Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “issues management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Automated Platform Management System Scheduling

The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.

Hull, Larry G.↗

Damage Tolerance Issues as Related to Metallic Rotorcraft Dynamic Components

In this paper issues related to the use of damage tolerance in life managing rotorcraft dynamic components are reviewed. In the past, rotorcraft fatigue design has combined constant amplitude tests of full-scale parts with flight loads and usage data in a conservative manner to provide "safe life" component replacement times. In contrast to the safe life approach over the past twenty years the United States Air Force and several other NATO nations have used damage tolerance design philosophies for fixed wing aircraft to improve safety and reliability. The reliability of the safe life approach being used in rotorcraft started to be questioned shortly after presentations at an American Helicopter Society's specialist meeting in 1980 showed predicted fatigue lives for a hypothetical pitch-link problem to vary from a low of 9 hours to a high in excess of 2594 hours. This presented serious cost, weight, and reliability implications. Somewhat after the U.S. Army introduced its six nines reliability on fatigue life, attention shifted towards using a possible damage tolerance approach to the life management of rotorcraft dynamic components. The use of damage tolerance in life management of dynamic rotorcraft parts will be the subject of this paper. This review will start with past studies on using damage tolerance life management with existing helicopter parts that were safe life designed. Also covered will be a successful attempt at certifying a tail rotor pitch rod using damage tolerance, which was designed using the safe life approach. The FAA review of rotorcraft fatigue design and their recommendations along with some on-going U.S. industry research in damage tolerance on rotorcraft will be reviewed. Finally, possible problems and future needs for research will be highlighted.

Everett, R. A., Jr.↗

QuEST: Qualifying Environmentally Sustainable Technologies

QuEST is a publication of the NASA Technology Evaluation for Environmental Risk Mitigation Principal Center (TEERM). This issue contains brief articles on: Risk Identification and Mitigation, Material Management and Substitution Efforts--Hexavalent Chrome-free Coatings and Low volatile organic compounds (VOCs) Coatings, Lead-Free Electronics, Corn-Based Depainting Media; Alternative Energy Efforts Hydrogen Sensors and Solar Air Conditioning. Other TEERM Efforts include: Energy and Water Management and Remediation Technology Collaboration.

Lewis, Pattie↗

Purpose, Principles, and Challenges of the NASA Engineering and Safety Center

NASA formed the NASA Engineering and Safety Center in 2003 following the Space Shuttle Columbia accident. It is an Agency level, program-independent engineering resource supporting NASA's missions, programs, and projects. It functions to identify, resolve, and communicate engineering issues, risks, and, particularly, alternative technical opinions, to NASA senior management. The goal is to help ensure fully informed, risk-based programmatic and operational decision-making processes. To date, the NASA Engineering and Safety Center (NESC) has conducted or is actively working over 600 technical studies and projects, spread across all NASA Mission Directorates, and for various other U.S. Government and non-governmental agencies and organizations. Since inception, NESC human spaceflight related activities, in particular, have transitioned from Shuttle Return-to-Flight and completion of the International Space Station (ISS) to ISS operations and Orion Multi-purpose Crew Vehicle (MPCV), Space Launch System (SLS), and Commercial Crew Program (CCP) vehicle design, integration, test, and certification. This transition has changed the character of NESC studies. For these development programs, the NESC must operate in a broader, system-level design and certification context as compared to the reactive, time-critical, hardware specific nature of flight operations support.

Gilbert, Michael G.↗

Biofilm Management in a Microgravity Water Recovery System

Biofilm growth continues to be a significant concern for NASA’s current and future water systems. The International Space Station (ISS) Water Processor Assembly (WPA) produces potable water from a combination of humidity condensate and urine distillate. The WPA waste tank requires significant management to prevent biofilm growth from impacting downstream components. This issue is magnified for future NASA manned missions due to the need to place the vehicle’s life support system in a dormant state during uncrewed operations (e.g., when the vehicle is in Mars orbit during the surface mission). NASA personnel and the Center for Biofilm Engineering at Montana State University are evaluating various methods for mitigating biofilm growth, including reduced nutrient levels, thermal treatment, sonic waves treatment, and identifying effective biocides in this application. This paper provides an overview of the current status of this effort.

