Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “fuel stations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Economics of wind energy for utilities

Utility acceptance of this technology will be contingent upon the establishment of both its technical and economic feasibility. This paper presents preliminary results from a study currently underway to establish the economic value of central station wind energy to certain utility systems. The results for the various utilities are compared specifically in terms of three parameters which have a major influence on the economic value: (1) wind resource, (2) mix of conventional generation sources, and (3) specific utility financial parameters including projected fuel costs. The wind energy is derived from modeling either MOD-2 or MOD-0A wind turbines in wind resources determined by a year of data obtained from the DOE supported meteorological towers with a two-minute sampling frequency. In this paper, preliminary results for six of the utilities studied are presented and compared.

Mccabe, T. F.↗

Measurement of performance using acceleration control and pulse control in simulated spacecraft docking operations

Nine commercial airline pilots served as test subjects in a study to compare acceleration control with pulse control in simulated spacecraft maneuvers. Simulated remote dockings of an orbital maneuvering vehicle (OMV) to a space station were initiated from 50, 100, and 150 meters along the station's -V-bar (minus velocity vector). All unsuccessful missions were reflown. Five way mixed analysis of variance (ANOVA) with one between factor, first mode, and four within factors (mode, bloch, range, and trial) were performed on the data. Recorded performance measures included mission duration and fuel consumption along each of the three coordinate axes. Mission duration was lower with pulse mode, while delta V (fuel consumption) was lower with acceleration mode. Subjects used more fuel to travel faster with pulse mode than with acceleration mode. Mission duration, delta V, X delta V, Y delta V., and Z delta V all increased with range. Subjects commanded the OMV to 'fly' at faster rates from further distances. These higher average velocities were paid for with increased fuel consumption. Asymmetrical transfer was found in that the mode transitions could not be predicted solely from the mission duration main effect. More testing is advised to understand the manual control aspects of spaceflight maneuvers better.

Brody, Adam R.↗

​​Hydrogen Transportation and Distributed Energy Systems Seismic Risk Assessment for Cascadia Subduction Zone Airport Facilities​

Portland International Airport in Oregon is exploring operating a fleet of 28 fuel cell electric buses to support airport operations and possibly provide backup power during outages. In this report, we evaluate the risk of hydrogen deployment at an airport considering the potential for seismic activity. We present a seismic risk assessment for pressurized piping for a generic hydrogen refueling station at the airport. Only pressurized piping was considered in the risk analysis because of its vulnerability and availability of fragility information unlike the other components. Seismic capacity of other components should be included as more information becomes available. To characterize the seismic hazard, we considered the initiating event frequency of a Cascadia Subduction Zone earthquake event based on data from the literature. Seismic stressors that translate to the site from an earthquake event are expressed as peak ground acceleration. Site disturbance is characterized as a function of soil conditions, represented by different shear wave velocity values, which affect how seismic waves propagate and impact structures. Pipe fragility curves as a function of seismic capacity were used to correlate ground acceleration and failure probability. These fragility characteristics were combined with site-specific soil conditions to calculate the probability of pipe rupture during a seismic event. It should be noted that multiple simultaneous failures due to an earthquake event as a common cause are not considered. Some epistemic uncertainties such as self-exciting shocks, aftershocks, and the time variant nature of the ground motion are not considered either.

08 HYDROGEN↗

Mission design for a halo orbiter of the earth

The International Sun-Earth Explorer (ISEE) scientific satellite to be stationed in 1978 in the vicinity of the sun-earth interior libration point to continuously monitor the space between the sun and the earth, including the distant geomagnetic tail is described. Orbit selection considerations for the ISEE-C are discussed along with stationkeeping requirements and fuel-optimal trajectories. Due to the alignment of the interior libration point with the sun as viewed from the earth, it will be necessary to place the satellite into a 'halo orbit' around the libration point, in order to eliminate solar interference with down-link telemetry. Parametric data for transfer trajectories between an earth parking orbit (altitude about 185 km) and a libration-point orbit are presented. It is shown that the insertion magnitude required for placing a satellite into an acceptable halo orbit is rather modest.

