620 records · Page 35

Multijunction Solar Cell Development and Production at Spectrolab

Development of multijunction space solar cells is much like that for any high technology product. New products face two major pressures from the market: improving performance while maintaining heritage. This duality of purpose is not new and has been represented since ancient times by the Roman god Janus.[1] This deity was typically represented as two faces on a single head: one facing forward and the other to the rear. The image of Janus has been used as symbolism for many combined forces of dual purpose, such as the balance in life between beginnings and endings, or between art and science. For our purposes, Janus represents our design philosophy balance between looking to the future for improvement while simultaneously blending past heritage. In the space photovoltaics industry there are good reasons for both purposes. Looking to the past, a product must have a space flight heritage to gain widespread use. The main reason being that this is an unforgiving business. Spacecraft are expensive to build, launch and operate. Typically once a satellite is launched, in-field service for a power systems problem is near impossible.[2Balanced with this is looking forward. New missions typically require more power than previous programs or attempt new objectives such as a new orbit. And there is always the cost pressure for both the satellite itself as well as the launch costs. Both of which push solar technology to improve power density at a lower cost. The consequence of this balance in a high-risk environment is that space PV develops as a series of infrequent large technology steps or generational changes interspersed with more frequent small technology steps or evolutionary changes. Figure 1 gives a bit of clarification on this point. It depicts the historical progress in space solar cells tracked by efficiency against first launch date for most major products introduced by Spectrolab. The first generation is the Si-based technology reaching a peak values near 15% AM0 (herein denoted for max. power, AM0, 1.353 W/cm2, 28 C). The GaAs single junction device generation supplanted this technology with first flight of GaAs on GaAs substrate in 1982.[3] More recently this generation has been supplanted by the multijunction solar cell GaInP/GaAs/Ge generation. The first launch of a commercial satellite powered by multijunction technology was in 1997 (Hughes HS 601HP) using solar arrays based on Spectrolab s dual junction (DJ) cells. The cells at that time were an impressive 21.5% efficient at beginning-of-life (BOL).[4] Eight years later, the multijunction device has evolved through several versions. The incorporation of an active Ge subcell formed the Triple Junction (TJ) product line at 25.1% efficient, on orbit since November 2001. The evolution of the TJ into the Improved Triple Junction (ITJ) at 26.8% efficient has been on orbit since June of 2002.[5]

Fetzer, Chris↗

In-situ hydrogen microstructural characterization of Si heterojunction passivation: Addressing V OC degradation and mitigation pathways

