Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “functional performance testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Aerodynamic parameter estimation via Fourier modulating function techniques

Parameter estimation algorithms are developed in the frequency domain for systems modeled by input/output ordinary differential equations. The approach is based on Shinbrot's method of moment functionals utilizing Fourier based modulating functions. Assuming white measurement noises for linear multivariable system models, an adaptive weighted least squares algorithm is developed which approximates a maximum likelihood estimate and cannot be biased by unknown initial or boundary conditions in the data owing to a special property attending Shinbrot-type modulating functions. Application is made to perturbation equation modeling of the longitudinal and lateral dynamics of a high performance aircraft using flight-test data. Comparative studies are included which demonstrate potential advantages of the algorithm relative to some well established techniques for parameter identification. Deterministic least squares extensions of the approach are made to the frequency transfer function identification problem for linear systems and to the parameter identification problem for a class of nonlinear-time-varying differential system models.

Pearson, A. E.↗

Preliminary Performance of Lithium-ion Cell Designs for Ares I Upper Stage Applications

NASA's Ares I Crew Launch Vehicle (CLV) baselined lithium-ion technology for the Upper Stage (US). Under this effort, the NASA Glenn Research Center investigated three different aerospace lithium-ion cell suppliers to assess the performance of the various lithium-ion cell designs under acceptance and characterization testing. This paper describes the overall testing approaches associated with lithium-ion cells, their ampere-hour capacity as a function of temperature and discharge rates, as well as their performance limitations for use on the Ares I US vehicle.

Miller, Thomas B.↗

Mechanical Properties of LaRC(tm) SI Polymer for a Range of Molecular Weights

Mechanical testing of an advanced polyimide resin (LaRC(tm)-SI) with known variations in molecular weight was performed over a range of temperatures below the glass transition temperature. Elastic and inelastic properties were characterized as a function of molecular weight and test temperature. It was shown that notched tensile strength is a strong function of both temperature and molecular weight, whereas stiffness is only a strong function of temperature. The combined analysis of calculated yield stress and notched tensile strength indicated that low molecular weight materials tended to fail in a brittle manner, whereas high molecular weight materials exhibited ductile failure. The microphotographs of the failure surfaces also supported these findings.

Whitley, Karen S.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Hypersonic research engine project. Phase 2: Aerothermodynamic Integration Model (AIM) data reduction computer program, data item no. 54.16

The data reduction program used to analyze the performance of the Aerothermodynamic Integration Model is described. Routines to acquire, calibrate, and interpolate the test data, to calculate the axial components of the pressure area integrals and the skin function coefficients, and to report the raw data in engineering units are included along with routines to calculate flow conditions in the wind tunnel, inlet, combustor, and nozzle, and the overall engine performance. Various subroutines were modified and used to obtain species concentrations and transport properties in chemical equilibrium at each of the internal and external engine stations. It is recommended that future test plans include the configuration, calibration, and channel assignment data on a magnetic tape generated at the test site immediately before or after a test, and that the data reduction program be designed to operate in a batch environment.

Gaede, A. E.↗

Sensor Analysis, Modeling, and Test for Robust Propulsion System Autonomy

An approach is presented supporting analysis, modeling, and test validation of operational flight instrumentation (OFI) that facilitates critical functions for the Space Launch System (SLS) main propulsion system (MPS). Certain types of OFI sensors were shown to exhibit highly nonlinear and non-gaussian noise characteristics during acceptance testing, motivating the development of advanced modeling and simulation (M&S) capability to support algorithm verification and flight certification. Hardware model and algorithm simulation fidelity was informed by a risk scoring metric; redesign of high-risk algorithms using test-validated sensor models significantly improved their expected performance as evaluated using Monte Carlo acceptance sampling methods. Autonomous functions include closed-loop ullage pressure regulation, pressurant leak detection, and fault isolation for automated safing and crew caution and warning (C&W).

Orr, Jeb S.↗

Full Scale Flat Floor Testing of a 500-M2-Class Solar Sail Deployer

Solar sailing missions rely on deployable systemsfor large area to mass ratios once in space, whilestill being small enough for launcher envelopes inthe stowed configuration. Many of thesedeployable systems feature booms that areflattened and subsequently coiled onto aspool/hub. As part of a collaborative deployablespace structures research effort of NASA and DLR,a boom deployment mechanism for a future 500 m²solar sail has been developed since 2017. To achieve the respective solar sail size goal, 16.5m long booms produced by NASA were integratedinto a DLR-designed deployer mechanism. Thisconsiderable size, as well as the lightweightconstruction of the booms and respectivedeployable systems makes ground testing asignificant challenge. Some systems for gravitycompensation and boom alignment will bepresented in the paper. However, the main focus isthe functional flat floor testing of the integratedboom-deployment mechanism system, as well asits challenges. The testing performed includes full deployment aswell as stowage of the booms. Both have beenperformed multiple times. The latter is one of thekey parameters determining packaging efficiency,which in turn confirms design assumptions. Duringsystem development, small scale tests and modelshave been used in preparation of flat floor testingof the 33 m span cross of the full-scale booms anddeployment mechanism. Hence a small chapter isalso devoted to analysing the differences inbehaviour between small- and full-scaledeployment systems. More parameters that are vital to design decisionshave been determined this way, such as drivingbelt force or hub brake torque. This paper alsofocuses on development goals and needs forfuture steps to achieve higher levels of technologyreadiness, such as the balancing of driving motorforce, synchronisation of its transmission and thecountering hub brake torque

