Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “meter, test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Development of an Advanced Hydrogen Energy Storage System using Aerogel in a Cryogenic Flux Capacitor

The Cryogenic Flux Capacitor (CFC) is a cold, dense fluid storage core with integrated design features that afford the designer flexibility and provide new possibilities for the storage and discharge of energy. The stored energy, in this case, is represented by hydrogen physically bonded within the nanoscale pores within the aerogel composite blanket material, and the process of bonding or debonding is governed by the principles of physical adsorption (physisorption) and thermodynamics. The large surface area afforded by the nanoporous aerogel (~1,000 m 2 /g) allows for storage densities close to, or in some cases exceeding, that of normal boiling point liquids. Its performance easily exceeds what can be achieved via ambient temperature and high-pressure gas storage for an equivalent volume. CFC storage is predicted to be easily scalable, constructed from readily available commercial materials, and lends itself to a range of pressure applications. The project team designed and manufactured the CFC, integrating it into a set of temperature-controlled flow loops. The CFC test setup was validated against existing data from previous NASA work. Tests used bottled hydrogen gas for test validation. A cryogenic fluid, nitrogen, flowed through a metered control system. Hydrogen temperature, pressure, and flow rates, as well as the temperature control targets, provided all necessary control targets. The team analyzed the recorded data and updated the Technology Maturation Plan based on the results of the test, making recommendations for a follow-up test, scale-up, and maturation pathway. For the engineering development and maturation of CFC hydrogen storage technology, a Techno-Economic Assessment (TEA) and Commercialization Plan for the integration of this technology with various power generation assets were produced. A companion analytical model was developed, experimentally validated, compared against performance metric, and used to tune the model and scale up the technology.

08 HYDROGEN↗

Friction Stir Weld Application and Tooling Design for the Multi-purpose Crew Vehicle Stage Adapter

The Multi-Purpose Crew Vehicle (MPCV), commonly known as the Orion capsule, is planned to be the United States' next manned spacecraft for missions beyond low earth orbit. Following the cancellation of the Constellation program and creation of SLS (Space Launch System), the need arose for the MPCV to utilize the Delta IV Heavy rocket for a test launch scheduled for 2014 instead of the previously planned Ares I rocket. As a result, an adapter (MSA) must be used in conjunction with the MPCV to account for the variation in diameter of the launch vehicles; 5.5 meters down to 5.0 meters. Prior to ight article fabrication, a path nder (test article) will be fabricated to ne tune the associated manufacturing processes. The adapter will be comprised of an aluminum frustum (partial cone) that employs isogrid technology and circumferential rings on each end. The frustum will be fabricated by friction stir welding (FSW) three individual panels together on a Vertical Weld Tool (VWT) at NASA Marshall Space Flight Center. Subsequently, each circumferential ring will be friction stir welded to the frustum using a Robotic Weld Tool (RWT). The irregular geometry and large mass of the MSA require that extensive tooling preparation be put into support structures for the friction stir weld. The tooling on the VWT will be comprised of a set of conveyors mounted on pre-existing stanchions so that the MSA will have the ability to be rotated after each of the three friction stir welds. The tooling requirements to friction stir weld the rings with the RWT are somewhat more demanding. To support the mass of the MSA and resist the load of the weld tool, a system of mandrels will be mounted to stanchions and assembled in a circle. The goal of the paper will be to explain the design, fabrication, and assembly of the tooling, to explain the use of friction stir welding on the MSA path nder, and also to discuss the lessons learned and modi cations made in preparation for ight article fabrication in support of the 2014 launch of the Orion MPCV.

Alcorn, John↗

Effect of airstream velocity on mean drop diameters of water sprays produced by pressure and air atomizing nozzles

A scanning radiometer was used to determine the effect of airstream velocity on the mean drop diameter of water sprays produced by pressure atomizing and air atomizing fuel nozzles used in previous combustion studies. Increasing airstream velocity from 23 to 53.4 meters per second reduced the Sauter mean diameter by approximately 50 percent with both types of fuel nozzles. The use of a sonic cup attached to the tip of an air assist nozzle reduced the Sauter mean diameter by approximately 40 percent. Test conditions included airstream velocities of 23 to 53.4 meters per second at 293 K and atmospheric pressure.

