Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Tool for Insertion of a Fiber-Optic Terminus in a Connector

A tool has been developed for the special purpose of inserting the terminus of an optical fiber in a cable connector that conforms to NASA Specification SSQ- 21635. What prompted the development of the tool was the observation that because of some aspects of the designs of fiber-optic termini and of springs, sealing rings, and a grommet inside the shell of such a connector, there is a tendency for the grommet to become damaged and detached from the sealing rings during installation. It is necessary to ensure the integrity of the grommet for proper sealing and proper functioning of the connector. The special-purpose tool provides the needed protection for the grommet. The grommet-protection tool resembles a funnel into which an axial slit has been cut (see figure). Prior to insertion, the grommet-protection tool is rolled so that one side of the slit overlaps the other side. The rolled-up grommet-protection tool is inserted in one of the connector holes that accommodate the fiber-optic termini and is pushed in until the flange (the wider of the two conical portions) of the tool becomes seated on the connector grommet. Then a special-purpose installation tool is inserted in the flange of the grommet-protection tool and pressed in until it becomes seated in the flange. This operation expands the narrower of the two conical portions of the grommet-protection tool. The installation tool is removed and the grommet-protection tool remains expanded due to the flat surfaces on the axial slit. By use of a standard contact-insertion tool, a fiber-optic terminus is inserted, through the grommet-protection tool, into the connector cavity. By use of a pair of forceps or needle-nose pliers, the grommet-protection tool is then pulled out of the cavity. Finally, the grommet-protection tool is removed from around the installed fiber-optic cable by pulling the cable through the axial slit. Unlike in some prior procedures for installing the fiber-optic termini in the connector, the procedure that involves the use of the present grommet-protection tool does not include the use of lubricants that can contaminate the interior of the connector. The grommet-protection tool is made of a fluoropolymer, taking advantage of the flexibility of such polymers and further taking advantage of the inherent slipperiness of fluoropolymers. Although the tool is designed primarily for insertion of a fiber-optic terminus, it might also be useful for extracting a previously installed fiber-optic terminus.

King, Wes↗

Performance of a Supersonic Over-Wing Inlet with Application to a Low-Sonic-Boom Aircraft

Development of commercial supersonic aircraft has been hindered by many related factors including fuel-efficiency, economics, and sonic-boom signatures that have prevented over-land flight. Materials, propulsion, and flight control technologies have developed to the point where, if over-land flight were made possible, a commercial supersonic transport could be economically viable. Computational fluid dynamics, and modern optimization techniques enable designers to reduce the boom signature of candidate aircraft configurations to acceptable levels. However, propulsion systems must be carefully integrated with these low-boom configurations in order that the signatures remain acceptable. One technique to minimize the downward propagation of waves is to mount the propulsion systems above the wing, such that the wing provides shielding from shock waves generated by the inlet and nacelle. This topmounted approach introduces a number of issues with inlet design and performance especially with the highly-swept wing configurations common to low-boom designs. A 1.79%-scale aircraft model was built and tested at the NASA Glenn Research Center's 8-by 6-Foot Supersonic Wind Tunnel (8x6 SWT) to validate the configuration's sonic boom signature. In order to evaluate performance of the top-mounted inlets, the starboard flow-through nacelle on the aerodynamic model was replaced by a 2.3%-scale operational inlet model. This integrated configuration was tested at the 8x6 SWT from Mach 0.25 to 1.8 over a wide range of angles-of-attack and yaw. The inlet was also tested in an isolated configuration over a smaller range of angles-of-attack and yaw. A number of boundary-layer bleed configurations were investigated and found to provide a substantial positive impact on pressure recovery and distortion. Installed inlet performance in terms of mass capture, pressure recovery, and distortion over the Mach number range at the design angle-of-attack of 4-degrees is presented herein and compared to that at 0- degrees, as well as the isolated inlet configuration to highlight installation effects. Performance of the installed inlet fell below that of the isolated inlet at Mach numbers of 1.4 and greater. The installed inlet demonstrated adequate operability over the expected range of angles-of-attack and yaw, but did exhibit definite angle-ofattack and yaw limits at supersonic conditions. At each supersonic flight Mach number, performance parameters near zero yaw angle were relatively insensitive to yaw, but in general the yaw angle yielding best performance was non-zero and varied with angle-of-attack. Performance of the installed inlet is also presented as functions of angle-of-attack and yaw to highlight these effects. Distortion at the aerodynamic interface plane ranged between 10 and 25% at the inlet critical points over the range of flight Mach numbers tested and did not decrease significantly for the isolated inlet. Although these distortion levels would be considered high for operation with a turbine engine, the over-wing installation is likely not as significant a contributor as the low test Reynolds number. This is demonstrated by comparing CFD analysis of the isolated inlet at test scale with that at intermediate and full scales.