Si heterojunction (SHJ) solar cells have demonstrated record efficiency >27%, approaching the theoretical limit of ≈ 29%, primarily due to best surface/interface defect passivation provided by deposited thin layers of hydrogenated amorphous silicon (a-Si:H). Such excellent surface/interface passivation reduces recombination loss and result in >100 mV improvement of cell open circuit voltage (V OC ) to ≈ 750 mV, thus the cell efficiency. However, fielded SHJ modules exhibit loss of V OC and hence efficiency over time in years, presumably due to degradation related to a-Si:H layers. This adversely affects the technology’s market acceptance, and levelized cost of energy (LCOE). It is hypothesized that the origin of a-Si:H degradation is somehow related to the presence of weak Si–Si bonds and hydrogen in a-Si:H films. The objective of this project is to test this hypothesis by directly measuring chemical and structural changes occurring within SHJ component layers and solar cells. This is achieved by developing an innovative in-situ Fourier transform infrared (FTIR) spectrometry apparatus to monitor hydrogen microstructural changes occurring within amorphous silicon and decipher hydrogen evolution kinetics over time when samples are exposed to heat and/or light stress. These in-situ measured hydrogen microstructural changes are correlated to the changes in effective minority carrier lifetime (τ eff ), implied V OC (iV OC ), surface recombination velocity (S), and cell V OC . These mechanistic understandings will provide critical guidance to mitigate the V OC -driven degradation of SHJ solar cell performance. Passivation optimization and degradation analysis of individual SHJ component structures were achieved through systematic deposition of three symmetric structures and the completed SHJ solar cell structure. The three symmetric structures used were intrinsic a-Si:H [(i)a-Si:H] layers in a bilayer structure, intrinsic and p-type doped stacked layers [(i-p)a-Si:H] representing the front heterojunction in the SHJ cell, and intrinsic and n-typed doped stacked layers [(i-n)a-Si:H] representing the back-side back surface field (BSF) in the SHJ cell. State-of-the-art passivation qualities are demonstrated by a champion iV OC of 740 mV for the (i)a-Si:H layers, and the (i-n)a-Si:H symmetric structure. A 725 mV iV OC is observed for the (i-p)a-Si:H symmetric structure. These symmetric passivated SHJ component structures were subsequently subjected to different accelerated lifetime (ALT) stressors to identify which conditions contribute the most to iV OC degradation. Degradation of the thin (10 nm) (i)a-Si:H passivation layers without any additional overlying layers is minimal; complexity of this study arises due to unavoidable surface oxidation of (i)a-Si:H layer during most of the stress application, which is likely irrelevant for a full SHJ cell configuration with overlying protective layers. The iV OC degradation of symmetric structures is found to occur primarily at the (i-p)a-Si:H passivation stack under dark heat stress with associated hydrogen loss from the (p)a-Si:H layer. An activation energy for increase in S (defect creation) of 0.65 eV can be correlated to the activation energy of ≈ 0.4 eV for hydrogen loss from the (i-p)a-Si:H stack. This also suggests the presence of weakly bonded hydrogen in the (p)a-Si:H films, which effuses out of the film stack at such low activation energy. When light and heat stress are applied together, similar hydrogen loss from (i-p)a-Si:H stack is observed, however, does not appreciably degrade iV OC or increase S. This is an important result and departure from direct correlation between hydrogen loss and defect creation. This perhaps indicates additional defect chemistries or annealing that might be occurring in the presence of light requiring further detailed defect measurements. The full SHJ cell structure used for this project is depicted in Fig.1(d). SHJ cells with an initial V OC ≈ 700 mV were fabricated and subjected to similar ALT stress conditions. Cell V OC is found to degrade the most under dark heat stress and is confirmed by observed hydrogen migration out of the (i-p)a-Si:H stack. However, hydrogen cannot escape from the cell stack, it accumulates near the (p)a-Si:H/ITO contact interface, where ITO acts as a barrier preventing hydrogen loss. Furthermore, light-heat combined stress does not degrade V OC appreciably, confirming the occurrence of a defect annealing process.

14 SOLAR ENERGY↗

Geospatial assessment of the economic opportunity for reforestation in Maryland, USA

Afforestation and reforestation have the potential to provide effective climate mitigation through forest carbon sequestration. Strategic reforestation activities, which account for both carbon sequestration potential (CSP) and economic opportunity, can provide attractive options for policymakers who must manage competing social and environmental goals. In particular, forest carbon pricing can incentivize reforestation on private land, but this may require landholders to forego other profits. Here, we utilize an ambitious geospatial approach to quantify economic opportunities for reforestation in the state of Maryland (USA) based on high-resolution remoting sensing, ecosystem modeling, and economic analysis. Our results identify spatially-explicit areas of economic opportunity where the potential revenue from forest carbon outcompetes the expected profit of existing cropland at the hectare scale. Specifically, we find that under a baseline economic scenario of 20 dollars per ton of carbon (5% rental rate) and decadal average crop profitability, a transition to forest on agricultural land would be more profitable than 23.2% of cropland in Maryland under a 20-year land-use commitment. Accounting for variations in carbon and crop pricing, 5.5% to 55.4% of cropland would be immediately outcompeted by expected forest carbon revenue, with the potential for an additional 0.5% to 10.6% of outcompeted cropland within 20 years. Under the baseline economic scenario, an annual allocation of $5.8 million towards a carbon rental program could protect 6.93 Tg C (2.2% of the state’s total CSP) on reforested croplands. This moderate yearly cost is equal to 9.7% of Maryland’s average annual auction proceeds from participation in the Regional Greenhouse Gas Initiative (between 2014-2018), and 19.3% of the average annual subsidy payments for corn, soy, and wheat allocated over the same period. This methodological approach may be useful for state governments, not-for-profit organizations, or regional climate initiatives interested in identifying strategic areas for reforestation.

