Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Demonstration of a modeling toolkit for the design of building electrical distribution systems

The deployment of building equipment (e.g., lighting, security) and miscellaneous electrical loads that fundamentally require DC power for operation is increasing. Powering these DC loads has traditionally required an AC/DC converter, but the installation of photovoltaic (PV) and battery energy storage systems that primarily produce DC power eliminates the need for AC/DC converters at each end-device. However, analyzing system energy efficiency and cost for different electrical distribution architectures can be challenging as software tools that support this are not readily available. This paper presents preliminary results from a laboratory verification of the Building Electrical Efficiency Analysis Model (BEEAM) toolkit that was developed to address this gap. Three different eight-luminaire lighting systems comprised of market-available products were designed and modeled: one that used traditional AC distribution, a second that used a hybrid AC -to- centralized DC electrical distribution architecture, and a third that used a hybrid AC -to- distributed DC architecture. Notably, AC/DC conversions are required in all three systems. BEEAM models for LED drivers as well as Power-over-Ethernet (PoE) switches were created using laboratory characterization data. The lighting systems were simulated in Modelica, and the results were compared with each other and physics-based expectations. Simulation results show that PoE system energy efficiency is highly dependent on both device specification (e.g., LED driver and PoE switch efficiency) and system architecture (e.g., PoE switch loading) choices, as expected. For the products and system architectures selected for this study, the two DC systems were found to be less efficient than the AC system over the course of typical operation. In future work, simulation results will be compared with laboratory measurements to validate the usefulness of this software for design, and lighting systems with integrated PV and battery energy storage will be simulated to quantify the energy performance improvements that result from the elimination of some AC/DC converters.

Waghale, Anay S.↗

Study of a High Voltage Ion Engine Power Supply

A complete laboratory breadboard version of a ion engine power converter was built and tested. This prototype operated on a line voltage of 80-120 Vdc, and provided output ratings of 1100 V at 1.8 kW, and 250 V at 20 mA. The high-voltage (HV) output voltage rating was revised from the original value of 1350 V at the beginning of the project. The LV output was designed to hold up during a 1-A surge current lasting up to 1 second. The prototype power converter included a internal housekeeping power supply which also operated from the line input. The power consumed in housekeeping was included in the overall energy budget presented for the ion engine converter. HV and LV output voltage setpoints were commanded through potentiometers. The HV converter itself reached its highest power efficiency of slightly over 93% at low line and maximum output. This would dip below 90% at high line. The no-load (rated output voltages, zero load current) power consumption of the entire system was less than 13 W. A careful loss breakdown shows that converter losses are predominately Metal-Oxide-Semiconductor Field Effect Transistor (MOSFET) conduction losses and HV rectifier snubbing losses, with the rectifier snubbing losses becoming predominant at high line. This suggests that further improvements in power efficiency could best be obtained by either developing a rectifier that was adequately protected against voltage overshoot with less snubbing, or by developing a pre-regulator to reduced the range of line voltage on the converter. The transient testing showed the converter to be fully protected against load faults, including a direct short-circuit from the HV output to the LV output terminals. Two currents sensors were used: one to directly detect any core ratcheting on the output transformer and re-initiate a soft start, and the other to directly detect a load fault and quickly shut down the converter for load protection. The finished converter has been extensively fault tested without failure. The finished converter has been packaged suitable for use as a laboratory prototype for further testing. The finished converter is readily transportable. An article on design issues for high voltage converters for ion engines is included as an attachement.

Stuart, Thomas A.↗

Investigation of a high impedance magnetically insulated transmission line oscillator with hollow load

A novel high-impedance magnetically insulated transmission line oscillator (MILO) with greatly restrained power deposition on the anode has been investigated. Methods to increase the MILO impedance and decrease the anode current are discussed. A MILO with impedance of 30 {Omega} and power conversion efficiency of 25% is presented by particle-in-cell simulations. Compared with the previous MILO in our lab, the anode current of the proposed MILO is reduced about 50%, the power conversion efficiency doubles, and the power deposition on anode is reduced nearly one half. Furthermore, considerations for reducing the power deposition on load have also been carried out in MILO design, and the load current is reduced to 4.6 kA, only 17% of the total anode current. Finally, a hollow load was introduced to reduce the power deposition density on the load, without decreasing the power conversion efficiency.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Coordinated net-load management