Ingebo, R. D.↗

Effect of airstream velocity on mean drop diameters of water sprays produced by pressure and air atomizing nozzles

A scanning radiometer was used to determine the effect of airstream velocity on the mean drop diameter of water sprays produced by pressure atomizing and air atomizing fuel nozzles used in previous combustion studies. Increasing airstream velocity from 23 to 53.4 meters per second reduced the Sauter mean diameter by approximately 50 percent with both types of fuel nozzles. The use of a sonic cup attached to the tip of an air assist nozzle reduced the Sauter mean diameter by approximately 40 percent. Test conditions included airstream velocities of 23 to 53.4 meters per second at 293 K and atmospheric pressure.

Ingebo, R. D.↗

Large Payload Ground Transportation and Test Considerations

Many spacecraft concepts under consideration by the National Aeronautics and Space Administration’s (NASA’s) Evolvable Mars Campaign take advantage of a Space Launch System payload shroud that may be 8 to 10 meters in diameter. Large payloads can theoretically save cost by reducing the number of launches needed--but only if it is possible to build, test, and transport a large payload to the launch site in the first place. Analysis performed previously for the Altair project identified several transportation and test issues with an 8.973 meters diameter payload. Although the entire Constellation Program—including Altair—has since been canceled, these issues serve as important lessons learned for spacecraft designers and program managers considering large payloads for future programs. A transportation feasibility study found that, even broken up into an Ascent and Descent Module, the Altair spacecraft would not fit inside available aircraft. Ground transportation of such large payloads over extended distances is not generally permitted, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 67 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA’s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure—roads, bridges, airframes, and buildings—necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications. Although this paper focuses on the canceled Altair spacecraft as a case study, the issues identified here have wide applicability to other large payloads, including concepts under consideration for NASA’s Evolvable Mars Campaign.

Rucker, Michelle A.↗

Development of the 15 meter diameter hoop column antenna

The building of a deployable 15-meter engineering model of the 100 meter antenna based on the point-design of an earlier task of this contract, complete with an RF-capable surface is described. The 15 meter diameter was selected so that the model could be tested in existing manufacturing, near-field RF, thermal vacuum, and structural dynamics facilities. The antenna was designed with four offset paraboloidal reflector surfaces with a focal length of 366.85 in and a primary surface accuracy goal of .069 in rms. Surface adjustment capability was provided by manually resetting the length of 96 surface control cords which emanated from the lower column extremity. A detailed description of the 15-meter Hoop/Column Antenna, major subassemblies, and a history of its fabrication, assembly, deployment testing, and verification measurements are given. The deviation for one aperture surface (except the outboard extremity) was measured after adjustments in follow-on tests at the Martin Marietta Near-field Facility to be .061 in; thus the primary surface goal was achieved.

Source record↗

Factors affecting dwell times on digital displaying

A series of exploratory tests were conducted to investigate the effects of advanced display formats and display media on pilot scanning behavior using Langley's oculometer, a desktop flight simulator, a conventional electro-mechanical meter, and various digital displays. The primary task was for the test subject to maintain level flight, on a specific course heading, during moderate turbulence. A secondary task of manually controlling the readout of a display was used to examine the effects of the display format on a subject's scan behavior. Secondary task scan parameters that were evaluated were average dwell time, dwell time histograms, and number of dwells per meter change. The round dial meter demonstrated shorter dwell times and fewer dwells per meter change than the digital displays. The following factors affected digital display scanning behavior: (1) the number of digits; (2) the update rate of the digits; (3) the display media; and (4) the character font. The size of the digits used in these tests (0.28 to 0.50 inches) did not affect scan behavior measures.

Williams, A. J.↗

PING Gamma Ray and Neutron Measurements of a Meter-Sized Carbonaceous Asteroid Analog

