Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Annual Report: Carbon Capture Simulation Initiative

The Carbon Capture Simulation Initiative (CCSI) is a partnership among national laboratories, industry and academic institutions that is developing and deploying state-of-the-art computational modeling and simulation tools to accelerate the commercialization of carbon capture technologies from discovery to development, demonstration, and ultimately the widespread deployment to hundreds of power plants. The CCSI Toolset will provide end users in industry with a comprehensive, integrated suite of scientifically validated models, with uncertainty quantification (UQ), optimization, risk analysis and decision making capabilities. The CCSI Toolset incorporates commercial and open-source software currently in use by industry and is also developing new software tools as necessary to fill technology gaps identified during execution of the project. Ultimately, the CCSI Toolset will (1) enable promising concepts to be more quickly identified through rapid computational screening of devices and processes; (2) reduce the time to design and troubleshoot new devices and processes; (3) quantify the technical risk in taking technology from laboratory-scale to commercial-scale; and (4) stabilize deployment costs more quickly by replacing some of the physical operational tests with virtual power plant simulations.

54 ENVIRONMENTAL SCIENCES↗

Annual Report: Carbon Capture Simulation Initiative (CCSI) (30 September 2013)

The Carbon Capture Simulation Initiative (CCSI) is a partnership among national laboratories, industry and academic institutions that is developing and deploying state-of-the-art computational modeling and simulation tools to accelerate the commercialization of carbon capture technologies from discovery to development, demonstration, and ultimately the widespread deployment to hundreds of power plants. The CCSI Toolset will provide end users in industry with a comprehensive, integrated suite of scientifically validated models, with uncertainty quantification (UQ), optimization, risk analysis and decision making capabilities. The CCSI Toolset incorporates commercial and open-source software currently in use by industry and is also developing new software tools as necessary to fill technology gaps identified during execution of the project. Ultimately, the CCSI Toolset will (1) enable promising concepts to be more quickly identified through rapid computational screening of devices and processes; (2) reduce the time to design and troubleshoot new devices and processes; (3) quantify the technical risk in taking technology from laboratory-scale to commercial-scale; and (4) stabilize deployment costs more quickly by replacing some of the physical operational tests with virtual power plant simulations. CCSI is led by the National Energy Technology Laboratory (NETL) and leverages the Department of Energy (DOE) national laboratories’ core strengths in modeling and simulation, bringing together the best capabilities at NETL, Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), and Pacific Northwest National Laboratory (PNNL). The CCSI’s industrial partners provide representation from the power generation industry, equipment manufacturers, technology providers and engineering and construction firms. The CCSI’s academic participants (Carnegie Mellon University, Princeton University, West Virginia University, Boston University and the University of Texas at Austin) bring unparalleled expertise in multiphase flow reactors, combustion, process synthesis and optimization, planning and scheduling, and process control techniques for energy processes. During Fiscal Year (FY) 13, CCSI announced the initial release of its first set of computational tools and models during the October 2012 meeting of its Industry Advisory Board. This initial release led to five companies licensing the CCSI Toolset under a Test and Evaluation Agreement this year. By the end of FY13, the CCSI Technical Team had completed development of an updated suite of computational tools and models. The list below summarizes the new and enhanced toolset components that were released following comprehensive testing during October 2013. 1. FOQUS. Framework for Optimization and Quantification of Uncertainty and Sensitivity. Package includes: FOQUS Graphic User Interface (GUI), simulation-based optimization engine, Turbine Client, and heat integration capabilities. There is also an updated simulation interface and new configuration GUI for connecting Aspen Plus or Aspen Custom Modeler (ACM) simulations to FOQUS and the Turbine Science Gateway. 2. A new MFIX-based Computational Fluid Dynamics (CFD) model to predict particle attrition. 3. A new dynamic reduced model (RM) builder, which generates computationally efficient RMs of the behavior of a dynamic system. 4. A completely re-written version of the algebraic surrogate model builder for optimization (ALAMO). The new version is several orders of magnitude faster than the initial release and eliminates the MATLAB dependency. 5. A new suite of high resolution filtered models for the hydrodynamics associated with horizontal cylindrical objects in a flow path. 6. The new Turbine Science Gateway (Cluster), which supports FOQUS for running multiple simulations for optimization or UQ using a local computer or cluster. 7. A new statistical tool (BSS-ANOVA-UQ) for calibration and validation of CFD models. 8. A new basic data submodel in Aspen Plus format for a representative high viscosity capture solvent, 2-MPZ system. 9. An updated RM tool for CFD (REVEAL) that can create a RM from MFIX. A new lightweight, stand-alone version will be available in late 2013. 10. An updated RM integration tool to convert the RM from REVEAL into a CAPE-OPEN or ACM model for use in a process simulator. 11. An updated suite of unified steady-state and dynamic process models for solid sorbent carbon capture included bubbling fluidized bed and moving bed reactors. 12. An updated and unified set of compressor models including steady-state design point model and dynamic model with surge detection. 13. A new framework for the synthesis and optimization of coal oxycombustion power plants using advanced optimization algorithms. This release focuses on modeling and optimization of a cryogenic air separation unit (ASU). 14. A new technical risk model in spreadsheet format. 15. An updated version of the sorbent kinetic/equilibrium model for parameter estimation for the 1st generation sorbent model. 16. An updated process synthesis superstructure model to determine optimal process configurations utilizing surrogate models from ALAMO for adsorption and regeneration in a solid sorbent process. 17. Validation models for NETL Carbon Capture Unit utilizing sorbent AX. Additional validation models will be available for sorbent 32D in 2014. 18. An updated hollow fiber membrane model and system example for carbon capture. 19. An updated reference power plant model in Thermoflex that includes additional steam extraction and reinjection points to enable heat integration module. 20. An updated financial risk model in spreadsheet format.

