Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid operators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Multi-Port Autonomous Reconfigurable Solar Power Plant

As the penetration level of power electronics increases and remote photovoltaic (PV) generation is integrated into the alternating current (ac) grid, the short-circuit ratio (SCR) at the point of interconnection of a hybrid PV–energy storage system (ESS) plant may be low. Additionally, the inertia of the alternating current (ac) grid may be low. The low SCRs and inertias can lead to reliability challenges in the power grid. These operating conditions require additional reinforcements, such as synchronous condensers, static var compensators, static synchronous compensators, and high-voltage direct current (HVdc) links/grids. HVdc links or grids may also provide the additional capability of connecting the plant to asynchronous grids and/or connecting asynchronous grids, among others. This scenario leads to discrete development of solar inverters, energy storage inverters, HVdc converters, and several transformers. Some of the problems associated with this discrete development and inverter-based generation include increased cost, lower reliability, and reduced efficiency associated with duplication of power electronics (PEs); competing controls of several individual discrete inverter-based generators due to the presence of multiple PEs, which leads to derating of the system; and transient stability problems arising from inverter-based generation, such as voltage/frequency events leading inverter shutdowns, voltage instability and control interactions in the formed weak grid, and harmonics caused by resonances of multiple inverters.

14 SOLAR ENERGY↗

A Data-Driven Algorithm for Enabling Delay Tolerance in Resilient Microgrid Controls Using Dynamic Mode Decomposition

The increased implementation of smart grid technologies in the power distribution grid presents unique opportunities that enable resiliency, but also brings challenges motivating needs for novel solutions and mitigation techniques. The bi-directional power and data flow allow for the grid to operate with increased resiliency, which is the ability to avoid discontinuity of service to end-use loads during extreme events. However, in applications where control of the distribution grid or microgrid relies on communication networks, the degradation of communication systems in the form of loss or high latency can cause maloperation and result in loss of end-use loads. Here this paper presents a novel framework to enable delay tolerance of centralized microgrid control schemes to mitigate communication system latency impacts and guarantee successful control action. We demonstrate the delay tolerance on a control scheme that operates a battery energy storage system (BESS) to offset the sudden loss of generation and maintain system frequency. During periods of severely degraded communication system performance, the proposed delay-tolerant algorithm compensates for the latency by utilizing a data-driven model generated at the device level using dynamic mode decomposition (DMD) to determine the performance of the communications. The DMD technique predicts the system’s frequency using device-level terminal measurements and provides updated control signals. The HELICS cosimulation platform evaluates the cyber-physical interaction of the power system model in GridLAB-D, the centralized control agent in Python, and the discrete network model in NS-3. The framework is tested and validated on the IEEE-123 node system modified to represent a networked remote microgrid model, and the results show an improvement in the dynamic performance

24 POWER TRANSMISSION AND DISTRIBUTION↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions (FAST-DERMS)

This document provides system-level specifications for a federated architecture for secure and transactive distributed energy resource management solutions (FAST-DERMS), presents a solution, and describes operational concepts for the proposed solution. FAST-DERMS enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs). We first present the principles and objectives of FAST-DERMS. Then, after discussing important system concepts, we present the specifications for FAST-DERMS and a solution that employs a distributed and federated control methodology in which the DERs connected to a single point of common coupling with the rest of the system, such as individual substations, are optimized coordinately to provide system-level grid services. FAST-DERMS aims to aggregate and coordinate the operations of DERs to support T&D grid operations. The key optimization and control component of this FAST-DERMS reference implementation is a flexible resource scheduler (FRS) that aggregates the DERs within a substation service area. These FRSs operate at the substation level and perform constrained economic dispatch of DERs, either directly or through a transactive market or aggregator, as shown in Figure ES-1. An FRS Coordinator at the distribution system operator (DSO) level aggregates distribution substations operated by FRSs and interfaces with the transmission system operator (TSO) to provide transmission services. FAST-DERMS also allows for the integration of the FRS Coordinator with an existing distribution utility management system that could be employed by the DSO to enhance distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Soft Actor Critic Based Volt-VAR Co-optimization in Active Distribution Grids

Modern distribution networks are undergoing several technical challenges, such as voltage fluctuations, because of high penetration of distributed energy resources (DERs). This paper proposes a deep reinforcement learning (DRL)-based Volt VAR co-optimization technique for reducing voltage fluctuations as well as power loss under high penetration of DERs. In addition, the proposed approach minimizes the operational cost of the grid. A stochastic policy optimization based soft actor critic (SAC) agent is proposed to configure the optimal set-points of the reactive power outputs of the inverters. The performance of the proposed model is verified on the modified IEEE 34- and 123-bus systems and compared with a base case scenario with no reactive supply by inverters, and a local droop control approach. The results demonstrate that the proposed framework outperforms the conventional droop control method in improving the voltage profile, minimizing the network power loss, and reducing grid operational cost.