Performance↗

Interim Measures Work Plan: South Repeater Building: Solid Waste Management Unit 121: Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances: Kennedy Space Center, Florida

This document presents the design details of a granular activated carbon (GAC) hydraulic containment and groundwater treatment system Interim Measures Work Plan for the South Repeater Building site (South Repeater, Solid Waste Management Unit 121), located at John F. Kennedy Space Center (KSC), Florida. The interim measures (IM) treatment area includes the source area and downgradient property boundary, which have been impacted by per- and polyfluoroalkyl substances (PFAS). The objectives of the IM are to treat the source area and mitigate PFAS migration to areas outside of KSC boundaries. This document was prepared by AECOM Technical Services, Inc., for the National Aeronautics and Space Administration under Contract 80KSC019D0010, Task Order 80KSC021F0096. The IM consists of the installation and operation of 19 extraction wells and an associated groundwater treatment system. A total of 13 wells will be installed to a depth of 34 feet below land surface (bls) to target the upper medium-grained sand with shell layer. A total of six wells will be installed to a depth of 56 feet bls to target the lower layer of poorly graded sand with shell fragments. The system will be designed to operate each extraction well simultaneously using submersible pumps at flow rates of 5 or 10 gallons per minute (gpm), excluding one extraction well with a flow rate of 30 gpm. The extracted groundwater will be conveyed to a groundwater treatment system, where it will be treated via GAC prior to disposal via infiltration. To evaluate treatment system performance, baseline groundwater sampling will be conducted prior to treatment system startup. Performance monitoring will be completed quarterly for the first year. A total of eight performance monitoring wells will be installed to a depth of 12 feet bls, and eight performance monitoring wells will be installed to a depth of 30 feet bls. In addition to the installation of 16 performance monitoring wells, 12 existing monitoring wells will be incorporated into the performance monitoring program.

groundwater treatment↗

Effect of forward motion on engine noise

Methods used to determine a procedure for correcting static engine data for the effects of forward motion are described. Data were analyzed from airplane flyover and static-engine tests with a JT8D-109 low-bypass-ratio turbofan engine installed on a DC-9-30, with a CF6-6D high-bypass-ratio turbofan engine installed on a DC-10-10, and with a JT9D-59A high-bypass-ratio turbofan engine installed on a DC-10-40. The observed differences between the static and the flyover data bases are discussed in terms of noise generation, convective amplification, atmospheric propagation, and engine installation. The results indicate that each noise source must be adjusted separately for forward-motion and installation effects and then projected to flight conditions as a function of source-path angle, directivity angle, and acoustic range relative to the microphones on the ground.

Blankenship, G. L.↗

Integrated residential photovoltaic array development

Three basic module design concepts were analyzed with respect to both production and installation costs. The results of this evaluation were used to synthesize a fourth design which incorporates the best features of these initial concepts to produce a module/array design approach which offers the promise of a substantial reduction in the installed cost of a residential array. A unique waterproofing and mounting scheme was used to reduce the cost of installing an integral array while still maintaining a high probability that the installed array will be watertight for the design lifetime of the system. This recommended concept will also permit the array to be mounted as a direct or stand-off installation with no changes to the module design.

