Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 649 records · Page 36

4.5m GTEM RS105 Test Capability Commissioning

This work details the reconfiguration of the 4.5 m Gigahertz Transverse Electromagnetic test facility at Sandia National Laboratories to operate in accordance with the RS105 (radiated susceptibility) test from MIL-STD-461 representing a high-altitude electromagnetic pulse. This reconfiguration involved removal of the existing continuous wave source and connecting both a high voltage feed and a coaxial feed housing the Marx bank pulser. Marx control settings were calibrated for several voltage levels across two pulsers, and position-dependent measurements of the peak electric field were taken throughout the test volume for each pulser. The results showed field uniformity and purity across the test volume comparable to continuous wave operations, and field peaks were measured from 1.63 kV/m to 54.8 kV/m, with maximum capabilities expected to exceed 100 kV/m. Some challenges in consistent pulser operations at lower Marx bank voltages and high frequency reflections in the system were identified for future capability improvements.

42 ENGINEERING↗

Platform for Remote Deployment and Training for Enhanced Building Operation Practices (Building Re-Tuning and On-going Commissioning)

While a building’s energy usage is driven largely by its design and use, building operator behavior has a strong influence on its energy consumption. This project developed and piloted a specific, data-driven coaching methodology to help operators understand how they can adjust operations and/or affect no/low-cost repairs or upgrades to their specific building HVAC systems to reduce energy consumption. Named BuildingCoach, the operational optimization method used is based on the Building Re-tuning approach developed by the Pacific Northwest National Laboratory. A building operations analytics market has matured over the past decade, though its potential to affect energy-saving changes has not been fully realized. Training operators to understand the methods for operational optimization with the explicit approach of using building-system performance data is hypothesized to create a more effective, longer lasting result in building energy efficiency, and this strategy is the fundamental premise of this project. With the support of an Industry Advisory Board, the project succeeded in developing materials and recruiting for and delivering three pilot cohorts. Deliverables included twenty-two self-paced training modules (accessed via a Learning Management System) and a web-based platform that includes access to real-time building system data and a repository for building system documentation. The project set out to have 100 participants from 50 buildings in three pilot cohorts. In the end, there were 28 participants from 17 buildings, i.e., a significant shortfall. The first two pilot cohorts had only two buildings in each, and this was partially due to difficulties in deploying the Building Operator Coaching Solution (“the BOCS”), which is technology that extracts the data from the controls network and presents it as prescribed for coaching. In the third cohort, the project team deployed the BOCS successfully to 13 buildings, the methodology was piloted as intended, and numerous opportunities for optimization were identified. The BuildingCoach business plan charts a path to an economically sustainable effort. However, even with a licensing model captured in the final version of the business plan, the scalability is still limited to keeping less than 1,000 buildings affected by 2033. Even so, there are unexplored paths to greater scalability that are being considered. CUNY BPL is working to perpetuate and grow the use of BuildingCoach. As of this writing, about twenty buildings have either been connected or will be connected with operators coached / to be coached in the NYC municipal portfolio, twelve buildings across four campuses in NY State will use BuildingCoach, a NY upstate county wishes for six or seven buildings to participate with the support of funding from NYSERDA, and others have also expressed interest. In the decades to come, there will be an increasing percentage of large and mid-sized buildings that incorporate automated system optimization (ASO), and the building operators’ role will shift to spend more time on maintenance and monitoring. Meanwhile, programs such as BuildingCoach will play a critical role in optimizing operations. And, regardless of the emergence of ASO, operators will still need to understand how their systems operate so that they can monitor them properly. Within that context, BuildingCoach is an important step towards operators’ understanding of efficient building system operations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Installation and Commissioning of the SBC-LAr10 Detector at Fermilab

This report describes the progress towards a scalable detector capable of quasi-background-free detection of sub-keV nuclear recoils under DOE award DE-SC0024254. Work supported by this award follows two distinct thrusts: (1) the first calibration of sensitivity to sub-keV nuclear recoils in a liquid-noble bubble chamber, based on data taken in a prototype liquid xenon bubble chamber run previously at Northwestern University, and (2) the successful assembly and installation of the 10-kg liquid argon bubble chamber SBC-LAr10 in the MINOS underground area at Fermilab. These accomplishments have paved the way for the precision calibration of SBC-LAr10 in the MINOS underground area at Fermilab in the coming year, which will use novel calibration techniques to measure the potential of the liquid noble bubble chamber technology for the detection of GeV-scale dark matter particles and the measurement of coherent elastic nuclear scattering by reactor anti-neutrinos (CEvNS).