—Distribution grids, deep reinforcement learning, ↗

Balancing Authority Data Reformatted

We collect the data from the electricity balancing authorities (BAs) that operate the grid. A balancing authority ensures, in real time, that power system demand and supply are finely balanced. This balance is needed to maintain the safe and reliable operation of the power system.

17 WIND ENERGY↗

Electric Power Grid and Natural Gas Network Operations and Coordination

In this report, we present findings from three studies related to the coordination of natural gas and electricity system operations. We first propose and demonstrate a modeling platform for examining the interdependence of natural gas and electricity networks based on a direct current unit-commitment and economic dispatch model for the power system and a transient hydraulic gas model for the gas system. We use this platform to analyze the value of day-ahead coordination of power and natural gas network operations and to show the importance of considering gas system constraints when analyzing power systems operation with high penetration of gas generators and variable renewable energy sources. In the second study, we utilize our modeling platform to consider the U.S. Federal Energy Regulatory Commission (FERC) Order 809, issued in 2015 to improve day-ahead and intraday coordination of power and gas systems. Finally, in the third study we expand our modeling platform to focus on market-based coordination of electricity and natural gas system operations for a real system, namely a subset of the power and gas networks in the Front Range region of Colorado. We use real system data to evaluate the benefits of coordination operations under different conditions, including different levels of renewable penetration and the use of time-variant, shaped flow nominations. Our results indicate that coordination at various timescales can contribute to a reduction in curtailed gas in high-stress periods (such as those with large ramps in gas offtakes) and a reduction in energy consumption of gas compressor stations. We find that intraday coordination can reduce total power system production costs and natural gas deliverability constraints, yielding cost and reliability benefits. We observe these benefits for the test system as well as in the Colorado case study, where we find that coordination and shaped flows may provide additional value for systems with high penetration of variable renewable energy. Together, these three studies demonstrate a pathway for integrated gas and electricity grid modeling and for studying the benefits of coordinated operations of these increasingly interdependent energy systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Coordinated Modeling of Electric Grid and Natural Gas Network Operations

Presentation based upon full report of a Colorado case study and coordination framework, which is available at https://www.nrel.gov/docs/fy20osti/77096.pdf. JISEA analysts Brian Sergi, Omar Guerra, and Bri-Mathias Hodge will present on recent JISEA work on coordination between the natural gas and electricity sectors. Power and gas are becoming increasingly interdependent but weren't designed to function together. How does greater coordination impact system operations with different levels of solar and wind penetrations? This free JISEA presentation will take place in a Webinar on Tuesday, May 11, 2021 at 12 p.m.: Learn how greater coordination between the natural gas and electricity sectors impacts system operations with different levels of solar and wind penetrations. Presentation information includes: Historical and projected data for natural gas consumption and power generation in the United States as demonstrated by 2014 East Coast Polar Vortex, 2021 Texas Winter Storm Uri. Showing coupling points, FERC identified need for better coordination, different levels of coordination (decision making and optimization control), coordination framework. Case study on Colorado Front Range, ramping requirements and gas nominations, real-time dispatch (June and December scenarios), results of analysis of impacts of coordination on unserved load. Total real-time gas offtakes by node, impacts on unserved gas, effect on CO2 emissions. Discussions on clusions drawn from Colorado Case study expanded co-simulation via HELICS, objectives of the HELICS+ natural gas use case, modeling of hydrogen blending, techno economic assessment of blending, and blending impacts on energy content and pressure.

analysis↗

A Novel Protection Scheme for Unbalanced Faults in Inverter Dominated Networks: A Computationally Efficient Algorithm for Entry-Level Relays

