Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “customize”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Wyandotte Integrated Renewable Energy Strategy (WIRES 2) (Final Technical Report)

Wyandotte Municipal Services (WMS), a Michigan Municipal Utility offering electric generation, transmission & distribution, water filtration & distribution and Broadband/Video sought to deploy a set of renewable energy projects for their Electric Utility that contributed to reducing the City’s environmental and energy impact, provided examples that would encourage businesses and citizens to adopt cleaner energy practices and help WMS meet the required renewable energy standards of the State of Michigan (10% in 2015, 15% in 2021). WMS generates and delivers roughly 280,000 megawatt hours (MWh) of electricity annually to more than 10,000 homes and 1,000 businesses within the City of Wyandotte. The Wyandotte Integrated Renewable Energy Strategy – WIRES 2 resulted in deployment of a set of community-scale micro-wind turbines, evaluation and installation of energy-efficient and low-maintenance light-emitting diode (LED) street lights and park lights in highly visible locations in the City and expansion of the geothermal heating and cooling district that already included residential geothermal systems, to include larger scale business/institutional systems at the Utility’s largest electric customer and at the City Library. Finally, WMS identified the need for job training in energy efficiency and renewable energy technologies to further develop a local skilled workforce in these areas. Partially funded by the grant, the wind turbine project provides a benchmark for WMS, local businesses and residents in the evaluation of utility-scale wind v. micro-wind in an urban environment as a renewable energy strategy. Also partially funded by the grant, the LED project benefited the City of Wyandotte by reducing load on the electric system for the public utility but also reduced City costs for streetlighting, parking lot lighting and park lighting without a compromise in security. The project also resulted in a visual success that has led to additional approvals for non-Grant related LED lighting installations resulting in further reduction in the electric load in the City. Commercial Geothermal installations resulted in the Utility being able to eliminate steam customers who formerly utilized the byproduct of steam from WMS electric production. Due to the reduction in natural gas prices and the overall reduction in market purchased power, it was no longer feasible for WMS to operate its Power Plant as a base load plant and to only operate on a market dispatch philosophy when market prices dictated that WMS could produce electricity cheaper than the market purchase price. This has resulted in fewer operating days for the WMS Power Plant, resulting in less environmental impact. WMS has now completely exited the steam business and the ability to offer a geothermal option to two (2) former steam customers (BASF-Wyandotte and the Bacon Memorial Library) allowed for that. In addition, peak loads have been shaved for these two (2) large customers due to the consistent temperature offered by geothermal heating and cooling, reducing the swings associated with thermostat changes caused by outside temperature changes during extreme high and low temperatures. Finally, energy efficiency and renewable energy college-level classes at Wayne County Community College allowed a group of interested students to pursue studies in those technologies through grant provided tuition, books and course materials. This effort provided a foundation of potential future employees not only for WMS but other energy efficiency/renewable energy employers such as Franklin Energy, a partner with WMS in energy optimization efforts with Wyandotte businesses.

17 WIND ENERGY↗

Processing Meteorological Data for the CAP-88 PC Model at Los Alamos National Laboratory

The Environmental Protection and Compliance-Compliance Programs (EPC-CP) group at Los Alamos National Laboratory (LANL) uses the Clean Air Act Assessment Package 1988 (CAP-88, Littleton 2020) PC model (Version 4.1) to estimate radiological doses for a set of areal sectors surrounding a release location, in order to satisfy the Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAP) dose calculation requirement in 40 CFR 61 Subpart H. Among several types of data that must be prepared for CAP-88 input is a text file of meteorological data (“WIND” file), consisting of the joint frequency of wind direction, wind speed, and atmospheric stability categories. EPC-CP produces customized WIND files by running a CAP-88 utility program on a user generated text file of wind data in a different format, known as a STability ARray (STAR) file (Turner, 1964). At LANL, EPC-CP meteorologists prepare customized STAR files with data over desired time periods at selected meteorological towers. A custom program written in Precision Visuals -Workstation Analysis and Visualization Environment (PV-WAVE), a commercial Fortran-like language, is used to read LANL meteorological data and write a STAR file; the executable filename is “Star.out”. However, the outdated PV-WAVE utility program is being phased out by EPC-CP, due to the inefficient process to run it and an inability to modify the code. To preserve the ability to create customized meteorological data for CAP-88 in a way that will be easy to use and maintain, a new replacement utility program, written in the Python programming language, has been developed. The new, improved program reads a data file from any LANL meteorological tower, and at each desired observation time, determines the wind direction, wind speed, and stability categories defined in the CAP-88 documentation. The frequencies of all combinations of the three sets of categories are calculated and written to a file in the STAR format, which can later be converted to a WIND file for input into CAP-88.

