Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONGESTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

642 records · Page 36

Automated Demand Response Opportunities in Wastewater Treatment Facilities

Wastewater treatment is an energy intensive process which, together with water treatment, comprises about three percent of U.S. annual energy use. Yet, since wastewater treatment facilities are often peripheral to major electricity-using industries, they are frequently an overlooked area for automated demand response opportunities. Demand response is a set of actions taken to reduce electric loads when contingencies, such as emergencies or congestion, occur that threaten supply-demand balance, and/or market conditions occur that raise electric supply costs. Demand response programs are designed to improve the reliability of the electric grid and to lower the use of electricity during peak times to reduce the total system costs. Open automated demand response is a set of continuous, open communication signals and systems provided over the Internet to allow facilities to automate their demand response activities without the need for manual actions. Automated demand response strategies can be implemented as an enhanced use of upgraded equipment and facility control strategies installed as energy efficiency measures. Conversely, installation of controls to support automated demand response may result in improved energy efficiency through real-time access to operational data. This paper argues that the implementation of energy efficiency opportunities in wastewater treatment facilities creates a base for achieving successful demand reductions. This paper characterizes energy use and the state of demand response readiness in wastewater treatment facilities and outlines automated demand response opportunities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Network traffic control for multi-homed end-hosts via SDN

Software-defined networking (SDN) is an emerging technology of efficiently controlling and managing computer networks, such as in data centres, wide-area networks, as well as in ubiquitous communication. In this study, the authors explore the idea of embedding the SDN components, represented by SDN controller and virtual switch, in end-hosts to improve network performance. In particular, the authors consider load balancing across multiple network interfaces on end-hosts with different link capacity scenarios. The authors have explored and implemented different SDN-based load-balancing approaches based on OpenFlow software switches, and have demonstrated the feasibility and the potential of this approach. The proposed system has been evaluated with MultiPath transmission control protocol (MPTCP). Furthermore, the proposed results demonstrated the potential of applying the SDN concepts on multi-homed devices resulting in an increase in achieved throughput of 55% compared to the legacy single network approach and 10% compared to the MPTCP.

97 MATHEMATICS AND COMPUTING↗

Computing Bottleneck Structures at Scale for High-Precision Network Performance Analysis

The Theory of Bottleneck Structures is a recently-developed framework for studying the performance of data networks. It describes how local perturbations in one part of the network propagate and interact with others. This framework is a powerful analytical tool that allows network operators to make accurate predictions about network behavior and thereby optimize performance. Previous work implemented a software package for bottleneck structure analysis, but applied it only to toy examples. In this work, we introduce the first software package capable of scaling bottleneck structure analysis to production-size networks. Here, we benchmark our system using logs from ESnet, the Department of Energy's high-performance data network that connects research institutions in the U.S. Using the previously published tool as a baseline, we demonstrate that our system achieves vastly improved performance, constructing the bottleneck structure graphs in 0.21 s and calculating link derivatives in 0.09 s on average. We also study the asymptotic complexity of our core algorithms, demonstrating good scaling properties and strong agreement with theoretical bounds. These results indicate that our new software package can maintain its fast performance when applied to even larger networks. They also show that our software is efficient enough to analyze rapidly changing networks in real time. Overall, we demonstrate the feasibility of applying bottleneck structure analysis to solve practical problems in large, real-world data networks.

benchmark↗

Are coupled renewable-battery power plants more valuable than independently sited installations?

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$$10/MWh across ISOs on average. The highest boost occurs in California ($\$$15/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$$12.5/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$$12.5/MWh coupling penalty is reduced to $\$$1.6/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$$2–$\$$13/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗

MEP Core Tools

This slide deck provides an update on the progress of the project titled "MEP Core Tools" funded by the Energy Efficient Mobility Systems program in the Vehicle Technologies Office at the Department of Energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

17 WIND ENERGY↗

Transmission Considerations for Market Operation: U.S. Design (Presentation)

Presented at the Utility Wind Integration Group (UWIG) Workshop on Market Design and Operation With Variable Renewables, 22 June 2011, Fredericia, Denmark. This presentation provides an overview of the present U.S. electricity market, how it operates, and some solutions for improving its operation, cost accounting, and integration of renewable power resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