Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “task management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Evaluation of Howard A. Hanson Dam Juvenile Fish Passage and Survival Study Live Fish Injury Assessment, Sensor Fish, and BioPA Modeling Tasks

The live fish injury assessment, Sensor Fish, and BioPA modeling study tasks were conducted by researchers from Pacific Northwest National Laboratory (PNNL). The four tasks were part of the larger Evaluation of Howard A. Hanson Dam (HAHD) Juvenile Fish Passage and Survival study, which had six total tasks. To achieve study objectives for each of the four tasks, field work occurred at Green Peter Dam (GPR) to evaluate the highest elevation steep slope bypass pipe, at HAHD to evaluate baseline conditions of the horseshoe tunnel, and at PNNL’s Aquatic Research Laboratory (ARL) to evaluate simulated dam passage conditions (i.e., shear forces and collision). Each of these evaluations utilized live fish injury assessment, Sensor Fish, and BioPA modeling. Live fish injury assessment and survival (tagged with and without balloon or passive integrated transponder [PIT] tags) was correlated with Sensor Fish to determine thresholds. The CFD analyses were then performed, and the computed values were compared to the corresponding measured values of Sensor Fish data. The results of the overall injury and survival of fish was also used in the validation of the CFD modeling method. Collectively, the results will aid in future modeling of fish passage at HAHD. Results from these tasks can be used by biologists, engineers, resource managers, and regional decision-makers to inform baseline conditions under current operations and the engineering design of the new FPF at HAHD. This draft report contains initial data and results from the four tasks. Table 8 1, Table 8 2, and Table 8 3, and Figure 8 1, Figure 8 2, and Figure 8 3 depict the CFD modeling findings for the GPR steep slope bypass, HAHD horseshoe tunnel, and laboratory testing. Table 8 4, Table 8 5, and Table 8 6 depict the Sensor Fish findings for the GPR steep slope bypass and HAHD horseshoe tunnel testing. The Mv values observed in the HAHD were significantly lower compared to the laboratory experiments conducted at PNNL. Currently, investigations are underway to understand the reasons for this disparity and to establish an appropriate threshold value for Mv. Survival predictions presented in the tables below should be considered preliminary and should not be used until further analyses and adjustments are completed. The next steps for modeling will include the flow regime, (i.e., density of flow regimes due to water and air mixing ) to continue to improve on the threshold value for Mv.

13 HYDRO ENERGY↗

Coordinating complex problem-solving among distributed intelligent agents

A process-oriented control model is described for distributed problem solving. The model coordinates the transfer and manipulation of information across independent networked applications, both intelligent and conventional. The model was implemented using SOCIAL, a set of object-oriented tools for distributing computing. Complex sequences of distributed tasks are specified in terms of high level scripts. Scripts are executed by SOCIAL objects called Manager Agents, which realize an intelligent coordination model that routes individual tasks to suitable server applications across the network. These tools are illustrated in a prototype distributed system for decision support of ground operations for NASA's Space Shuttle fleet.

Adler, Richard M.↗

General purpose architecture for intelligent computer-aided training

An intelligent computer-aided training system having a general modular architecture is provided for use in a wide variety of training tasks and environments. It is comprised of a user interface which permits the trainee to access the same information available in the task environment and serves as a means for the trainee to assert actions to the system; a domain expert which is sufficiently intelligent to use the same information available to the trainee and carry out the task assigned to the trainee; a training session manager for examining the assertions made by the domain expert and by the trainee for evaluating such trainee assertions and providing guidance to the trainee which are appropriate to his acquired skill level; a trainee model which contains a history of the trainee interactions with the system together with summary evaluative data; an intelligent training scenario generator for designing increasingly complex training exercises based on the current skill level contained in the trainee model and on any weaknesses or deficiencies that the trainee has exhibited in previous interactions; and a blackboard that provides a common fact base for communication between the other components of the system. Preferably, the domain expert contains a list of 'mal-rules' which typifies errors that are usually made by novice trainees. Also preferably, the training session manager comprises an intelligent error detection means and an intelligent error handling means. The present invention utilizes a rule-based language having a control structure whereby a specific message passing protocol is utilized with respect to tasks which are procedural or step-by-step in structure. The rules can be activated by the trainee in any order to reach the solution by any valid or correct path.