A management device includes at least one processor communicatively coupled to at least one energy resource controller controlling at least one energy resource and to at least one deferrable load controller controlling power to at least one deferrable load. The is configured to receive an indication, determined based on a frequency value of an electrical network and a nominal frequency value, that a frequency anomaly event has occurred. Responsive to receiving the indication that the frequency anomaly event has occurred, the processor is also configured to determine, for at least one of the energy resource and the deferrable load, based on the frequency value, the nominal frequency value, and a power value of the electrical network, a respective power command, and cause at least one of the at least one energy resource and the at least one deferrable load to modify operation based on the respective power command.

42 ENGINEERING↗

Coordinated net-load management

A management device includes at least one processor communicatively coupled to at least one energy resource controller controlling at least one energy resource and to at least one deferrable load controller controlling power to at least one deferrable load. The is configured to receive an indication, determined based on a frequency value of an electrical network and a nominal frequency value, that a frequency anomaly event has occurred. Responsive to receiving the indication that the frequency anomaly event has occurred, the processor is also configured to determine, for at least one of the energy resource and the deferrable load, based on the frequency value, the nominal frequency value, and a power value of the electrical network, a respective power command, and cause at least one of the at least one energy resource and the at least one deferrable load to modify operation based on the respective power command.

Lundstrom, Blake Richard↗

Comparative Analysis of HEATNETS for Geothermal Network Performance

Thermal energy networks (TENs), also known as 5th generation district energy systems, or more specifically geothermal networks when exchanging heat with geothermal boreholes, are an important technology for decarbonization. In these networks an ambient loop connects buildings and thermal sources, such as a borehole field, to exchange energy and maintain a desired loop temperature. Water-source heat pumps are used at the buildings to connect to the ambient or thermal loop to meet to the building heating and cooling loads and maintain comfort. A semi-transient, reduced-order technical model and techno-economic model, called HEATNETS, has been developed at NREL that captures the flow of energy around a TEN. In this work, a comparison of the HEATNETS technical model and a well-known coding platform used for modeling geothermal networks, TRNSYS, has been completed for a proposed geothermal network as a verification and validation process. Hourly data provided from the TRNSYS simulation included building loads, pumping power, heat pump power, temperature entering and leaving the borehole field, and mass flow rates. The hourly borehole temperatures were used to create a linear regression model utilized in HEATNETS to estimate the borehole field heat exchange. The building loads and mass flow rates were direct inputs to HEATNETS while the pumping power, heat pump power, borehole temperatures, and coefficients of performance were all simulated and calculated by HEATNETS, allowing for direct comparison of the thermal energy transfer HEATNETS considers the full process from design inputs to economic outputs and can provide modeling options for high-level initial system design and operational optimization. This study focuses on a validation of HEATNETS using results from TRNSYS. HEATNETS is not intended to replace other modeling tools, but this work demonstrates, via a comparison with an industry standard code, that HEATNETS can be a unique, high-level and rapid modeling tool for estimating the performance of a full geothermal network system.

15 GEOTHERMAL ENERGY↗

Comparative Analysis of HEATNETS for Geothermal Network Performance: Preprint

Thermal energy networks (TENs), also known as 5th generation district energy systems, or more specifically geothermal networks when exchanging heat with geothermal boreholes, are an important technology for decarbonization. In these networks an ambient loop connects buildings and thermal sources, such as a borehole field, to exchange energy and maintain a desired loop temperature. Water-source heat pumps are used at the buildings to connect to the ambient or thermal loop to meet to the building heating and cooling loads and maintain comfort. A semi-transient, reduced-order technical model and techno-economic model, called HEATNETS, has been developed at NREL that captures the flow of energy around a TEN. In this work, a comparison of the HEATNETS technical model and a well-known coding platform used for modeling geothermal networks, TRNSYS, has been completed for a proposed geothermal network as a verification process. Hourly data provided from the TRNSYS simulation included building loads, pumping power, heat pump power, temperature entering and leaving the borehole field, and mass flow rates. The hourly borehole temperatures were used to create a linear regression model utilized in HEATNETS to estimate the borehole field heat exchange. The building loads and mass flow rates were direct inputs to HEATNETS while the pumping power, heat pump power, borehole temperatures, and coefficients of performance were all simulated and calculated by HEATNETS, allowing for direct comparison of the thermal energy transfer, rather than also comparing control systems responses. HEATNETS considers the full process from design inputs to economic outputs and can provide modeling options for high-level initial system design and operational optimization. This study shows that HEATNETS, while not intended to replace other modeling tools, can be a unique modeling tool for the performance of a full geothermal network system.