Shepard, N. F., Jr.↗

A supersonic through-flow fan engine airframe integration study

A study is undertaken to investigate the engine airframe integration effects for supersonic through-flow fan engines installed on a Mach 3.20 supersonic cruise vehicle. Six different supersonic through-flow fan engine installations covering the effects of engine size, nacelle contour, nacelle placement, and approximate bypass plume effects are presented. The different supersonic through-flow fan installations are compared with a conventional turbine bypass engine configuration on the same basic airframe. The supersonic through-flow fan engine integrations are shown to be comparable to the turbine bypass engine configuration on the basis of installed nacelle wave drag. The supersonic through-flow fan engine airframe integrated vehicles have superior aerodynamic performance on the basis of maximum lift-to-drag ratio than the turbine bypass engine installation over the entire operating Mach number range from 1.10 to 3.20. When approximate bypass plume modeling is included, the supersonic through-flow fan engine configuration shows even larger improvements over the turbine bypass engine configuration.

Barnhart, Paul J.↗

A supersonic through-flow fan engine airframe integration study

Engine airframe integration effects are investigated for supersonic through-flow fan engines installed on a Mach 3.20 supersonic cruise vehicle. Six different supersonic through-flow fan engine installations covering the effects of engine size, nacelle contour, nacelle placement, and approximate bypass plume effects are presented. The different supersonic through-flow fan installations are compared with a conventional turbine bypass engine configuration on the same basic airframe. The supersonic through-flow fan engine integrations are shown to be comparable to the turbine bypass engine configuration on the basis of installed nacelle wave drag. The supersonic through-flow fan engine airframe integrated vehicles have superior aerodynamic performance on the basis of maximum lift-to-drag ratio than the turbine bypass engine installation over the entire operating Mach number range from 1.10 to 3.20. When approximate bypass plume modeling is included, the supersonic through-flow fan engine configuration shows even larger improvements over the turbine bypass engine configuration.

Barnhart, Paul J.↗

Implementation of interconnect simulation tools in spice

Accurate computer simulation of high speed digital computer circuits and communication circuits requires a multimode approach to simulate both the devices and the interconnects between devices. Classical circuit analysis algorithms (lumped parameter) are needed for circuit devices and the network formed by the interconnected devices. The interconnects, however, have to be modeled as transmission lines which incorporate electromagnetic field analysis. An approach to writing a multimode simulator is to take an existing software package which performs either lumped parameter analysis or field analysis and add the missing type of analysis routines to the package. In this work a traditionally lumped parameter simulator, SPICE, is modified so that it will perform lossy transmission line analysis using a different model approach. Modifying SPICE3E2 or any other large software package is not a trivial task. An understanding of the programming conventions used, simulation software, and simulation algorithms is required. This thesis was written to clarify the procedure for installing a device into SPICE3E2. The installation of three devices is documented and the installations of the first two provide a foundation for installation of the lossy line which is the third device. The details of discussions are specific to SPICE, but the concepts will be helpful when performing installations into other circuit analysis packages.

Satsangi, H.↗

STS-26: Preparations for Launch

Preparations for launch of STS-26 are shown. They include: (1) VAB to OPF high bay rollover; (2) Main engine unpacking and installation; (3) OMS pod installation; (4) Crew hatch removal; (5) Modified crew hatch installation; (6) Nose cap installation; (7) 17 inch disconnect work; (8) Ku-band antenna stow and deploy; (9) Tile work; (10) Oasis payload installation; (11) Solid rocket boosters arrival, preps and stacking; (13) Modified SRB segments: Arrival via train at KSC RPSF; (14) AFT segment rotation to vertical in RPSF; (15) AFT skirt to AFT segment mating; (16) SRB grain inspection; (17) Lift AFT segment; and (18) Lift and mate external tank.