Deployment mechanism↗

Ultralightweight Fresnel Lens Solar Concentrators for Space Power

The first phase of this project was completed in March 2000, and included the successful technology demonstration of a new ultralightweight photovoltaic concentrator array at the fully functional panel level. The new array is called the Stretched Lens Aurora (SLA) array, and uses deployable, flexible, thin-film silicone rubber Fresnel lenses to focus sunlight onto high efficiency multijunction solar cells, which are mounted to a composite radiator surface for waste heat dissipation. A prototype panel was delivered to NASA Marshall in March 2000, and comprised four side-by-side lenses focussing sunlight onto four side-by-side photovoltaic receivers. This prototype panel was tested by NASA Glenn prior to delivery to NASA Marshall. The best of the four lens/receiver modules achieved 27.4% efficiency at room temperature in the NASA Glenn solar simulator tests. This performance equates to 375 W/sq.m. areal power and 378 W/kg specific power at the fully functional panel level. We believe this to be the first space solar array of any kind to simulataneously meet the two long-standing NASA goals of 300 W/sq.m. and 300 W/kg at the functional panel level. Key results for the first phase of the program have been documented by ENTECH in a Draft Final Technical Report, which is presently being reviewed by NASA, and which should be published in the near future.

ONeill, M. J.↗

Tri-Gas Pressurization System Testing and Modeling for Cryogenic Applications

The use of Tri‐gas in rocket propulsion systems is somewhat of a new technology. This paper defines Tri‐gas as a mixture of gases composed largely of helium with a small percentage of a stoichiometric mixture of hydrogen and oxygen. When exposed to a catalyst the hydrogen and oxygen in the mixture combusts, significantly raising the temperature of the mixture. The increase in enthalpy resulting from the combustion process significantly decreases the required quantity of gas needed to pressurize the ullage of the vehicle propellant tanks. The objective of this effort was to better understand the operating characteristics of Tri‐gas in a pressurization system with low temperature applications. In conjunction with ongoing programs at NASA Marshall Space Flight Center, an effort has been undertaken to evaluate the operating characteristics of Tri‐gas through modeling and bench testing. Through improved understanding of the operating characteristics, the risk of using this new technology in a launch vehicle propulsion system was reduced. Bench testing of Tri‐gas was a multistep process that targeted gas characteristics and performance aspects that pose a risk to application in a pressurization system. Pressurization systems are vital to propulsion system performance. Keeping a target ullage pressure in propulsions tanks is necessary to supply propellant at the conditions and flow rates required to maintain desired engine functionality. The first component of testing consisted of sampling Tri‐gas sources that had been stagnant for various lengths of time in order to determine the rate at which stratification takes place. Second, a bench test was set up in which Tri‐gas was sent through a catalyst bed. This test was designed to evaluate the performance characteristics of Tri‐gas, under low temperature inlet temperatures, in a flight‐like catalyst bed reactor. The third, most complex, test examined the performance characteristics of Tri‐gas at low temperature temperatures in a test configuration built to more closely resemble a vehicle pressurization system. The results of these bench tests address various risks that all relate to underperformance of Tri‐gas pressurization systems.

Taylor, B.↗

Optimization of structures on the basis of fracture mechanics and reliability criteria

Systematic summary of factors which are involved in optimization of given structural configuration is part of report resulting from study of analysis of objective function. Predicted reliability of performance of finished structure is sharply dependent upon results of coupon tests. Optimization analysis developed by study also involves expected cost of proof testing.

Heer, E.↗

On the effect of emotional states on operator thinking

A combination sonic and electrical skin stimuli stress test is reported that is suitable for the psychological selection of individuals to perform operator functions. The behavior of these people is characterized by a fighting spirit, increased work capacity, minimum expenditure of strength and insignificant fatigue.

Solodkova, A. V.↗

A J-band space-fed phased array

A J-band, space-fed transmissive array suitable to the constraints of space platform applications has been designed and an engineering model array has been fabricated and tested. Attention is given to the design of the aperture, radiating element, phase shifter module, and flatplate feed. Test results and performance are discussed with reference to gain, sidelobe level, and beamwidth as functions of frequency and scan angle.