Determining the elemental composition of carbonaceous (spectral type C) asteroids is still one of the basic problems when studying these objects. The only main source of elemental composition information for asteroids is from their optical, NIR and IR properties, which include their spectral reflectance characteristics, albedo, polarization, and the comparison of optical spectroscopy with meteorite groups corresponding to asteroids of every spectral type. Unfortunately, these sources reflect observations from widely contrasting spatial scales that presently yield a void in the continuum of microscopic and macroscopic evidence, a lack of in situ measurement confirmation, and require deeper sensing techniques to discern the nature of these asteroids. The Probing In situ with Neutrons and Gamma rays (PING) instrument is ideally suited to address this problem because it can be used to determine the bulk elemental composition, H and C content, the average atomic weight and density of the surface and subsurface layers of C-type asteroids, and can provide measurements used to determine the difference between and distinguish between different types of asteroids. We are currently developing the PING instrument that combines gamma ray and neutron detectors with a 14 Me V pulsed neutron generator to determine the in-situ bulk elemental abundances and geochemistry of C-type asteroids with a spatial resolution of 1 m down to depths of tens of cm to 1 m. One aspect of the current work includes experimentally testing and optimizing PING on a known meter-sized Columbia River basalt C-type asteroid analog sample that has a similar composition and the same neutron response as that of a C-type asteroid. An important part of this effort focuses on utilizing timing measurements to isolate gamma rays produced by neutron inelastic scattering, neutron capture and delayed activation processes. Separating the gamma ray spectra by nuclear processes results in higher precision and sensitivity elemental composition measurements. Using gated data acquisition techniques allows for the unambiguous identification of gamma ray lines from different isotopes and nuclear processes, especially in situations when limited detector resolution results in overlapping gamma ray lines that cannot be individually resolved. In this paper, we will present the PING basalt layering experimental data, taken at the test facility at NASA Goddard Space Flight Center using the time tagged event-by-event data analysis technique, compared to our MCNPX computer simulation results for the C-type asteroid and basalt layering simulant models. Comparison of these data will show the advantages, validity, and measurement sensitivity of PING's nuclear interrogation methods to obtain more precise and sensitive in situ bulk elemental composition and density measurements of the subsurface of asteroids.

Bodnarik, J.↗

Advanced Mirror Technology Development (AMTD): Year Five Status

The Advanced Mirror Technology Development (AMTD) project is in Phase 2 of a multiyear effort initiated in Fiscal Year (FY) 2012, to mature the Technology Readiness Level (TRL) of critical technologies required to enable 4-m-or-larger monolithic or segmented ultraviolet, optical, and infrared (UVOIR) space telescope primary-mirror assemblies for general astrophysics, ultra-high-contrast observations of exoplanets, and National Interest missions. Key accomplishments of 2016/17 include the completion of the Harris Corp approximately 150 Hz 1.5-meter Ultra-Low Expansion (ULE Registered trademark) mirror substrate using stacked core method to demonstrate lateral stability of the stacked core technology, as well as the characterization and validation by test of the mechanical and thermal performance of the 1.2-meter Zerodur (Registered trademark) mirror using the STOP model prediction and verification of CTE homogeneity.

Space Mirror Technology↗

Preliminary results from screening tests of commercial catalysts with potential use in gas turbine combustors. II - Combustion test rig evaluation

Several commercial monolithic catalysts were tested in a combustion test rig to determine their suitability for use in a gas-turbine combustor primary zone. The catalyst test bed consisted of two to four elements of 12-centimeter diameter by 2.5-centimeter long monolith. Results are presented of the measured combustion efficiency and catalyst bed temperature history for an inlet propane-air mixture temperature of 800 K, a pressure of 300,000 newtons per square meter, inlet velocities of 10 to 25 meters per second and equivalence ratios of 0.1 to 0.3. The best catalysts tested gave combustion efficiencies of virtually 100% for reaction temperatures ranging from 1325 K at 10 meters per second to 1400 K at 25 meters per second. This performance was only possible with fresh catalysts. The catalysts tested were not specifically developed for use at these conditions and showed some loss in activity after about 3 hours' testing.

Anderson, D. N.↗

Aspects of Assessment of Packages with Wood Filled Impact Limiters during Fire Tests - 17191

