Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Pre-commercial Demonstration of Direct Non-iterative State Estimator for Operational Use of Synchrophasor Management Systems

The objective of this project was to demonstrate functionality and performance of a Direct Non-iterative State Estimator (DNSE) integrated with NYPA’s Energy Management System (EMS) and with enhanced Real Time Dynamics Monitoring System (RTDMS) synchrophasor platform from Electric Power Group (EPG). DNSE is designed to overcome a major obstacle to operational use of Synchro-Phasor Management Systems (SPMS) by providing to synchrophasor management systems (SPMS) applications a consistent and a complete synchrophasor data foundation in the same way that a traditional EMS State Estimator (SE) provides to EMS applications. Specifically, DNSE is designed to use synchrophasor measurements collected by a central PDC, Supervisory Control and Data Acquisition (SCADA) measurements, and Energy Management System (EMS) network model, to obtain the complete state of the utility’s operating model at rates that are close to the synchrophasor data rates. In this way, the system is comprehensive in that it does not only cover the part of the network that is “visible” via synchrophasors, but also the part that is only “visible” through the SCADA measurements. Visualization needs associated with the use of DNSE results are fulfilled through suitably enhanced Real Time Dynamics Monitoring System (RTDMS), with the enhancements implemented by EPG. This project had the following goals in mind: To advance the deployment of commercial grade DNSE software application that relies on synchrophasor and SCADA data ; Apply DNSE at other utilities, to address a generic and fundamental need for “clean” operational data for synchrophasor applications; Provide means for “live” estimated data access by control system operators; Enhance potential for situational awareness through full system operational model coverage; Sub-second execution rate of the Direct Non-iterative State Estimator, eventually at a near-phasor data rate execution speed, i.e. < 0.1 sec. Anticipated benefits from this projects are: Enhanced reliability and improvements in the economic efficiency of bulk power system planning and operations; Providing “clean” data to other synchrophasor applications; Enhancement of situational awareness by providing the full operational model updated at near synchrophasor rate; A production-grade software tool that incorporate synchrophasor and SCADA data; Provides a basis for development of next generation monitoring and control applications, based on both SCADA and PMU data. Quanta Technology (QT) team worked in collaboration with Electric Power Group (EPG) whose team has enhanced its commercial Real Time Dynamics Monitoring System (RTDMS) to accommodate the requirements posed by DNSE application. EPG also provided its ePDC and Model-less Data Conditioning (PDVC) software for integration with DNSE+. QT developed the system requirements for DNSE; developed system architecture and defined interfaces between internal DNSE components. The core DNSE algorithm with all surrounding interfaces was named DNSE+. Since the DNSE development was done in a simulated system environment, QT used its PMU simulator that was enhanced during this project for development and factory acceptance testing (FAT). SCADA data in this stage was simulated by commercial PSS/e software. The output of DNSE are estimates of System states in C37.118-2 format, sent to RTDMS for further processing and display. As the number of these states is large, it was necessary to expand the C37.111-2 standard to accommodate large data sets. This enhancement was implemented in RTDMS. The demonstration of pre-production DNSE technology was done at NYPA using streaming field data from NYPA PMUs and from its RTUs through their SCADA system. NYPA provided ICCP interface as well as Common Information Model (CIM). The relevance of the DNSE+ application is that it provides state estimation of the power system based on hybrid set of data, consisting of both available PMU data and SCADA measurements. As this is a direct, non-iterative method of calculation of the system states, if does not suffer from convergence issues which is potential problem for conventional state estimators. Also, it can take any available PMU measurements, so it does not need to have a high percentage of PMU coverage needed in the case of Linear State Estimator. As the DNSE calculates synchrophasors of the system states (both phase and absolute value) as sub-second rate, this application can provide a basis for development of next generation of applications based both on SCADA and PMU data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ARM-Related Unmanned Aerial System (UAS) and Tethered Balloon System (TBS) Operational Requirements and Approval