Orr, C. L.↗

Acoustic measurements of a full-scale coaxial hingeless rotor helicopter

Acoustic data were obtained during a full-scale test of the XH-59A Advancing Blade Concept Technology Demonstrator in the 40- by 80-Foot Wind Tunnel. The XH-59A is a research helicopter with two coaxial rotors and hingeless blades. Performance, vibration, and noise at various forward speeds, rotor lift coefficients and rotor shaft angles of attack were investigated. The noise data were acquired over an isolated rotor lift coefficient range of 0.024 to 0.162, an advance ratio range of 0.23 to 0.45 corresponding to tunnel wind speeds of 89 to 160 knots, and angles of attack from 0 deg to 10 deg. Acoustic data are presented for seven microphone locations for all run conditions where the model noise is above the background noise. Model test configuration and performance information are also listed. Acoustic waveforms, dBA, and 1/3-octave spectra as functions of operating condition for selected data points and microphones are presented. In general, the noise level is shown to increase with rotor lift coefficient except under certain operating conditions where significant impulsive blade/vortex interactions increase noise levels.

Peterson, R. L.↗

A comparison of software verification techniques

A controlled experiment performed by the Software Engineering Laboratory (SEL) to compare the effectiveness of code reading, functional testing, and structural testing as software verification techniques is described. The experiment results indicate that code reading provides the greatest error detection capability at the lowest cost, whereas structural testing is the least effective technique. The experiment plan is explained, the experiment results are described, related results from other studies are discussed. The application of these results to the development of software in the flight dynamics environment is considered. Appendices summarize the experiment data and list the test programs.

Source record↗

Development of a microprocessor controller for stand-alone photovoltaic power systems

A controller for stand-alone photovoltaic systems has been developed using a low power CMOS microprocessor. It performs battery state of charge estimation, array control, load management, instrumentation, automatic testing, and communications functions. Array control options are sequential subarray switching and maximum power control. A calculator keypad and LCD display provides manual control, fault diagnosis and digital multimeter functions. An RS-232 port provides data logging or remote control capability. A prototype 5 kW unit has been built and tested successfully. The controller is expected to be useful in village photovoltaic power systems, large solar water pumping installations, and other battery management applications.

Millner, A. R.↗

Development of the HIDEC inlet integration mode

The Highly Integrated Digital Electronic Control (HIDEC) development program conducted at NASA-Ames/Dryden will use an F-15 test aircraft for flight demonstration. An account is presently given of the HIDEC Inlet Integration mode's design concept, control law, and test aircraft implementation, with a view to its performance benefits. The enhancement of performance is a function of the use of Digital Electronic Engine Control corrected engine airflow computations to improve the scheduling of inlet ramp positions in real time; excess thrust can thereby be increased by 13 percent at Mach 2.3 and 40,000 ft. Aircraft supportability is also improved through the obviation of inlet controllers.

Chisholm, J. D.↗

Validation of Lithium-ion cell technology for JPL's 2003 Mars Exploration Rover Mission

n early 2004 JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling >300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20 C to +40 C), withstanding long storage periods (e.g., cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the viability of Lithium-ion technology to meet these stringent requirements, a comprehensive test program was implemented aimed at demonstrating the performance capability of prototype cells fabricated by Lithion, Inc. (Yardney Technical Products, Inc.). The testing performed includes, determining the (a) room temperature cycle life, (b) pulse capability as a function of temperature, (e) self-discharge and storage characteristics mission profile capability, (f) cycle life under mission simulation conditions, (g) impedance characteristics, (h) impact of cell orientation, and (i) performance in 8-cell engineering batteries. As will be discussed, the Lithium-ion prototype cells and batteries were demonstrated to meet, as well as, exceed the requirements defined by the mission.

2003 Mars Exploration Rover (MER)↗

The MSFC Systems Engineering Guide: An Overview and Plan

As systems and subsystems requirements become more complex in the pursuit of the exploration of space, advanced technology will demand and require an integrated approach to the design and development of safe and successful space vehicles and there products. System engineers play a vital and key role in transforming mission needs into vehicle requirements that can be verified and validated. This will result in a safe and cost effective design that will satisfy the mission schedule. A key to successful vehicle design within systems engineering is communication. Communication, through a systems engineering infrastructure, will not only ensure that customers and stakeholders are satisfied but will also assist in identifying vehicle requirements; i.e. identification, integration and management. This vehicle design will produce a system that is verifiable, traceable, and effectively satisfies cost, schedule, performance, and risk throughout the life-cycle of the product. A communication infrastructure will bring about the integration of different engineering disciplines within vehicle design. A system utilizing these aspects will enhance system engineering performance and improve upon required activities such as Development of Requirements, Requirements Management, Functional Analysis, Test, Synthesis, Trade Studies, Documentation, and Lessons Learned to produce a successful final product. This paper will describe the guiding vision, progress to date and the plan forward for development of the Marshall Space Flight Center (MSFC) Systems Engineering Guide (SEG), a virtual systems engineering handbook and archive that will describe the system engineering processes that are used by MSFC in the development of complex systems such as the Ares launch vehicle. It is the intent of this website to be a "One Stop Shop" for our systems engineers that will provide tutorial information, an overview of processes and procedures and links to assist system engineering with guidance and references, and provide an archive of systems engineering artifacts produced by the many NASA projects developed and managed by MSFC over the years.

Shelby, Jerry A.↗