01 COAL, LIGNITE, AND PEAT↗

Overview of the U.S. DOE’s Carbon Capture Simulation Initiative for Accelerating the Commercialization of CCS Technology

The Carbon Capture Simulation Initiative (CCSI) is a partnership among national laboratories, industry and academic institutions that will develop and deploy state-of-theart computational modeling and simulation tools to accelerate the commercialization of carbon capture technologies from discovery to development, demonstration, and ultimately the widespread deployment to hundreds of power plants. The CCSI Toolset will provide end users in industry with a comprehensive, integrated suite of scientifically validated models with uncertainty quantification, optimization, risk analysis and decision making capabilities. The CCSI Toolset will incorporate commercial and open-source software currently in use by industry and will also develop new software tools as necessary to fill technology gaps identified during execution of the project. The CCSI Toolset will (1) enable promising concepts to be more quickly identified through rapid computational screening of devices and processes; (2) reduce the time to design and troubleshoot new devices and processes; (3) quantify the technical risk in taking technology from laboratory-scale to commercial-scale; and (4) stabilize deployment costs more quickly by replacing some of the physical operational tests with a virtual power plant.

Miller, David↗

Green Propellant Landing Demonstration at U.S. Range

The Green Propellant Loading Demonstration (GPLD) was conducted December 2015 at Wallops Flight Facility (WFF), leveraging work performed over recent years to bring lower toxicity hydrazine replacement green propellants to flight missions. The objective of this collaboration between NASA Goddard Space Flight Center (GSFC), WFF, the Swedish National Space Board (SNSB), and Ecological Advanced Propulsion Systems (ECAPS) was to successfully accept LMP-103S propellant at a U.S. Range, store the propellant, and perform a simulated flight vehicle propellant loading. NASA GSFC Propulsion (Code 597) managed all aspects of the operation, handling logistics, preparing the procedures, and implementing the demonstration. In addition to the partnership described above, Moog Inc. developed an LMP-103S propellant-compatible titanium rolling diaphragm flight development tank and loaned it to GSFC to act as the GPLD flight vessel. The flight development tank offered the GPLD an additional level of flight-like propellant handling process and procedures. Moog Inc. also provided a compatible latching isolation valve for remote propellant expulsion. The GPLD operation, in concert with Moog Inc. executed a flight development tank expulsion efficiency performance test using LMP-103S propellant. As part of the demonstration work, GSFC and WFF documented Range safety analyses and practices including all elements of shipping, storage, handling, operations, decontamination, and disposal. LMP-103S has not been previously handled at a U.S. Launch Range. Requisite for this activity was an LMP-103S Risk Analysis Report and Ground Safety Plan. GSFC and WFF safety offices jointly developed safety documentation for application into the GPLD operation. The GPLD along with the GSFC Propulsion historical hydrazine loading experiences offer direct comparison between handling green propellant versus safety intensive, highly toxic hydrazine propellant. These described motives initiated the GPLD operation in order to investigate the handling and process safety variances in project resources between LMP-103S and typical in-space propellants. The GPLD risk reduction operation proved successful for many reasons including handling the green propellant at a U.S. Range, loading and pressurizing a flight-like tank, expelling the propellant, measuring the tank expulsion efficiency, and most significantly, GSFC propulsion personnel's new insight into the LMP-103S propellant handling details.