This procedure addresses the requirements and process for obtaining approval for Unmanned Aerial System (UAS) and Tethered Balloon System (TBS) operations at DOE Office of Science (SC) Atmospheric Radiation Measurement user facility observatories (ARM sites), ARM-supported training flights, atmospheric instrument development flights, and campaigns at non-ARM sites. ARM sites include both ARM observatories and ARM mobile facility deployments. The protection of people, property, and the environment during UAS and TBS operations is the foundation of executing a successful mission using UAS or TBS. This procedure is designed to facilitate safe mission execution. It does not address obtaining approval for ARM-supported research, which is approved through the ARM Field Campaign (AFC) or Engineering Evaluation (EE) processes. Approval of UAS and TBS operations is a prerequisite for final approval of an AFC or EE by the Infrastructure Management Board (IMB) and may be conducted in parallel with preparation and submittal of the AFC or EE proposal to the IMB. This procedure addresses UAS and TBS requirements; mission planning; documentation; maintenance; risk assessment; airworthiness determination; operation approval; training and qualification requirements and responsibilities for UAS remote pilots; TBS operators; visual observers; maintenance technicians; and A&P mechanics. It also addresses the responsibilities of ARM site managers, the Office of Science Aviation Safety Manager, principal investigators, requesting organizations, and Range Safety Officers. This procedure is derived from DOE O 440.2C, Aviation Management and Safety, and Federal Aviation Administration (FAA) Regulations (FARs), 14 CFR 107, and 14 CFR 101. It contains two sections: Section 3.0 addresses UAS operations; Section 4.0 addresses TBS operations.

unmanned aerial systems, tethered balloon systems,↗

GOOML: Geothermal Operational Optimization with Machine Learning

Geothermal Operational Optimization with Machine Learning (GOOML) is a project focused on maximizing increased availability and capacity from existing industrial-scale geothermal generation assets. The GOOML project will develop a suite of machine learning-based algorithms that analyze historical production datasets and provide predictive setpoints for geothermal field operations. Historical datasets from New Zealand and the US will provide the input to develop digital geothermal system twins which allow prediction of market conditions, maintenance operations and steamfield optimization. The algorithms will identify key parameters within fields and suggest setpoints for components of the system to maintain optimal generation. Set-points can be instructed to follow mass flow restrictions, generation maximization and optimal field/reservoir balance and give field operators a guide by which generation can be optimized. The datasets that will be used to develop GOOML are sourced from operating geothermal fields in New Zealand and the United States with varying degrees of complexity. This will ensure that most geothermal systems can utilize the GOOML tool to assist in optimizing operations. GOOML aims to achieve a step-change in geothermal operations by developing state-of-the-art machine learning algorithms, comprehensive data analytics, and a first-of-its-kind automated, intelligent geothermal system model.

algorithms↗

Operating Strategies for Dispatchable PEM Electrolyzers that Enable Low-Cost Hydrogen Production