15 GEOTHERMAL ENERGY↗

Effect of vortex generators on the power conversion performance and structural dynamic loads of the Mod-2 wind turbine

Applying vortex generators from 20 to 100 percent span of the Mod-2 rotor resulted in a projected increase in annual energy capture of 20 percent and reduced the wind speed at which rated power is reached by nearly 3 m/sec. Application of vortex generators from 20 to 70 percent span, the fixed portion of the Mod-2 rotor, resulted in a projected increase in annual energy capture of about half this. This improved performance came at the cost of a small increase in cyclic blade loads in below rated power conditions. Cyclic blade loads were found to correlate well with the change in wind speed during one rotor revolution.

Sullivan, T. L.↗

Integrated Optimization and Control of a Hybrid Gas Turbine/sCO 2 Power System

During phase-I, the project team led by Echogen Power Systems (EPS) had two primary objectives based on investigating the application of gas turbines with supercritical carbon dioxide (sCO 2 ) power cycles. The first objective was to improve the overall efficiency and performance of a hybrid gas turbine/sCO 2 power system through a joint optimization of the two subsystems (gas turbine and sCO 2 power cycle) using non-linear optimization techniques that simultaneously evaluate thermal performance of the combined cycle. The hybrid power system included several points of interaction, including (but not limited to) gas turbine exhaust, fuel heating, inlet chilling and turbine cooling. The second objective was to establish a baseline transient response model of the hybrid power system and a notional microgrid and begin steps to integrate the control systems of the three major elements (gas turbine, sCO 2 cycle and grid controller). The project team established a baseline performance for a combined cycle power plant using a production gas turbine and scaled sCO 2 power cycle only utilizing exhaust heat recovery. Echogen’s non-linear techno-economic optimization code was extended by adding gas turbine component models derived from a in-house developed gas turbine design code. With the two cycles coupled by the gas turbine exhaust, design parameters of both cycles were allowed to vary simultaneously to determine performance opportunity versus isolated designs. Returning to the baseline gas turbine/sCO 2 power cycle transient models: Echogen had in-house developed sCO 2 cycle transient model in GT-Suite system simulation software, and had partnered with Siemens Finspång for gas turbine transient model, and Siemens PTI group to provide micro-grid load profile as well as hybrid power cycle generated load (power and frequency) analysis. The transient model for the SGT-750 Siemens gas turbine was a “black-box” functional mock-up interface (FMI) model developed by Siemens Industrial Turbomachinery in Finspång, Sweden. The SGT-750 is a twin-shaft gas turbine that produces 40 MW electricity with an efficiency of about 40% at ISO conditions. At 100% gas turbine throttle (load), the SGT-750 has average exhaust conditions of 114.6 kg/s and 469.8°C. The transient model for sCO 2 power cycle was developed by Echogen in GT-SUITE 1D system simulation software platform. The basic CO 2 flow circuit has single-shaft turbomachinery with net 11.5 MW electrical power output at design conditions. The power turbine has a double-ended shaft with one end connected to synchronous generator through a fixed-ratio gearbox. The other end of power turbine is connected to the compressor through a continuously variable transmission. The major components of the sCO 2 power cycle modeled include air cooled condenser/cooler, CO 2 compressor, recuperator, two waste heat exchanger coils, power turbine, continuous variable transmission, gearbox and generator. Integration of SGT-750 transient model and sCO 2 power cycle transient model was done in Matlab Simulink. In the integrated model, the gas turbine and sCO 2 power cycle interacted at two points, first one being the gas turbine exhaust gas flow rate and temperature, which were inputs to sCO 2 power cycle model. The second point was the distribution of micro-grid load demand signal between the SGT-750 generator and sCO 2 cycle generator. For a given combined-cycle load demand, the gas turbine load demand was equal to the total demand minus the sCO 2 cycle power generated. In the present study the integrated model was simulated for two cases of grid load demand: (i) for a step change, both positive-step and negative-step, in grid load demand (ii) for a micro-grid load demand curve provided by Siemens PTI group. Finally, the time series plots representing load demand versus integrated system response were presented including the sCO 2 power cycle control system performance plots. The actual generated power and frequency of both the generators, gas turbine and sCO 2 power cycle, was supplied to Siemens PTI group for dynamic grid assessment, results of which are provided in appendices.

