Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

Commissioning the NIFFTE Time Projection Chamber: Towards the U-238/U-235 (n,f) Cross-section Ratio

The Neutron Induced Fission Fragment Tracking Experiment (NIFFTE) collaboration is developing a Time Projection Chamber (TPC) to measure neutron-induced fission cross sections with unprecedented accuracy. Modifying TPC technology for nuclear physics applications is a challenging endeavor, and frequent testing and evaluation is required to ensure that all components are behaving as expected. In-beam tests of the NIFFTE TPC at the Los Alamos Neutron Science Center (LANSCE) commenced in 2010. An overview of the NIFFTE TPC experiments performed at LANSCE will be presented, along with preliminary performance results.

Meharchand, Rhiannon↗

Commissioning and operation in magnetic field of CMS GE1/1 station

In October and November 2021 the CMS Gas Electron Multiplier (GEM) detectors of station GE1/1 were operated for the first time in presence of a magnetic field in CMS. The phenomena observed in this first period led to performing a test on GE1/1 chambers to study their behaviour in presence of a magnetic field ramp. The magnetic field has been created using the Goliath magnet installed in the CERN North Area. In conclusion, the aim of the test is to determine if a magnetic field ramp causes serious problems to the operation of the GEM chambers and to develop a clear set of procedures, that will permit the safe operations of the GEM chambers during a magnetic field ramp.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning of the neutron irradiation station at the University of Notre Dame

Cross section data for neutron-induced reactions are needed for applications in nuclear astrophysics, stockpile stewardship, and nuclear reactor design but often contain discrepancies and gaps. A neutron source with a high neutron flux, a well-characterized neutron energy distribution, and a wide range of available neutron energies is ideal for studying such reactions in order to improve on existing data and provide new experimental results. For this purpose, the Neutron Irradiation Station (NIS) was developed using the 7 Li(p,n) 7 Be reaction. Neutron energy profiles were obtained using 3 He spectrometers and neutron standards were used to determine the neutron flux using the activation method. The neutron energy profile was found to be quasi-monoenergetic and neutrons were produced at energies from 1 keV to 1 MeV. Finally, the flux at the production target was found to be (1.42 ± 0.20) x 10 8 s −1 cm −2 .

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Design and commissioning of readout electronics for a $K$$^{0}_{L}$ and $μ$ detector at the Belle II experiment

The K-long and muon detector (KLM) constitutes the outer-most volume of the Belle II spectrometer at the interaction region of the SuperKEKB collider in Tsukuba, Japan. The KLM detector was partially upgraded since the Belle experiment by replacing many of its resistive-plate chambers with scintillators containing wavelength-shifting fibers and instrumenting it with silicon photomultipliers. Here, we describe the readout electronics, firmware, and software created to control and acquire data from the scintillators and resistive-plate chambers.

Belle II↗

Design and commissioning of the Correlated Gamma-Neutron Array for sCattering (CoGNAC)

The Correlated Gamma-Neutron Array for sCattering (CoGNAC) is a dual $n$-$γ$ detector array fielded at the Weapons Neutron Research facility at the Los Alamos Neutron Science Center. Here, the detector array utilizes elpasolite detectors and liquid scintillators to perform measurements of neutron elastic and inelastic scattering cross sections and emitted particle angular distributions. This manuscript details the design and experimental setup of CoGNAC as well as some of the preliminary studies performed to select the elpasolite detectors deployed in the array. Examples of the analysis methods available to CoGNAC are given in the context of past CoGNAC measurements of neutron scattering reactions on 28 Si and 56 Fe.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Taking 'control': Federal energy regulatory Commission policy on acquisitions of electric utility securities

Section 203 of the Federal Power Act remains subject to considerable uncertainty. Therefore, it is important to keep several rules in mind. Each potential acquisition must be separately analyzed under Section 203(a)(1) and 203(a)(2) of the Act. A proposed acquisition that is exempt or preapproved under one provision may still require prior FERC approval under the other one. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A fractured climate? the political economy of public utility commissions in an age of climate change

Between 1997 and 2005, states that elected their public utility commissioners had an annual percent change in CO{sub 2} emissions that was nearly three times as much as those states that appoint their PUC commissioners. This suggests that developing institutions which provide decision-makers with political independence through an appointment system might be an important element in lowering environmental externalities and preventing future warming of the Earth. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Re-Examining first principles of regulation: NRG power marketing, LLC v. Maine public utilities Commission