Hydrogen is a pathway to enabling decarbonization across multiple economic sectors that cannot be directly decarbonized with electricity including heat for industrial operations, medium- and heavy-duty transportation applications, long-duration energy storage, and as a feedstock for chemical synthesis. Producing hydrogen at low costs and carbon footprint is likely essential to economically decarbonize these otherwise "hard to decarbonize" sectors. Low-temperature polymer electrolyte membrane (PEM) electrolysis produces hydrogen from water and electricity and is a rapidly developing pathway towards making hydrogen at the scales required for decarbonization applications. The levelized cost of electrolytic hydrogen is dependent on the capital cost, efficiency, and durability of the electrolyzer system as well as the price of electricity supplied to the electrolyzer and the annual utilization of the electrolyzer (capacity factor). Electricity price and capacity factor depend on the source of energy that the system uses and impact other economic factors. Electricity price and capacity factor and the connections between other aspects of hydrogen production via PEM electrolyzers are the focus of this work. PEM electrolyzers have conventionally been operated at high capacity factors using electricity purchased from utilities with a constant price throughout the year. To achieve lower effective electricity prices, recent work has investigated opportunities for electrolyzers to purchase electricity in wholesale markets, where the cost of electricity varies hourly. This option can lead to lower electricity costs when the electrolyzer is a controllable load that ramps up and down rapidly and turns on and off frequently. This configuration and operating strategy capitalizes on times of low wholesale electricity prices and results in lower hydrogen levelized costs than constant operation due to reduced electricity costs even though the reduced capacity factor increases the cost of recovering the capital investment. Cycling on and off frequently also has implications for electrolyzer durability. An electrolyzer configuration where it is directly connected to renewable generation such as wind or solar, only running when the generator is producing energy, has similar implications on operating strategy, hydrogen levelized cost, capacity factor, and durability. This work provides insight into the relationships between dispatchable electrolyzer operating strategies and the cost of producing hydrogen from these systems, outlining strategies and opportunities to minimize production costs while minimizing operations that are likely to negatively impact system durability and efficiency. We find strategies that minimize electrolyzer cycling and the resulting durability impacts while increasing the hydrogen levelized cost only slightly above the minimum. We also find opportunities for batteries to minimize the number of cycles in systems directly connected to renewable generation. These findings outline key opportunities for future electrolyzer deployments and the synergistic benefits between electrolyzers and increased deployment of renewable energy generation like wind and solar. They also inform research and development that is reducing electrolyzer capital cost while managing durability impacts.

electricity markets↗

GOOML - Finding Optimization Opportunities for Geothermal Operations: Preprint

Geothermal Operational Optimization with Machine Learning (GOOML) is a transferable and extensible component-based geothermal asset modeling framework that considers complex steamfield relationships and identifies optimization prospects using a data-driven approach. We have used this framework to develop digital twins that provide steamfield operators with an operational environment to analyze and understand historical and forecasted power production, explore new steamfield configuration possibilities, and seek optimal asset management for real world applications. The GOOML modeling software is built on a generic component-based systems framework that allows for both historical and forecast analysis. A GOOML model can perform historical data-assimilation using first-principal thermodynamics to create a meaningful data model. Historical production data can then be coupled with a forecast framework to train machine-learning models of steamfield components to predict future outputs. This modeling environment enables digital exploration of steamfield design configurations and operational scenarios. GOOML digital twins have been developed for steamfields in New Zealand and the United States representing differing power generation and field conditions. These digital twins have been validated by comparing hindcast predictions against historical production data. Reinforcement learning experiments were conducted to demonstrate the ability to programmatically explore the operations space using machine learning agents. Our initial results are compelling; two to five percent increases in annual energy production were demonstrated by the GOOML models with no additional infrastructure build required. GOOML offers a new approach to geothermal operations by applying state-of-the-art machine learning algorithms, comprehensive data analytics, and interaction with digital twins. Through application of these tools, operators will realize greater availability and higher net generation which will increase the cost effectiveness of geothermal energy projects.

access↗

Vitrification assistance program: international co-operation on vitrification technology

