely financial perspective, but preferable from an environmental and social perspective. There is therefore a need to quantify external costs in monetary terms, so that different disposal options can be compared on the basis of their overall costs to society (financial plus external costs). This study attempts to estimate the external costs of landfilling in the City of Cape Town for different scenarios, using the benefits transfer method (for emissions) and the hedonic pricing method (for disamenities). Both methods (in particular the process of transferring and adjusting estimates from one study site to another) are described in detail, allowing the procedures to be replicated elsewhere. The results show that external costs are currently R111 (in South African Rands, or approximately US$16) per tonne of waste, although these could decline under a scenario in which energy is recovered, or in which the existing urban landfills are replaced with a new regional landfill.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expert elicitation survey predicts 37% to 49% declines in wind energy costs by 2050

Wind energy has experienced accelerated cost reduction over the past five years—far greater than predicted in a 2015 expert elicitation. Here we report results from a new survey on wind costs, compare those with previous results and discuss the accuracy of the earlier predictions. In this work, we show that experts in 2020 expect future onshore and offshore wind costs to decline 37–49% by 2050, resulting in costs 50% lower than predicted in 2015. This is due to cost reductions witnessed over the past five years and expected continued advancements. If realized, these costs might allow wind to play a larger role in energy supply than previously anticipated. Considering both surveys, we also conclude that there is considerable uncertainty about future costs. Our results illustrate the importance of considering cost uncertainty, highlight the value and limits of using experts to reveal those uncertainties, and yield possible lessons for energy modellers and expert elicitation.

17 WIND ENERGY↗

Implications of Cost Effectiveness Screening Practices in a Low Natural Gas Price Environment: Case Study of a Midwestern Residential Energy Upgrade Program

With the proliferation of statewide energy savings targets and other policies favorable to energy efficiency, savings from utility customer-funded energy efficiency programs could rise to offset much of annual load growth by 2025 (Barbose et al 2013). For these increased savings to occur, however, nearly all of these programs must pass screening for cost effectiveness. Some program administrators and state regulators are finding that conventional analyses, which only consider a narrow set of energy-savings related efficiency program benefits, are now resulting in some natural gas efficiency programs failing their cost-effectiveness criteria in the new low natural gas price environment. Regulators are considering whether to scale back or terminate gas portfolios in at least four states (WA, OR, ID, NM) because of cost-effectiveness concerns. Stakeholders in several regions of the country have asked LBNL to help assess alternatives to reducing the pursuit of energy savings in their regions. We address these requests by producing two working papers: one exploring cost-effectiveness screening policy implications of low to moderate natural gas prices, and a second assessing some of the values that policymakers may take into account in weighing the pros and cons of ending natural gas efficiency programs. In this policy brief, we lay out the challenges that low gas prices pose for cost effectiveness of an electric-gas efficiency program and portfolio. We then quantify options available to regulators and administrators who want to evaluate the tradeoffs among multiple policy objectives. A multi-measure, residential energy upgrade program in the Midwest is used as a lens to explore the implications of common and emerging cost-effectiveness policies in the context of low prices for natural gas. We illustrate the results across a range of cost-effectiveness screening options, including different discount rates, levels of test application, various benefit-cost tests, and the inclusion of non-energy resource benefits.

03 NATURAL GAS↗