Yo-ann Velez Justiniano↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Borehole Disposal: Update on the Science, Technology, and Potentially Suitable Radioactive Wastes - 20170

A recent Special Issue of the Energies Journal on Deep Borehole Disposal of Nuclear Waste has delivered a timely update on the science and technology of borehole disposal and the types of radioactive wastes it could potentially accommodate. The Special Issue papers discuss (i) circumstances under which a national waste management programme might wish to consider deep borehole disposal [1], (ii) a status report of deep borehole disposal options in Germany [2], (iii) the use of deep horizontal drill-holes in sedimentary, metamorphic or igneous rocks for disposal of spent nuclear fuel and high-level radioactive waste [3], (iv) the analysis of corrosion performance of engineered barrier systems [4], (v) a review of the potential cementing systems suitable for deep borehole disposal [5], (vi) the thermal evolution around heat-generating waste for a wide range of material properties and disposal configurations [6], (vii) a geochemical analysis of deep brines focussed on fluid-rock interactions [7], (viii) post-closure performance assessment calculations for deep borehole disposal of Cs/Sr capsules [8], and (ix) an example safety case for deep borehole disposal of nuclear wastes [9]. This paper provides an overview of the main findings from these publications and highlights some of the technological and scientific challenges that need to be overcome when developing a deep borehole disposal concept. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Trajectory Synthesizer Generalized Profile Interface

The Trajectory Synthesizer is a software program that generates aircraft predictions for Air Traffic Management decision support tools. The Trajectory Synthesizer being used by researchers at NASA Ames Research Center was restricted in the number of trajectory types that could be generated. This limitation was not sufficient to support the rapidly changing Air Traffic Management research requirements. The Generalized Profile Interface was developed to address this issue. It provides a flexible approach to describe the constraints applied to trajectory generation and may provide a method for interoperability between trajectory generators. It also supports the request and generation of new types of trajectory profiles not possible with the previous interface to the Trajectory Synthesizer. Other enhancements allow the Trajectory Synthesizer to meet the current and future needs of Air Traffic Management research.

Lee, Alan G.↗

Waste Information Management System with 2019-20 Waste Streams - 20491

The Waste Information Management System (WIMS) 2019-20 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 35 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and intermodal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of climate change on adaptive management decisions in the face of water scarcity

Reoccurring drought through the early 2000s has caused a serious water scarcity issue in the Colorado River Basin. Previous modeling studies have focused on the impact of climate change without considering the adaptive behaviors of farmers and under-utilized Indian water rights. Here, we use a coupled agent-based water resource model (ABM) to investigate how the adaptive decisions of farmers can affect water resource management under both climate change impacts and fully utilized Indian water right conditions. We used five General Circulation Model projections with RCP8.5 scenarios for the study. The results of farm-level decision-making showed different responses in irrigated areas that were changing due to climate change impact. While winter precipitation changes might partially explain the behavior changes, no specific pattern could be concluded based on their location. Also, farmers’ responses about annual water diversion showed more significant inter-year variation compared to irrigated areas. Basin-level metrics showed that climate change impacts will generally worsen water scarcity issues as measured in Navajo Reservoir storage, flow to Lake Powell, and instream flow requirement. But these basin-level water scarcity metrics cannot reflect individual farm-level impacts under climate change, which is why modeling the bottom-up management actions is necessary. When the under-utilized Indian water rights are fully used, it is more likely to trigger the shortage sharing agreement due to the higher tribal water depletion. Evaluation of model uncertainty and a more realistic setup for adaptive actions under drought contingency plans are suggested for future research.