With 10 vitrification lines in operation (3 on WVP in Sellafield, 1 on AVM in Marcoule and 6 on AVH in La Hague), Sellafield Ltd and Areva NC benefit from the most in-depth experience worldwide in the vitrification of highly active liquors within a framework of commercial operations. Based on the two-step process design, using a calciner and an induction-heated hot melter, which was initially deployed in Marcoule in 1978, core vitrification equipment has been continuously improved by the independent development programmes of the two companies. In March 2005, Sellafield Ltd and Areva NC signed the Vitrification Assistance Program (hereafter referred to as VAP); a co-operative project lasting 4 years during which Areva NC is to share some areas of their experience and expertise with Sellafield Ltd. Now at the halfway point of this project, this paper summarises the work performed by the VAP team to date, highlighting the early benefits and lessons learned. The following points will be developed: - Equipment delivery and preparation for implementation on WVP - Training organization and dissemination to WVP teams - Lessons learned from the early changes implemented in operations (Calciner, Melter, Dust Scrubber and Primary off gas system), and initial feedback from the first campaign using a VAP equipped line. In conclusion: The vitrification process and technology implemented at Sellafield and at La Hague, based on the two-step process, have proved to be efficient in treating high active liquor of various types. Ten lines based on this principle have been successfully operated for more than 15 years in France and in the UK. The process has also been demonstrated to be sufficiently versatile to benefit from continuous improvement and development programmes. VAP, as a complete package to support vitrification technology and knowledge transfer from AREVA NC to Sellafield Ltd, has provided the framework for fruitful technical exchanges and discussions between the two companies. From equipment delivery to knowledge embedding within the WVP teams, both companies have worked hard together to respect the tight schedule of the contract, despite growing external constraints. This has been closely managed in order to achieve the best results for the VAP without jeopardizing the continuing production operations on both the Sellafield and La Hague sites. For future campaigns, WVP1 will be equipped with an automatic heating control system similar to the one used at La Hague (i.e. based on 4 kHz). This will facilitate the work of the WVP operators and finalise the conversion of WVP melter control systems from manual to automatic, meaning that the melters on all 3 lines will be automatically controlled. Further implementation of VAP equipment is also planned on the other lines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A New Offering for the Seaman Status Labyrinth - Seaman Status for Nuclear Reactor Operators on Floating Nuclear Power Plants

Floating nuclear power plants present a unique operating environment for land-based nuclear reactor operators. Traditionally located in the control room of a nuclear power plant on land, development of floating nuclear power plants exposes the traditional land-based employees to the marine environment. With the extension of nuclear power generation facilities into the maritime domain, do nuclear reactor operators working on a floating nuclear power plant qualify as seaman under maritime law? Applying existing maritime law, the answer is no, a nuclear reactor operator who operates the nuclear reactor on a floating nuclear power plant does not qualify as a seaman because their work is not in support of the mission of the vessel and the reactor is not connected to a vessel because a floating nuclear power plant is not a vessel. Applying the analysis developed by the Supreme Court in Chandris v. Latsis and the recent Sanchez v. Smart Fabricators of Texas, L.L.C. en banc decision by the Fifth Circuit, a nuclear reactor operator on a floating nuclear power plant does not qualify for seaman status under the Jones Act because their function supports the operation of the reactor and the structure on which the reactor resides does not meet the reasonable person standard established in Lozman v. City of Riviera Beach. Further, existing case law highlights that rendering a structure practically impossible to move eliminates the structure from consideration as a vessel. Because a floating nuclear power plant may be anchored at a seaport or anchored offshore but connected via transmission cables and protected by physical protection barriers, a floating nuclear power plant, with no current means of propulsion is rendered a power plant on water, which is its true function. Recognizing that technological change may alter the conclusion presented in this Article, current designs and structures that exist illustrate the intersection between nuclear and maritime law and the ever-evolving concepts that underpin seamen status in maritime law.

Fialkoff, Marc↗

Facility Improvements and Modifications to Extend the Operational Life of the Modular Caustic-Side Solvent Extraction Process - 16082

