Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Communication costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Chalcogenide phase-change material advances programmable terahertz metamaterials: a non-volatile perspective for reconfigurable intelligent surfaces

Terahertz (THz) waves have gained considerable attention in the rising 6G communication due to their large bandwidth. However, the cost and power consumption become the major constraints for the commercialization of 6G THz systems as the frequency increases. Reconfigurable intelligent surface (RIS) comprising active metasurfaces and digital controllers has been proposed for beamforming in the 6G multiple-input-multiple-output systems, showing good potential to suppress the system size, weight, and power consumption (SWaP). Currently, their controlling diodes can hardly work up to THz frequencies. Therefore, several active stimuli have been investigated as alternatives. Among them, chalcogenide phase-change material Ge 2 Sb 2 Te 5 (GST) addresses large modulation depth, picosecond switching speed, and non-volatile properties. Notably, the non-volatile GST may enable RIS systems with memory and low control power. This work briefly reviews the advances of GST-tuned THz metamaterials (MTMs), discusses the current obstacles to overcome, and gives a perspective of GST applications in the rising 6G communications.

6G↗

Highly reusable space transportation: Approaches for reducing ETO launch costs to $100 - $200 per pound of payload

The Commercial Space Transportation Study (CSTS) suggests that considerable market expansion in earth-to-orbit transportation would take place if current launch prices could be reduced to around $400 per pound of payload. If these low prices can be achieved, annual payload delivered to low earth orbit (LEO) is predicted to reach 6.7 million pounds. The primary market growth will occur in communications, government missions, and civil transportation. By establishing a cost target of $100-$200 per pound of payload for a new launch system, the Highly Reusable Space Transportation (HRST) program has clearly set its sights on removing the current restriction on market growth imposed by today's high launch costs. In particular, achieving the goal of $100-$200 per pound of payload will require significant coordinated efforts in (1) marketing strategy development, (2) business planning, (3) system operational strategy, (4) vehicle technical design, and (5) vehicle maintenance strategy.

Olds, John R.↗

Developing satellite communications for public service: Prospects in four service areas

The Public Service Satellite Consortium evaluated prospects for satellite telecommunications in four areas of the public service: the U.S. health care system, elementary and secondary education, American libraries, and that sector of the public service which is concerned with the provision of continuing education to health professionals. Three important conclusions were reached. First, throughout the public service there are three recurring needs: improved access, cost containment, and maintenance of quality. Appropriate application of communication satellite systems could ameliorate each of these concerns. Second, there appears to be an enormous latent demand for data communication services throughout the public service. The potential demand in 1982 to support requirements in hospital administration, library services and other information-retrieval activities, equipment maintenance, and environmental monitoring may be in excess of $300 million a year. Third, administrative applications of data communication networks show particular promise, especially in rural areas.

Source record↗

DSN Antenna Array Architectures Based on Future NASA Mission Needs

A flexible method of parametric, full life-cycle cost analysis has been combined with data on NASA's future communication needs to estimate the required number and operational dates of new antennas for the Deep Space Network (DSN). The requirements were derived from a subset of missions in the Integrated Mission Set database of NASA's Space Communications Architecture Working Group. Assuming that no new antennas are 'constructed', the simulation shows that the DSN is unlikely to meet more than 20% of mission requirements by 2030. Minimum full life-cycle costs result when antennas in the diameter range, 18m-34m, are constructed. Architectures using a mixture of antenna diameters produce a slightly lower full life-cycle cost.

array↗

Synthesis of a large communications aperture using small antennas

In this report we compare the cost of an array of small antennas to that of a single large antenna assuming both the array and single large antenna have equal performance and availability. The single large antenna is taken to be one of the 70-m antennas of the Deep Space Network. The cost of the array is estimated as a function of the array element diameter for three different values of system noise temperature corresponding to three different packaging schemes for the first amplifier. Array elements are taken to be fully steerable paraboloids and their cost estimates were obtained from commercial vendors. Array loss mechanisms and calibration problems are discussed. For array elements in the range 3 - 35 m there is no minimum in the cost versus diameter curve for the three system temperatures that were studied.