Source record↗

Design-of-experiments to Reduce Life-cycle Costs in Combat Aircraft Inlets

It is the purpose of this study to demonstrate the viability and economy of Design- of-Experiments (DOE), to arrive at micro-secondary flow control installation designs that achieve optimal inlet performance for different mission strategies. These statistical design concepts were used to investigate the properties of "low unit strength" micro-effector installation. "Low unit strength" micro-effectors are micro-vanes, set a very low angle-of incidence, with very long chord lengths. They are designed to influence the neat wall inlet flow over an extended streamwise distance. In this study, however, the long chord lengths were replicated by a series of short chord length effectors arranged in series over multiple bands of effectors. In order to properly evaluate the performance differences between the single band extended chord length installation designs and the segmented multiband short chord length designs, both sets of installations must be optimal. Critical to achieving optimal micro-secondary flow control installation designs is the understanding of the factor interactions that occur between the multiple bands of micro-scale vane effectors. These factor interactions are best understood and brought together in an optimal manner through a structured DOE process, or more specifically Response Surface Methods (RSM).

Anderson, Bernhard H.↗

STS-121: Discovery Space Shuttle Safety Improvements Briefing

Steve Poulos, Space Shuttle Orbiter Projects Office Manager, and John Chapman, Space Shuttle External Tank Project Manager is shown in this STS-121 Space Shuttle Discovery safety improvements briefing. A graphic presentation of the gap filler installation is shown. The graphics include: 1) Protruding gap fillers during STS-114 mission; 2) STS-114 gap fillers removed on orbiter; 3) Gap filler installation prior to STS-114; 4) Post-STS-114 installation techniques; 5) Gap filler installation post STS-114; 6) Gap filler priority areas; 7) Discovery gap filler installation table and status for STS-121; 8) Damaged blanket on STS-114; 9) On-orbit photography and post-landing photography on STS-114; and 10) STS-114 insulation tiles. Poulos presents imagery that was obtained on STS-114. The imagery includes: 1) The Enhanced Launch Vehicle Imaging System (ELVIS); 2) Liquid oxygen external tank view; 3) Hand-held imagery of the external tank falling into the ocean; 4) ELVIS on STS-121, short, medium and long range camera configurations; 5) Radar capability on the ground at Kennedy Space Center, and 6) STS-121 aft external tank door tiles. Poulos says that STS-121 will have even more imagery than STS-114. John Chapman presents video animation of the external tank where modifications were made along with the ice frost ramps with extensions. Chapman explains these areas using an external tank model. Questions are then answered from the media.

Source record↗

Testing and Performance Verification of a High Bypass Ratio Turbofan Rotor in an Internal Flow Component Test Facility

A 1/5 scale model rotor representative of a current technology, high bypass ratio, turbofan engine was installed and tested in the W8 single-stage, high-speed, compressor test facility at NASA Glenn Research Center (GRC). The same fan rotor was tested previously in the GRC 9x15 Low Speed Wind Tunnel as a fan module consisting of the rotor and outlet guide vanes mounted in a flight-like nacelle. The W8 test verified that the aerodynamic performance and detailed flow field of the rotor as installed in W8 were representative of the wind tunnel fan module installation. Modifications to W8 were necessary to ensure that this internal flow facility would have a flow field at the test package that is representative of flow conditions in the wind tunnel installation. Inlet flow conditioning was designed and installed in W8 to lower the fan face turbulence intensity to less than 1.0 percent in order to better match the wind tunnel operating environment. Also, inlet bleed was added to thin the casing boundary layer to be more representative of a flight nacelle boundary layer. On the 100 percent speed operating line the fan pressure rise and mass flow rate agreed with the wind tunnel data to within 1 percent. Detailed hot film surveys of the inlet flow, inlet boundary layer and fan exit flow were compared to results from the wind tunnel. The effect of inlet casing boundary layer thickness on fan performance was quantified. Challenges and lessons learned from testing this high flow, low static pressure rise fan in an internal flow facility are discussed.