Savannah River Remediation, LLC (SRR) is working to remove, stabilize, and dispose of approximately 36.7 million gallons (138.9 million liters) of liquid radioactive waste currently stored in 43 underground waste tanks, and ultimately close waste tanks. In 2008, as an interim salt treatment system to remove cesium from high level waste salt solutions prior to the Salt Waste Processing Facility start up, the Modular Caustic-Side Solvent Extraction Unit (MCU) initiated the removal of cesium from liquid radioactive salt waste prior to disposal. The MCU was designed and built for an expected three-year operational life and five-year design life. The first MCU cold runs began in June 2007 and hot startup was completed in April 2008. MCU remains in hot operation to this day, aiding in multiple, high-level tank closures. In an effort to continue liquid waste disposition at the Savannah River Site (SRS), equipment upgrades and operational improvements have been made to extend the life of the MCU beyond the original three years. Several pieces of fixed equipment have been converted into removable equipment which reduces the downtime associated with equipment change-outs and thereby reduces the dose to workers and processing impacts. Multiple pumps and filters have been upgraded to more robust designs. Process monitoring and controls have been upgraded to improve process performance. Redundant centrifugal contactor vibration equipment has been installed on each contactor in order to better assess the reliability, processing performance, and lifetime of the contactors. A new Solvent Hold Tank (SHT) Sampler has been installed to minimize the organic cross-contamination within the sampler, dose to workers, and sample analysis time. To increase processing availability and aid in visually obtained data, camera port has been added to the Salt Solution Feed Tank (SSFT). In order to decrease the overall background dose to the workers, the Process Vessel Ventilation (PVV) duct work now has the capability to be flushed to remove contamination. The caustic wash addition system has been modified to be a once-through system to improve equipment reliability, decrease downtime, and decrease dose to workers. In addition, the solvent that MCU utilizes to extract Cesium out of salt waste has been upgraded to Next Generation Solvent (NGS) which is based on MaxCalix extractant instead of a BobCalix extractant. Further, these upgrades and improvements have allowed MCU to be able to process at higher flow rates (up to 8.5 GPM) and with increased throughput (as high as 1.3 million gallons in FY13 and 5.3 million gallons since hot operations initiated) that have allowed SRR to continue the disposition of nuclear salt waste. The continued operation of MCU ensures more curies are stabilized into a glass matrix at SRS's Defense Waste Processing Facility (DWPF) and less curies are retained within South Carolina at SRS's Saltstone Disposal Facility (SDF). Unique challenges associated with modifying and improving a demonstration plant that is in hot operations and was designed to be temporary with a limited plant footprint have been successfully overcome. Further, creative strategies for removing old equipment have been utilized given the limited decontamination agents available for use that will not interfere with the organic solvent. This paper presents and discusses the deployment of these upgrades and operational improvements to MCU in order to allow continued, increased salt waste processing beyond the initial design life. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulating Operational Safety at a Future Geological Disposal Facility in the UK - 18038

The United Kingdom (UK) has generated commercial nuclear energy for over 60 years; generating a significant and varied inventory of higher activity radioactive waste (HAW). In accordance with international practice, UK Government policy for long-term management of HAW is disposal in a geological disposal facility (GDF). The nuclear materials comprising HAW include high level waste, intermediate level waste and some low level waste, not suitable for disposal to the Low Level Waste Repository. In addition, other nuclear materials may be reclassified as waste in the future and will require to be managed as HAW for disposal to a GDF; these include spent fuel, uranium and plutonium. The operator of a GDF will be required to obtain a nuclear site licence from the Office for Nuclear Regulation (ONR), as the nuclear safety and security regulator, in order to construct and operate the facility. In the period prior to submission of a licence application, ONR is working to develop its regulatory expectations and provide advice on its regulatory role with regards to a future GDF. ONR has developed regulatory guidance on operational safety, benchmarked against the relevant IAEA Safety Standards and the Western European Nuclear Regulators Association (WENRA) Safety Reference Levels for Disposal. This guidance draws upon ONR's current expectations for nuclear sites; including operational reactors, fuel manufacture and reprocessing facilities, and reactors undergoing decommissioning; and incorporates relevant good practice drawn from international programmes for geological disposal and related industries (eg mining). In addition to the technical assessment guidance, ONR has developed guidance on the licensing process specific to a GDF; providing clarity for example on when a licence will be required. A review of the standard licence conditions applied to all nuclear sites concluded no significant amendment would be required for application to a GDF. Through its voluntary agreement with Radioactive Waste Management Limited (RWM), the developer and future operator of a GDF in the UK, ONR exerts regulatory influence on the design and organisational development of the future licensee. As part of this scrutiny, ONR has assessed RWM's generic Disposal System Safety Case. Subjecting the generic design and safety case to regulatory review provides opportunity for early engagement to ensure the appropriate standards will be achieved. ONR will only grant the necessary regulatory permissions if RWM adequately demonstrates the GDF will be constructed, operated and closed safely. Future challenges faced by ONR with respect to a GDF include building and maintaining regulatory competence and confidence, and engaging effectively with the public as the UK begins its search for a suitable site to provide appropriate assurance that a GDF will be operated safely and securely. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Practical Approach of Mining Operational Risks in Cigeo - A field-test - 19349