54 ENVIRONMENTAL SCIENCES↗

Techno-Economic Analysis and Market Potential of Geological Thermal Energy Storage (GeoTES) Charged With Solar Thermal and Heat Pumps

In this project, we developed a techno-economic analysis (TEA) model that can be used to evaluate the viability of a proposed Geological Thermal Energy Storage (GeoTES) design. This MATLAB-based model integrates distinct subsystem models for the reservoir, wells, power cycle, and solar field to capture their distinct characteristics. It applies this approach in simulating GeoTES storage and dispatch operations for durations ranging from hourly to seasonal. Using cases studies based on GeoTES designs provided by industry partners - Premier Resource Management (PRM) and EarthBridge Energy - we validated the TEA model estimations of system performance and costs (such as thermal and electrical power/energy inflow and outflow, capital costs, and levelized costs of energy and storage) for both concentrating solar thermal (CST) and Carnot Battery (CB) pairings with GeoTES (CST-GeoTES and CB-GeoTES). For the CST-GeoTES case, the model was validated against the proposed system designed by PRM. It showed good agreement with PRM's estimations when well and pump costs derived from PRM's estimations were used. When GETEM-based costs were used, there was a slight overprediction due to GETEM's project/site agnostic assumption of these costs. From a sensitivity analysis perspective, the levelized cost of electricity (LCOE) of the CST-GeoTES case was most sensitive to well flow rate and the charging temperature. An optimal design scenario resulted in an LCOE of 0.11 $\$$/kWhe. CST-GeoTES can also provide a source of heat to meet seasonal demands. With 12-hour and 24-hour levelized cost of heat (LCOH) of 0.018 $\$$/kWhth and 0.022 $\$$/kWhth, respectively, CST-GeoTES could be competitive in the California market with an average industrial price of natural gas in California between 0.041-0.047 $\$$/kWhth. The levelized cost of storage (LCOS) for CST-GeoTES depends on the energy storage duration. Although the LCOS is relatively higher for shorter durations (e.g., ~0.50 $\$$/kWhe for 1 hour of storage), it is an order of magnitude lower (0.06 $\$$/kWhe) for longer storage durations and competitive with lithium-ion batteries (beyond 12 hours of storage) and molten-salt thermal energy storage (beyond 32 hours). Energy. Three options were explored and applied to the EarthBridge case study: (1) A Carnot Battery design using R125 working fluid with both hot and cold storage; (2) A Carnot Battery design using R125 working fluid with only hot storage; (3) A Carnot Battery using a commercially available heat pump with carbon dioxide (CO2) working fluid and hot storage only. The CB-GeoTES with cold storage only had a slight (round-trip) efficiency advantage over the system without (43.4% vs. 42.8%). This is because the cold storage is limited by the freezing point of water, so the cold storage is not much colder than the environment. The system using commercially available technologies was the least efficient - partly because different cycles were used in the heat pump (CO2) and heat engine (binary cycle) which leads to some inefficiencies. Using the commercially available design, the levelized cost of energy (LCOS) from the model (0.10 $\$$/kWhe) was higher than that estimated by EarthBridge (0.068 $\$$/kWhe). This is because of the low round-trip (38.7%) efficiency of the commercially available design. Sensitivity analysis reveals that the model is most sensitive to electricity price. Including electricity price in the TEA for CB-GeoTES leads to an increase in LCOS from the base value to 0.25 $\$$/kWhe. To determine storage sites suitable for GeoTES, we gathered and analyzed geological, petrophysical, and geophysical data of oil and gas reservoir and aquifers in California and Texas. We down-selected possible sites based on cut-off values for site characteristics (e.g., reservoir temperature, formation thickness, permeability, porosity, depth, and brine salinity) and preliminary costs. Using this approach, the Carrizo-Wilcox, Yegua-Jackson, and Dockum brackish aquifers in Texas were identified as having the highest suitability. Similarly, in the central California region, the White Wolf, Belridge South Tulare, and Belridge South Reef Ridge were the most suitable. Going further, we assessed the storage potential in the selected sites. To do this we developed distributions of reservoir characteristic data and applied a Monte Carlo-based analysis to account for intrinsic uncertainty in the acquired data. The analysis revealed that the Carrizo-Wilcox aquifer had the highest storage potential with a mean capacity of 554 TWhth (i.e., 63 TWhe). The estimated capacity serves as an upper limit of storage potential given that not all fields in the basin will be developed. We participated in multiple outreach activities including conference presentations, panel session discussions, and the facilitation of a GeoTES workshop at the NREL Golden campus.