Resch, George M.↗

Minimal Energy Routing of a Leader and a Wingmate with Periodic Connectivity

We consider a route planning problem in which two unmanned vehicles are required to complete a set of tasks present at distinct locations, referred to as targets, with minimum energy consumption. The mission environment is hazardous, and to ensure a safe operation, the UVs are required to communicate with each other at every target they visit. The problem objective is to determine the allocation of the tasks to the UVs and plan tours for the UVs to visit the targets such that the weighted sum of the distances traveled by the UVs and the distances traveled by the communicating signals between them is minimized. We formulate this problem as an Integer program and show that naively solving the problem using commercially available off-the-shelf solvers is insufficient in determining scalable solutions efficiently. To address this computational challenge, we develop an approximation and a heuristic algorithm, and employ them to compute high-quality solutions to a special case of the problem where equal weights are assigned to the distances traveled by the vehicles and the communicating signals. For this special case, we show that the approximation algorithm has a fixed approximation ratio of 3.75. We also develop lower bounds to the optimal cost of the problem to evaluate the performance of these algorithms on large-scale instances. We demonstrate the performance of these algorithms on 500 randomly generated instances with the number of targets ranging from 6 to 100, and show that the algorithms provide high-quality solutions to the problem swiftly; the average computation time of the algorithmic solutions is within a fraction of a second for instances with at most 100 targets. Finally, we show that the approximation ratio has a variable ratio for the weighted case of the problem. Specifically, if ρ denotes the ratio of the weights assigned to the distances representing the communication and travel costs, the algorithm has an a posteriori ratio of $3 + \frac{3ρ}{4}$ when ρ ≥ 1, and $\frac{3}{ρ}$ + $\frac{3}{4}$ when ρ ≤ 1.

42 ENGINEERING↗

TT and C - First TDRSS, Then Commercial GEO and Big LEO and Now through LEO

The advent of low earth orbit (LEO) commercial communications satellites provides an opportunity to dramatically reduce Telemetry Tracking and Control (TT&C) costs of launch vehicles and Unpiloted Aerial Vehicles (UAVs) by reducing or eliminating ground infrastructure. Personnel from the Goddard Space Flight Center Wallops Flight Facility (GSFC/WFF) in Virginia have successfully used commercial GEO & Big LEO communications satellites for Long Duration Balloon flight TT&C. In addition, TDRSS capability for these balloons has been developed by WFF for the Ultra Long Duration Balloons with the first test flight launch in January 2001 for one global circumnavigation at 120,000 feet altitude launched from Alice Springs. Australia. Numerous other low cost applications can new utilize the commercial LEO satellites for TT&C. The Flight Modern became a GSFC/WFF Advanced Range Technology Initiative (ARTI) in an effort to streamline TT&C capability to the user community at low cost. Phase I ground tests of The Flight Modem verified downlink communications quality of service and measured transmission latencies. These tests were completed last year, Phase II consisting of aircraft flight tests provide much of the data presented in this paper. Phase III of the Flight Modern baseline test program is a demonstration of the ruggedized version of the WFF Flight Modem flown on one sounding rocket launched from Sweden. Flights of opportunity have been and are being actively pursued with other centers, ranges and users at universities. The WFF goal is to reduce TT&C costs by providing a low cost COTS Flight Modem with a User Handbook containing system capability and limitation descriptions. Additionally, since data transmission is by packetized Internet Protocol (IP), data can be received and commands initialed from practically any location with no infrastructure. The WFF, like most ranges, has been using GPS receivers on sounding rockets and long duration balloons for several years, The WFF Flight Modem contains a GPS receiver to provide vehicle position for tracking and vehicle recovery. The system architecture which integrates antennas, GPS receiver, commercial satellite packet data modem. and a single board computer with custom software is described and a number of technical challenges are discussed along with the plan for their resolution. These include antenna development, high Doppler rates, reliability, environmental ruggedness, hand over between satellites and data security. An aggressive test plan is included which in addition to environmental Testing measures bit error rate latency and antenna patterns. Additional flight tests are planned far the near future on aircraft, long duration balloons and sounding rockets and these results as well as the current status of the project arc reported. Use of the WFF Flight Modem on small satellites is also being pursued. The LEO satellite constellation altitude above 1400 km is not an obstacle because most spacecraft do not require continuous Communications. The challenge is scheduling where store and forward techniques for command are required and downlink when the communications link allows connection (above 60 percent of the time depending on the satellite altitude). Sophisticated scheduling techniques utilizing 2-line orbital element sets available on the NASA/NORAD Internet site could be implemented for rare special cases. The current 9600 baud rate of the LEO communications link may be increased With special techniques that are planned for development in the WFF Flight Modem project.