Propellant↗

Green Propellant Loading Demonstration at U.S. Range

The Green Propellant Loading Demonstration (GPLD) was conducted December 2015 at Wallops Flight Facility (WFF), leveraging work performed over recent years to bring lower toxicity hydrazine replacement green propellants to flight missions. The objective of this collaboration between NASA Goddard Space Flight Center (GSFC), WFF, the Swedish National Space Board (SNSB), and Ecological Advanced Propulsion Systems (ECAPS) was to successfully accept LMP-103S propellant at a U.S. Range, store the propellant, and perform a simulated flight vehicle propellant loading. NASA GSFC Propulsion (Code 597) managed all aspects of the operation, handling logistics, preparing the procedures, and implementing the demonstration. In addition to the partnership described above, Moog Inc. developed an LMP-103S propellant-compatible titanium rolling diaphragm flight development tank and loaned it to GSFC to act as the GPLD flight vessel. The flight development tank offered the GPLD an additional level of flight-like propellant handling process and procedures. Moog Inc. also provided a compatible latching isolation valve for remote propellant expulsion. The GPLD operation, in concert with Moog Inc. executed a flight development tank expulsion efficiency performance test using LMP-103S propellant. As part of the demonstration work, GSFC and WFF documented Range safety analyses and practices including all elements of shipping, storage, handling, operations, decontamination, and disposal. LMP-103S has not been previously handled at a U.S. Launch Range. Requisite for this activity was an LMP-103S Risk Analysis Report and Ground Safety Plan. GSFC and WFF safety offices jointly developed safety documentation for application into the GPLD operation. The GPLD along with the GSFC Propulsion historical hydrazine loading experiences offer direct comparison between handling green propellant versus safety intensive, highly toxic hydrazine propellant. These described motives initiated the GPLD operation in order to investigate the handling and process safety variances in project resources between LMP-103S and typical in-space propellants. The GPLD risk reduction operation proved successful for many reasons including handling the green propellant at a U.S. Range, loading and pressurizing a flight-like tank, expelling the propellant, measuring the tank expulsion efficiency, and most significantly, GSFC propulsion personnel's new insight into the LMP-103S propellant handling details.

Green Propellant↗

Element mobilization and immobilization from carbonate rocks between CO 2 storage reservoirs and the overlying aquifers during a potential CO 2 leakage

Despite the numerous studies on changes within the reservoir following CO2 injection and the effects of CO2 release into overlying aquifers, little or no literature is available on the effect of CO2 release on rock between the storage reservoirs and subsurface. To address this knowledge gap, relevant rock materials, temperatures and pressures were used to study mineralogical and elemental changes in this intermediate zone. After rocks reacted with CO2, liquid analysis showed an increase of major elements (e.g., Ca, and Mg) and variable concentrations of potential contaminants (e.g., Sr and Ba); lower concentrations were observed in N2 controls. In experiments with As/Cd and/or organic spikes, representing potential contaminants in the CO2 plume originating in the storage reservoir, most or all of these contaminants were removed from the aqueous phase. SEM and Mössbauer spectroscopy results showed the formation of new minerals and Fe oxides in some CO2-reacted samples, indicating potential for contaminant removal through mineral incorporation or adsorption onto Fe oxides. These experiments show the interactions between the CO2-laden plume and the rock between storage reservoirs and overlying aquifers have the potential to affect the level of risk to overlying groundwater, and should be considered during site selection and risk evaluation.

Environmental Molecular Sciences Laboratory↗

Once-Through Steam Generator Model Analysis Using Python and Advanced Optimization Tools (Summer Internship Report)

This study focuses on the parametric analysis of design parameters for a once-through steam generator (OTSG) model, using python and advanced optimization tools to facilitate applications such as the flowing autoclave steam generator (FASG) test cases. Building on previous research involving another OTSG with a different design, this project aims to enhance our understanding of how steam generators (SGs) behave and how their outputs are influenced by changes in design. The reason for this design change is to allow for more precise modeling and optimization of SG performance, to provide a comparative analysis between the two designs, and to set up the model for integration with the FASG test case. The OTSG python-model is a mathematical representation (including fluid flow and heat transfer equations/models/correlations) of a steam-generating unit in a pressurized water reactor-type small modular reactor system. Design studies involve changing the model’s input design parameters to observe the resulting effects on the output of the system. By using advanced optimization tools, such as the Risk Analysis Virtual Environment (RAVEN) developed at Idaho National Laboratory, detailed design parametric studies and model optimization were performed. Six input parameters—pressure, temperature, and mass flow rate for the inlet of the primary-side (hot fluid) and secondary-side (cold fluid), respectively, of the SG—were randomly perturbed via RAVEN’s Monte Carlo Sampler module, using uniform distributions (i.e., ±1%, ±5% and ±10% relative changes) for 600 samples. The analysis provides valuable insights into SG optimization and can be used for sensor placement optimization to effectively monitor and obtain experimental data in other tests.

