Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “payload assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Scaling Climbing Collaborative Mobile Manipulators for Outfitting a Tall Lunar Tower and Truss Structures

In-space and planetary truss structures like the Tall Lunar Tower (TLT) can greatly benefit from truss climbing collaborative mobile manipulators (C2M2) for outfitting and other servicing tasks. Mobile robotic systems traversing truss structures will allow for improved access to the structure for placing equipment and routing cables after the structure has been assembled. The C2M2 is designed to provide access to the structure through collaborative mobile robotics. A series of gaits are developed allowing the robot to reach any point on the structure and validate the capabilities of the joint configuration. Scaling the system during the design phase is a necessary process given the wide range of trusses in development and payloads which are required for outfitting. The variable features of the system are the actuators and the length of the links connecting the two-degrees of freedom (DOF) modules. A scaling method was developed for determining the range of usable link lengths for a selected actuator in a design environment. The focus of the design is on a six-DOF robot arranged with two-DOF at each end and at the center. Two grippers are mounted at each end for grappling on the truss and holding cargo.

Collaborative Robotics↗

Driving and latching of the Starlab pointing mirror doors

The Starlab Experiment, a major SDIO technology initiative, is an attached payload which will be delivered into Earth orbit aboard NASA's Space Shuttle in 1991. Starlab will generate and aim an 80 cm diameter laser beam into space through a large opening in the structure which houses the pointing mirror. Two doors, each somewhat larger than a desktop, cover the opening when the laser optics system is nonoperational. Latch Mechanism Assemblies hold the doors shut during liftoff and ascent and, again, during Orbiter reentry. Each door is powered by a Door Drive System during the many open/close cycles between various experiments. The design, testing, and resultant failure modes of these mechanisms are examined.

Beaven, Herbert R., Jr.↗

Analysis and design of a six-degree-of-freedom Stewart platform-based robotic wrist

The kinematic analysis and implementation of a six degree of freedom robotic wrist which is mounted to a general open-kinetic chain manipulator to serve as a restbed for studying precision robotic assembly in space is discussed. The wrist design is based on the Stewart Platform mechanism and consists mainly of two platforms and six linear actuators driven by DC motors. Position feedback is achieved by linear displacement transducers mounted along the actuators and force feedback is obtained by a 6 degree of freedom force sensor mounted between the gripper and the payload platform. The robot wrist inverse kinematics which computes the required actuator lengths corresponding to Cartesian variables has a closed-form solution. The forward kinematics is solved iteratively using the Newton-Ralphson method which simultaneously provides a modified Jacobian Matrix which relates length velocities to Cartesian translational velocities and time rates of change of roll-pitch-yaw angles. Results of computer simulation conducted to evaluate the efficiency of the forward kinematics and Modified Jacobian Matrix are discussed.

Nguyen, Charles C.↗

Utilization of common pressurized modules on the Space Station Freedom

During the preliminary design review of Space Station Freedom elements and subsystems, it was shown that reductions of cost, weight, and on-orbit integration and verification would be necessary in order to meet program constraints, particularly nominal Orbiter payload launch capability. At that time, the Baseline station consisted of four resource nodes and two 44 ft modules. In this study, the viability of a common module which maintains crew and payload accommodation is assessed. The size, transportation, and orientation of modules and the accommodation of system racks and user experiments are considered and compared to baseline. Based on available weight estimates, a module pattern consisting of six 28 ft. common elements with three radial and two end ports is shown to be nearly optimal. Advantageous characteristics include a reduction in assembly flights, dual egress from all elements, logical functional allocation, no adverse impacts to international partners, favorable airlock, cupola, ACRV (Assured Crew Return Vehicle), and logistics module accommodation, and desirable flight attitude and control characteristics.

Gould, Marston J.↗

Utilization of common pressurized modules on the Space Station Freedom

During the preliminary design review of Space Station Freedom elements and subsystems, it was shown that reductions of cost, weight, and on-orbit integration and verification would be necessary in order to meet program constraints, particularly nominal Orbiter payload launch capability. At that time, the Baseline station consisted of four resource nodes and two 44 ft modules. In this study, the viability of a common module which maintains crew and payload accommodation is assessed. The size, transportation, and orientation of modules and the accommodation of system racks and user experiments are considered and compared to baseline. Based on available weight estimates, a module pattern consisting of six 28 ft common elements with three radial and two end ports is shown to be nearly optimal. Advantageous characteristics include a reduction in assembly flights, dual egress from all elements, logical functional allocation, no adverse impacts to international partners, favorable airlock, cupola, ACRV (Assured Crew Return Vehicle), and logistics module accommodation, and desirable flight attitude and control characteristics.