Packages for the transport of radioactive material are often equipped with impact limiters consisting of wood, encapsulated by steel sheets. These impact limiters shall ensure that the transport casks meet the mechanical and thermal IAEA regulatory test requirements. According to the accident conditions of transport it is mandatory to expose the specimens to a cumulative effect by mechanical and thermal impacts. The mechanical tests consist of a free drop from 9 m onto a flat unyielding target and a 1 m drop onto a puncture bar. After damage caused by mechanical test sequences the package has to withstand a severe fire scenario. Corresponding to the IAEA advisory material it is required that the impact attitudes for the 9 m drop test and for the puncture test have to be such as to produce maximum damage, taking into account the thermal test. Moreover, any damage, which would give rise to increased radiation or loss of containment or affect the confinement system after the thermal test, should be considered. During and following the thermal test, the specimen shall not be artificially cooled and any combustion of materials of the package shall be permitted to proceed naturally. Different works from the French Institute for Radiological Protection and Nuclear Safety (IRSN) and BAM show that additional energy supply from a pre-damaged impact limiter to the cask could occur. This effect should be considered within the safety assessment of the containment. Thermal effects at the closure system of the cask, which might result in an elevated activity release, have to be excluded. BAM conducted small scale tests with wood filled metal buckets showing continuing combustion processes during the cooling down phase. These test results are presented. As not much is known about smouldering processes in wood filled impact limiters, it is highly complex to define pre-damage of impact limiters, which are conservative, regarding the maximum damaging energy flow from the impact limiter to the containment system. More research has to be done to develop models to examine the effects of smouldering impact limiters on the containment of packages for the transport of radioactive material. Aspects of assessment and its difficulties are shown. BAM as a competent authority for the approval of transport casks for radioactive material in Germany operates the test facilities to examine the issue of mechanical damage, combustion and heat transfer for such kind of package systems. For this purpose, the knowledge from real drop tests with casks of a mass partly over 100 tons was transferred to a test application. A thermal test will take place with a wood filled test specimen with a diameter of about 2.3 meters. The aim is to understand the phenomena of smouldering under the consideration of relevant regulatory boundary conditions. The process of smouldering is described with regard to the requirements in the thermal assessment of safety of packages for the transport of radioactive material. Requirements concerning the pre-damage of packages for the maximum damage of impact limiters are discussed. Parameters influencing the smouldering process are identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conversion of METL Diagnostic Flowmeters to Permanent Magnet Based Electromagnetic Flowmeters

The Mechanisms Engineering Test Loop (METL) uses three flowmeters to monitor sodium circulation through the main loop, the Cold Trap leg, and the Plugging Meter leg. When constructed, the Cold Trap flowmeter (CTFM) and Plugging Meter flowmeter (PMFM) were equipped with permanent magnets and Hall Sensors. By October of 2019, during normal operations, both the CTFM and PMFM failed, producing either erroneous or zero signals. Repairs to the flowmeters were attempted in January of 2020 but failed to resolve the issues. Therefore, starting in March of 2021, a plan was developed to convert the installed flowmeters to more robust permanent magnet based electromagnetic flowmeters (EMFMs). The Cold Trap EMFM (CT EMFM) and Plugging Meter EMFM (PM EMFM) were fully installed by August of 2021. Initial testing and commissioning were completed in November of 2021. Finally, the first calibration runs were finished in March of 2022. This report discusses the design, conversion, and calibration of the as-built CTFM and PMFM to robust permanent magnet based EMFMs. During the design phase, theoretical models were used to estimate the signal output and required magnet sizes. Then, the CTFM and PMFM were disassembled and converted to EMFMs. After commissioning, the CT EMFM and PM EMFM were calibrated using a ‘Time Transfer Procedure’ carried out with METL Expansion Vessels and Test Vessel Two. The accuracy of the calibration was estimated through an uncertainty analysis. Finally, the report describes some lessons learned for future flowmeter conversions and follow-up work. In total, both METL EMFM’s met the desired performance targets. Testing data showed that the METL EMFMs provide a output signal of roughly 2 mV at 1 GPM and 250 °C. During calibration, flowrates between 0.7 GPM and 2.4 GPM were achieved. In this flow range, calibration coefficients of 0.485 and 0.935 were measured as with errors ranging from 15-5% and 16-5% for the CT EMFM and PM EMFM, respectively. Above 1.5 GPM, the error was assumed to be about 5% for both METL EMFMs. Several points will be considered for future follow-up work on the METL EMFM’s. First, the signal noise issues in the PM EMFM will be addressed. It is likely the source of the noise is due to some stray EMF from a heater. Secondly, the NdFeB magnets will be replaced with a grade that has a Curie temperature above 80 °C. For example, a few grades of NeFeB magnets have Curie temperatures which exceed 150 °C and some SmCo magnets have Curie temperatures as high as 500 °C. Third, more calibration runs will be completed in the range of 0.5-2.5 GPM. This will further improve the accuracy of the calibration coefficient. Fourth, calibration runs will be completed up to 5 GPM. This requires a larger pressure relief valve to be installed on the Expansion Vessel and Test Vessel 2, as well as a revised calibration procedure. Lastly, calibration runs will be completed to account for cold spots in the system, which reduced the inlet temperature of the METL EMFMs. Overall, these points will improve the calibration coefficients derived in this work and also improve the performance of the METL EMFMs.