VanZante, Dale E.↗

Electrostatic Evaluation of the SRB Velostat(Trademark) Pads

During RSRM Grain inspection, pads constructed of Velostat are grounded and installed in the RSRM bore enabling inspectors to move throughout the bore during the inspection. Velostat pads are installed by grounding the first pad installed and subsequent pads are installed overlapping the previously installed pad maintaining a conductive path to facility ground. Pads are removed upon completion of the inspection in a reverse fashion. As the pads are removed scanning of propellant surfaces is performed per OMRS. During PPICI Audit of B5308.006 (Forward Segment Grain Inspection) in October 07 one audit finding noted that electrostatic scanning of propellant surfaces was being performed during removal of conductive pads following grain inspection. ATK does not perform electrostatic scanning of propellant surfaces during pad removal following final inspection at the plant. The integrated team consisting of NASA SE, USA SE, USA QE, ATK LSS, ATK Systems Safety and ATK DE concurred that electrostatic scanning of propellant surfaces was unnecessary as the conductive pads are grounded. Additional time spent in bore performing scanning presents itself as additional risk. Technicians reported that they have never seen any voltage readings while scanning propellant surfaces during pad removal. USA Systems engineering has written KB 17530 in response to the finding which will delete the requirement (item 2 B47GEN.ll0) to scan propellant surfaces during pad removal. As a result of an E3 panel discussion on December 13, 2007, it was decided that verification of the electrical grounding of the Velostat pads be verified.

Buhler, Charles R.↗

Modifying Ship Air-Wake Vortices for Aircraft Operations

Columnar-vortex generators (CVG) have been proposed as means to increase the safety of takeoffs and landings of aircraft on aircraft or helicopter carriers and other ships at sea. According to the proposal, CVGs would be installed at critical edge locations on ships to modify the vortices in the air wakes of the ships. The desired effects of modifications are to smooth airflows over takeoff and landing deck areas and divert vortices from takeoff and landing flight paths. With respect to aircraft operations, the wake flows of primary interest are those associated with the bow and side edges of aircraft-carrier decks and with superstructures of ships in general (see Figure 1). The bow and deck-edge vortices can adversely affect airplane and helicopter operations on carriers, while the superstructure wakes can primarily affect operations of helicopters. The concept of the CVG is not new; what is new is the proposed addition of CVGs to ship structures to effect favorable modifications of air wakes. Figure 2 depicts a basic CVG, vertical and horizontal CVGs installed on a simple superstructure, and horizontal CVGs installed on the bow and deck edges. The vertical CVGs would be closed at the deck but open at the top. Each horizontal CVG would be open at both ends. The dimensions of the CVGs installed on the aft edges of the superstructure would be chosen so that the portion of the flow modified by the vertical CVGs would interact synergistically with the portion of the flow modified by the horizontal CVG to move the air wake away from the takeoff-and-landing zone behind the superstructure. The deck-edge CVGs would be mounted flush with, and would extend slightly ahead of the bow of, the flight deck. The overall length of each tube would exceed that of the flight deck. Each deck-edge CVG would capture that portion of the airflow that generates a deck-edge vortex and would generate a columnar vortex of opposite sense to that of the unmodified vortex. The vortex generated by the CVG could be dispersed at its base, thereby removing unwanted turbulence in the path of an approaching airplane. The deck-edge CVGs would promote smooth flow over the entire flight deck. In the case of a Nimitz-class aircraft carrier like that of Figure 1, there would be a CVG on each of the outer edges of the two left portions of the flight deck and a single CVG on the right side of the flight deck. The forward-most CVG on the left side would take the generated vortex underneath the angled flight deck. A CVG could also be installed on the bow of the flight deck to smooth the flow of air onto the flight deck. In the case of wind incident on the deck from an azimuth other than straight ahead, the vortex generated by the bow CVG could, perhaps, be used to feed the CVG(s) of the leeward side edge of the flight deck.