Maine PUC and Morgan Stanley have resolved some of the key issues facing the energy industry. The Supreme Court has plainly and directly in both cases reaffirmed the central role that private contracts play in the energy industry and set terms to balance the need to secure long-term investment with the public interest that lies at the heart of the Federal Power Act. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Where the champsaur commission's critics Have got it wrong

In order to be constructive, the debate on markets versus electrical system regulation must be based on experience in real operating markets and regulated environments. If dogmatism prevails, it can fall into the contradiction of economical rationality. Unlike the U.S., where evolution has been driven by practice, the European Union wants to impose uniformity - electricity regulation regardless of individual countries' special circumstances. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

State environmental law and carbon emissions: Do public utility commissions use environmental statutes to fight global warming?

In many states environmental statutes provide the authority for public utility commissioners to make decisions to reduce greenhouse gases from electricity generation. This article looks at six such laws and how the presence of these laws affected CO{sub 2} emissions during a nine-year period from 1997 to 2005. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EC power management in ITER for NTM control: the path from the commissioning phase to demonstration discharges

Time dependent simulations that evolve consistently the magnetic equilibrium and plasma pressure profiles and the width and frequency rotation of magnetic islands under the effect of the Electron Cyclotron feedback system are used to assess whether the control of NTMs on ITER is compatible with other simulataneous functionalities of the EC system, like core heating and current profile tailoring, or sawtooth control. Furthermore, results indicate that the power needs for control can be reduced if the EC power is reserved and if pre-emptive control is used as opposed to an active search for an already developed island.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

On the Commissioning of CT-simulation in Radiotherapy Treatment Planning: A Phantom Study

The development of CT-simulation leads to major improvements in radiation therapy treatment planning. However it is not clear whether this new technology has evolved to the point of completely eliminating the ''physical simulator''. At present there is an ongoing debate about the significance of virtual simulation in the treatment planning process and its limitations for different clinical purposes. The purpose of this study is to measure the accuracy in the determination of the isocenter in a virtual simulation process and to report about parameters which influence on the precision of its determination.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

First commissioning results with the Grenoble test electron cyclotron resonance ion source at iThemba LABS

iThemba Laboratory for Accelerator Based Science (iThemba LABS) is a multi-disciplinary accelerator facility. One of its main activities is the operation of a separated-sector cyclotron with a K-value of 200, which provides beams of various ion species. These beams are used for fundamental nuclear physics research in the intermediate energy region, radioisotope production, and medical physics applications. Due to the requirements of nuclear physics for new ion species and higher energies, the decision was made to install a copy of the so-called Grenoble test source (GTS) at iThemba LABS. In this paper, we will report on the experimental setup and the first results obtained with the GTS2 at iThemba LABS.

43 PARTICLE ACCELERATORS↗

Commissioning of heating neutral beams for COMPASS-D tokamak

Two neutral beam injectors have been developed for plasma heating on COMPASS-D tokamak (Institute of Plasma Physics, Prague). The 4-electrodes multihole ion-optical system with beam focusing was chosen to provide the low divergence 300 kW power in both deuterium and hydrogen atoms. The accelerating voltage is 40 kV at extracted ion current up to 15 A. The power supply system provides the continuous and modulated mode of the beam injection at a maximal pulse length 300 ms. The optimal arrangement of the cryopanels and the beam duct elements provides sufficiently short-length beamline which reduces the beam losses. The evolution of the impurities and molecular fraction content is studied in the process of the high voltage conditioning of the newly made ion sources. Two injectors of the same type have been successfully tested and are ready for operation at tokamak in IPP, Prague.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Assembly and commissioning of a new SRF cryomodule for the ATLAS intensity upgrade

The Argonne National Laboratory Physics Division is in the final stages of a major upgrade to the Argonne Tandem Linear Accelerator System national user facility, referred to as the intensity upgrade. The intensity upgrade project will substantially increase beam currents for experimenters working with the existing ATLAS stable and in-flight rare isotope beams and for the neutron-rich beams from the Californium Rare Isotope Breeder Upgrade. This project includes the replacement of three existing cryomodules, containing 18 superconducting accelerator cavities and 9 superconducting solenoids, with a single cryomodule with seven SC 72.75 MHz accelerator cavities optimized for ion velocities of 7.7% the speed of light and 4 SC solenoids all operating at 4.5 K. This presentation will report: how we minimized the heat load into the 4 K and 80 K coolant streams feeding the cryomodule, a comparison of the calculated and measured static heat loads at 80 K and the mechanical design of the vacuum vessel.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