Mazanek, Daniel D.↗

Energetic Particles Investigation (EPI)

The EPI instrument operates during the pre-entry phase of the Galileo Probe. The main objective is the study of the energetic particle population in the inner Jovian magnetosphere and in the upper atmosphere. This will be achieved through omnidirectional measurements of electrons, protons, alpha-particles and heavy ions (Z greater than 2) and recording intensity profiles with a spatial resolution of about 0.02 Jupiter radii. Sectored data will also be obtained for electrons, protons, and alpha-particles to determine directional anisotropies and particle pitch angle distributions. The detector assembly is a two-element telescope using totally depleted circular silicon surface-barrier detectors surrounded by cylindrical tungsten shielding. The lower energy threshold of the particle species investigated during the Probe's pre-entry phase is determined by the material thickness of the Probe's rear heat shield which is required for heat protection of the scientific payload during entry into the Jovian atmosphere. The EPI instrument is combined with the Lightning and Radio Emission Detector and both instruments share one interface of the Probe's power, command, and data unit.

Fischer, H. M.↗

STS-84 Day 04 Highlights

On this fourth day of the STS-84 mission, the flight crew, Cmdr. Charles J. Precourt, Pilot Eileen M. Collins, Payload Cmdr, Jean-Francois Clervoy (ESA), Mission Specialists Edward T. Lu, Carlos I. Noriega, Elena V. Kondakova, Jerry M. Linenger (download), and C. Michael Foale (upload) spend their first full day of work together conducting science investigations and transferring equipment from one spacecraft to the other. The Spacehab double module at the rear of Atlantis' payload bay was the focus of activity today as crew members conducted science experiments in the Biorack facility and transferred items to and from the Mir Space Station. In an interview with CBS News, Precourt and Tsibliev praise the sixth joint docking mission between the U.S. and Russia, indicating it is serving as a worthwhile exercise to prepare for the assembly of the International Space Station. Precourt also said the Mir appears to be in good condition despite recent systems problems, and said Mir will be a perfectly safe home for Foale for his stay on orbit.

Source record↗

STS-112 Flight Day 4 Highlights

On the fourth day of STS-112, its crew (Jeffrey Ashby, Commander; Pamela Melroy, Pilot; David Wolf, Mission Specialist; Piers Sellers, Mission Specialist; Sandra Magnus, Mission Specialist; Fyodor Yurchikhin, Mission Specialist) onboard Atlantis and the Expedition 5 crew (Valery Korzun, Commander; Peggy Whitson, Flight Engineer; Sergei Treschev, Flight Engineer) onboard the International Space Station (ISS) are seen preparing for the installation of the S1 truss structure. Inside the Destiny Laboratory Module, Korzun and other crewmembers are seen as they busily prepare for the work of the day. Sellers dons an oxygen mask and uses an exercise machine in order to purge the nitrogen from his bloodstream, in preparation for an extravehicular activity (EVA). Whitson uses the ISS's Canadarm 2 robotic arm to grapple the S1 truss and remove it from Atlantis' payload bay, with the assistance of Magnus. Using the robotic arm, Whitson slowly maneuvers the 15 ton truss structure into alignment with its attachment point on the starboard side of the S0 truss structure, where the carefully orchestrated mating procedures take place. There is video footage of the entire truss being rotated and positioned by the arm, and ammonia tank assembly on the structure is visible, with Earth in the background. Following the completion of the second stage capture, the robotic arm is ungrappled from truss. Sellers and Wolf are shown exiting the the Quest airlock hatch to begin their EVA. They are shown performing a variety of tasks on the now attached S1 truss structure, including work on the Crew Equipment Translation Cart (CETA), the S-band Antenna Assembly, and umbilical cables that provide power and remote operation capability to cameras. During their EVA, they are shown using a foot platform on the robotic arm. Significant portions of their activities are shown from the vantage of helmet mounted video cameras. The video closes with a final shot of the ISS and its new S1 truss.