Lamar, John E.↗

System Noise Assessment and the Potential for a Low Noise Hybrid Wing Body Aircraft with Open Rotor Propulsion

An aircraft system noise assessment was conducted for a hybrid wing body freighter aircraft concept configured with three open rotor engines. The primary objective of the study was to determine the aircraft system level noise given the significant impact of installation effects including shielding the open rotor noise by the airframe. The aircraft was designed to carry a payload of 100,000 lbs on a 6,500 nautical mile mission. An experimental database was used to establish the propulsion airframe aeroacoustic installation effects including those from shielding by the airframe planform, interactions with the control surfaces, and additional noise reduction technologies. A second objective of the study applied the impacts of projected low noise airframe technology and a projection of advanced low noise rotors appropriate for the NASA N+2 2025 timeframe. With the projection of low noise rotors and installation effects, the aircraft system level was 26.0 EPNLdB below Stage 4 level with the engine installed at 1.0 rotor diameters upstream of the trailing edge. Moving the engine to 1.5 rotor diameters brought the system level noise to 30.8 EPNLdB below Stage 4. At these locations on the airframe, the integrated level of installation effects including shielding can be as much as 20 EPNLdB cumulative in addition to lower engine source noise from advanced low noise rotors. And finally, an additional set of technology effects were identified and the potential impact at the system level was estimated for noise only without assessing the impact on aircraft performance. If these additional effects were to be included it is estimated that the potential aircraft system noise could reach as low as 38.0 EPNLdB cumulative below Stage 4.

Thomas, Russell H.↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗

Initial Calibrations and Wind Tunnel Test Results for an In-Flow Reference Array Using New In-Flow Acoustic Sources in Four Array Mount Configurations

This paper describes efforts to develop a small in-flow phased microphone array as a reference acoustic sensor and quantify its level-measurement accuracy with new in-flow calibration sources. The devices can be applied to a wide variety of in- and out-of-flow measurement applications and test facilities. Recent tests of the array and two calibration sources in the NASA Anechoic Chamber and Army 7- by 10-foot Wind Tunnel at NASA Ames Research Center demonstrated that the array was functional over a frequency range of 2 to 100 kilohertz for emission angles of 92 degrees, 108 degrees, and 120 degrees, and Mach numbers of 0, 0.15, and 0.25. The array and calibration sources were then used to assess the relative effects of array installation on background noise and level measurement accuracy by locating the array in the flow (strut- and wall-mounted) as well as outside the flow behind a porous wall screen and a free shear layer. The wind tunnel array measurements were compared with anechoic chamber measurements using discrete microphones at the same source distance and emission angles. At 92 degrees, the noise floor and attenuation spectra were comparable (within 5 decibels) for each installation from 2 to 30 kilohertz. At higher angles, the array installation behind the Kevlar screen had the lowest noise floor at M = 0.15 and 0.25. The array installation 10 inches (maximum available distance) behind a free shear layer had higher background noise that is typically reduced to a lower level by moving the array back further from the flow. For emission angles greater than 92 degrees, both the Kevlar and free shear layer installations exhibited stronger attenuations in measured level, beginning at lower frequencies than either the wall- or strut-mount configurations. Additional array and calibration source units of the same design are being tested at NASA’s Glenn Research Center and Langley Research Center in their aeroacoustic research facilities in an effort to improve measurement accuracy and repeatability.

Aeroacoustic Wind Tunnel Research↗

External Wireless Communications (EWC) Coverage Expansion Boom Interface Control Document (ICD)

This document defines and controls the physical and functional interfaces between the External Wireless Communications Coverage Expansion (EWCCE) boom and any payload that is planned to be installed on the scarred locations on the boom. The hardware will be referenced as EWCCE boom or simply boom in this document. The boom is comprised of two short boom sections,the upper boom and the lower boom, an Active Worksite Interface (AWIF) and two mounting plates. The boom will be launched soft stowed in a bag and assembled in the Internation Space Station (ISS) via IVA. The assembly will include two sections of the boom and a built-to-print AWIF. The installation of the final assembly to the ISS Truss location is designated as a free-float EVA worksite activity. Once installed on the truss, the interfaces on the Long Boom may be used for attachment of future Orbital Replacement Units (ORUs) to either the Television Camera (TVC) Mounting Slide interface (e.g., an External High Definition Camera [EHDC] or similar ORU) or to future On-orbit Installed Hand-rails (OIHs) installed at the seat track interfaces. Compliance with this Interface Control Document (ICD) will ensure compatibility and successful integration of the hardware.

Vidyasagar, Sagar↗