54 ENVIRONMENTAL SCIENCES↗

A Comprehensive Investigation into the Effect of a Low Surface Energy Treatment on Gas Hydrate, Asphaltene, and Wax Formation, Deposition, and Adhesion

The formation/precipitation and deposition of pipeline solids, such as gas hydrates, asphaltenes, and waxes have long plagued production fields. Given the vast differences in chemistries of these solids, any current prevention or mitigation strategy, particularly for cases in which multiple issues are a concern, is likely to involve an extensive assortment of chemical additives that are both costly and add complexity to the system. Surface treatments (coatings), on the other hand, present a relatively viable option for management strategies. A chemically and physically robust surface treatment with the ability to address deposition issues for multiple pipeline solids could not only decrease the operating expenditures for a field through material cost savings and obviation of downstream separation, but could also simplify produced fluids by eliminating additional chemicals from the mixture. The purpose of this study was to explore the feasibility of a particular surface treatment as part of a solids management strategy. This work used an omniphobic surface treatment to probe its effects on gas hydrate, asphaltene, and wax deposition. Specifically, an interfacial tensiometer (IFT) collected contact angle measurements for wettability studies. High-pressure rocking cells studied gas hydrate nucleation and deposition. A bench-scale flow loop quantified the deposition of oil and asphaltenes after a set time period. Finally, a mechanical shear device measured the adhesion force of wax deposits on untreated/treated surfaces. Static contact angle results showed that the omniphobic surface treatment had reduced surface interaction with water droplets in air, altering from the complete wetting on corroded surfaces to slightly hydrophobic conditions of greater than 100°. In addition, rocking-cell tests indicated that these omniphobic surface treatments may prevent gas hydrate deposition for up to 72 hours. The gas hydrate rocking-cell tests also demonstrated possible increases in induction time and occasional elimination of hydrate nucleation with the surface treatment. Finally, the surface treatment application, which also decreased surface roughness, showed that crude oil and asphaltene particles deposition, as well as the shear required to remove solidified wax deposits, could be reduced by a large factor. Overall, promising results were recorded for all major flow-assurance solids in the presence of the surface treatment.

Engineering↗

OPTOM: Optimization of Parabolic Trough - Operations & Maintenance

The US Department of Energy’s SunShot goals look to reduce the cost of Concentrating Solar Power (CSP) technology to 5¢/kWh for baseload plants. This is about a 50% reduction from current costs. To achieve this cost target, a significant reduction in operation and maintenance (O&M) costs of 40 to 50% is likely needed. Advances are needed in the O&M practices of CSP plants if the technology is to achieve the SunShot cost goals. Digitization of plant performance and O&M data has become a new best practice in the world of renewable energy asset management. Owners and operators of large photovoltaic and wind power plants are working to digitize performance and O&M data at their existing assets, to improve their management of the facilities, to increase performance, reduce O&M costs, and lower the overall life cycle cost of ownership. CSP power plants are behind the curve of other technologies on the digitization of plant information to aid in the plant asset management. This project directly addresses the objective of digitizing the O&M data of the solar field, focusing on three areas: 1) creating a framework for sharing data and information, 2) creating a system for monitoring and managing the maintenance of the solar field collectors, and 3) developing analytic tools to identify issues in the solar field. According to the NREL CSP Best Practices Study, the current practice at many CSP plants is to rely on paper lists, spreadsheets, and email for monitoring and managing problems and maintenance in the solar field. The key element to digitize solar field O&M is the creation of a centralized data archive that all users and systems can interface with. This project developed a centralized relational database framework that allows users and applications to access and share data. Conventional power plants utilize Computerized Maintenance Management Systems (CMMSs) to track the corrective, preventive (scheduled), and predictive maintenance of equipment and subsystems in the power plant. CSP plants use these systems in the power block, but while these systems specialize at tracking maintenance on up to thousands of pieces of equipment, they are not well suited for tracking the tens or hundreds of thousands of components in large commercial CSP or photovoltaic solar fields. In this project we developed a new software application referred to as FieldStatus (TM). This is a specialized database program that is used to track the status of each collector and its components. This application is designed to complement the existing CMMS to enable improved tracking and management of maintenance activities in the solar field. One of the major maintenance tasks for solar fields is maintaining the cleanliness of the mirrors. Although seemingly a relatively straight forward task, it has often proven challenging to maintain high levels of cleanliness in an efficient and cost-effective manner. This project developed new tools and metrics for monitoring and optimizing solar field cleaning resources and overall solar field cleanliness.