Loftin, R. Bowen↗

Active causal learning for decoding chemical complexities with targeted interventions

Abstract Predicting and enhancing inherent properties based on molecular structures is paramount to design tasks in medicine, materials science, and environmental management. Most of the current machine learning and deep learning approaches have become standard for predictions, but they face challenges when applied across different datasets due to reliance on correlations between molecular representation and target properties. These approaches typically depend on large datasets to capture the diversity within the chemical space, facilitating a more accurate approximation, interpolation, or extrapolation of the chemical behavior of molecules. In our research, we introduce an active learning approach that discerns underlying cause-effect relationships through strategic sampling with the use of a graph loss function. This method identifies the smallest subset of the dataset capable of encoding the most information representative of a much larger chemical space. The identified causal relations are then leveraged to conduct systematic interventions, optimizing the design task within a chemical space that the models have not encountered previously. While our implementation focused on the QM9 quantum-chemical dataset for a specific design task—finding molecules with a large dipole moment—our active causal learning approach, driven by intelligent sampling and interventions, holds potential for broader applications in molecular, materials design and discovery.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Upgrade Your Work Plans for Better Performance - 16103

Most work plans involve at least two basic pieces: a list of things to do and a timeline for doing them. These 'tasks-and-times' plans can be used for managing a project, an organizational change, or the implementation of a strategic objective. But given the high rate of plan failures - often cited as ranging from 35% to over 80% - something must be missing. Three ideas for upgrading work plans have demonstrated higher success rates than the time-and-task method alone. First, maintain a 'GPS Scorecard' of the Goals, Performance metrics, and Schedules for accomplishment. Second, maintain a Performance Circle Register of all key players, and the key deliverables to and from each of them, that will ensure success. Third, implement all three parts of an accountability management system, collectively referred to as 'T3': Tracking, Team assignments, and Talk-times to update status and progress against the plan. Why bother to take the extra steps to strengthen work plans? There are three reasons: (a) Because traveling without a map is risky in times of high change in infrastructure, staffing, and technology; (b) Because 'expectations' do not guarantee delivery as reliably as well-defined agreements; and (c) Because 'accountability' is a management practice, not a personality trait. Together, implementing these three ideas can provide for clarity of purpose, guidance in establishing the productive relationships necessary for success, and a system of supporting accountability for all participants, both on the team and with others inside and outside of the organization. (authors)

99 GENERAL AND MISCELLANEOUS↗

NASA Schedule Management Handbook

The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

Source record↗

Lessons Learned With Risk Management: A Systems Engineer's Perspective

Risk management is a communications device that, when executed as an essential task, enables systems engineering to effectively balance risk across the project. Developing and baselining risks is an essential continuous task to ensure top project concerns both from bottom up and top down are being mitigated. Risk management provides the opportunity to avoid the consequence of the risk when mitigation steps start early enough. Just discussing risk with all the project flight elements during development, even if no risks are open, provides an excellent communication opportunity between systems engineering and those elements, ensuring concerns and worries have a platform for discussion. A well-managed risk identification process will identify concerns that are serious but not being clearly communicated, and it will enable mitigation of those potential problems before they cause a failure. Effective risk management requires considerable time and effort, but that effort will save time and money across the development. Risk management must be frequent enough to be useful and in depth enough to bring out emerging issues. It also requires a trusting relationship between the lead systems engineer and element and/or subsystem leads. The discussions need to be with the right number of individuals (typically a handful) and the right duration in time (typically an hour a month). Outside of these risk working groups, there is a formal management process to input, status, and disposition risks, and a monthly Risk Management Board meeting where key project stakeholders are informed. This paper provides good guidance on effective risk management from a systems engineering perspective and provides project lessons learned from the NASA spaceflight missions NICER, Landsat 9, LRO, and OSIRIS-REx to demonstrate the effectiveness of risk management.