47 OTHER INSTRUMENTATION↗

National Electric Vehicle Infrastructure Formula Program (NEVI) Brief for State Public Utility Commissions

The National Electric Vehicle Infrastructure (NEVI) Formula Program (NEVI program) is a funding opportunity for all 50 U.S. states, the District of Columbia, and Puerto Rico, established by the Bipartisan Infrastructure Law (BIL). The NEVI program instructs states to “strategically deploy electric vehicle (EV) charging infrastructure and to establish an interconnected network to facilitate data collection, access, and reliability.” The NEVI program allocates more than $\$$5 billion to states from Fiscal Year (FY) 2022 to 2026 on a formula basis. NEVI funds are available to private entities, including utilities, to build EV Supply Equipment (EVSE)1 and associated EV grid infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

State Spotlight on Resilience: The Washington Utilities and Transportation Commission’s Wildfire Mitigation Plans

Wildfires present a significant risk to critical infrastructure, endangering energy systems by damaging transmission lines and imposing a variety of costs on utilities and their customers. Wildfires have increased nationally in both extent and intensity as vegetation conditions become drier and wind patterns become more turbulent. Aging infrastructure may also cause transmission lines to ignite vegetation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

National Laboratory of the Rockies: Pennsylvania Public Utility Commission/ Technical Utility Services Bureau Distribution System Resilience Deep Dive 2025

The following is a summary of the National Laboratory of the Rockies (NLR) - Pennsylvania PUC/ Technical Utility Services Bureau (TUS) Distribution System Resiliency Deep-Dive project. This is work that NLR performed to provide the support that the TUS requested under the Resources and Support for State Energy Offices & Regulators (RASOR) program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Guide for Public Utility Commissions: Building Internal Technical Capacity and Recruiting Talent for Grid Resilience

This guide offers insight into how PUCs can strategically expand their technical workforce to meet evolving gird resilience demands. It outlines critical skill sets needed to support informed regulatory decision-making around resilience, such as modeling and weather forecasting, electric power systems analysis, and advanced data interpretation. In addition, it provides strategies for developing technical talent both internally and through additional recruitment efforts. Two appendices provide a list of grid resilience training resources and a compendium of sample job descriptions that reflect grid resilience technical expertise for PUC consideration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Independent Verification and Validation SAPHIRE Version 8 Final Report Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the SAPHIRE version 8 software product. SAPHIRE version 8 is being developed with a phased or cyclic iterative rapid application development methodology. Due to this approach, a similar approach has been taken for the IV&V activities on each vital software object. IV&V and Software Quality Assurance (SQA) activities occur throughout the entire development life cycle and therefore, will be required through the full development of SAPHIRE version 8. Later phases of the software life cycle, the operation and maintenance phases, are not applicable in this effort since the IV&V is being done prior to releasing Version 8.

99 GENERAL AND MISCELLANEOUS↗

Commissioning a Vibrating Wire System for Quadrupole Fiducialization

Quadrupoles will be placed between the undulator segments in LCLS to keep the electron beam focused as it passes through. The quadrupoles will be assembled with their respective undulator segments prior to being placed into the tunnel. Beam alignment will be used to center the quadrupoles, along with the corresponding undulators, on the beam. If there is any displacement between the undulator and the quadrupole axes in the assemblies, the beam will deviate from the undulator axis. If it deviates by more than 80{micro}m in vertical or 140{micro}m in horizontal directions, the undulator will not perform as required by LCLS. This error is divided between three sources: undulator axis fiducialization, quadrupole magnetic axis fiducialization, and assembly of the two parts. In particular, it was calculated that the quadrupole needs to be fiducialized to within 25{micro}m in both vertical and horizontal directions. A previous study suggested using a vibrating wire system for finding the magnetic axis of the quadrupoles. The study showed that the method has high sensitivity (up to 1{micro}m) and laid out guidelines for constructing such a system. There are 3 steps in fiducializing the quadrupole with the vibrating wire system. They are positioning the wire at the magnet center (step 1), finding the wire with position detectors (step 2), and finding the quadrupole tooling ball positions relative to the position detector tooling balls (step 3). A previous study investigated the error associated with each step by using a permanent quadrupole magnet on an optical mover system. The study reported an error of 11{micro}m for step 1 and a repeatability of 4{micro}m for step 2. However, the set up used a FARO arm to measure tooling balls and didn't allow to accurately check step 2 for errors; an uncertainty of 100{micro}m was reported. Therefore, even though the repeatability was good, there was no way to check that the error in step 2 was small. Following the recommendations of that study, we used a CMM (Coordinate Measuring Machine) instead of the FARO arm for measuring the tooling balls. In addition, a roller cam positioner system replaced the optical movers for moving the quadrupole. With the exception of the quadrupole itself, the system was identical to what will be used in fiducializing the undulator quadrupoles. In this study, we investigate the new vibrating wire set up, including the error associated with each step of fiducialization. A vibrating wire system was constructed to fiducialize the quadrupoles between undulator segments in the LCLS. This note is a continuation of previous work to study the ability of the system to fulfill the fiducialization requirements.

43 PARTICLE ACCELERATORS↗

The New Muon $g-2$ Experiment at Fermilab: Commissioning and First Physics Data Taking

Extremely precise measurements of the muon magnetic dipole moment two decades ago revealed a tantalizing hint of an anomalous excess at the sub-ppm level over Standard Model predictions. This ~3.5 sigma discrepancy has been widely cited due to the anomaly's potential for constraining many natural extensions to the Standard Model. A new experiment at the Fermi National Accelerator Laboratory will be able to refine this measurement by a factor of four over the next few years by measuring the spin precession of 3.1 GeV muons trapped in a precisely tuned magnetic field. This talk offers an update on the early stages of the experiment and our expectations for accumulating the required statistics.

Stapleton, James↗