14 SOLAR ENERGY↗

Field Geologic Observation and Sample Collection Strategies for Planetary Surface Exploration: Insights from the 2010 Desert RATS Geologist Crewmembers

Observation is the primary role of all field geologists, and geologic observations put into an evolving conceptual context will be the most important data stream that will be relayed to Earth during a planetary exploration mission. Sample collection is also an important planetary field activity, and its success is closely tied to the quality of contextual observations. To test protocols for doing effective planetary geologic field- work, the Desert RATS(Research and Technology Studies) project deployed two prototype rovers for two weeks of simulated exploratory traverses in the San Francisco volcanic field of northern Arizona. The authors of this paper represent the geologist crew members who participated in the 2010 field test.We document the procedures adopted for Desert RATS 2010 and report on our experiences regarding these protocols. Careful consideration must be made of various issues that impact the interplay between field geologic observations and sample collection, including time management; strategies relatedtoduplicationofsamplesandobservations;logisticalconstraintson the volume and mass of samples and the volume/transfer of data collected; and paradigms for evaluation of mission success. We find that the 2010 field protocols brought to light important aspects of each of these issues, and we recommend best practices and modifications to training and operational protocols to address them. Underlying our recommendations is the recognition that the capacity of the crew to flexibly execute their activities is paramount. Careful design of mission parameters, especially field geologic protocols, is critical for enabling the crews to successfully meet their science objectives.

Hurtado, Jose M., Jr.↗

Investigating the Impact of Off-Nominal Events on High-Density "Green" Arrivals

Trajectory-based controller tools developed to support a schedule-based terminal-area air traffic management (ATM) concept have been shown effective for enabling green arrivals along Area Navigation (RNAV) routes in moderately high-density traffic conditions. A recent human-in-the-loop simulation investigated the robustness of the concept and tools to off-nominal events events that lead to situations in which runway arrival schedules require adjustments and controllers can no longer use speed control alone to impose the necessary delays. Study participants included a terminal-area Traffic Management Supervisor responsible for adjusting the schedules. Sector-controller participants could issue alternate RNAV transition routes to absorb large delays. The study also included real-time winds/wind-forecast changes. The results indicate that arrival spacing accuracy, schedule conformance, and tool usage and usefulness are similar to that observed in simulations of nominal operations. However, the time and effort required to recover from an off-nominal event is highly context-sensitive, and impacted by the required schedule adjustments and control methods available for managing the evolving situation. The research suggests ways to bolster the off-nominal recovery process, and highlights challenges related to using human-in-the-loop simulation to investigate the safety and robustness of advanced ATM concepts.

Callatine, Todd J.↗

Evaluation of a Robust, In-Situ Surface Treatment for Pipeline Solids Deposition Mitigation in Flowing Systems