15 GEOTHERMAL ENERGY↗

Higher Efficiency, Demand Flexible Refrigerator with On-Demand Micro-Vibrational De-icing Technology

Refrigerator technology has advanced significantly over the last couple of decades. Today’s refrigerators use only about 25% of the energy that was required to power models built in 1975. Even as they continually improve efficiency to meet standards, refrigerators have increased in size by almost 20%, added energy-consuming features such as through-the-door ice, and provide more benefits than ever before. However, a few challenges and technology gaps are preventing further improvement of the demand responsiveness and efficiency of the refrigerators. One of the major technology gaps in existing refrigerators is their outdated de-icing process. When the evaporator generates frost, an old-fashioned resistive heating element melts the ice. Most refrigerators have a timed defrost cycle, rather than an active system that could monitor the state of the frost. In these systems, not only is the precious electricity used at its least efficient form of conversion (direct conversion of electricity to heat), but also all the latent heat associated with the ice is wasted during the melting process. On top of that, the refrigerator needs to work harder to pull the temperature down after defrosting, and, last but not least, the food quality is severely impacted by the temperature swings during the defrost cycle. According to a study, the EU alone wastes 89 million tons of food in the supply chain every year. Any temperature swing during defrosting (about 6F according to Emerson for low-temperature cases) can negatively impact the shelf life of meat and other products for multiple days. All these issues can happen during the peak demand time of the electric grid. Unlike the conventional systems, the proposed novel advanced micro-vibrational deicing process uses no heat for defrosting. Instead, it uses the micro vibrations generated by a piezoelectric or vibration-generating module to mechanically break ice from the heat exchanger almost instantaneously. The project titled “Higher Efficiency, Demand Flexible Refrigerator with On-Demand Micro-Vibrational De-icing Technology, performed by Ultrasonic Technology Solutions, LLC (UTS) of Knoxville, TN, in collaboration with Emerson (now Copeland), represents the final phase of a multi-year effort funded under the U.S. Department of Energy’s Building Technologies Office (BTO) BENEFIT FOA 2020. Initiated on October 1, 2021, and completed after a nine-month no-cost extension ending September 30, 2025, this project aimed to develop and validate a novel micro-vibrational mechanical defrosting system, achieving more than 25% improvement in defrosting energy efficiency over conventional baseline defrosting technologies. Over sixteen quarters, the project advanced from fundamental ice-mechanical characterization and prototype development to full-scale system integration and validation. Initial efforts established project management infrastructure and characterized ice adhesion properties, followed by the design and fabrication of early aluminum-based prototypes for resonance frequency testing. Subsequent quarters saw rapid technical progression, including the identification of optimal piezoelectric and motor-based vibration mechanisms, the demonstration of effective de-icing over 6x6-inch aluminum surfaces. The team achieved its Go/No-Go milestone by exceeding the 25% energy-efficiency improvement target—reaching up to 3,340% under optimized conditions—and later confirmed that motor-driven systems offered superior performance and energy efficiency compared to piezoelectric alternatives. Continued refinement led to the development of amplifier systems on printed circuit boards, improved control and instrumentation hardware, and integration into full-scale heat exchanger (HX) prototypes at both UTS and Copeland facilities. Multiple vibration-mounting studies and frost-growth experiments guided mechanical optimization and noise-mitigation strategies, achieving a 17.5 dB reduction in sound pressure level and verifying robust mechanical performance. Advanced analyses, including modal and harmonic simulations, established a quantitative understanding of vibrational behavior and de-icing efficiency across >1000 cm² systems. The final project phase successfully demonstrated scalable integration within reach-in and chest freezer prototypes, confirmed >25% efficiency improvements in large-area systems, and completed a comprehensive business model and scale-up strategy identifying electric defrost systems as the primary beachhead market. The culmination of this DOE-supported effort establishes micro-vibrational defrosting as a viable, high-efficiency, low-noise, and demand-flexible de-icing technology, paving the way for commercial deployment and broader application in next-generation refrigeration systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

