Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning and operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

The Enceladus Orbilander Mission Concept: Balancing Return and Resources in the Search for Life

Enceladus’s long-lived plume of ice grains and water vapor makes accessing oceanic material readily achievable from orbit (around Saturn or Enceladus) and from the moon’s surface. In preparation for the National Academies of Sciences, Engineering and Medicine 2023–2032 Planetary Science and Astrobiology Decadal Survey, we investigated four architectures capable of collecting and analyzing plume material from orbit and/or on the surface to address the most pressing questions at Enceladus: Is the subsurface ocean inhabited? Why, or why not? Trades specific to these four architectures were studied to allow an evaluation of the science return with respect to investment. The team found that Orbilander, a mission concept that would first orbit and then land on Enceladus, represented the best balance. Orbilander was thus studied at a higher fidelity, including a more detailed science operations plan during both orbital and landed phases, landing site characterization and selection analyses, and landing procedures. The Orbilander mission concept demonstrates that scientifically compelling but resource-conscious Flagship-class missions can be executed in the next decade to search for life at Enceladus.

Shannon M. MacKenzie↗

SPACE: Three Decades of Spacecraft Power Systems Analysis with Fortran

The SPACE (System Power Analysis for Capability Evaluation) Fortran program developed at NASA Glenn Research Center has enabled power generation predictions and energy balance analyses for spacecraft electrical power systems (EPS) since 1988. SPACE was originally designed to analyze the EPS of the Space Station Freedom and continues to support certifications for visiting vehicles and extravehicular activities on the International Space Station today. Another version of SPACE currently supports design and mission planning operations for the Orion and Gateway vehicles as part of NASA’s Artemis program. In total, over 50 engineers have contributed to the development and use of SPACE on various platforms throughout its history. Ongoing code modernization efforts aim to generalize the program for use with different vehicles and configurations. While SPACE team analysts currently interact with the program via the command line, future development work also includes the creation of a graphical user interface for use by flight operations personnel. The SPACE code thus has a long legacy in spacecraft EPS analysis and will continue to play a critical role in future human spaceflight missions by leveraging the computational power of Fortran.

Fortran↗

Assessment of Crew Time for Maintenance and Repairs Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, it will be necessary to understand how crew repair and maintenance timelines are impacted by mission operations and technology changes. Past work has been done using historical ISS data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available data sets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat, and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA International Space Station (ISS) maintenance and crew time data are logged into two central databases, the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS) respectively. Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. MDC provides a detailed catalog of failure events and an overview of the failure’s required maintenance and OPTimIS provides a description of crew activities and crew time durations dedicated to maintenance. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair times for each failure event. Data is also classified by the outcome of each repair event, whether the failed component was replaced or whether it was repaired in place. The entire maintenance activity dataset is then categorized based on the class of failed component to allow for a statistically significant sample size for each class and to provide accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time To Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

Characterization of Lunar Polar Volatiles for Curation and ISRU - Executive Summary

The goal of this project is to support lunar exploration by simulating and characterizing ice and volatile-rich materials expected to be found at the lunar poles. These materials are highly sensitive to heating, which could significantly alter their composition and prevent scientific studies on lunar samples. During FY19, we obtained materials for and designed a simulated lunar environment, within which volatile-rich simulant could be made. We also refined the procedure for moderate-fidelity lunar simulants at cryogenic temperatures. In FY20, we completed our test setup, and we can now reach cryogenic temperatures and near-lunar pressures with active compositional monitoring of volatiles in the vapor phase. For FY21, we: 1) progressed towards developing sample storage temperature requirements for volatile-rich samples by completing storage testing, along with materials testing for Artemis geologic sampling, 2) obtained instrumentation for solid sample monitoring to characterize solid species, and 3) progressed towards water extraction testing for ISRU. Our test results will directly feed into Artemis science requirements, hardware designs for sample return, vehicle requirements (HLS, Gateway, Orion), and operations planning for lunar exploration activities.