Andra is currently completing the detailed engineering phase of the stepwise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository, aka DGR). Various technical issues are at stake, including the risk management requirements linked to the safety of 'Mining Operations' (i.e. occupational safety issues related to underground excavation/dismantling works at some 500 m of depth), at different stages of the DGR life cycle (i.e. from its construction start-up to its final closure and future monitoring/or conversely a decision of waste retrieval). These occupational safety requirements have a significant impact on Cigeo's design, its progressive construction and later closure. On a shorter term, one must demonstrate that the design bases are technically sound and that the solutions selected (to build, operate, close the DGR infrastructures or conversely retrieve the waste) are both feasible and safe. In that sense (and following an identification of operational risks during construction), Andra focused on two sensitive cases: - The construction of large diameter drift crossings, in particular those related to the connection between a transfer drift (main) and a IL-LLW disposal vault (i.e. during construction operations), - The partial dismantling of a drift concrete lining (made of concrete segment rings, erected and placed by a TBM) at time of construction of a horizontal seal (i.e. during closure operations). The discussion starts with a description of the geotechnical conditions prevailing at the (French) Bure site, in the Callovo-Oxfordian (COx) claystone formation. Then the paper presents the Cigeo underground architecture (at large) and the specific structural choices made (at the end of the detailed engineering phase) for drifts, disposal vaults and seals. The discussion on construction - deconstruction challenges for each of the critical issues cited above provides an opportunity to explain the operational sequences (and how the methodology selected enables to reduce the risks). The following part of the paper focuses the technological demonstration (an in-situ test to be planned in detail) of a partial dismantling of the concrete segments rings forming the support lining of two tunnels previously built in the Meuse/Haute-Marne URL (Underground Research Laboratory) infrastructures, combined with the construction of a specific drift crossing. In this dismantling and construction test, the technical demonstration objective is three-fold: - The capacity to lay down compressible arch segments and support (by bolts and mesh) the rock after the lining removal, - The capacity to excavate and line the drift crossing, - The structural / geomechanical behavior (evolution with time) of the rock and lining compared with that of 'neighboring' zones. This paper provides a timeline of the tests. Should the results obtained deliver some positive perspectives of technical feasibility (and convincing operational safety) Andra will incorporate this dismantling/construction solution in the 'design freeze' of the DGR underground infrastructures. The positive outcomes of this technical test campaign will also provide 'elements of proof' for the instruction of the Cigeo licensing (a process likely to take place between 2020 and 2024) by the French Nuclear Safety Authority (ASN). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On-Line Monitoring to Detect Sensor and Process Degradation under Normal Operational Transients - 327

Calibration assessment of nuclear plant sensors and transmitters is currently performed through periodic maintenance actions during plant refueling outages. On-line monitoring (OLM) can be used to reduce the time and cost of this maintenance process by using empirical models to evaluate sensor calibration. The implementation of OLM can also mitigate human error associated with unnecessary maintenance on sensors operating within calibration tolerances. OLM has been studied and validated for plants under steady-state baseload operation, but the extension to load-following operation is not well-documented in the literature. Auto-associative kernel regression (AAKR) provides an error-corrected prediction of process sensor measurements for OLM through a weighted average of historic data. The current study evaluates the performance of AAKR for prediction under normal operational transients (such as expected under load-following operation). Performance of the AAKR model with two anomaly detection routines, error uncertainty limit monitoring (EULM) and sequential probability ratio test (SPRT), was evaluated for normal operation, sensor faults, and process degradation. The data used to develop and evaluate the OLM system were collected from a forced flow loop with temperature and flow sensors. Three models of well-correlated groups of sensors are trained to predict normal system behavior under planned transients. The anomaly detection routines are tested for sensor faults and process faults. The results of this experimental study suggest AAKR and an appropriate anomaly detection routine can be applied for sensor calibration and process fault detection under transient operation. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Efficient Annual-Performance Model of a Geothermal Network for Improved System Design, Operation, and Control: Preprint