Farquhar, R. W.↗

Scaling for Nuclear Reactor System: Overview

A scaling analysis is essential for predicting the behavior of a reactor system under various operating conditions, as well as for ensuring safe and reliable experimentation and adequate dataset generation for supporting the system code model development and assessment in accordance with USNRC guidelines 1.203. Testing and modeling can be carried out at various scales, from small test units to full-scale reactors, to validate the predictions produced by the analysis. However, due to the cost and challenges associated with full-scale testing, the nuclear industry uses scaled test facilities—integral effect test (IET) and separate effect test (SET)—to identify potential design issues and optimize the design to ensure regulatory compliance for safer operation and anticipated accident management. In general, IET facilities are non-nuclear thermal hydraulics test facilities. In contrast, SET facilities can be non-nuclear testing (e.g., steam generator, containment, pump system SETs) and nuclear testing (mostly fuel-material irradiation testing). IETs are used to study the system-level thermal-hydraulic behavior of the reactor coolant system (RCS) under different anticipated operational occurrences (AOOs) and design basis accidents (DBAs) such as loss-of-coolant-accident (LOCA) and loss-of-power (i.e., station blackout) and loss-of-flow (i.e., failure of RCS pump). Several LOCA scenarios could happen in reactor DBAs, such as main steam line break (MSLB), SG tube rapture (SGTR), break in direct vessel injection (DVI), and other small breaks LOCA. Scaling analysis determines the appropriate size and operating conditions for the test facility. This involves analyzing the system's thermal-hydraulic behavior at different scales and identifying the key parameters that affect the thermal-hydraulic behavior of the reactor. These key parameters can be identified so that the scaled facility can replicate the expected conditions in a prototypical setting. The scaled facility can simulate the same flow rates, pressure gradients, heat transfer coefficients, and fluid properties as the prototype. Scaling analysis is used to ensure that the results from these tests can be scaled up to predict the behavior of a full-scale prototype with an acceptable range of scaling distortions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of an extravehicular activity self rescue technique for Space Station

A design study was conducted to delineate potential failure modes and to evaluate various solutions to the many risks to which an astronaut is exposed while performing EVA activities. Among these are suit depressurization as a result of micrometeoroid impact and portable life system failure. There is also a risk of prolonged separation from the vehicle should a tether break or a manned maneuvering unit run out of fuel. In order to simplify contingency operations and to prepare for the situation when no other means are available, a self-rescue capability must be determined. Rescue options are detailed and a number of possible approaches and solutions are presented.

Brody, Adam↗

PV large systems project

Near term photovoltaic central-station markets are analyzed. Cost effectiveness of photovoltaic plants is determined in terms of reduction of oil consumption. The breakeven photovoltaic system cost vs oil-steam power generation is given. The value of photovoltaic power plants in Southern California and in Los Angelos is given in terms of fuel savings and capacity value. The potential value of third party financing, facilitated by Federal and state tax incentives is analyzed.

Leonard, S. L.↗

Integrated launch and emergency vehicle system

A heavy launch vehicle is discussed. The launch vehicle is comprised of an expendable, multi-container, propellant tank that has a plurality of winged booster propulsion modules at one end and a payload supported by adapter structure at the other end. The preferred payload is an entry module that can be adapted for docking to the space station and used as a return vehicle for the space station crew. Additionally, the payload may include communication satellites, supplies, equipment, and/or structural elements for the space station. The winged propulsion modules are released from the expendable propellant tank, in pairs, and they return to Earth in a controlled glide. After a safe landing, at or near the launch site, the modules are prepared for reuse. The rocket engines for each propulsion module are dual-fuel, dual-mode engines and use methane-oxygen and hydrogen-oxygen from the multi-containers of the propellant tank. When the propulsion modules are released from the expendable propellant tank, the rocket engines are moved into the module cargo bay for the return glide flight.

Martin, James A.↗

Radiative Enhancement Effects on Flame Spread (REEFS) Project Studied "Green House" Effects on Fire Spread

The Radiative Enhancement Effects on Flame Spread (REEFS) project, slated for flight aboard the International Space Station, reached a major milestone by holding its Science Concept Review this year. REEFS is led by principal investigator Paul Ronney from the University of Southern California in conjunction with a project team from the NASA Glenn Research Center. The study is focusing on flame spread over flat solid fuel beds to improve our understanding of more complex fires, such as those found in manned spacecraft and terrestrial buildings. The investigation has direct implications for fire safety, both for space and Earth applications, and extends previous work with emphasis on the atmospheres and flow environments likely to be present in fires that might occur in microgravity. These atmospheres will contain radiatively active gases such as carbon dioxide (CO2) from combustion products, and likely gaseous fuels such as carbon monoxide (CO) from incomplete combustion of solid fuel, as well as flows induced by ventilation currents. During tests in the 2.2-Second Drop Tower and KC-135 aircraft at Glenn, the principal investigator introduced the use of foam fuels for flame spread experiments over thermally thick fuels to obtain large spread rates in comparison to those of dense fuels such as PMMA. This enables meaningful results to be obtained even in the 2.2 s available in drop tower experiments.