Source record↗

External Tank Program - Legacy of Success

The largest single element of Space Shuttle is the External Tank (ET), which serves as the structural backbone of the vehicle during ascent and provides liquid propellants to the Orbiter s three Main Engines. The ET absorbs most of the seven million pounds of thrust exerted by the Solid Rocket Boosters and Main Engines. The design evolved through several block changes, reducing weight each time. Because the tank flies to orbital velocity with the Space Shuttle Orbiter, minimization of weight is mandatory, to maximize payload performance. The initial configuration, the standard weight tank, weighed 76,000 pounds and was an aluminum 2219 structure. The light weight tank weighed 66,000 pounds and flew 86 missions. The super light weight tank weighed 58,500 pounds and was primarily an aluminum-lithium structure. The final configuration and low weight enabled system level performance sufficient for assembly of the International Space Station in a high inclination orbit, vital for international cooperation. Another significant challenge was the minimization of ice formation on the cryogenic tanks. This was essential due to the system configuration and the choice of ceramic thermal protection system materials on the Orbiter. Ice would have been a major debris hazard. Spray on foam insulation materials served multiple functions including thermal insulation, conditioning of cryogenic propellants, and thermal protection for the tank structure during ascent and entry. The tank is large, and unique manufacturing facilities, tooling, and handling, and transportation operations were developed. Weld processes and tooling evolved with the design as it matured through several block changes. Non Destructive Evaluation methods were used to assure integrity of welds and thermal protection system materials. The aluminum-lithium alloy was used near the end of the program and weld processes and weld repair techniques had to be refined. Development and implementation of friction stir welding was a substantial technology development incorporated during the Program. Automated thermal protection system application processes were developed for the majority of the tank surface. Material obsolescence was an issue throughout the multi-decade program. Process controls were implemented to assure cleanliness in the production environment, to control contaminants, and to preclude corrosion. Each tank was accepted via rigorous inspections, including non-destructive evaluation techniques, proof testing, and all systems testing. In the post STS-107 era, the project focused on ascent debris risk reduction. This was accomplished via stringent process controls, post flight assessment using substantially improved imagery, and selective redesigns. These efforts were supported with a number of test programs to simulate combined environments. The debris risk was reduced by two orders of magnitude. During this time a major natural disaster was overcome when hurricane Katrina damaged the manufacturing facility. Numerous lessons from these efforts, the manufacturing and material processing issues, the key design features, and evolution of the design will be discussed.

Pilet, Jeffery C.↗

ARC Cell Science Validation (CS-V) Payload Overview

Automated cell biology system for laboratory and International Space Station (ISS) National Laboratory research. Enhanced cell culture platform that provides undisturbed culture maintenance, including feedback temperature control, medical grade gas supply, perfusion nutrient delivery and removal of waste, and automated experiment manipulations. Programmable manipulations include: media feeds change out, injections, fraction collections, fixation, flow rate, and temperature modification within a one-piece sterile barrier flow path. Cassette provides 3 levels of containment and allows Crew access to the bioculture chamber and flow path assembly for experiment initiation, refurbishment, or sample retrieval and preservation.

Space Biology↗

Ideas For Infusing In-Space Servicing, Assembly and Manufacturing Concepts into Nuclear Electric Propulsion Architectures

NASA is currently investigating nuclear electric propulsion (NEP) for human Mars transport within the space nuclear propulsion portfolio. NEP spacecraft have the following characteristics, they: 1) include very large structures (~100-meter length); 2) are comprised of many components/modules; and 3) have very long lifetimes (e.g., 50 years for fuel rods). Thus, NEP spacecraft can be classified as a “persistent asset,” which is any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. NEP spacecraft will benefit from taking advantage of, and incorporating, In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities in the spacecraft architecture from the onset, enabling system maintenance, repair, and evolution. ISA has a long history of being proposed for, and studied as, a means for achieving large systems in space. More recently, the benefits of ISA have been recognized by NASA, the Department of Defense (DOD), other government agencies, and commercial space companies, and thus, ISAM is being actively pursued at a national level. Past and current strategies for achieving large structures in space have relied largely on two strategies; the first is to launch monolithic structures (designed to meet launch vehicle requirements for payload size and mass) that are docked or berthed to other monolithic structures on-orbit to form a larger structure (e.g., the International Space Station [ISS]); the second is folding and packaging large structures to fit inside a payload fairing and deploying the full-sized structure (unaided) once on-orbit (e.g., the James Webb Space Telescope [JWST]). To date, conceptual architecture studies performed for NEP spacecraft capable of human-rated Mars transport have only included a combination of the two previously mentioned strategies. This paper will propose ideas for infusing ISAM strategies into NEP vehicle architectures that leverage existing and near future technologies and enable the resulting NEP systems to be realized in a more time- and cost-efficient manner.