Lessons Learned↗

Lessons Learned With Risk Management: A Systems Engineer’s Perspective

Risk management is a communications device that, when executed as an essential task, enables systems engineering to effectively balance risk across the project. Developing and baselining risks is an essential continuous task to ensure top project concerns both from bottom up and top down are being mitigated. Risk management provides the opportunity to avoid the consequence of the risk when mitigation steps start early enough. Just discussing risk with all the project flight elements during development, even if no risks are open, provides an excellent communication opportunity between systems engineering and those elements, ensuring concerns and worries have a platform for discussion. A well-managed risk identification process will identify concerns that are serious but not being clearly communicated, and it will enable mitigation of those potential problems before they cause a failure. Effective risk management requires considerable time and effort, but that effort will save time and money across the development. Risk management must be frequent enough to be useful and in depth enough to bring out emerging issues. It also requires a trusting relationship between the lead systems engineer and element and/or subsystem leads. The discussions need to be with the right number of individuals (typically a handful) and the right duration in time (typically an hour a month). Outside of these risk working groups, there is a formal management process to input, status, and disposition risks, and a monthly Risk Management Board meeting where key project stakeholders are informed. This paper provides good guidance on effective risk management from a systems engineering perspective and provides project lessons learned from the NASA spaceflight missions NICER, Landsat 9, LRO, and OSIRIS-REx to demonstrate the effectiveness of risk management.

Lessons Learned↗

User Interaction with the CNPC Link

As part of NASAs UAS in the NAS project, human factor guidelines are being developed for the ground control station of unmanned aircraft systems. A critical task for the pilot of a UAS is the management and control of the terrestrial radio links used to provide control of the vehicle and relay communications with air traffic control. An analysis of the task of the UAS pilot has been conducted to identify areas where guidelines are required. This analysis has identified a set of information requirements that must be supported by the radio equipment used to provide Control and Non-payload Communication (CNPC). Key requirements include the need for an alert when the link is lost, information on the current quality and latency of the link, and information to enable the future quality of the link to be anticipated as the aircraft changes location. These identified requirements can assist in the development of minimum operational performance standards for CNPC equipment.

unmanned aerial systems↗

Concepts and Tools for the Software Life Cycle

The tools, techniques, and aids needed to engineer, manage, and administer a large software-intensive task are themselves parts of a large softwaare base, and are incurred only at great expense. The needs of the software life cycle in terms of such supporting tools and methodologies are highlighted. The concept of a distributed network for engineering, management, and administrative functions is outlined, and the key characteristics of localized subnets in high-communications-traffic areas of software activity are discussed. A formal, deliberate, structured, systems-engineering approach for the construction of a uniform, coordinated tool set is proposed as a means to reduce development and maintenance costs, foster adaptability, enhance reliability, and promote standardization.

Tausworthe, R. C.↗

Concepts and tools for the software life cycle

The tools, techniques, and aids needed to engineer, manage, and administer a large software-intensive task are themselves parts of a large software base, and are incurred only at great expense. The needs of the software life cycle in terms of such supporting tools and methodologies are highlighted. The concept of a distributed network for engineering, management, and administrative functions is outlined, and the key characteristics of localized subnets in high-communications-traffic areas of software actively are discussed. A formal, deliberate, structured, systems-engineering approach for the construction of a uniform, coordinated tool set is proposed as a means to reduce development and maintenance costs, foster adaptability, enhance reliability, and promote standardization.

Tausworthe, R. C.↗

Continuous Risk Management at NASA

NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.

Hammer, Theodore F.↗

Continuous Risk Management: A NASA Program Initiative

NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

Hammer, Theodore F.↗

MaROS: Information Management Service

This software is provided by the Mars Relay Operations Service (MaROS) task to a variety of Mars projects for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The Information Management Service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such, greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These relay sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This software component is an application process running as a Java virtual machine. The component provides all service interfaces via a Representational State Transfer (REST) protocol over https to external clients. There are two general interaction modes with the service: upload and download of data. For data upload, the service must execute logic specific to the upload data type and trigger any applicable calculations including pass delivery latencies and overflight conflicts. For data download, the software must retrieve and correlate requested information and deliver to the requesting client. The provision of this service enables several key advancements over legacy processes and systems. For one, this service represents the first time that end-to-end relay information is correlated into a single shared repository. The software also provides the first multimission latency calculator; previous latency calculations had been performed on a mission-by-mission basis.