Abstract The formation/precipitation and deposition of pipeline solids, such as gas hydrates, asphaltenes, and waxes have long plagued production fields. Given the vast differences in chemistries of these solids, any current prevention or mitigation strategy, particularly for cases where multiple issues are a concern, is likely to involve an extensive assortment of undefined chemical additives that are both costly and add complexity to the system. Surface treatments (coatings), on the other hand, present a relatively new viable option for management strategies. A chemically and physically robust surface treatment with the ability to address deposition issues for multiple pipeline solids could not only decrease the operating expenditures for a field through material cost savings and obviation of downstream separation, but could also simplify produced fluids by eliminating additional chemicals from the mixture. The purpose of this study is to explore the feasibility of a particular surface treatment as part of a solids management strategy. This work utilizes an omniphobic surface treatment to probe its effects on gas hydrate, asphaltene, and wax deposition. Specifically, high pressure rocking cells are employed to study gas hydrate nucleation and deposition. A bench-scale flowloop filled with crude oil and heptane is used to quantify the deposition of crude oil and asphaltenes after a set time period. Lastly, a mechanical shear device measures the adhesion force of wax deposits on untreated/treated surfaces. The gas hydrate rocking cell tests demonstrate an increase in induction time and occasional elimination of hydrate nucleation with the surface treatment. Moreover, the same apparatus indicates that the critical shear to avoid hydrate deposition may be lowered in the presence of the surface treatment compared to untreated pristine carbon steel coupons. A custom-built asphaltene flowloop then establishes that this surface treatment is effective in dramatically reducing the deposition of the aliphatic components of a crude oil, with a moderate reduction in the asphaltene fraction. Finally, mechanical adhesion force measurements for solidified paraffin wax display trends in agreement with the asphaltene results. The surface treatment on both pristine and corroded surfaces is able to reduce the adhesion of wax deposits to values below a pristine, untreated surface.

03 NATURAL GAS↗

ROBIN (RuciO/BIgData Express/SENSE) A Next-Generation High-Performance Data Service Platform

Increasingly, scientific research discoverydepends on the analysis of extremely large amounts of data. Thisdata is gathered through very large scientific instruments, verylarge numbers of small devices, and mid-scale instruments.These devices generate exponentially increasing volumes of data.Such data is often obtained, analyzed, stored, visualized, andtransferred at and among sites world-wide by largecollaborations of science communities. Managing and movingextremely large volumes of data across today’s networks is aspecial multidimensional challenge. Also, existing datamanagement and movement services and tools often areinadequate to address all specific requirements. This paperdescribes the various components of this challenge and howthose issues can be addressed by ROBIN, a uniquecomprehensive set of integrated services designed specificallyfor managing and moving extremely large amounts of data overlong distances, e.g., thousands of miles around the globe. Thispaper also describes the results of initial experiments using thatset of integrated services.

Wu, Wenji↗

Shifting Trade-offs: Finding the Sustainable Nexus of Hydropower and Environmental Flows in the San Joaquin River Watershed, California

Environmental flow management in watersheds with multi-objective reservoirs is often presented as an additional constraint to an already strained and over-allocated stream system. Nevertheless, environmental flow legislation and regulatory policies are increasingly being developed and implemented globally. In California, USA, recent legislative and regulatory policies place environmental flows at the forefront of the state’s water management objectives; however, the increased reliance on hydropower to support climate change mitigation goals may complicate efforts on both issues. This study modelled alternative environmental flow strategies in the major tributaries to the San Joaquin River in California. Strategies included detailed water management rules for hydropower production, flood control, and water deliveries, and three methodological approaches to environmental flow releases: minimum instream flows (“baseline”) year-round, 40% of full natural flow (FNF) during the spring runoff season and minimum releases the remainder of the year, and functional flows year-round. Results show that environmental flow strategies affect downstream flow releases in each of the San Joaquin’s four sub-basins differently depending on infrastructure capacity, water management objectives, and hydrologic year types. While hydropower production was comparable or declined in the Stanislaus, Tuolumne, and Merced basins, functional flow and 40% FNF strategies increased hydropower production in the Upper San Joaquin basin by 11%. Uncontrolled spill of high flow events decreased when high flow releases were based on hydrologic cues rather than exclusively on flood storage capacity. Water deliveries were reduced in all years regardless of environmental flow strategy. The 40% FNF and functional flow strategies both increased water released to the river relative to baseline, but in different ways. The functional flow strategy allocated water in a holistic approach that enhanced ecological functions in all years, but particularly in moderate and wet years. In contrast, the 40% FNF strategy provided increased flows relative to baseline and some ecological benefit in dry years, but less ecological benefit in other years. This study shows that alternative environmental flow strategies will have different and important trade-offs for integrated water management, and may mutually benefit seemingly conflicting objectives.

13 HYDRO ENERGY↗