Microgrids are now a common practice in distribution systems to increase resilience and reliability. However, microgrid protection remains a critical challenge, considering its requirement to operate in both grid connected and islanded, and the variability in fault characteristics under each mode of operation. This paper presents unbalanced power (S unb ) based fault detection algorithm, which considers local voltage and current unbalances to determine faults in the system. S unb is a computationally efficient fault detection algorithm that is suitable for implementation in the programmable logic of entry level protective relays. In addition, the difference in current and voltage unbalance (D n ) is used to determine the fault type. The proposed method demonstrates high sensitivity and selectivity for line-to-ground (LG), line-to-line (LL), and double line-to-ground (LLG) faults, representing the most common faults in distribution systems. It also allows relay coordination with upstream and downstream protection devices in both island and grid connected operation, while preserving grading margins. The same pickup and time multiplier settings of a particular relay for both modes of operation eliminates the need for adaptive settings, which rely on communication networks. Validation was performed with a hardware-in-the-loop (HIL) setup using Typhoon HIL real time simulator interfaced with three entry-level, SEL 751 relays. Results confirmed the algorithm’s ability to discriminate fault conditions, and determine the fault type under both operating modes, maintain fast detection times, and ensure proper protection coordination.

fault classification↗

Reliability and quality assurance on the MOD 2 wind system

The Safety, Reliability, and Quality Assurance (R&QA) approach developed for the largest wind turbine generator, the Mod 2, is described. The R&QA approach assures that the machine is not hazardous to the public or to the operating personnel, is operated unattended on a utility grid, demonstrates reliable operation, and helps establish the quality assurance and maintainability requirements for future wind turbine projects. The significant guideline consisted of a failure modes and effects analysis (FMEA) during the design phase, hardware inspections during parts fabrication, and three simple documents to control activities during machine construction and operation.

Mason, W. E. B.↗

Experience with modified aerospace reliability and quality assurance method for wind turbines

The SR&QA approach assures that the machine is not hazardous to the public or operating personnel, can operate unattended on a utility grid, demonstrates reliability operation, and helps establish the quality assurance and maintainability requirements for future wind turbine projects. The approach consisted of modified failure modes and effects analysis (FMEA) during the design phase, minimal hardware inspection during parts fabrication, and three simple documents to control activities during machine construction and operation. Five years experience shows that this low cost approach works well enough that it should be considered by others for similar projects.

Klein, W. E.↗

A Review of Unmanned Aerial Vehicle Technology in Power Line Inspection

The electric power industry is one of the heaviest adopters of Unmanned Aerial Vehicles (UAV) technology, utilizing their versatility to enhance power line maintenance programs. For reliable power grids, routine maintenance operations and rapid repair operations are required across substantial geographical distances. Both maintenance and repair decisions are driven by assessment operations, such as inspections of mechanical structures with visible-band sensors, inspections for the presence of high voltage coronas and hot spots with multispectral sensors, and surveying of equipment and adjacent features (particularly vegetation) with photogrammetric and Light Detection and Ranging (LiDAR) sensors. Assessment was historically accomplished with manned helicopter flights or foot patrols. Recently, this critical economic segment harnessed advances in Unmanned Aerial Systems (UAS)technology to accomplish assessment tasks with faster results, lower cost, and higher levels of safety than historical methods. Adoption of UAVs in high-voltage electric power transmission activities is well underway. Adoption of UAVs for low voltage distribution activities is still emerging, with the important exception of post-storm damage assessment following major hurricanes (Harvey and Maria in 2017 and Michael in 2018). This report reviews the broad UAS adoption in high-voltage electric power transmission operations and early attempts at adoption in distribution operations. The ability to fly beyond visual line of sight (BVLOS) may increase the advantages of UAV inspection over former options, and in the United States, regulators have approved two pilot projects to demonstrate BVLOS methods and their benefits in operating and maintaining the power grid.

UAV↗

Digital Twin + AI: Control Room of the Future

A digital twin enhances power grid control room operations by providing real-time monitoring, predictive insights, simulation capabilities, remote control, training opportunities, data integration, and decision support. This technology empowers control room operators to effectively manage the grid, optimize performance, and ensure reliable and efficient energy distribution.

control room of the future↗

Experimental investigation of a 2.5 centimeter diameter Kaufman microthruster

A 2.5-centimeter-diameter Kaufman electron bombardment microthruster was fabricated and tested. The microthruster design was based on the 15-centimeter-diameter SERT 2 and 5-centimeter-diameter Lewis experimental thruster designs. The microthruster with a two-grid system, operating at a net accelerating potential of 600 volts and an accelerator potential of 500 volts, produced a calculated 445 micronewton thrust when it was run with a 9-milliampere beam current. A glass grid was initially used in testing. Later a two-grid system was successfully incorporated. Both the propellant utilization efficiency and the total power efficiency were lower than for large-size advanced thrusters, as expected; but they were sufficiently high that 2.5-centimeter thrusters show promise for future space applications. Total power of the microthruster with an assumed 7-watt hollow-cathode neutralizer was less than 30 watts at a thrust level of 445 micronewton (100 Nu LBf). The hollow cathode was operated at zero tip heater power for power requirement tests.