03 NATURAL GAS↗

Comparison of three DWM-based wake models at above-rated wind speeds

In this study we investigate three mid-fidelity wind turbine wake models based on the dynamic wake meandering (DWM) model principle, and compare their performance with a reference dataset, produced with large-eddy simulations using the actuator line model. The models are compared with respect to flow field, power, and loads on a row of four 5MW reference turbines experiencing above-rated wind conditions. In general, the DWM models show fairly good agreement with large-eddy simulation for the time-averaged flow fields, blade forces and power, with increasing differences along the turbine row. Also when comparing fatigue loads of blade root moments, the differences between the models increase further into the row, with deviations up to 25 % of the reference case. However, while the development in blade root moment fatigue along the turbine row is predominantly driven by the energy content at the frequency corresponding to the turbine's rotational period (1 P ) for the DWM models, the large-eddy simulation results suggest that the key drivers for the blade root and tower loads are the increase in meandering and energy at higher frequencies (> 1 P ) deeper into the turbine row. For the tower loads, the DWM models highly underestimate the fatigue for the waked turbines. From these results, we suggest priorities for future model developments so that robust model implementations can be used in wind farm design and operation.

17 WIND ENERGY↗

Power Lane County Electric Grid Handbook

In 2024, Lane Couty was selected to participate in the U.S. Department of Energy’s Energy to Community program. Through the program, National Laboratory researchers from Lawrence Berkeley National Laboratory, Pacific Northwest National Laboratory, and the National Laboratory of the Rockies provide three years of technical assistance to Lane County and their project partners: the Center for Rural Livelihoods, Springfield Utility Board, and Emerald People’s Utility District. The project, named Power Lane County, aims to improve local electric system affordability, reliability and resilience in the face of natural hazards and potentially rising loads. The Power Lane County Electric Grid Handbook establishes a foundational understanding of the energy landscape and electric grid in Lane County to inform community engagement, education, and analysis in future project phases. This document synthesizes public data and utility and stakeholder engagement, including utility interviews to give the reader a comprehensive view of the challenges facing Lane County's electric system and the opportunities to address them

Electricity↗

Ocean power technology design optimization

For this study, the National Renewable Energy Laboratory and Ocean Power Technologies (OPT) conducted a collaborative code validation and design optimization study for OPT's PowerBuoy wave energy converter (WEC). NREL utilized WEC-Sim, an open-source WEC simulator, to compare four design variations of OPT's PowerBuoy. As an input to the WEC-Sim models, viscous drag coefficients for the PowerBuoy floats were first evaluated using computational fluid dynamics. The resulting WEC-Sim PowerBuoy models were then validated with experimental power output and fatigue load data provided by OPT. The validated WEC-Sim models were then used to simulate the power performance and loads for operational conditions, extreme conditions, and directional waves, for each of the four PowerBuoy design variations, assuming the wave environment of Humboldt Bay, California. And finally, ratios of power-to-weight, power-to-fatigue-load, power-to-maximum-extreme-load, power-to-water-plane-area, and power-to-wetted-surface-area were used to make a final comparison of the potential PowerBuoy WEC designs. Lastly, the design comparison methodologies developed and presented in this study are applicable to other WEC devices and may be useful as a framework for future WEC design development projects.