42 ENGINEERING↗

SLS-Derived Lab: Precursor to Deep Space Human Exploration

Plans to send humans to Mars are in work and the launch system is being built. Are we ready? Robotic missions have successfully demonstrated transportation, entry, landing and surface operations but for human missions there are significant, potentially show-stopping issues. These issues, called Strategic Knowledge Gaps (SKGs) are the unanswered questions concerning long-duration exploration beyond low-earth-orbit. The gaps represent a risk of loss of life or mission and because they require extended exposure to the weightless environment outside earth's protective geo-magnetic field they cannot be resolved on the earth or on the International Space Station (ISS). Placing a laboratory at the relatively close and stable lunar Distant Retrograde Orbit (DRO) provides an accessible location with the requisite environmental conditions for conducting SKG research and testing mitigation solutions. Configurations comprised of multiple 3 meter and 4.3 meter diameter modules have been studied but the most attractive solution uses elements of the human Mars launch vehicle or Space Launch System (SLS) for a Mars proving ground laboratory. A shortened version of an SLS hydrogen propellant tank creates a Skylab-like pressure vessel that flies fully outfitted on a single launch. This not only offers significant savings by incorporating SLS pressure vessel development costs but avoids the expensive ISS approach using many launches with substantial on-orbit assembly before becoming operational. One of the most challenging SKGs is crew radiation protection; this is why SKG laboratory research is combined with Mars transit Habitat systems development. Fundamentally, the two cannot be divorced because using the habitat systems for protection requires actual hardware geometry and material properties intended to contribute to shielding effectiveness. The SKGs are difficult problems, solutions are not obvious, and require integrated, iterative, and multi-disciplinary development. A lunar DRO lab built from the launch system elements enables an early and representative transit habitat test bed necessary for closing gaps before sending humans on a 1000 day Mars mission.

Griffin, Brand↗

Preliminary results from screening tests of commercial catalysts with potential use in gas turbine combustors. Part 2: Combustion test rig evaluation

Several commercial monolithic catalysts were tested in a combustion test rig to determine their suitability for use in a gas turbine combuster primary zone. The catalyst test bed consisted of two to four elements of 12-centimeter diameter by 2.5-centimeter long monolith. Results are presented of the measured combustion efficiency and catalyst bed temperature history for an inlet propane-air mixture temperature of 800 K, a pressure of 300,000 newtons per square meter, inlet velocities of 10 to 25 meters per second and equivalence ratios of 0.1 to 0.3. The best catalysts tested gave combustion efficiencies of virtually 100 percent for reaction temperatures ranging from 1,325 K at 10 meters per second to 1,400 K at 25 meters per second. This performance was only possible with fresh catalysts. The catalysts tested were not specifically developed for use at these conditions and showed some loss in activity after about 3 hours' testing.

Anderson, D. N.↗

Calibration of a V-Cone for Low Mass Flows For Small Core Compressor Research

Advancements in core compressor technologies are necessary for next generation, high Overall Pressure Ratio (OPR) turbofan engines. High pressure compressors (HPCs) for future engines are being designed with exit corrected mass flow rates less than 2.25 kg/s (5 lbm/s). In order to accurately measure the performance of these advanced designs, high accuracy measurements are needed in test facilities. The W7 High Speed Multistage Axial Compressor Facility at NASA Glenn Research Center has been used to acquire data for advanced compressor designs. This facility utilizes an advanced differential pressure flow meter called a V-Cone. The facility has historically tested components with physical mass flow rates in the range of 27 to 45 kg/s (60 to 100 lbm/s). As such, when the V-Cone was calibrated prior to installation, the calibrations focused on higher mass flow rates, and uncertainties in that regime range from 0.5% to 0.85%. However, for low mass flow rates under 9 kg/s (20 lbm/s), expected in tests of advanced high OPR HPCs rear stages, the uncertainties of the V-Cone exceed 2.5%. To address this, using a method similar to that utilized by the National Institute of Standards and Technology, an array of Critical Flow Venturi Nozzles (CFVs) was installed in the W7 test section and used to calibrate the V-Cone in 0.5 kg/s (1 lbm/s) increments up to 10.5 kg/s (23 lbm/s). This effort details the measurements and uncertainties associated with this calibration which resulted in a final uncertainty of the V-Cone measurements under 1%.