Gokoglu, Suleyman A.↗

The Double-Drained Drop: Symmetric Draining of Liquids from Containers with Interior Corners

An analytic solution is found for the late stage draining of a wetting capillary liquid from an interior corner. The solution exploits the symmetry of volumetric sink conditions at opposing ends of such a `double-drained' interior corner flow with applications ranging from liquid recovery in microfluidic devices on earth to liquid fuels scavenging in large fuel tanks aboard spacecraft. At long times t, the liquid depth is h~t^n, the liquid volume is V~ t^(2n), and the maximum volumetric liquid removal rate is Q~t^(2n-1), where n =-1. Representative experiments are conducted at larger length scales aboard the International Space Station and at microfluidic length scales in a terrestrial laboratory. Both sets of experiments confirm the solutions. We show that the approach offers a method to predict maximum drain rates from related geometries where a single drain location provides the required symmetry. We also show that the `fixed length' solution is one of many practical similarity solutions to the governing nonlinear evolution equation for the transient liquid profile along the interior corner. Exponential asymptotic Fourier series solutions are also found for partial corner fillling as well as draining.

microgravity↗

Should Oxygen, Hydrogen, and Water on the Moon Be Provided by Earth Supply, Life Support Recycling, or Regolith Mining?

The water needed for space life support has so far been provided by either direct supply from Earth on most missions or by life support wastewater recycling on the International Space Station (ISS). With the recent large reduction in launch cost, Earth resupply has become more attractive, but recycling always costs less than resupply for a large enough crew on a long enough mission. Water is also needed to make up recycling losses and oxygen and hydrogen are needed for propulsion fuel. This paper compares the costs of oxygen, hydrogen, and water on the moon for Earth supply, lunar recycling, and lunar mining. While Earth supply is the most expensive by far, lunar recycling and mining costs are not much different. Life support wastewater provides a large but limited supply, so lunar mining will always be needed. Minor cost reductions may make mining less expensive than recycling.

Harry W Jones↗

Material transfers detection with seismic observations

We are exploring the use of data from a seismic network around a research nuclear reactor and isotope production facility at Oak Ridge National Laboratory to study activity patterns related to the transfer of nuclear material. A sensor network with eight seismometers was installed around the High Flux Isotope Reactor and the Radiochemical Engineering Development Center and started operating in October 2019. These data are used to detect and characterize operational events around facility. We are using those data to extract signals related to the movement of vehicles involved in the transport of nuclear materials (e.g., transportation of reactor fuel, targets, and product isotopes). Large vehicles produce mechanical energy that can be observed as seismic signals, either as the result of sound emanating from the vehicle engine or by the generation of surface waves as a response of the ground to the load of the vehicles. In particular, the station located near the entrance gate of the facility displays a clear seismic signature as vehicles cross a metal platform on the ground. This signal is characterized by sharp energy bursts that correspond to the number of axles on the vehicle. We developed and are testing an algorithm to identify sequences of energy bursts to count and characterize vehicles of different sizes. We are also exploring the use of seismic polarization analysis to measure the degree of polarization of the observed signals. These two techniques for detection and characterization of vehicles used for nuclear material transfers will be validated with seismic data from a targeted collection using different vehicles and routes similar to the ones used in real-life scenarios at the High Flux Isotope Reactor.