Julie L Mitchell↗

RHU-RPS Long Duration Mars Hard Lander: Meteorology and Seismology Enabled by Radioisotopes (MASER)

Compass Team was tasked by the RPS Project at the NASA Glenn Research Center (GRC) to create an independent concept design for a spacecraft (S/C) utilizing low power radioisotope power. A list of candidate missions enabled by milliwatt class radioisotope power was evaluated and thus resulted in the selection of a Mars polar region seismology network of four hard landers. A science rational and science operations plan was developed to establish mission design requirements and S/C subsystem concept designs described herein.

RPS↗

A Geodetic and Positioning Thematic Layer - Identifying tools to connect the GGRF and IGIF

Effective and sustainable modernization of a nation’s geodetic framework relies on the ability of the relevant organizations and other stakeholders to communicate, integrate, and align both their strategic objectives and operational planning with the United Nations Committee of Experts on Global Geospatial Information Management (UN GGIM) Sub-Committee on Geodesy’s (SCoG) roadmap for a Global Geodetic Reference Frame (GGRF) for Sustainable Development. In addition, to implement geodetic modernization initiatives through multiple government agencies, a holistic country action plan (CAP) for geospatial information management must incorporate pertinent geodetic outcomes and outputs. Presently, the CAP framework and principles used by nations is the UN GGIM Integrated Geospatial Information Framework (IGIF). From engagement with geospatial and survey communities across emerging nations in the Asia Pacific region, it is evident more assistance and coordination is necessary to articulate, integrate and connect geodetic organizational strategies with the requirements of the GGRF roadmap; the strategic pathways of the IGIF; and resourcing for a meaningful and relevant multi-faceted CAP. One of the supporting mechanisms for such planning or preparation, which representatives of the International Federation of Surveyors (FIG) Asia Pacific Capacity Development Network (AP CDN) and the UN SCoG Education, Training and Capacity Building (ETCB) working group are considering, is a policy framework and guide for a “Geodetic and Positioning Thematic Layer” (GPTL). Essentially, this “thematic layer”, in terms of the GGRF and IGIF, aims to provide a comprehensive understanding of, and a toolbox for, the “why, what, how, and who” of geodesy and positioning. This discussion paper will provide background and insights for a GPTL dedicated to recognizing, and aligning the geodetic capacity development needs with broader geospatial information management issues and applications. The paper will also outline a rigorous, participatory, and inclusive consultation process for the design and development of a thematic layer. Furthermore, as the intention of the authors is to prepare a forthcoming “white paper” that will concisely describe the issues of a GPTL and initiatives for an appropriate guide and/or policy framework, this paper will seek feedback on: the potential scientific, social, environmental and political benefits of modernizing geodetic infrastructure and systems; the challenges associated with the GGRF roadmap; leveraging the geodesy-relevant elements of each IGIF strategic pathway; the importance of collaborative efforts; and the capacity development needs and resources in relation to governance, technology and people.

SARIB, Rob↗

Investigating the Applications of In-Situ Resource Utilization for Future Crewed Mars Missions

Several advancements are necessary before humans can safely explore Mars. One emerging strategy is In-Situ Resource Utilization (ISRU): the process of extracting raw materials found onsite and converting them into usable products to ensure a constant flow of vital resources and greatly reduce overall mission cost. Scientists must confirm the presence and accessibility of these resources for future crewed missions. Our team investigated the feasibility of ISRU in NE Syrtis, a region of Mars with varied geology, mineralogy, and hydrological history. NE Syrtis has abundant subsurface water and a diverse suite of mineral deposits including olivine, phyllosilicates, sulfates, and carbonates–all of which can be leveraged for fuel, medical supplies, and/or construction materials. We conceptualized a joint rover and helicopter expedition to analyze and sample these minerals over a two-year primary mission using Java Mission-planning and Analysis for Remote Sensing (JMARS), Planetary Data Systems (PDS), and Computer-Aided Design (CAD). We plotted a strategic traverse to regions of interest identified from remote sensing data and planned operations at each target. Our mission aimed to prepare for human presence on Mars by demonstrating the utility and viability of ISRU-focused operations.

