Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power systems planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A comprehensive framework for validating simulation models of power system equipment using terminal measurements

Accurate simulation of power-plants is essential to the planning and operation of modern power grids. The current methods used to periodically check power-plant simulation models have many open questions about their limitations and accuracy. The research in this project explored using Monte-Carlo Experimentation (MCE) as a means for answering these important questions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Develop a weather-aware climate model to understand and predict extremes and associated power outages and renewable energy shortages with uncertainty-aware and physics-informed machine learning

Focal Area(s): The focus area is predictive modeling through the use of AI techniques and AI-derived model components with a particular emphasis on extreme weather in Atmospheric Science and power outages and shortages in Energy Science. Science Challenge: Predicting weather extremes (e.g., heavy precipitation, strong wind, and large hailstones), and weather-related power system outages and shortages can mitigate economic losses, save lives, support renewables integration, and improve power system resiliency. However, currently, the poor reliability and large uncertainty associated with the weather extreme prediction in the current climate models make the problem intractable. The key challenges are: (1) physical factors like green-house gases (GHGs), aerosols, and land use and land cover (LULC) can significantly impact extreme storms, but the understanding of these impacts is limited, particularly globally; (2) the convective permitting resolutions needed to model severe convective storms and their impacts are computationally prohibitive with global climate models (GCMs); (3) interactions between weather extremes and power system outages are complex and subject to great uncertainty. Current outage prediction models are short lead (~ 3 days), which do not allow for long-time planning of energy production and distribution. Moreover, we have limited capacity to predict weather events leading to sustained shortages in a renewable-energy-dominated power system. These challenges drive motivation for mechanistic understanding and reliable and efficient predictive modeling of extremes and their impacts from the sub-seasonal to long term projections.

54 ENVIRONMENTAL SCIENCES↗

A Review on Simulation Models of Cascading Failures in Power Systems

Among various power system disturbances, cascading failures are considered the most serious and extreme threats to grid operations, potentially leading to significant stability issues or even widespread power blackouts. Simulating power systems' behaviors during cascading failures is of great importance to comprehend how failures originate and propagate, as well as to develop effective preventive and mitigative control strategies. The intricate mechanism of cascading failures, characterized by multi-timescale dynamics, presents exceptional challenges for their simulations. This paper provides a comprehensive review of simulation models for cascading failures, providing a systematic categorization and a comparison of these models. The challenges and potential research directions for the future are also discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Forecasting distributed energy resources adoption for power systems

Failing to incorporate accurate distributed energy resource penetration forecasts into long-term resource and transmission planning can lead to cost inefficiencies at best and system failures at worst. We have developed an open-source tool that employs an advanced Bass specification to calibrate and forecast technology adoption. The advanced specification includes geographic clustering, exogenously estimated market size, and dynamic time steps. Training on historical adoption of rooftop photovoltaics at the U.S. county-level and using detailed techno-economic estimates, our model achieves a two-year average mean-absolute-percentage-error of 19% in predicting system counts at the county-level, weighted by population. Model error was negatively correlated with market maturity - the error was 12% for counties in states with at least 28 W-per-capita of installed capacity. The advanced specification significantly reduces unweighted forecasting percent error compared to a conventional Bass specification: from 196% to 25% for capacity and from 226% to 22% for system count.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar radiation for Mars power systems

Detailed information about the solar radiation characteristics on Mars are necessary for effective design of future planned solar energy systems operating on the surface of Mars. A procedure and solar radiation related data from which the diurnally and daily variation of the global, direct (or beam), and diffuse insolation on Mars are calculated, are presented. The radiation data are based on measured optical depth of the Martian atmosphere derived from images taken of the Sun with a special diode on the Viking Lander cameras; and computation based on multiple wavelength and multiple scattering of the solar radiation.

Appelbaum, Joseph↗

The Core Flight System (cFS): NASA Quality Flight Software to Power Science and Exploration Available to the World

The presentation is planned to be a continuation of two previous discussions completed at the FSW Workshop regarding the cFS Test Framework (CTF) and Engineering Data Sheets (EDS). The presentation will also cover the latest advancements in cFS, including: 1. Quick into to cFS 2. An overview of our software release process + Git repo 3. Release of EDS files for the cFE + open-source apps 4. Overview of how to independently verify EDS files using CTF + what they can be used for. 5. Future plans for cFS. This presentation complements the talk on configuration management of distributed cFS repos, to be presented by Tam Ngo from Johnson Space Center.