Marcillo, Omar↗

Laser powered interorbital vehicle

A preliminary design of a low-thrust Laser Powered Interorbital Vehicle (LPIV) intended for cargo transportation between an Earth space station and a lunar base is presented. The selected mission utilizes a spiral trajectory, characteristic of a low-thrust spacecraft, requiring eight days for a lunar rendezvous and an additional nine days for return. The ship's configuration consists primarily of an optical train, two hydrogen plasma engines, a 37.1 m box-beam truss, a payload module, and propellant tanks. The total mass of the vehicle, fully loaded, is 63,300 kg. A single plasma, regeneratively cooled engine design is incorporated into the two 500 N engines. These are connected to the spacecraft by turntables that allow the vehicle to thrust tangential to the flight path. Proper collection and transmission of the laser beam to the thrust chambers is provided through the optical train. This system consists of a 23-m-diameter primary mirror, a convex parabolic secondary mirror, a beam splitter, and two concave parabolic tertiary mirrors. The payload bay is capable of carrying 18,000 kg of cargo and is located opposite the primary mirror on the main truss. Fuel tanks carrying a maximum of 35,000 kg of liquid hydrogen are fastened to tracks that allow the tanks to be moved perpendicular to the main truss. This capability is required to prevent the center of mass from moving out of the thrust vector line. The laser beam is located and tracked by means of an acquisition, pointing, and tracking system that can be locked onto the space-based laser station. Correct orientation of the spacecraft with the laser beam is maintained by control moment gyros and reaction control rockets. In addition, an aerobrake configuration was designed to provide the option of using the atmospheric drag in place of propulsion for a return trajectory.

Clarke, M. T.↗

Beta 2: A near term, fully reusable, horizontal takeoff and landing two-stage-to-orbit launch vehicle concept

A recent study has confirmed the feasibility of a near term, fully reusable, horizontal takeoff and landing two-stage-to-orbit (TSTO) launch vehicle concept. The vehicle stages at Mach 6.5. The first stage is powered by a turboramjet propulsion system with the turbojets being fueled by JP and the ramjet by LH2. The second stage is powered by a space shuttle main engine (SSME) rocket engine. For about the same gross weight as growth versions of the 747, the vehicle can place 10,000 lbm. in low polar orbit or 16,000 lbm. to Space Station Freedom.

Burkardt, Leo A.↗

Large Payload Transportation and Test Considerations

Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure - roads, bridges, airframes, and buildings - necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider how large spacecraft are designed, and where they are manufactured, tested, or launched, could result in unforeseen cost to modify/develop infrastructure, or incur additional risk due to increased handling or elimination of key verifications. During test and verification planning for the Altair project, a number of transportation and test issues related to the large payload diameter were identified. Although the entire Constellation Program - including Altair - was canceled in the 2011 NASA budget, issues identified by the Altair project serve as important lessons learned for future payloads that may be developed to support national "heavy lift" strategies. A feasibility study performed by the Constellation Ground Operations (CxGO) project found that neither the Altair Ascent nor Descent Stage would fit inside available transportation aircraft. Ground transportation of a payload this large over extended distances is generally not permitted by most states, so overland transportation alone would not have been an option. Limited ground transportation to the nearest waterway may be permitted, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing (which includes hypergolic fuels, pyrotechnic devices, and high pressure gasses).