Morgan, Dwayne↗

The Goonhilly 85-ft. steerable dish aerial

The choice of the basic type of aerial for a satellite communication ground station is of major importance in view of its influence on the overall performance, cost and time to complete the installation. In the case of the Post Office satellite communication earth station at Goonhilly Downs, Cornwall, a decision was made early in 1961 to use an 85-ft diameter steerable paraboloidal dish aerial, without a radome for tests with the Telstar and Relay, and other communication satellites. Tests with smaller paraboloidal dish aerials with the feed in the aperture plane had shown that a satisfactory electrical performance could be obtained, and experience with the 250-ft diameter radio telescope at Jodrell Bank had shown that the mechanical problems could be overcome. An important factor in the present case was the limited time--less than one year--available for the design, manufacture, construction and testing of the aerial.

COMMUNICATIONS SATELLITE↗

Planetary Science Technology Infusion Study: Findings and Recommendations Status

The Planetary Science Division (PSD) within the National Aeronautics and Space Administrations (NASA) Science Mission Directorate (SMD) at NASA Headquarters sought to understand how to better realize a scientific return on spacecraft system technology investments currently being funded. In order to achieve this objective, a team at NASA Glenn Research Center was tasked with surveying the science and mission communities to collect their insight on technology infusion and additionally sought inputs from industry, universities, and other organizations involved with proposing for future PSD missions. This survey was undertaken by issuing a Request for Information (RFI) activity that requested input from the proposing community on present technology infusion efforts. The Technology Infusion Study was initiated in March 2013 with the release of the RFI request. The evaluation team compiled and assessed this input in order to provide PSD with recommendations on how to effectively infuse new spacecraft systems technologies that it develops into future competed missions enabling increased scientific discoveries, lower mission cost, or both. This team is comprised of personnel from the Radioisotope Power Systems (RPS) Program and the In-Space Propulsion Technology (ISPT) Program staff.The RFI survey covered two aspects of technology infusion: 1) General Insight, including: their assessment of barriers to technology infusion as related to infusion approach; technology readiness; information and documentation products; communication; integration considerations; interaction with technology development areas; cost-capped mission areas; risk considerations; system level impacts and implementation; and mission pull. 2) Specific technologies from the most recent PSD Announcements of Opportunities (AOs): The Advanced Stirling Radioisotope Generator (ASRG), aerocapture and aeroshell hardware technologies, the NASA Evolutionary Xenon Thruster (NEXT) ion propulsion system, and the Advanced Materials Bi-propellant Rocket (AMBR) engine.This report will present the teams Findings from the RFI inputs and the recommendations that arose from these findings. Methodologies on the findings and recommendations development are discussed.

technology infusion↗

Design for an integrated discipline operations control center for Space Station Freedom

This paper presents selected features of a human factors oriented plan for a Space Station Freedom (SSF) ground Discipline Operations Center (DOC) that is integrated with other work areas used by multidisciplinary life scientists. This combined facility is referred to as an integrated DOC or IDOC. This plan is based upon the assumption that there will be a constantly changing array of specialized equipment and procedures used by life sciences principal investigators (PI) on the ground which must be linked to SSF through various DOC systems. Other sites will also be able to communicate with SSF (Anon., 1992). It is also assumed that cost reduction will be a major design consideration and that one integrated structure will be less expensive to build and operate than two separate ones. Since both the DOC personnel and PIs will need to communicate with the flight crew aboard SSF, the general interconnect architecture of the PIs' communication linkage is considered here. Key human factor design elements of this plan include: a candidate facility layout which accommodates three (3), multipurpose, rapidly reconfigurable work areas (suites) and consequent user traffic flow considerations, a multimedia telecommunications support capability, functional (human) traffic flow, optimized internal illumination and acoustics requirements, selected volumetric and safety requirements, and other architectural design parameters.

Haines, Richard F.↗

Compact, low profile antennas for MSAT and mini-M and Std-M land mobile satellite communications

CAL Corporation has developed a new class of low profile radiating elements for use in planar phased array antennas. These new elements have been used in the design of a low cost, compact, low profile antenna unit for MSAT and INMARSAT Mini-M land mobile satellite communications. The antenna unit which measures roughly 32 cm in diameter by 5 cm deep incorporates a compact LNA and diplexer unit as well as a complete, low cost, beam steering system. CAL has also developed a low profile antenna unit for INMARSAT-M land mobile satellite communications. A number of these units, which utilize a microstrip patch array design, were put into service in 1994.