Dan Knutsen↗

Cyber Threat Landscape for Distribution Systems

INL cyber analysts will present an overview of the current threat landscape for distribution systems. We will begin with examples of known attacks that have occurred recently to motivate the threat analysis and mitigation discussed in the remainder of the presentation. Examples may include the attacks affecting wind plants in Europe in Spring 2022, ransomware attacks on city utilities and commercial distribution systems, and advanced persistent threats (APTs) including the attacks on Ukrainian electric system in 2015 and 2016, as well as more recent evidence of other APT activity. We will present the end-to-end attack paths and discuss the various attacker skills, financing, motivations, and access that contributed to these attacks. In the second part of this presentation, we will discuss mitigating the cyber threats for distribution systems. We will discuss recent publicly disclosed vulnerabilities and explain their relevant context for distribution system security. Likely attacks to affect distribution systems, such as denial-of-service (DoS), ransomware, edge-device compromise, and advanced persistent threats (APTs) will be described. In addition to an overview of these kinds of attacks, we will provide examples of the various ways in which these attacks can start and what systems they can affect. Simple, cost-effective counter-measures to these attacks will be discussed and we will emphasize how these mitigations can reduce threats when properly applied and maintained.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrification Futures Study: Power Systems Operation with Newly Electrified and Flexible Loads

The Electrification Futures Study (EFS) is a multi-year study designed to analyze the impacts of widespread electrification in the U.S. energy system. In this webinar we present the detailed power systems operational analysis from the final report in the EFS series. For this analysis, we simulate multiple 2050 power systems for the conterminous United States to assess how variations in the magnitude and shape of electricity demand driven by electrification, and the extent of load participation to more-actively provide grid services, might impact the hourly operation, operational costs, and emissions of various power systems in 2050. The impacts of electrification and demand flexibility are overlayed across systems with significantly greater penetrations of variable renewable energy than today. Overall, we find that the high electrification scenarios envisioned in the EFS with significant VRE penetration (66% of annual national generation) can be operated to meet future increased levels of electrified demand. We also find that demand-side flexibility can enhance operational efficiency and reduce overall annual production costs by $5-$10 billion. The complementary relationship between flexible electric vehicle charging loads and solar generation is particularly pronounced, but in the absence of demand-side flexibility electrification can lead to increased wind and solar curtailment. By helping to reduce renewable curtailment, flexibility can also reduce power sector CO2 emissions. The analysis highlights the value of increased integration and coordination of demand- and supply-side resources in future electric system planning and operations—particularly under high electrification futures.

43 PARTICLE ACCELERATORS↗

Battery Storage Unlocked: Lessons Learned From Emerging Economies

The Clean Energy Ministerial (CEM) is a global forum that promotes policies and programs that advance clean energy technology. The CEM's mission is to bring together a community of global leaders to scale clean energy, amplifying the impact to all the sectors of the economy and applying a whole-of-society approach to meet collective climate and clean energy goals. At COP28 in Dubai, United Arab Emirates, the CEM announced the Supercharging Battery Storage Initiative as a vehicle to accelerate battery storage deployment around the world. The initiative supports countries around the world in co-creating strategies that enhance policy, regulation, supply chain, manufacturing, and financing solutions for battery energy storage deployment. Additionally, the initiative seeks to reduce the cost of the technology and promote diversified, sustainable, and secure supply chains (CEM n.d.). Through international collaboration, the initiative supports the integration of renewable energy globally, while securing the stability and reliability of the electricity grid.

batteries↗

Development and Use of the SPACE Computer Code for Analyzing the Space Station Electrical Power System