Geothermal district energy systems (DES), and specifically geothermal networks, provide a viable solution for decarbonizing residential and commercial heating and cooling loads. District energy systems of all kinds enable a thermal resource with a relatively high capital cost (such as a geothermal borehole field) to be shared among a large number of users. While district heating and cooling has been studied for many years, geothermal networks, fifth generation DES that utilize water-source heat pumps and an ambient temperature loop to meet heating and cooling loads, have not been implemented extensively and thus require additional technical and economic optimization to obtain maximum benefits. This paper presents a newly developed reduced-order model that captures the flow of energy within the network, including the commercial and residential users' electrical usage, at an hourly rate over a year. The model includes building loads, heat pumps, borehole fields, and auxiliary heat/cool input, all connected with an ambient-temperature thermal loop model. In the model, operational control is possible for the borehole fields, circulation pump, and auxiliary system. For a given system, the model can output the complete state parameters for each component, the thermal loop, and the collective system, such as flow rate over time, average thermal loop temperature over time, and total electricity usage. The model can also be used to optimize the system control for maximizing system efficiency or minimizing system operational cost. For example, one initial assessment of the borehole controller for an example system showed that a controller with on/off operation of the borehole field reduces annual electrical usage by 33%, compared with continuous operation mode. Hence, the model can assist in optimizing a given system's operation to get the most value out of a geothermal network installation. Future work will consider the model's application to a demonstration project, including the model validation against operational data and system operation optimization.

ambient-temperature loop↗

AGN-201 Digital Twin Concept of Operations

The AGN-201 is a nuclear reactor at Idaho State University (ISU) and is currently being used in the development of a digital twin (DT) with Idaho National Laboratory (INL). The goal is to create a DT (called the AGN-201 DT) which can monitor an operating nuclear reactor to determine when the reactor is being operated normally; normal operations are any operations that is declared by the ISU staff. To accomplish this, researchers at INL developed a DT ecosystem which can ingest data from the AGN-201 reactor. This data is fed into a series of machine learning (ML) and reactor physics models. The ML and reactor physics models assess the data and determine if the reactor is operating normally. Event(s) that are flagged as anomalies are investigated by the INL staff to determine if any undeclared experiments were conducted. The AGN-201 DT was verified in July/August 2023, when the ISU staff performed undeclared experiments and the INL staff were able to assess the anomalous events and determine what likely caused each event. This project was a steppingstone to promote the use of DTs for international safeguards and marks the first time a DT was able to monitor a nuclear reactor for this purpose. This document provides the concept of operations (CONOPS) for the AGN-201 digital twin (DT). The CONOPS describes how the AGN-201 and AGN-201 DT are expected to operate and details how each are established.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Theoretical Operational Model for Complex Experiments and its Invariance Theorems

We develop and systematize the Theoretical–Operational Model (TOM), a framework that treats preparation and measurement —including their operational residues— as intrinsic structures of physical theory. The central contribution is a principled geometric–algebraic organization of admissible operational deformations, formulated using quantum channels, renormalization-style flows, and information-geometric tools. Within this structure, operational residues and background processes are represented as effective morphisms attached to these operational components, whose invariants yield constraints on how theoretical parameters vary under specified classes of deformations. Illustrations drawn from muon–electron conversion, long-baseline neutrino oscillations, and quark–gluon-plasma phenomenology show how TOM maps operational effects into inferences about theoretical parameters, enables systematic cross-experimental comparisons, and stabilizes parameter estimation against defined deformation families. By embedding the operational layer—together with its residues—within a structured theoretical setting, TOM supports both theory testing and theory development, clarifying the conceptual relation between experimental realization and the physical quantities represented by the theory.