Allard, Daniel A.↗

Air Traffic Management-eXploration Testbed for Urban Air Mobility Research and Development

The presentation will describe the architecture, current capabilities and some future enhancements of the testbed that is being developed at the National Aeronautics and Space Administration (NASA) to enable benefit, impact, safety and cost assessments for accelerating the deployment of air traffic management concept and technologies in the national airspace system. The testbed will support analysis of operational feasibility of urban air mobility operations, a part of NASA's Air Traffic Management eXploration project, and provide the data needed by regulatory agencies charged with public safety. Introduction of concepts and technologies, especially new concepts and technologies, is difficult and often takes decades because of the inability to assess the operational impact of the interaction between the proposed concept and technology and operationally deployed systems in terms of system-wide safety, traffic flow efficiency, roles and workload of controllers and traffic managers, and impact on airlines and other operators. To overcome these limitations, the testbed is developing infrastructure to enable mathematical modeling, human-in-the-loop evaluations and testing with operational systems in a simulated environment. In addition to the difficulty of establishing communications between geographically distributed systems, downloading/installing software, and management of startup, error-handling and shutdown, a major impediment for conducting simulations and human-in-the-loop testing with operational systems is the tedious manual scenario generation process. Several of these difficulties have been addressed in the current state of the testbed. The testbed can be described in terms of the following elements (1) web-based frontend and backend, (2) Testbed Builder, (3) Data Distribution Service, (4) Component Library, (5) Simulation Management, and (6) Scenario Generation. The web-based frontend and backend enable the user to interact with the testbed for tasks such as composing a simulation, running a simulation and retrieving output data. The Testbed Builder application launched from the web frontend is a graphical user interface for the user to drag-and-drop and connect predefined blocks for composing a simulation/scenario generation task. The Builder writes a set of instructions for Simulation Management based on the links between the blocks and the block properties such as the component (executable) associated with a particular block. Management of the distributed simulation is accomplished by Execution and Component Managers. Execution Manager interprets the instructions provided by the Builder to instruct the Component Managers to download components from the Component Library to specified computers and to start them up. Once started, the components communicate with each other by publishing messages and subscribing to messages that are delivered by the Data Distribution Service. The Scenario Generation capability can be used for creating traffic scenarios for Multi-Aircraft Control System, which has been used extensively at NASA for human-in-the-loop-based concept evaluations. The presentation will provide a testbed enabled example scenario of Multi-Aircraft Control System based simulation in which the urban air mobility pilot using the conflict detection and resolution system would interact with the air traffic controllers for resolving conflicts with other aircraft during terminal area operations.

Testbed↗

Air Traffic Management-eXploration Testbed for Urban Air Mobility Research and Development

The presentation will describe the architecture, current capabilities and some future enhancements of the testbed that is being developed at the National Aeronautics and Space Administration (NASA) to enable benefit, impact, safety and cost assessments for accelerating the deployment of air traffic management concept and technologies in the national airspace system. The testbed will support analysis of operational feasibility of urban air mobility operations, a part of NASA's Air Traffic Management eXploration project, and provide the data needed by regulatory agencies charged with public safety. Introduction of concepts and technologies, especially new concepts and technologies, is difficult and often takes decades because of the inability to assess the operational impact of the interaction between the proposed concept and technology and operationally deployed systems in terms of system-wide safety, traffic flow efficiency, roles and workload of controllers and traffic managers, and impact on airlines and other operators. To overcome these limitations, the testbed is developing infrastructure to enable mathematical modeling, human-in-the-loop evaluations and testing with operational systems in a simulated environment. In addition to the difficulty of establishing communications between geographically distributed systems, downloading/installing software, and management of startup, error-handling and shutdown, a major impediment for conducting simulations and human-in-the-loop testing with operational systems is the tedious manual scenario generation process. Several of these difficulties have been addressed in the current state of the testbed. The testbed can be described in terms of the following elements- (1) web-based frontend and backend, (2) Testbed Builder, (3) Data Distribution Service, (4) Component Library, (5) Simulation Management, and (6) Scenario Generation. The web-based frontend and backend enable the user to interact with the testbed for tasks such as composing a simulation, running a simulation and retrieving output data. The Testbed Builder application launched from the web frontend is a graphical user interface for the user to drag-and-drop and connect predefined blocks for composing a simulation/scenario generation task. The Builder writes a set of instructions for Simulation Management based on the links between the blocks and the block properties such as the component (executable) associated with a particular block. Management of the distributed simulation is accomplished by Execution and Component Managers. Execution Manager interprets the instructions provided by the Builder to instruct the Component Managers to download components from the Component Library to specified computers and to start them up. Once started, the components communicate with each other by publishing messages and subscribing to messages that are delivered by the Data Distribution Service. The Scenario Generation capability can be used for creating traffic scenarios for Multi-Aircraft Control System, which has been used extensively at NASA for human-in-the-loop-based concept evaluations. The presentation will provide a testbed enabled example scenario of Multi-Aircraft Control System based simulation in which the urban air mobility pilot using the conflict detection and resolution system would interact with the air traffic controllers for resolving conflicts with other aircraft during terminal area operations.