This special publication tells the story of the dedicated efforts of very talented individuals to create a preeminent space electrical power system modeling and simulation tool called SPACE, short for System Power Analysis for Capability Evaluation. This computer model has evolved for 30 years, withstanding the test of time and obsolescence, and garnering international recognition for its ability to simulate complex space electrical power systems. The analytical results from this model have saved millions of dollars in hardware redesign, testing, and verification for NASA's International Space Station (ISS) and its European and Russian partners. SPACE has played a pivotal role in the station's design and development and continues to support its ongoing operation. It has also extended its reach beyond the ISS to other key NASA programs, where it guides the design and planned operation of NASA's Multi-Purpose Crew Vehicle Orion and simulates electric power system operation in a dusty atmosphere on Mars' surface. The SPACE lineage was created by a core civil servant staff, supplemented by a cadre of interns and other temporary helpers. They created a tightly integrated tool that includes all phenomena that impact a solar array and battery space power system performance. SPACE is self-contained, requiring no other software modules and associated license fees. SPACE "rings true" in that is has been extensively validated with ISS on-orbit telemetry data. This report is being released as the generation of engineers who created it are nearing retirement, passing the baton to a new generation. This next generation will carry the code into the future, no doubt further evolving it to be able to assure mission planners that newly conceived systems will successfully power NASA's next endeavors. As a previous SPACE code developer and analyst, I have worked alongside many of the people mentioned in this report. The engineers who created the code, along with those just now learning it, are among the best and brightest at NASA. It is an honor to write this foreword as the present Branch Chief under which the legacy of SPACE continues to thrive.

Electrical Power System↗

NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning tools included Kaizen/Lean events, mockups and human factors analysis. The majority of products developed by this team are applicable as KSC prepares 21st Century Ground Systems for the Orion Multi-Purpose Crew Vehicle and Space Launch System.

Letchworth, Gary↗

Geospatial mapping of distribution grid with machine learning and publicly-accessible multi-modal data

Abstract Detailed and location-aware distribution grid information is a prerequisite for various power system applications such as renewable energy integration, wildfire risk assessment, and infrastructure planning. However, a generalizable and scalable approach to obtain such information is still lacking. In this work, we develop a machine-learning-based framework to map both overhead and underground distribution grids using widely-available multi-modal data including street view images, road networks, and building maps. Benchmarked against the utility-owned distribution grid map in California, our framework achieves > 80% precision and recall on average in the geospatial mapping of grids. The framework developed with the California data can be transferred to Sub-Saharan Africa and maintain the same level of precision without fine-tuning, demonstrating its generalizability. Furthermore, our framework achieves a R 2 of 0.63 in measuring the fraction of underground power lines at the aggregate level for estimating grid exposure to wildfires. We offer the framework as an open tool for mapping and analyzing distribution grids solely based on publicly-accessible data to support the construction and maintenance of reliable and clean energy systems around the world.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions

This paper identifies and evaluates issues in traditional resource adequacy (RA) assessment practices, and how adjusting these practices may affect and depend on existing institutional arrangements for planning and procurement. The paper proposes a technical-institutional roadmap that would allow regulators in vertically-integrated jurisdictions and system planners and operators in restructured jurisdictions to revise RA practices across a range of components. First, we compile a critical review of current RA assessment practices based on (1) interviews with RA practitioners and (2) a review of recent technical literature. We find that (i) RA may need to expand beyond capacity adequacy to ensure energy adequacy – relevant for energy-limited resources such as storage – and potentially some form of ancillary service adequacy (e.g. enough ramping-up and ramping-down capability in the system); (ii) chronological hourly simulations for all hours in the year are the current best practice; (iii) metrics and models used do not reflect economic criteria in system operation and loss of load; and (iv) there is a need to improve representation of weather dependencies and weather data. Second, we review planning and RA reports for several private and public entities that plan generation and/or transmission infrastructure in the continental U.S. to look for existing practices involving resilience assessments. We find no systematic treatment of the costs of extreme weather and other hazards, the benefits of resilience, and resilience metrics in planning analyses and no systematic treatment of resilience metrics, methods, and outcomes for resource adequacy purposes. Third, we create a technical framework for probabilistic RA assessment and use it to study how key choices about how to model power system operations affect the values that are obtained for RA metrics. We find that (i) non-economic dispatch schemes that ignore economic objectives can lead to accurate RA assessments when coordinated with detailed operational strategies; (ii) multi-year data is critical to capture a wide variety of system conditions; (iii) not incorporating transmission limits into RA assessment could lead to substantial underestimation of traditional “expected value” RA metrics; and (iv) new RA metrics that capture event-specific shortfall characteristics should be used as supplements to traditional metrics. Finally, we examine RA assessments and use this information to propose a guide of evolving industry standards for resource adequacy assessments in resource planning and transmission planning. We report minimum, best, and frontier practices for temporal resolution of assessments, metrics and targets, weather data, load forecasting, characterization of variable renewable resources, characterization of transmission and market transactions, RA modeling and integration with planning processes, and capacity accreditation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NASA Low Power Stirling Convertor for Small Landers, Probes, and Rovers Operating in Darkness