20 FOSSIL-FUELED POWER PLANTS↗

Correlation Between Weather Alerts and Grid Component Failures for Grid Alert

Weather events cause most grid failures. Often, we even get notifications on our phones to take cover or be prepared for an imminent event. If electric grid utilities had a similar warning that also included probable scenarios and the equipment involved, they could prepare and minimize the effects. Recent research at Idaho National Laboratory into electric grid risk analysis methods resulted in a tool that allows for the development of the most likely scenarios given failure probabilities of grid components. INL has a project with the U.S. Department of Energy’s Cybersecurity, Energy Security, and Emergency Response (CESER) program to develop a Grid Alert application that receives messages from the existing emergency alert system, filters and determines components possibly affected by the emergency event, calculates probable scenarios uses MASTERRI and then notifies the utility if there is significant risk. Historical failure data of elements that comprise the U.S. electric grid have been compiled by utilities and organizations such as the international regulatory body North American Electric Reliability Corporation (NERC). Nominal failure rates are obtained from this data. To make this tool possible, estimated failure rates are needed for different component types given the alert type, severity, and location. Historic weather-related grid element failures are correlated with historic weather events from Integrated Public Alert & Warning System (IPAWS). These correlated events and failures are used along with Bayesian updates from the historical norms to provide a modified failure rate for grid elements in the alert areas and calculate probable scenarios. This discusses the Grid Alert project plan but focuses on the data gathered and process used in determining failure rates for possible grid failure scenarios.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic structural analysis: Introductory remarks

The development of probabilistic structural analysis methodology consists of the following program elements: (1) composite load spectra models, (2) computational probabilistic structural analysis methods, and (3) probabilistic constitutive relationships. The development of the probabilistic structural analysis methodology is a joint program of NASA Lewis in-house and sponsored research. The objective of this session is to illustrate recent progress on the application of this methodology to determine the reliability of structural components for rocket propulsion systems. The session contains descriptions of and progress reports on the following specific activities: (1) The NESSUS computer code, (2) approximate methods, (3) advanced methods, (4) composite load spectra applications, (5) probabilistic fracture mechanisms, and (6) probability of failure and risk analysis. Collectively, the progress to date demonstrates that the structural durability of hot engine structural components can be effectively evaluated in a formal probabilistic/reliability framework.

Chamis, Christos C.↗

Estimating the Risk of Renal Stone Events During Long-Duration Spaceflight

Introduction: Given the bone loss and increased urinary calcium excretion in the microgravity environment, persons participating in long-duration spaceflight may have an increased risk for renal stone formation. Renal stones are often an incidental finding of abdominal imaging studies done for other reasons. Thus, some crewmembers may have undiscovered, asymptomatic stones prior to their mission. Methods: An extensive literature search was conducted concerning the natural history of asymptomatic renal stones. For comparison, simulations were done using the Integrated Medical Model (IMM). The IMM is an evidence-based decision support tool that provides risk analysis and has the capability to optimize medical systems for missions by minimizing the occurrence of adverse mission outcomes such as evacuation and loss of crew life within specified mass and volume constraints. Results: The literature of the natural history of asymptomatic renal stones in the general medical population shows that the probability of symptomatic event is 8% to 34% at 1 to 3 years for stones < 7 mm. Extrapolated to a 6-month mission, for stones < 5 to 7 mm, the risk for any stone event is about 4 to 6%, with a 0.7% to 4% risk for intervention, respectively. IMM simulations compare favorably with risk estimates garnered from the terrestrial literature. The IMM forecasts that symptomatic renal stones may be one of the top drivers for medical evacuation of an International Space Station (ISS) mission. Discussion: Although the likelihood of a stone event is low, the consequences could be severe due to limitations of current ISS medical capabilities. Therefore, these risks need to be quantified to aid planning, limit crew morbidity and mitigate mission impacts. This will be especially critical for missions beyond earth orbit, where evacuation may not be an option.