Rucker, Michelle A.↗

Nuclear Thermal Propulsion Ground Test History

Nuclear Thermal Propulsion (NTP) was started in ~1955 under the Atomic Energy Commission as project Rover and was assigned to Los Alamos National Laboratory. The Nevada Test Site was selected in 1956 and facility construction began in 1957. The KIWI-A was tested on July 1, 1959 for 5 minutes at 70MW. KIWI-A1 was tested on July 8, 1960 for 6 minutes at 85MW. KIWI-A3 was tested on October 10, 1960 for 5 minutes at 100MW. The National Aeronautics and Space Administration (NASA) was formed in 1958. On August 31, 1960 the AEC and NASA established the Space Nuclear Propulsion Office and named Harold Finger as Director. Immediately following the formation of SNPO, contracts were awarded for the Reactor In Flight Test (RIFT), master plan for the Nuclear Rocket Engine Development Station (NRDS), and the Nuclear Engine for Rocket Vehicle Application (NERVA). From December 7, 1961 to November 30, 1962, the KIWI-B1A, KIWI-B1B, and KIWI-B4A were tested at test cell A. The last two engines were only tested for several seconds before noticeable failure of the fuel elements. Harold Finger called a stop to any further hot fire testing until the problem was well understood. The KIWI-B4A cold flow test showed the problem to be related to fluid dynamics of hydrogen interstitial flow causing fuel element vibrations. President Kennedy visited the NTS one week after the KIWI-B4A failure and got to see the engine starting to be disassembled in the maintenance facility. The KIWI-B4D and KIWI-B4E were modified to not have the vibration problems and were tested in test cell C. The NERVA NRX program started testing in early 1964 with NRX-A1 cold flow test series (unfueled graphite core), NRX-A2 and NRX-A3 power test series up to 1122 MW for 13 minutes. In March 1966, the NRX-EST (Engine System Test) was the first breadboard using flight functional relationship and total operating time of 116 minutes. The NRX-EST demonstrated the feasibility of a hot bleed cycle. The NRX-A5 had multiple start-ups in May-June 1966 with 30.75 minutes accumulative operating time at or above 1GW. The NRX-A6 was tested in December 1969 and ran for 62 minutes at 1100 MW. Each engine had post-test examination and found various structure anomalies which were identified for correction and the fuel element corrosion rate was reduced. The Phoebus series of research reactors began testing at test cell C, in June 1965 with Phoebus 1A. Phoebus 1A operated for 10.5 minutes at 1100 MW before unexpected loss of propellant and leading to an engine breakdown. Phoebus 1B ran for 30 minutes in February of 1967. Phoebus 2A was the highest steady state reactor built at 5GW. Phoebus 2A ran for 12 minutes at 4100 MW demonstrating sufficient power is available. The Peewee test bed reactor was tested November- December 1968 in test cell C for 40 minutes at 500MW with overall performance close to pre-run predictions. The XE' engine was the only engine tested with close to a flight configuration and fired downward into a diffuser at the Engine Test Stand (ETS) in 1969. The XE' was 1100 MW and had ~28 start-ups. The nuclear furnace NF-1 was operated at 44 MW with multiple test runs at 90 minutes in the summer of 1972. The NF-1 was the last NTP reactor tested. The Rover/NERVA program was cancelled in 1973. However, before cancellation, a lot of other engineering work was conducted by Aerojet on a 75, 000 lbf prototype flight engine and by Los Alamos on a ~16,000 lbf "Small Engine" nuclear rocket design. The ground test history of NTP at the NRDS also offers many lessons learned on how best to setup, operate, emergency shutdown, and post-test examine NTP engines. The reactor and engine maintenance and disassembly facilities were used for assembly and inspection of radioactive engines after testing. Most reactor/ engines were run at test cell A or test cell C with open air exhaust. The Rover/NERVA program became aware of a new environmental regulation that would restrict the amount of radioactive particulates allowed to be release in open air and successfully demonstrated a scrubber concept with the NF-1. The ETS stand was the only one with a high altitude test chamber used for XE'. The ETS and other test cells showed the effects the engine's radiation had on the facility materials and instrumentation as well as side effects the ground test facility has back on the engine operation. The breakdown of Phoebus 1A at test cell C showed how the site was cleaned up and back to operation for five more engines before the program was cancelled.

Gerrish, Harold P.↗

Large Payload Ground Transportation and Test Considerations

During test and verification planning for the Altair lunar lander project, a National Aeronautics and Space Administration (NASA) study team identified several ground transportation and test issues related to the large payload diameter. Although the entire Constellation Program-including Altair-has since been canceled, issues identified by the Altair project serve as important lessons learned for payloads greater than 7 m diameter being considered for NASA's new Space Launch System (SLS). A transportation feasibility study found that Altair's 8.97 m diameter Descent Module would not fit inside available aircraft. Although the Ascent Module cabin was only 2.35 m diameter, the long reaction control system booms extended nearly to the Descent Module diameter, making it equally unsuitable for air transportation without removing the booms and invalidating assembly workmanship screens or acceptance testing that had already been performed. Ground transportation of very large payloads over extended distances is not generally permitted by most states, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA's Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure-roads, bridges, airframes, and buildings-necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications.

Rucker, Michelle A.↗

Large Payload Ground Transportation and Test Considerations

Many spacecraft concepts under consideration by the National Aeronautics and Space Administration’s (NASA’s) Evolvable Mars Campaign take advantage of a Space Launch System payload shroud that may be 8 to 10 meters in diameter. Large payloads can theoretically save cost by reducing the number of launches needed--but only if it is possible to build, test, and transport a large payload to the launch site in the first place. Analysis performed previously for the Altair project identified several transportation and test issues with an 8.973 meters diameter payload. Although the entire Constellation Program—including Altair—has since been canceled, these issues serve as important lessons learned for spacecraft designers and program managers considering large payloads for future programs. A transportation feasibility study found that, even broken up into an Ascent and Descent Module, the Altair spacecraft would not fit inside available aircraft. Ground transportation of such large payloads over extended distances is not generally permitted, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 67 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA’s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure—roads, bridges, airframes, and buildings—necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications. Although this paper focuses on the canceled Altair spacecraft as a case study, the issues identified here have wide applicability to other large payloads, including concepts under consideration for NASA’s Evolvable Mars Campaign.

Rucker, Michelle A.↗