Measurement Uncertainty↗

SSA-A spacecraft magnetic tests

In the initial magnetic tests the spacecraft perm moment as received was 43 milliampere-meter squared (pole-cm), which was reduced by deperm treatment to milliampere-meter squared. Facility fluxgate probe bias results indicated Z axis bias at the SSS-A fluxgate magnetometer position to be about one half nanotesla (gamma) after Z axis deperm. The ASCS magnetometers, 01 and 02, were successfully aligned and proper operation of the ASCS system were verified. The spacecraft fluxgate magnetometer was calibrated in both the high and low sensitivity modes after a defective 01 electronics card was replaced. Problems were encountered in the Z axis search coil during calibration and the test was re-scheduled. Final test results indicated that the total perm moment could not be reduced any lower than 35 milliampere-meter squared by deperm treatment. However, the Z axis moment decreased from 22 milliampere-meter squared to 6 milliampere-meter squared after deperm. Correct operation and calibration was verified for all three axes of the spacecraft fluxgate magnetometer and no significant bias was observed during stray field testing. Null and spot calibration of the ASCS magnetometer was completed and the measured spin and attitude coil moments were: 2535 and 9820 milliampere-meter squared respectively.

Roy, T. N.↗

Indium Hybridization of Large Format TES Bolometer Arrays to Readout Multiplexers for Far-Infrared Astronomy

The advance of new detector technologies combined with enhanced fabrication methods has resulted in an increase in development of large format arrays. The next generation of scientific instruments will utilize detectors containing hundreds to thousands of elements providing a more efficient means to conduct large area sky surveys. Some notable detectors include a 32x32 x-ray microcalorimeter for Constellation-X, an infrared bolometer called SAFIRE to fly on the airborne observatory SOFIA, and the sub-millimeter bolometer SCUBA-2 to be deployed at the JCMT which will use more than 10,000 elements for two colors, each color using four 32x40 arrays. Of these detectors, SCUBA-2 is farthest along in development and uses indium hybridization to multiplexers for readout of the large number of elements, a technology that will be required to enable the next generation of large format arrays. Our current efforts in working toward large format arrays have produced GISMO, the Goddard IRAM Superconducting 2-Millimeter observer. GISMO is a far infrared instrument to be field tested later this year at the IRAM 30 meter telescope in Spain. GISMO utilizes transition edge sensor (TES) technology in an 8x16 filled array format that allows for typical fan-out wiring and wire-bonding to four 1x32 NIST multiplexers. GISMO'S electrical wiring is routed along the tops of 30 micron walls which also serve as the mechanical framework for the array. This architecture works well for the 128 element array, but is approaching the limit for routing the necessary wires along the surface while maintaining a high fill factor. Larger format arrays will benefit greatly from making electrical connections through the wafer to the backside, where they can be hybridized to a read-out substrate tailored to handling the wiring scheme. The next generation array we are developing is a 32x40 element array on a pitch of 1135 microns that conforms to the NIST multiplexer, already developed for the SCUBA-2 instrument This architecture will utilize electrical connections that route from the TES to the support frame and through the wafer. The detector chip will then be hybridized to the NIST multiplexer via indium bump bonding. In our development scheme we are using substrates that allow for diagnostic testing of electrical continuity across the entire array and we are testing our process to minimize or eliminate any contact resistance at metal interfaces. Our goal is hybridizing a fully functional 32x40 array of TES bolometers to a NIST multiplexer. The following work presents our current progress toward enabling this technology.

Miller, Timothy M.↗

Deployment loads data from a free-flight investigation of all flexible parawings having 371.612 sq meters (4000 sq feet) of wing area

A free-flight test program to determine the deployment characteristics of all-flexible parawings was conducted. Both single-keel and twin-keel parawings having a wing area of 4000 square feet with a five-stage reefing system were tested by use of a bomb-type instrumented test vehicle. Several twin-keel-parawing tests were also made by using an instrumented controllable sled-type test vehicle. The systems were launched from either a C-130 or a C-119 carrier airplane, and a programer parachute was used to bring the test vehicle to a proper dynamic pressure and near-vertical flight path prior to deployment of the parawing system. The free-flight deployment loads data are presented in the form of time histories of individual suspension-line loads and total loads.

Croom, D. R.↗