Reyes, David↗

Estimating the Risk of Renal Stone Events during Long-Duration Spaceflight

Introduction: Given the bone loss and increased urinary calcium excretion in the microgravity environment, persons participating in long-duration spaceflight may have an increased risk for renal stone formation. Renal stones are often an incidental finding of abdominal imaging studies done for other reasons. Thus, some crewmembers may have undiscovered, asymptomatic stones prior to their mission. Methods: An extensive literature search was conducted concerning the natural history of asymptomatic renal stones. For comparison, simulations were done using the Integrated Medical Model (IMM). The IMM is an evidence-based decision support tool that provides risk analysis and has the capability to optimize medical systems for missions by minimizing the occurrence of adverse mission outcomes such as evacuation and loss of crew life within specified mass and volume constraints. Results: The literature of the natural history of asymptomatic renal stones in the general medical population shows that the probability of symptomatic event is 8% to 34% at 1 to 3 years for stones < 7 mm. Extrapolated to a 6-month mission, for stones < 5 to 7 mm, the risk for any stone event is about 4 to 6%, with a 0.7% to 4% risk for intervention, respectively. IMM simulations compare favorably with risk estimates garnered from the terrestrial literature. The IMM forecasts that symptomatic renal stones may be one of the top drivers for medical evacuation of an International Space Station (ISS) mission. Discussion: Although the likelihood of a stone event is low, the consequences could be severe due to limitations of current ISS medical capabilities. Therefore, these risks need to be quantified to aid planning, limit crew morbidity and mitigate mission impacts. This will be especially critical for missions beyond earth orbit, where evacuation may not be an option.

Reyes, David↗

Correlation of Spacecraft Mission and Project Costs

A key component of any cost risk analysis is the level of correlation between individual elements of cost. This analysis supplements the available historical records with the cost estimates from the JPL Advanced Design Team. The costs from actual JPL flight projects are then used to validate the results, clearly indicating that, on average, the correlation between elements of cost is between 0.4 and 0.7.

correlation↗

Development of F and B Operation Strategy with LPSI and H-SIT

In the current nuclear power plants (NPPs), most of the critical safety functions are provided by many active safety systems. However, in order to meet the futuristic goals of safety, relying on these active safety systems alone does not seem to be viable. As passive system has a strength on the mitigation of station black out accident and it also contributes to increase the diversity of mitigation way, application of passive system becomes a paramount in the nuclear industry to enhance the nuclear plant safety. Recently, many researches for developing passive systems and operation strategies have been carried out in the nuclear field. General passive systems and strategies, however, have a critical limitation, especially for passive injection systems. As these systems use gravity as their driving force, it is difficult to inject coolant in a passive way in a high-pressure condition thus depressurization has to be preferentially performed to do passive injection. The problem is that depressurization inevitably causes the loss of core inventory thus it is not preferred in order to secure plant safety. Hybrid safety injection tank (H-SIT) system was newly suggested a few years ago to passively inject the coolant into the reactor coolant system (RCS) without depressurization in a high-pressure condition. The H-SIT system is planned to be integrated into advanced power reactor plus (APR+). Generally, the H-SIT system can inject water using the pressure from nitrogen gas as a conventional safety-injection tank in low-pressure accidents, such as large and medium-break loss of coolant accidents (LOCA). Additionally, the H-SIT system can also inject water using gravitational force in high-pressure accidents. If a high pressure accident occurs, the pressure of each H-SIT is equalized with pressure of pressurizer through equalizing pipes, thus allowing the H-SITs to inject water by gravitational force. In the target plant, four H-SITs are planned to be installed. Each has a 2.5 in diameter equalizing pipe and it can be operated manually. Long-term cooling of core is an ultimate goal of all mitigation actions for plant safety and feed and bleed (F and B) operation strategy is one of the long-term cooling strategies in conventional pressurized water reactor (PWR). The important point of F and B operation is that injection for feed operation is performed by only high pressure safety injection (HPSI) pump because operation of low pressure safety injection (LPSI) pump needs the depressurization and it causes core dry out. As H-SIT is passively operated in an accident situation, it was originally designed for mitigation of station black out accident. Besides, operator can use the H-SIT system same as high pressure injection pump in any accident situations. Thus, function of high pressure injection by H-SIT can be used for feed operation when HPSI pumps fail. If it is possible, H-SIT can make up the core during depressurization then LPSI pumps can be used for F and B operation. In this study, F and B operation strategy with LPSI and HSIT is developed. This is a new concept for the long-term cooling operation. If this strategy is applied, low pressure injection pump can be successfully used for F and B operation thus operator has the additional mitigation way. As this strategy make plant safe even though HPSI and PAFS are both failed, it can effectively enhance the plant safety. For this strategy two RCGVSs and two POSRVs are needed as a depressurization system for bleed operation and only one LPSI is enough for feed operation. H-SIT operation is also needed to make up core inventory during bleed operation. For this operation, four H-SITs have to be used to make up core safely. Based on the risk analysis using PSA method, if this strategy is applied, core damage frequency is 1.868 e-6 which declined 7 percent from original model. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Systematic Evidence Based Performance Approach to Regulation of Nuclear Sites in England and Wales - 20058