HarDWR - Harmonized Water Rights Records

A dataset within the Harmonized Database of Western U.S. Water Rights (HarDWR). For a detailed description of the database, please see the meta-record v2.0. Changelog v2.0 - Recalculated based on data sourced from WestDAAT - Changed using a Site ID column to identify unique records to using aa combination of Site ID and Allocation ID - Removed the Water Management Area (WMA) column from the harmonized records. The replacement is a separate file which stores the relationship between allocations and WMAs. This allows for allocations to contribute to water right amounts to multiple WMAs during the subsequent cumulative process. - Added a column describing a water rights legal status - Added "Unspecified" was a water source category - Added an acre-foot (AF) column - Added a column for the classification of the right's owner v1.02 - Added a .RData file to the dataset as a convenience for anyone exploring our code. This is an internal file, and the one referenced in analysis scripts as the data objects are already in R data objects. v1.01 - Updated the names of each file with an ID number less than 3 digits to include leading 0s v1.0 - Initial public release Description Here we present an updated database of Western U.S. water right records. This database provides consistent unique identifiers for each water right record, and a consistent categorization scheme that puts each water right record into one of seven broad use categories. These data were instrumental in conducting a study of the multi-sector dynamics of inter-sectoral water allocation changes though water markets (Grogan et al., *in review*). Specifically, the data were formatted for use as input to a process-based hydrologic model, Water Balance Model (WBM), with a water rights module (Grogan et al., *in review*). While this specific study motivated the development of the database presented here, water management in the U.S. West is a rich area of study (e.g., Anderson and Woosly, 2005; Tidwell, 2014; Null and Prudencio, 2016; Carney et al., 2021) so releasing this database publicly with documentation and usage notes will enable other researchers to do further work on water management in the U.S. West. We produced the water rights database presented here in four main steps: (1) data collection, (2) data quality control, (3) data harmonization, and (4) generation of cumulative water rights curves. Each of steps (1)-(3) had to be completed in order to produce (4), the final product that was used in the modeling exercise in Grogan et al. (*in review*). All data in each step is associated with a spatial unit called a Water Management Area (WMA), which is the unit of water right administration utilized by the state in which the right came from. Steps (2) and (3) required use to make assumptions and interpretation, and to remove records from the raw data collection. We describe each of these assumptions and interpretations below so that other researchers can choose to implement alternative assumptions an interpretation as fits their research aims. Motivation for Changing Data Sources The most significant change has been a switch from collecting the raw water rights directly from each state to using the water rights records presented in WestDAAT, a product of the Water Data Exchange (WaDE) Program under the Western States Water Council (WSWC). One of the main reasons for this is that each state of interest is a member of the WSWC, meaning that WaDE is partially funded by these states, as well as many universities. As WestDAAT is also a database with consistent categorization, it has allowed us to spend less time on data collection and quality control and more time on answering research questions. This has included records from water right sources we had previously not known about when creating v1.0 of this database. The only major downside to utilizing the WestDAAT records as our raw data is that further updates are tied to when WestDAAT is updated, as some states update their public water right records daily. However, as our focus is on cumulative water amounts at the regional scale, it is unlikely most records updates would have a significant effect on our results. The structure of WestDAAT led to several important changes to how HarWR is formatted. The most significant change is that WaDE has calculated a field known as `SiteUUID`, which is a unique identifier for the Point of Diversion (POD), or where the water is drawn from. This separate from `AllocationNativeID`, which is the identifier for the allocation of water, or the amount of water associated with the water right. It should be noted that it is possible for a single site to have multiple allocations associated with it and for an allocation to be able to be extracted from multiple sites. The site-allocation structure has allowed us to adapt a more consistent, and hopefully more realistic, approach in organizing the water right records than we had with HarDWR v1.0. This was incredibly helpful as the raw data from many states had multiple water uses within a single field within a single row of their raw data, and it was not always clear if the first water use was the most important, or simply first alphabetically. WestDAAT has already addressed this data quality issue. Furthermore, with v1.0, when there were multiple records with the same water right ID, we selected the largest volume or flow amount and disregarded the rest. As WestDAAT was already a common structure for disparate data formats, we were better able to identify sites with multiple allocations and, perhaps more importantly, allocations with multiple sites. This is particularly helpful when an allocation has sites which cross WMA boundaries, instead of just assigning the full water amount to a single WMA we are now able to divide the amount of water between the number of relevant WMAs. As it is now possible to identify allocations with water used in multiple WMAs, it is no longer practical to store