in-space assembly↗

Ideas for Infusing In-Space Servicing, Assembly, and Manufacturing Concepts into Nuclear Electric Propulsion Architectures

NASA is currently investigating nuclear electric propulsion (NEP) for human Mars transport within the space nuclear propulsion portfolio. NEP spacecraft have the following characteristics, they: 1) include very large structures (~100-meter length); 2) are comprised of many components/modules; and 3) have very long lifetimes (e.g., 50 years for fuel rods). Thus, NEP spacecraft can be classified as a “persistent asset,” which is any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. NEP spacecraft will benefit from taking advantage of, and incorporating, In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities in the spacecraft architecture from the onset, enabling system maintenance, repair, and evolution. ISA has a long history of being proposed for, and studied as, a means for achieving large systems in space. More recently, the benefits of ISA have been recognized by NASA, the Department of Defense (DOD), other government agencies, and commercial space companies, and thus, ISAM is being actively pursued at a national level. Past and current strategies for achieving large structures in space have relied largely on two strategies; the first is to launch monolithic structures (designed to meet launch vehicle requirements for payload size and mass) that are docked or berthed to other monolithic structures on-orbit to form a larger structure (e.g., the International Space Station [ISS]); the second is folding and packaging large structures to fit inside a payload fairing and deploying the full-sized structure (unaided) once on-orbit (e.g., the James Webb Space Telescope [JWST]). To date, conceptual architecture studies performed for NEP spacecraft capable of human-rated Mars transport have only included a combination of the two previously mentioned strategies. This paper will propose ideas for infusing ISAM strategies into NEP vehicle architectures that leverage existing and near future technologies and enable the resulting NEP systems to be realized in a more time- and cost-efficient manner.

in-space assembly↗

LOLA: The lunar operations landing assembly

Because the President of the United States has begun the Space Exploration Initiative (SEI), which entails a manned mission to Mars by the year 2016, it is necessary to use the Moon as a stepping stone to this objective. In support of this mission, unmanned scientific exploration of the Moon will help re-establish man's presence there and will serve as a basis for possible lunar colonization, setting the stage for a manned Mars mission. The lunar landing platform must provide support to its payload in the form of power, communications, and thermal control. The design must be such that cost is held to a minimum, and so that a wide variety of payloads may be used with the lander. The objectives of this mission are (1) to further the SEI by returning to the moon with unmanned scientific experiments, (2) to demonstrate to the public that experimental payload missions are feasible, (3) to provide a common lunar lander platform so select scientific packages could be targeted to specific lunar locales, (4) to enable the lander to be built from off-the-shelf hardware, and (5) to provide first mission launch by 1996.

Abreu, Mike↗

The influence of radiation shielding on reusable nuclear shuttle design

Alternate reusable nuclear shuttle configurations were synthesized and evaluated. Particular attention was given to design factors which reduced tank exposure to direct and scattered radiation, increased payload-engine separation, and improved self-shielding by the LH2 propellant. The most attractive RNS concept in terms of cost effectiveness consists of a single conical aft bulkhead tank with a high fineness ratio. Launch is accomplished by the INT-21 with the tank positioned in the inverted attitude. The NERVA engine is delivered to orbit separately where final stage assembly and checkout are accomplished. This approach is consistent with NERVA definition criteria and required operating procedures to support an economically viable nuclear shuttle transportation program in the post-1980 period.

Littman, T. M.↗

International Space Station Internal Thermal Control System Lab Module Simulator Build-Up and Validation

As part of the Sustaining Engineering program for the International Space Station (ISS), a ground simulator of the Internal Thermal Control System (ITCS) in the Lab Module was designed and built at the Marshall Space Flight Center (MSFC). To support prediction and troubleshooting, this facility is operationally and functionally similar to the flight system and flight-like components were used when available. Flight software algorithms, implemented using the LabVIEW(Registered Trademark) programming language, were used for monitoring performance and controlling operation. Validation testing of the low temperature loop was completed prior to activation of the Lab module in 2001. Assembly of the moderate temperature loop was completed in 2002 and validated in 2003. The facility has been used to address flight issues with the ITCS, successfully demonstrating the ability to add silver biocide and to adjust the pH of the coolant. Upon validation of the entire facility, it will be capable not only of checking procedures, but also of evaluating payload timelining, operational modifications, physical modifications, and other aspects affecting the thermal control system.