Cohen, A. J.↗

Deploying Intra-hour Uncertainty Analysis Tools to ABB’s GridView - CRADA 445

The quickly-changing generation resource mix in the US grid, with large additions of variable resources, retirements of traditional thermal generation, distributed generation and demand response, are creating new challenges on the traditional operation of both the generation and transmission systems. The ability to perform intra-hour high fidelity production cost modeling (PCM) is needed to allow grid operators and grid planners to integrate high penetration (more than 50%) of variable energy resources, and to make prompt well informed decisions in market operations and planning. In the last decade, PNNL has developed several stand-alone tools to enable grid operators and planners to understand the impact of high variable generation on their systems. These tools have been used is studies such as: (1) Evaluation the benefits of WECC balancing authorities coordination under high variable generation penetration , (2) Benefits of Energy Imbalance Market in the North West Power Pool and (3) Duke Energy and NV Energy solar integration studies. ABB’s GridView is a widely used commercial PCM tool. It is the tool used by WECC and their stakeholders to develop the WECC PCM planning model on bi-annual basis. This proposal is focused on the integrating of PNNL intra-hour uncertainty analysis tools to GridView.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Scalable Quantum Cryptography Network for Protected Automation Communication (Final Report)

This is the final report for a CEDS-funded project aimed at developing a new quantum technology for securing utility communication networks used to control and monitor electrical grid equipment. Securing these control networks represents a unique challenge as the performance of the security solution has a direct impact on the stability and reliability of the electrical grid. Traditional, software-based solutions - developed for information networks - are not suitable for utility control networks because they introduce latency, require burdensome maintenance and upgrades, are often incompatible with legacy equipment, and introduce operational complexity that reduces grid reliability. Consequently, many U.S. utilities do not use existing solutions and, instead, protect their critical control networks through the careful isolation and obscuration of their networked equipment. With more utilities embracing grid automation, the attack surface that utilities must defend from hackers has grown to an unmanageable size. To address this situation, Qubitekk and its partners proposed and developed a hardware-based solution that can secure critical control networks without negatively impacting grid performance. This new solution is based on quantum key distribution (QKD) techniques that guarantee secure key generation and distribution across a utility control network. Through deployment and field testing of a prototype QKD system, we have shown that this solution delivers long-term network security, is technically feasible to implement and maintain on a utility’s distribution substation network and does not negatively impact grid operations. In addition, the project has identified and solved key challenges associated with generating, transmitting, and measuring coherent photonic quantum states on a real-world fiber optic network. These additional findings are playing a critical role in advancing quantum networks for quantum computing applications. An overview of the QKD prototype development effort, field testing activities and results, and additional findings relevant to emerging quantum networks are presented in this report.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

High-Fidelity Analysis of EV Integration on Real Utility Feeders in Colorado

Residential electric vehicle (EV) charging has the potential to alter long-held assumptions on load characteristics impacting distribution grid planning, operations, and design standards. This study identifies analysis and control methods to increase the affordability of residential EV charging both for Xcel Energy and their customers. The project also provides solutions for more reliable grid interconnection that can support a reliable utility business model prepared for increasing EV charging load in the coming years. For this project, we referenced Level 2 alternating current (AC) onboard charging profiles for various vehicle models and high-fidelity charging data collected at the experimental setup established at the EV Research Infrastructure Laboratory at the National Renewable Energy Laboratory (NREL). Next, we developed EV adoption models for 2030 and 2040 for the Boulder and Aurora regions in Colorado. Moreover, we evaluated different smart charging control algorithms and compared their performance. We developed time-of-use (TOU)-based and grid-aware active EV charging control methods and integrated them within the study region to understand field impacts. Diving deeper, we selected 10 feeders in Boulder and Aurora for high-fidelity grid modeling down to the house level. We executed detailed grid analysis comparing the smart charge management (SCM) algorithms we developed. Finally, we created a novel tool, Electric Vehicle Infrastructure--Distribution System Integration Tool (EVI-DiST), to integrate all the approaches in a single software environment to provide easy integration, fast simulation, and detailed evaluation capability for utility engineers and other stakeholders.

33 ADVANCED PROPULSION SYSTEMS↗

Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset

Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