A variety of mission concepts have been studied by NASA and the U. S. Department of Energy that would utilize low power Radioisotope Power Systems (RPS) for probes, landers rovers, and repeaters. These missions would contain science instruments distributed across planetary surfaces or near objects of interest where solar flux is insufficient for using solar cells. Landers could be used to provide data like radiation, temperature, pressure, seismic activity, and other surface measurements for planetary science and to inform future mission planners. The studies proposed using fractional versions of the General Purpose Heat Source (GPHS) or multiple Light Weight Radioisotope Heater Units (LWRHU) to heat power conversion technologies for science instruments and communication. Dynamic power systems are capable of higher conversion efficiencies, which could enable equal power using less fuel or more power using equal fuel, when compared to less efficient static power conversion technologies. Providing spacecraft with more power would decrease duty cycling of basic functions and, therefore, increase the quality and abundance of science data. Low power Stirling convertors are being developed at NASA Glenn Research Center (GRC) to provide future micro spacecraft with electrical power by converting heat from one or more LWRHUs. An initial design converts multiple watts of heat to one watt of electrical power output using a Stirling convertor. Development of the concept includes maturation of convertor and controller designs, performance evaluation of an evacuated metal foil insulation, and development of system interfaces. Demonstration of the convertor is planned and represents a new class of RPS with power levels an order of magnitude lower than previous practical designs.

Wilson, Scott D.↗

Puerto Rico Grid and Recovery Post Hurricane Maria

This presentation discusses the impact of and recovery from Hurricanes Irma and Maria in Puerto Rico. The hurricanes hit two weeks apart in 2017, resulting in damage to all elements (generation, distribution, and transmission) of Puerto Rico's already fragile energy system.

demand response↗

Power System Wildfire Risks and Potential Solutions: A Literature Review & Proposed Metric

Several fire risk evaluation, fire tracking, and fire response resources are available. The risk metrics and fire response programs are sometimes modified to include a power system context. The risk metrics often evaluate the risk of fires causing power system faults or outages, especially on transmission systems. The response programs are modified to ensure the safety of power system equipment and first responders as well as to coordinate power system outages to both ensure safety during an active fire and prevent fire ignition during high risk periods. Although some aspects of wildfire responses have been adapted to include power system concerns, adaptations to power system operations and maintenance to include wildfire risks and responses are still nascent. In particular, a risk metric that evaluates the potential for power system components to ignite wildfires is needed to help guide power system upgrade efforts and power system fire safety measures. This document serves as a brief literature review of wildfire risk metrics and response programs and how they relate to power systems. It also includes a proposed risk metric and structure for describing the risk of a power system component igniting a fire.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of Renewable Energy Data for Facilitating the Clean Energy Transition in Vietnam

Vietnam is transforming its power system with an increasing share of variable renewable energy (VRE) in the generation mix and plans to achieve 27% VRE by capacity in 2030 and 42% by capacity in 2045, as indicated by the draft Eighth Power Development Plan for 2020–-2045 (PDP8). Further increase in VRE penetration is possible with data-driven analysis where availability of data, specifically VRE data, becomes critical. NREL has worked with various stakeholders in Vietnam to create high-resolution multi-year VRE data publicly available to all. This paper reviews this new VRE data for Vietnam and how different stakeholders can use this data to inform VRE deployment decisions.

24 POWER TRANSMISSION AND DISTRIBUTION↗