Paul Wieland↗

A Common Probe Design for Multiple Planetary Destinations

Atmospheric probes have been successfully flown to planets and moons in the solar system to conduct in situ measurements. They include the Pioneer Venus multi-probes, the Galileo Jupiter probe, and Huygens probe. Probe mission concepts to five destinations, including Venus, Jupiter, Saturn, Uranus, and Neptune, have all utilized similar-shaped aeroshells and concept of operations, namely a 45-degree sphere cone shape with high density heatshield material and parachute system for extracting the descent vehicle from the aeroshell. Each concept designed its probe to meet specific mission requirements and to optimize mass, volume, and cost. At the 2017 International Planetary Probe Workshop (IPPW), NASA Headquarters postulated that a common aeroshell design could be used successfully for multiple destinations and missions. This "common probe" design could even be assembled with multiple copies, properly stored, and made available for future NASA missions, potentially realizing savings in cost and schedule and reducing the risk of losing technologies and skills difficult to sustain over decades. Thus the NASA Planetary Science Division funded a study to investigate whether a common probe design could meet most, if not all, mission needs to the five planetary destinations with extreme entry environments. The Common Probe study involved four NASA Centers and addressed these issues, including constraints and inefficiencies that occur in specifying a common design. Study methodology: First, a notional payload of instruments for each destination was defined based on priority measurements from the Planetary Science Decadal Survey. Steep and shallow entry flight path angles (EFPA) were defined for each planet based on qualification and operational g-load limits for current, state-of-the-art instruments. Interplanetary trajectories were then identified for a bounding range of EFPA. Next, 3-degrees-of-freedom simulations for entry trajectories were run using the entry state vectors from the interplanetary trajectories. Aeroheating correlations were used to generate stagnation point convective and radiative heat flux profiles for several aeroshell shapes and entry masses. High fidelity thermal response models for various Thermal Protection System (TPS) materials were used to size stagnation-point thicknesses, with margins based on previous studies. Backshell TPS masses were assumed based on scaled heat fluxes from the heatshield and also from previous mission concepts. Presentation: We will present an overview of the study scope, highlights of the trade studies and design driver analyses, and the final recommendations of a common probe design and assembly. We will also indicate limitations that the common probe design may have for the different destinations. Finally, recommended qualification approaches for missions will be presented.

Hwang, H. H.↗

Performance of the AstroPix Prototype Module for the Barrel Imaging Calorimeter at the ePIC Detector and in Space-Based Payloads

AstroPix is a high-voltage CMOS (HV-CMOS) monolithic active pixel sensor originally developed to enable precision gamma-ray imaging and spectroscopy in the medium-energy regime (~100 keV–100 MeV) based on the groundwork laid by ATLASpix and MuPix. It features a 500 μm pixel pitch, in-pixel amplification and digitization, and low power consumption (~3-4 mW/cm2), making it scalable for large-area, multilayer telescope detector planes. The detectors have a designed dynamic range of 25 keV to 700 keV. With these features, AstroPix meets the requirements of future space-based high-energy telescopes and the imaging layers of the Barrel Imaging Calorimeter (BIC) in the Electron-Proton/Ion Collider (ePIC) detector at the future Electron-Ion Collider (EIC). For the space-based payload, AstroPix is being integrated into sounding rocket and balloon payloads to demonstrate the technical readiness of the devices. For BIC, AstroPix-based imaging layers interleaved within the lead/scintillating-fiber (Pb/SciFi) sampling calorimeter provide granular shower imaging, enabling key performance features such as electron/pion or gamma/neutral pion separation. As part of the ongoing detector R&D efforts, we have been testing various AstroPix_v3 configurations: the single chip, a quad-chip assembly, a three-layer stack of quad chips, and a 9-chip module that represents the smallest prototype unit of the BIC imaging layer. This presentation will highlight recent performance test results from these AstroPix detector configurations.

Kim, Bobae (ORCID:0000000295396815)↗

Failure of the Trailing Umbilical System Disconnect Actuator on the International Space Station

In December of 2005, one of two trailing umbilical cables used on the International Space Station (ISS) Mobile Transporter (MT) was inadvertently severed by an internal cutter system designed to free a snagged cable or jammed reel while transporting hazardous payloads. The mechanism s intended means of actuation is electrical; however, troubleshooting revealed a mechanical actuation occurred. The investigation of the failed component revealed several lessons learned in developing hardware requirements, understanding and following the rationale behind the requirements throughout the design life cycle, understanding the impacts of gaps and tolerances in a mechanism, and the importance of identifying critical steps during assembly.

Gilmore, Adam↗