this information within a single column. Instead the stAllocationToWMATab.csv file was created, which is an allocation by WMA matrix containing the percent Place of Use area overlap with each WMA. We then use this percentage to divide the allocation's flow amount between the given WMAs during the cumulation process to hopefully provide more realistic totals of water use in each area. However, not every state provides areas of water use, so like HarDWR v1.0, a hierarchical decision tree was used to assign each allocation to a WMA. First, if a WMA could be identified based on the allocation ID, then that WMA was used; typically, when available, this applied to the entire state and no further steps were needed. Second was the spatial analysis of Place of Use to WMAs. Third was a spatial analysis of the POD locations to WMAs, with the assumption that allocation's POD is within the WMA it should belong to; if an allocation still had multiple WMAs based on its POD locations, then the allocation's flow amount would be divided equally between all WMAs. The fourth, and final, process was to include water allocations which spatially fell outside of the state WMA boundaries. This could be due to several reasons, such as coordinate errors / imprecision in the POD location, imprecision in the WMA boundaries, or rights attached with features, such as a reservoir, which crosses state boundaries. To include these records, we decided for any POD which was within one kilometer of the state's edge would be assigned to the nearest WMA. Other Changes WestDAAT has Allowed In addition to a more nuanced and consistent method of assigning water right's data to WMAs, there are other benefits gained from using the WestDAAT dataset. Among those is a consistent categorization of a water right's legal status. In HarDWR v1.0, legal status was effectively ignored, which led to many valid concerns about the quality of the database related to the amounts of water the rights allowed to be claimed. The main issue was that rights with legal status' such as "application withdrawn", "non-active", or "cancelled" were included within HarDWR v1.0. These, and other water rights status' which were deemed to not be in use have been removed from this version of the database. Another major change has been the addition of the "unspecified water source category. This is water that can come from either surface water or groundwater, or the source of which is unknown. The addition of this source category brings the total number of categories to three. Due to reviewer feedback, we decided to add the acre-foot (AF) column so that the data may be more applicable to a wider audience. We added the ownerClassification column so that the data may be more applicable to a wider audience. File Descriptions The dataset is a series of various files organized by state sub-directories. In addition, each file begins with the state's name, in case the file is separate from its sub-directory for some reason. After the state name is the text which describes the contents of the file. Here is each file described in detail. Note that st is a placeholder for the state's name. stFullRecords_HarmonizedRights.csv: A file of the complete water records for each state. The column headers for each of this type of file are: state - The name of the state to which the allocations belong to. FIPS - The two digit numeric state ID code. siteID - The site location ID for POD locations. A site may have multiple allocations, which are the actual amount of water which can be drawn. In a simplified hypothetical, a farm stead may have an allocation for "irrigation" and an allocation for "domestic" water use, but the water is drawn from the same pumping equipment. It should be noted that many of the site ID appear to have been added by WaDE, and therefore may not be recognized by a given state's water rights database. allocationID - The allocation ID for the water right. For most states this is the water right ID, and what is recommended to use should a right be looked up on a given state's water rights database. The water amounts associated with these IDs tend to be finer scaled than those associated with siteID. It should be noted that some allocations may be extracted from multiple sites, particularly for larger Places of Use. ownerClassification - A classification of the types of owners for water rights. The most common is `Private` which incorporates a wide range of entities. Several classifications would be grouped into a government category, most of which are for the U.S. Federal Government. These allocations could be listed as "Federal", "United States of America", or as the names of any number of federal agencies. The last major grouping of entities is for "Native American"s. priorityDate - The date we use as the water right priority date for our modeling analysis. This is the legal priority date when it is available. However, for some rights, specifically from California and New Mexico, we used a pseudo priority date (e.g. well completion date or start of well drilling date) when a legal priority date was not available. The most questionable dates come from New Mexico, where the only date associated with certain water right records was the date the allocation was recorded in the database. As the allocation record creation tended to be within a few months of the filing of the application of the water right, from manually double checking the water rights, and our analysis focuses on aggregating water rights on the timescale of years, we determined it was acceptable to use such dates to include as many records as possible. primaryBeneficialUse - From the numerous state water use categories, WaDE categorized them into 21 categories WestDAAT. This column is the original WaDE category for the primary water use at the PoD site. allocationBeneficialUse - From the numerous state water use categories, WaDE categorized them into 21 categories for WestDAAT. This column is the original WaDE category

Economics↗