Zahra M. Ronizi↗

Gaseous By-Product of Thermal Vacuum Processing of Lunar Highland Simulant

Scientists at Kennedy Space Center are advancing technologies to achieve oxygen extraction on the Lunar surface. One such technology is Molten Regolith Electrolysis (MRE) in which regolith simulant is melted under high temperatures to perform oxygen extraction through electrolysis of the melt pool. A study was conducted to understand the molten formation and proper-ties of Lunar Highlands Simulants (LHS-1) under high vacuum environments ranging between 10-6 Torr. These studies include investigating the regolith melt behavior and by-product gas analysis systems to prepare for pilot plant development and operations. The off-gassing rates and pressure build-up, gaseous compounds, and material compatibility may be a risk to MRE systems. The KSC findings are reported here for inclusion into future mis-sion architecture and operational planning. The four stages of the experiment were vacuum, resistive heating, regolith melt and gas detection. The regolith mass of 70 g was melted in a 40 cm tall x 50 cm diameter vacuum chamber at temperature increase rate 47 ℃ /min and ramp rate of 1 ampere/3 min up to an 18-amp maximum. The test is conducted for about 60 minutes and the constituent gases produced during heating of regolith is monitored with a re-sidual gas analyzer. During the molten formation, primary off-gassing volatiles included water vapor (18 amu), a peak at 44 amu (FeO2 – expected), and atomic oxygen (16 amu), among a series of other compounds that could create compatibility issues such as magnesium, chlorine, and silicon oxide. These results add to the knowledge required for successful oxygen extraction on the moon.

Molten Regolith Electrolysis↗

Tri-Agency Reliability Engineering Post: Mission Disposal and Extension Assessment Guidance Addendum

The intent of this addendum is to support the guidance document, Tri-Agency Reliability Engineering Guidance: Post Mission Disposal and Extension Assessment (https://ntrs.nasa.gov/citations/20210024973). It is intended to further assist spacefaring entities in assessing their designs and operational plans for extending missions and Post Mission Disposal (PMD) by providing an hypothetical mission example.

Digital transformation↗

Lunar Communications Services with Emphasis on Commercialization

In mid-2020 Lockheed Marin Space (LM) and NASA’s Jet Propulsion Laboratory (JPL) formed a working group to study and address the need for a lunar communications network to service a growing lunar economy, beginning with the initial crewed and robotic mission needs in 2024. Multiple commercial relay architectures were studied and evaluated for platform requirements, communications capabilities, and commercial business viability in a growing ecosystem. The evolution of communications needs around the Moon were mapped to infrastructure build out. Trade studies were performed to evaluate reliability and lifetime requirements, and the viability of various data protocols. Mission concepts and operations plans were developed for both initial mission support and future autonomous network support. This work has led to Lockheed Martin and JPL to evaluate a single dedicated relay satellite in a frozen lunar orbit, with simultaneous coverage of the far-side and south pole landing sites for over 10 hours per day as a first step towards a comprehensive solution to lunar connectivity. This first satellite is compatible with an ESPA Grande launch volume and would be capable of launching on a rideshare into a variety of orbits and trajectories. The satellite is equipped with both high- and low-rate communications relay payloads with software-defined radios and a delay/disruption tolerant networking protocol. The system is designed to service initial and future mission needs in a commercialized manner, enabling a new class of missions to the Moon. The relay satellite leverages prior spacecraft platform work with on-orbit heritage in a lunar environment expected by 2023.

Davarian, Faramaz↗

Mathematical Models for Optimization of Grid-Integrated Energy Storage Systems

Energy storage has been proven to yield positive effects on planning, operation and control of electric grids. It has become a crucial task to properly model the energy storage systems (ESS) under the framework of grid optimization on transmission and distribution networks including microgrids. This paper presents a review on mathematical models and test cases of ESSs used for grid optimization studies, where the network constraints of power systems are included. The existing ESS models are mainly classified into two categories – linear and nonlinear models. The two main categories are further divided into several subcategories respectively; such as mixed-integer linear and convex nonlinear sub-categories. Based on the review and discussions, this paper aims at providing suggestions for choosing proper ESS models for specific grid optimization studies considering the chosen power network model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Introduction to the Minitrack on Monitoring, Control, and Protection.