Simulation↗

NNSA-IAEC Science Area V Environmental ISR: Waste Management and Subsurface Science (Final Report FY18-FY20)

In August 2017, the U.S. National Nuclear Security Administration (NNSA) and the Israel Atomic Energy Commission (IAEC) launched a joint waste management program to evaluate the feasibility of siting a radioactive waste repository at intermediate depths in Israel. The bilateral collaboration involves three National Laboratories (LLNL, LANL, and Sandia), and the Nuclear Research Center, Negev, Geological Survey of Israel, and Ben Gurion University in Israel. This research is designed to assist with the evaluation of locations for an intermediate nuclear waste repository in Israel. This final report is a high-level summary of the results from the past three years by the team that worked on the WM-2: Radionuclide colloid-facilitated transport in fractured carbonate rock project for Science Area V, Environmental ISR: Subsurface Science and Waste Management. We have completed all of our tasks and met all of our milestones. MW-2 had three integrated tasks. Task 1 was laboratory experiments investigating colloid transport of radionuclides in natural fractured carbonate rocks from the Avdat formation, Israel. Task 2 was field experiments injecting radionuclide analogues pre-sorbed to clay colloids into fractured carbonate rock, and task 3 was numerical modeling of laboratory and field experimental results to assess the importance of colloids in the migration of relevant radionuclides. This task was incorporated into tasks 1 and 2. A 4 th task was initiated in FY20, to investigate the role of organics in facilitating radionuclide transport under the same conditions explored in task 1 due to the high organic content of the rocks being investigated for the immediate borehole locations. Preliminary results will be summarized here and the work will continue in FY21-23. The overall objective of this research is to evaluate the role of colloids (naturally occurring < 1 micron particles) in facilitating the transport of long-lived radionuclides from a nuclear waste repository situated in fractured carbonate rocks. Currently little data exists on radionuclide transport in carbonate rocks, but this is the main rock type available for siting a repository in Israel. Laboratory experiments were carried out in both Israel and the U.S., field experiments have taken place in Israel, and reactive transport modeling involved LLNL, LANL and Israel partner institutions. LLNL hosted a graduate student, Emily Tran, from Ben Gurion University in FY18 and FY19 and much of the work presented here was part of her PhD research.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Introduction to SIMRAND: Simulation of research and development project

SIMRAND: SIMulation of Research ANd Development Projects is a methodology developed to aid the engineering and management decision process in the selection of the optimal set of systems or tasks to be funded on a research and development project. A project may have a set of systems or tasks under consideration for which the total cost exceeds the allocated budget. Other factors such as personnel and facilities may also enter as constraints. Thus the project's management must select, from among the complete set of systems or tasks under consideration, a partial set that satisfies all project constraints. The SIMRAND methodology uses analytical techniques and probability theory, decision analysis of management science, and computer simulation, in the selection of this optimal partial set. The SIMRAND methodology is truly a management tool. It initially specifies the information that must be generated by the engineers, thus providing information for the management direction of the engineers, and it ranks the alternatives according to the preferences of the decision makers.

Miles, R. F., Jr.↗