Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “long term”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Advanced Process Control and Dynamic Optimization of Reversible Solid Oxide Cell Systems for Performance and Long-Term Health

This presentation was delivered at the 2024 Hydrogen Annual Merit Review Meeting. It focuses on three aspects of projects focusing on solid oxide cell systems- advanced control including nonlinear model predictive control and traditional control, dynamic optimization with due consideration of chemical degradation over the cell lifetime, dynamic optimization considering physical degradation.

Allan, Douglas↗

Model 9975 O Ring Fixture Long-Term Leak Performance (FY2024 Status Report)

Leak testing experiments to monitor the aging performance of Viton ® GLT and GLT-S O-rings used in the model 9975 shipping package have been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The mock-up PCV fixtures are leak tested periodically, and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years of aging without failure. Two of these retired fixtures were returned to testing and heated to 350 °F to evaluate the impact of additional heating at higher temperature for aged O-rings. Fixture #20 failed after 3 months of testing while fixture #18 remained leak tight. These O-rings demonstrated that aged and in-service O-rings can continue to be used, even at higher temperatures, after being in storage, and their leak performance are consistent with other samples at 350 °F.

42 ENGINEERING↗

FEED Study for Climeworks Direct Air Capture at a California Geothermal Facility with Long-Term Storage (Final Scientific/Technical Report)

The overall objective of the project is to execute and complete a front-end engineering and design (FEED) study of an advanced Direct Air Capture (DAC) and Storage (DAC+S) system that is capable of removing and sequestering a minimum of 5,000 tonne/yr of CO 2 from the air based on cradle-to-gate life cycle assessment (LCA). The project will examine retrofitting and utilizing an existing domestic geothermal resource. The selected DAC system will be technology from Climeworks AG (Climeworks) that consists of an adsorption-desorption process to remove CO 2 from ambient air by using a selective filter. The geothermal host site is operated by Ormat Technologies Inc. (ORMAT). The DAC system will capture CO 2 using thermal energy from the host geothermal resource. This Final Scientific/Technical Report is a collection of the deliverables for the project. The project team was not able to successfully complete all the necessary tasks for this project. Shortly after the start of the project, two (2) project partners removed themselves from the study. The Awardee attempted to find a replacement for the direct air capture technology provider and geothermal energy provider. Due to this the awardee submitted a letter of cancellation for the project, letter is attached in the appendix. No funds were expended during the course of the project.

15 GEOTHERMAL ENERGY↗

Advanced Test Reactor Long-Term (20-Year) Operational Strategy

The Department of Energy Office of Nuclear Energy (DOE-NE) and the Naval Nuclear Propulsion Program (NNPP) have identified the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) as a critical need for continued thermal irradiation testing capability to support and advance U.S. commercial and naval nuclear power systems. The ATR is currently the only suitable test reactor operating in the world that can provide these capabilities at volume. ATR must, then, plan to operate for at least the next 20 years. As of the beginning of 2024, ATR has operated for 57 years, with many of the original reactor structures, systems, and components installed and operated for 60 years. Some ATR Complex and reactor support equipment that is currently in use was installed 75 years ago with the startup of the Materials Testing Reactor (MTR).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Long-Term Land-Atmosphere Studies in Northern Alabama

A new multiyear research effort in northern Alabama will gather data on how clouds, vegetation, and tiny aerosol particles in the atmosphere interact to affect local weather and Earth’s climate.

54 ENVIRONMENTAL SCIENCES↗

FY2025 Status Report: Model 9975 O Ring Fixture Long-Term Leak Performance

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package have been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The mock-up PCV fixtures are leak tested periodically, and all GLT O-ring fixtures aged at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aged at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years of aging without failure. Two of these retired fixtures were returned to testing and heated to 350 °F to evaluate the impact of additional heating at higher temperature for aged O-rings. Fixture #20 failed after 3 months while fixture #18 failed after 9 months at 350 °F. These O-rings demonstrated that aged and in-service O-rings can continue to be used, even at higher temperatures, after being in storage, and their leak performance are consistent with other samples at 350 °F. There has been one GLT O-ring fixture which failed after 13.4 years of aging at 200 °F. However, 20 other GLT O-rings aging at 200 °F have remained leak-tight for over 16.9 years and remain in test. There are two GLT O-ring fixtures at 270 °F; one fixture has failed after 12.9 years while the other fixture remains in test after 12.5 years. All GLT-S O-ring fixtures aged at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 250 °F for 14.9 years, while one GLT-S O-ring fixture failed after 12.4 years at 200 °F. The leak testing data to date suggest the GLT and GLT-S O-rings aging in the K-Area Complex (KAC) storage at temperatures of 158 °F might maintain a leak-tight seal for up to 59 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in KAC. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 24 mock-up PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Impacts of Constrained Transmission Deployment on the Cost-Reliability Tradeoff

Traditional Resource Adequacy (RA) frameworks in the U.S. undervalue the contributions of inter-regional transmission to resource adequacy during stress periods, focusing on the availability of nameplate capacity instead. However, availability of nameplate capacity does not always translate into electricity delivery, especially during tail events. Moreover, the rapid deployment of energy-limited resources and increasing electricity demand challenge existing resource adequacy frameworks and couple regional electricity demand and availability of supply via transmission. We propose a two-stage framework that goes beyond the existing capacity-centered approaches to reveal the RA contributions of transmission. In the first stage we introduce a multi-objective optimization framework to quantify the merits of transmission expansion via Pareto Frontiers under alternative futures of no transmission investment, primary energy resources availability and demand growth. The second stage focuses on tail events and leverages the results of the first stage to characterize the risk profile of regional consumers across the U.S. under the alternative energy futures. We find that no new transmission can lead to a more expensive and less reliable national grid across scenarios, however, the impact on regional RA can vary. The probabilistic analysis reveals that transmission investments can alleviate the tail risk of consumers, however, the availability of fuel resources does not always alleviate regional tail risks. Our findings inform policymakers and utilities on the prioritization of transmission investments to mitigate the risk of widespread outages, also for tail events, and ensure reliable and affordable electricity delivery to all.

24 POWER TRANSMISSION AND DISTRIBUTION↗