This minitrack is on topics related to the monitoring, control, and protection of electric power systems for real-time operations and short-term operations planning. This year the emphasis has been on recent developments in the area of large-scale dynamic research for power systems and on hybrid and distributed control concepts for decentralized command and control of existing critical energy infrastructures.

Eto, Joseph H↗

Electrification Futures Study: Scenarios of Power System Evolution

Electrification of end-use technologies could have important implications for bulk power sector planning, operations, and impacts. By combining previously-defined electrification scenarios with capacity expansion modeling, we evaluate the potential challenges and opportunities associated with electrification. Our scenario analysis reveals that electrification reduces energy consumption and air emissions from across the energy sector, and its impacts on energy system costs are modest due, in part, to the abundance of low-cost resources in the United States.

43 PARTICLE ACCELERATORS↗

Inventory Management Improvement Project

The Lawrence Livermore National Laboratory (LLNL) conducts research and development for the National Nuclear Security Agency (NNSA) and its affiliates. The Polymer AM team at LLNL conducts research and development in 3D printing, specifically direct-ink-write, in accordance with LLNL and NNSA missions. The team is composed of machine operators, chemists, testing engineers, and project engineers across multiple lab spaces with one shared storage area at LLNL. The operations use a variety of different consumables and hardware to conduct research applications for LLNL and NNSA. These items are critical to performing operation tasks; if an item is out of stock, operations associated with the respective item could be suspended for weeks. As such, the Polymer AM team manages an inventory of spare consumables and hardware to ensure these items are always available. However, the current management system, an excel sheet managed by the project engineer group, is not intuitive in providing inventory information despite the high labor utilization needed to maintain the system. As such, the team is looking to improve their inventory management that can send notifications regarding inventory needs, accessible to other team members, provide all relevant information to a specific item, and store historical information for budget and operation planning. The proposed solution is a Computer Maintenance Management System (CMMS): a web-based management software that stores inventory information and provides automated notifications. The system will store information on each item including quantity in stock, technical information, supplier information, costs, lead times, and expiration date. The system has a notifications function that can send notifications to the respective team member’s when an item needs to be counted, item inventory is low, or an item is approaching their expiration date. Information for each item can be tracked over time creating data to be used for budget planning and process improvement purposes. Due to its web-based source, the system can be accessed by the respective team member viewing technical information, quantity, and purchasing information.

42 ENGINEERING↗

Insights from NREL’s Electrification Futures and LA100 Studies

Electrification of end-use technologies could have important implications for bulk power sector planning, operations, and impacts. By combining previously-defined electrification scenarios with capacity expansion modeling, we evaluate the potential challenges and opportunities associated with electrification. Our scenario analysis reveals that electrification reduces energy consumption and air emissions from across the energy sector, and its impacts on energy system costs are modest due, in part, to the abundance of low-cost resources in the United States.

43 PARTICLE ACCELERATORS↗

The Role of Hydropower in the Next-Generation Grid

Hydropower can provide a low-carbon source of energy, capacity, and flexibility to the grid. The National Renewable Energy Laboratory's (NREL's) hydropower research covers multiple aspects of grid integration, including hydropower's role in grid planning, operations modeling, and reliability and resilience research.

grid integration↗

Electrolyzer and method of use

Provided herein are methods for operating carbon oxide (CO x ) reduction reactors (CRR) and related apparatus. In some embodiments, the methods involve shutting off, reducing, or otherwise controlling current during various operation stages including hydration, break-in, normal operation, planned shut-offs, and extended shutoff or storage periods.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The Cybersecurity Value-at-Risk Framework

Hydropower remains one of the strongest forms of renewable energy generation methods. It is crucial to address the increasing risks associated with the rapid digitization. The push towards decarbonization also factors in the need to ensure security and resilience for grid-connected renewable energy resources. This report summarizes the U.S. Department of Energy's Water Power Technologies Office's effort to develop a cybersecurity valuation methodology that assists hydropower stakeholders in assessing risks associated with plan operations and gathers valuation guidance through a web-based applicaiton. The Hydropower Cybersecurity Value-at-Risk Framework delivers a platform for industry members to perform self assessments and make informed decisions on their cybersecurity investments.

CVF↗