The Environment Agency for England has developed a systematic evidence-based approach to pursue our strategic environmental objectives for the regulation of nuclear sites. We use an annual evidence review process to ensure effective and efficient targeting of limited resources to achieve those objectives. Over the last 8 years, we have been developing and refining this approach to ensure risk-based and value driven regulation. The approach comprises nuclear site and nuclear sector review processes known as Site Environment Review (SER) and Nuclear Environment Review (NER). This approach complements our regulation of nuclear site permit holders under the Environmental Permitting Regulations (EPR). We deliver our regulation of nuclear sites in England and Wales alongside the Office for Nuclear Regulation. The SER process involves the lead regulator for each nuclear site assessing the permit holder's environmental performance across 14 themes, set within the context of the site's main activities and associated waste disposals. Our themes include environmental leadership, resources and climate change, radioactive waste management, facility management and decommissioning, groundwater, and environmental radiological protection. We use evidence from site inspections and working within our subject matter groups to grade current and predicted future environmental performance. We are particularly interested in sustainability and the application of Best Available Techniques (BAT) to prevent the creation, and minimise the disposal, of radioactive wastes. We use risk analysis (strengths, weaknesses, threats and opportunities) to examine performance against our strategic environmental objectives, which are set out, in our 5-year Nuclear Delivery Plan (NDP). The output supports the targeting of our resources at each nuclear site. We consult the relevant permit holders on the SER priorities and use their feedback to refine our plans. We expect all permit holders to take account of our priorities when considering their own programmes of work, objectives and plans. The NER process brings together what we learn and achieve through regulation across the sector. It provides input to planning priorities, supported by qualitative and semi-quantitative evidence. It covers the 28 nuclear sites in England and Wales and spans the same 14 environmental themes. During the process we collate, compile and summarise evidence from the SERs and other sources such as inspection reports and evidence from our other nuclear work programmes. The output is the NER annual report. This provides a snapshot of the status of the nuclear sector and gives insights to enable us to regulate more efficiently and effectively. It also takes account of cross-cutting issues and risks such as changes in international standards, domestic policy, regulatory framework, domestic standards and guidance, learning from experience such as incidents, events and good practice, and innovation, research and development. It provides graphics that illustrate the grading of environmental performance for the nuclear sector across the fourteen environmental themes. This analysis allows benchmarking of nuclear site's environmental performance and the visualisation provides a convenient comparison of performance across themes, sites, and over time. We use this intelligence to inform our investment in training and development of our staff, and our cross-cutting engagement on strategic issues with government, the Nuclear Decommissioning Authority (NDA) and other corporate organisations. Adopting this approach can provide benefits with organisational reputation, stakeholder participation and ensuring value from the public investment. This paper describes the history of the SER/NER process, a selection of outputs from the process and ideas for improvement. The paper will be of interest to other regulators and organisations across the world that are interested in supporting continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Artemis IV

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D Hilmers↗

Medical Risk Estimates and Clinical Capability Needs for A Long Duration Artemis Mission

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. DISCUSSION: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for an extended duration Artemis mission of approximately 9 months, with phases including outbound transit, 3 months on the Lunar Gateway space station, 3 months on the Lunar surface with EVAs, 3 months on Gateway (simulating the return phase of a Mars mission), and transit back to Earth. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk.

W Thompson↗

Medical Risk Estimates and Clinical Capability Needs for a Late Artemis Mission

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. DISCUSSION: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for an extended duration Artemis mission of approximately 9 months, with phases including outbound transit, 3 months on the Lunar Gateway space station, 3 months on the Lunar surface with EVAs, 3 months on Gateway (simulating the return phase of a Mars mission), and transit back to Earth. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care –RTDC), and an estimate of crew time list due to medical conditions (Task Time Lost –TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk.

A Anderson↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Late Artemis Missions

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D. Hilmers↗