Pronskikh, Vitaly [Fermilab] (ORCID:00000002518174↗

Integration of the advanced transparency framework to advanced nuclear systems : enhancing Safety, Operations, Security and Safeguards (SOSS).

The advent of the nuclear renaissance gives rise to a concern for the effective design of nuclear fuel cycle systems that are safe, secure, nonproliferating and cost-effective. We propose to integrate the monitoring of the four major factors of nuclear facilities by focusing on the interactions between Safeguards, Operations, Security, and Safety (SOSS). We proposed to develop a framework that monitors process information continuously and can demonstrate the ability to enhance safety, operations, security, and safeguards by measuring and reducing relevant SOSS risks, thus ensuring the safe and legitimate use of the nuclear fuel cycle facility. A real-time comparison between expected and observed operations provides the foundation for the calculation of SOSS risk. The automation of new nuclear facilities requiring minimal manual operation provides an opportunity to utilize the abundance of process information for monitoring SOSS risk. A framework that monitors process information continuously can lead to greater transparency of nuclear fuel cycle activities and can demonstrate the ability to enhance the safety, operations, security and safeguards associated with the functioning of the nuclear fuel cycle facility. Sandia National Laboratories (SNL) has developed a risk algorithm for safeguards and is in the process of demonstrating the ability to monitor operational signals in real-time though a cooperative research project with the Japan Atomic Energy Agency (JAEA). The risk algorithms for safety, operations and security are under development. The next stage of this work will be to integrate the four algorithms into a single framework.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A CNES remote operations center for the MSL ChemCam instrument

For the first time, a CNES remote operations center in Toulouse will be involved in the tactical operations of a Martian rover in order to operate the ChemCam science instrument in the framework of the NASA MSL (Mars Science Laboratory) mission in 2012. CNES/CESR and LANL have developed and delivered to JPL the ChemCam (Chemistry Camera) instrument located on the top of mast and in the body of the rover. This instrument incorporates a Laser-Induced Breakdown Spectrometer (LIBS) and a Remote Micro-Imager (RMI) for determining elemental compositions of rock targets or soil samples at remote distances from the rover (2-7 m). An agreement has been achieved for operating ChemCam, alternatively, from Toulouse (FR) and Los Alamos (NM, USA), through the JPL ground data system in Pasadena (CA, USA) for a complete Martian year (2 years on Earth). After a brief overview of the MSL mission, this paper presents the instrument, the mission operational system and JPL organization requirements for the scientific investigators (PI and Co-Is). This paper emphasizes innovations applied on the ground segment components and on the operational approach to satisfy the requirements and constraints due to these shared and distributed operations over the world.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Tensor operators: Constructions and applications for long-range interaction systems

We consider the representation of operators in terms of tensor networks and their application to the ground-state approximation and time evolution of systems with long-range interactions. We provide an explicit construction to represent an arbitrary many-body Hamilton operator in terms of a one-dimensional tensor network (i.e., as a matrix product operator). For pairwise interactions, we show that such a representation is always efficient and requires a tensor dimension growing only linearly with the number of particles. For systems obeying certain symmetries or restrictions we find optimal representations with minimal tensor dimension. We discuss the analytic and numerical approximation of operators in terms of low-dimensional tensor operators. We demonstrate applications for time evolution and the ground-state approximation, in particular for long-range interaction with inhomogeneous couplings. The operator representations are also generalized to other geometries such as trees and two-dimensional lattices, where we show how to obtain and use efficient tensor network representations respecting a given geometry.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

New length operator for loop quantum gravity

An alternative expression for the length operator in loop quantum gravity is presented. The operator is background independent, symmetric, positive semidefinite, and well defined on the kinematical Hilbert space. The expression for the regularized length operator can moreover be understood both from a simple geometrical perspective as the average of a formula relating the length to area, volume and flux operators, and also consistently as the result of direct substitution of the densitized triad operator with the functional derivative operator into the regularized expression of the length. Both these derivations are discussed, and the origin of an undetermined overall factor in each case is also elucidated.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