16 TIDAL AND WAVE POWER↗

EMP Coupling to a Straight Conductor Above Ground: Transmission Line Formulation Based on Electromagnetic Reciprocity

A simple model for coupling of an electromagnetic plane wave incident on a conductor above ground has been developed using reciprocity theory, providing some advantages as compared to the conventional transmission line approach. The model is developed using a semi-infinitely long single conductor above a lossy ground plane and connected by an arbitrary load impedance to a vertical grounding conductor. This configuration corresponds to the worst-case wave coupling, because it leads to a line induced current larger than in the cases of finite and multiconductor lines. A frequency-domain Thévenin equivalent model is developed to relate the incident wave amplitude to the voltage across a generic load, connected at any point on the vertical conductor. The application to the threat analysis of a high-altitude electromagnetic pulse impact on a power transmission line is discussed by considering the time-domain solution (via inverse Fourier transform) for an incident EMP fast-rise transient (E1) waveshape, following the standard IEC specifications. For typical high-voltage power line load impedances, it is shown that voltage magnitudes in the MV range can be induced across the line termination, in the case of a wave with a near-grazing incidence angle and with wave vector aligned along the horizontal conductor.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fault-tolerant adaptive control for load-following in static space nuclear power systems

The possible use of a dual-loop model-based adaptive control system for load following in static space nuclear power systems is investigated. The proposed approach has thus far been applied only to a thermoelectric space nuclear power system but is equally applicable to other static space nuclear power systems such as thermionic systems.

Parlos, Alexander G.↗

Distributed Automatic Load-Frequency Control with Optimality in Power Systems

With the increasing penetration of renewable energy resources, power systems face new challenges in balancing power supply and demand and maintaining the nominal frequency. This paper studies load control to handle these challenges. In particular, a fully distributed automatic load control algorithm, which only needs local measurement and local communication, is proposed. We prove that the control algorithm globally converges to an optimal operating point which minimizes the total disutility of users, restores the nominal frequency and the scheduled tie-line power flows, and respects the thermal constraints of transmission lines. It is also shown that the convergence still holds even when inaccurate system parameters are used in the control algorithm. Lastly, the effectiveness, optimality, and robustness of the proposed algorithm are demonstrated via numerical simulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy and water sector policy strategies for drought mitigation.

Tensions between the energy and water sectors occur when demand for electric power is high and water supply levels are low. There are several regions of the country, such as the western and southwestern states, where the confluence of energy and water is always strained due to population growth. However, for much of the country, this tension occurs at particular times of year (e.g., summer) or when a region is suffering from drought conditions. This report discusses prior work on the interdependencies between energy and water. It identifies the types of power plants that are most likely to be susceptible to water shortages, the regions of the country where this is most likely to occur, and policy options that can be applied in both the energy and water sectors to address the issue. The policy options are designed to be applied in the near term, applicable to all areas of the country, and to ease the tension between the energy and water sectors by addressing peak power demand or decreased water supply.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Novel Auto-Scaling MPPT Algorithm based on Perturb and Observe Method for Photovoltaic Modules under Partial Shading Conditions

Maximum Power Point Tracking (MPPT) controller is required in a solar photovoltaic (PV) system to deliver the maximum power to load from PV module. This paper proposes a novel stepped MPPT method to realize a simple MPPT controller, which can track the real maximum power point (RMPP) even under partial shading conditions. The proposed algorithm is started by scanning the characteristic curve of the PV modules to detect the global maximum power point and then the algorithm will be switched to the conventional P&O algorithm to track the true maximum power point. The obtained simulation results, using Power electronic simulation software (PSIM), are compared with those found using the P&O method to confirm the performance of our proposed MPPT method even under non-uniform solar irradiation.

14 SOLAR ENERGY↗

ARPA-E PERFORM datasets

Time-coincident load, wind, and solar data including actual and probabilistic forecast datasets at 5-min resolution for ERCOT, MISO, NYISO, and SPP. Wind and solar profiles are supplied for existing sites as well as planned sites based on interconnection queue projects as of 2021. For ERCOT actuals are provided for 2017 and 2018 and forecasts for 2018, and for the remaining ISOs actuals are provided for 2018 and 2019 and forecasts for 2019. There datasets were produced by NREL as part of the ARPA-E PERFORM project, an ARPA-E funded program that aim to use time-coincident power and load seeks to develop innovative management systems that represent the relative delivery risk of each asset and balance the collective risk of all assets across the grid. For more information on the datasets and methods used to generate them see https://github.com/PERFORM-Forecasts/documentation.

5-min data↗