Strickland, P. C.↗

Distress detection, location, and communications using advanced space technology

This paper briefly introduces a concept for low-cost, global, day-night, all-weather disaster warning and assistance. Evolving, advanced space technology with passive radio frequency reflectors in conjunction with an imaging synthetic aperture radar is employed to detect, identify, locate, and provide passive communication with earth users in distress. This concept evolved from a broad NASA research on new global search and rescue techniques. Appropriate airborne radar test results from this research are reviewed and related to potential disaster applications. The analysis indicates the approach has promise for disaster communications relative to floods, droughts, earthquakes, volcanic eruptions, and severe storms.

Sivertson, W. E., Jr.↗

Distress detection, location, and communications using advanced space technology

This paper briefly introduces a concept for low-cost, global, day-night, all-weather disaster warning and assistance. Evolving, advanced space technology with passive radio frequency reflectors in conjunction with an imaging synthetic aperture radar is employed to detect, identify, locate, and provide passive communication with earth users in distress. This concept evolved from a broad NASA research on new global search and rescue techniques. Appropriate airborne radar test results from this research are reviewed and related to potential disaster applications. The analysis indicates the approach has promise for disaster communications relative to floods, droughts, earthquakes, volcanic eruptions, and severe storms.

Sivertson, W. E., Jr.↗

SPACEWAY(TM) Providing Afordable and Versatile Telecommunication Solutions

This paper presents a summary description of SPACEWAY(TM), a network of Ka band geostationary satellites being developed by Hughes Communications, Inc. to provide worldwide interactive telecommunications services to small, low cost user terminals. By the end of this decade SPACEWAY(TM), using relatively few satellites and tightly focused spot beams, will provide affordable interactive 'bandwidth on demand' communication services on a global basis to consumer and commercial end users. This paper describes the system concept, details the space and ground segment characteristics, and discusses communication links.

Fitzpatrick, Edward James↗

An Evaluation of OpenSHMEM Interfaces for the Variable-Length Alltoallv() Collective Operation, In: OpenSHMEM and Related Technologies. Experiences, Implementations, and Technologies

Alltoallv() is a collective operation which allows all processes to exchange variable amounts of data with all other processes in the communication group. This means that Alltoallv() requires not only O(N2) communications, but typically also additional exchanges of the data lengths that will be transmitted in the eventual Alltoallv() call. This pre-exchange is used to calculate the proper offsets for the receiving buffers on the target processes. However, we propose two new candidate interfaces for Alltoallv() that would mitigate the need for the user to set up this extra exchange of information at the possible cost of memory efficiency. We explain the new interface variants and show how a single call can be used in place of the traditional Alltoall()/ Alltoallv() pair. We then discuss the performance tradeoffs for overall communication and memory costs, as well as both software and hardware-based optimizations and their applicability to the various proposed interfaces.

Computer Science↗

Utility of space transportation system to space communication community: Executive summary

The space transportation system (STS) offers the opportunity for maintaining, and perhaps accelerating, growth of the space communication community. This new launch vehicle service, however, must be obtained at a cost lower than the current expandable launch vehicles cost. A cost competitive STS is defined for geostationary payloads. It is concluded that the STS will be useful to the space communication community, as well as to other geostationary satellite system users, if the proposed recommendations are adapted.

Bronstein, L. M.↗

Aerospace Vehicle Design, Spacecraft Section. Final Project Reports: Project Groups 6-8 - Volume 2

Three groups of student engineers in an aerospace vehicle design course present their designs for a vehicle that can be used to resupply the Space Station Freedam and provide emergency crew return to earth capability. The vehicle's requirements include a lifetime that exceeds six years, low cost, the capability for withstanding pressurization, launch, orbit, and reentry hazards, and reliability. The vehicle's subsystems are structures, communication and command data systems, attitude and articulation control, life support and crew systems, power and propulsion, reentry and recovery systems, and mission management, planning, and costing. Special attention is given to spacecraft communications.

Source record↗

The HyRIGHT Project: 700 bar Hydrogen Refueling Interface for Gaseous Heavy-Duty Trucks

Heavy duty truck fueling places additional constraints on the station. The HyRIGHT project was developed to evaluate a subset of key areas around precooling, communications, and safety risks that aims to:  Utilize a dynamic model that includes the relevant station components and vehicle to develop an optimized precooling strategy based on initial precooling status, real time communications that can support fueling protocol development.  Perform a techno economic cost assessment (TEA) related to effects of precooling including station storage and efficiency effects.  Develop a Cyber Vulnerability assessment and framework for refueling of HD vehicles with station communications.  Disseminate the results in support of the HD fueling protocol development to the relevant standards development organizations.

JAMES, Charles W.↗