54 ENVIRONMENTAL SCIENCES↗

Increasing Access to Grid-Tied Distributed Photovoltaics for Low-Income Populations: Considerations for Developing Countries

Governments around the world are under immense pressure to promote inclusive economic growth, reduce budget deficits, and promote sustainable development goals. Such goals may potentially be addressed through public policy approaches to encourage the use of distributed photovoltaic (DPV) systems in developing countries, particularly among low-income electricity customers. At the same time, low-income customers face numerous barriers to DPV deployment including a lack of access to capital and financing, a lack of awareness about the technology, lack of homeownership, and distorted price signals via lower retail tariffs. As a result of these factors, among others, they are often the least likely customers in developed and developing countries alike to deploy solar. However, under the right set of conditions, low-income grid tied DPV programs can offer beneficial outcomes for governments, customers, utilities, and the environment. This brief informs decision makers in developing countries as they explore ways to promote equitable access to solar energy in their communities.

14 SOLAR ENERGY↗

Improving Solar and Solar+Storage Screening Techniques to Reduce Utility Interconnection Time and Costs (Final Technical Report)

Residential PV installations have increased rapidly over the last decade, and the increased application volume has caused permitting delays and lower overall adoption rates. In this project, we developed and evaluated whether data-driven secondary modeling and screening techniques can help utilities assess customer applications more accurately than traditional screening shortcuts. Secondary topologies are predicted using decision trees and commonly available information, such as service transformer, customer, and street locations. Conductors were predicted using a logistic regression method based on real world object (RWO) types, service transformer ratings, conductor length, and distance to transformer. After developing the combined primary and secondary distribution network model, hosting capacity results were used to train a random forest model to predict the pass/fail likelihood of a customer application. Powerflow based models with predicted secondaries and data-driven methods both increased the screening success rate, relative to common utility heuristics, by as much as 55 percentage points. Data-driven screening techniques were described by one utility as a "right-sized" approach for residential customers given the low-risk of small errors and the high-cost of accurate modeling.

14 SOLAR ENERGY↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Potential State Regulatory Pathways to Facilitate Low-Carbon Fuels

States and the federal government are increasingly engaged in the challenges around decarbonizing the electric grid. In particular, regulators, consumers, stakeholders, and utilities recognize the need to carefully consider the role natural gas will play in a decarbonized future. A variety of technology and policy options to reduce greenhouse gas emissions associated with natural gas use are available, including energy efficiency programs, demand reduction tools, strategic electrification, and strategies to reduce emissions from natural gas production, transportation, and consumption. Low-carbon fuels – mainly renewable natural gas (RNG) and clean hydrogen – are being considered an important component of decarbonization goals. RNG and hydrogen may be able to meaningfully reduce emissions from processes independent of geologic natural gas, displacing emissions of methane, a powerful greenhouse gas. Although RNG and hydrogen are not cost-competitive today with geologic natural gas and are smaller in scale and potential than other decarbonization options, they can be explored as potential critical tools to decarbonize sectors that are difficult to electrify or shift off of natural gas entirely, such as air travel, industrial processes, maritime transport, long-distance trucking, space heating on cold days, and railroads (Nadel, 2022). The role of this report is to provide informational context for state utility regulators to understand the impacts of and challenges associated with broader integration of low-carbon fuels, followed by examples of state regulatory actions taken to date to facilitate the development of low-carbon fuels. Setting clear guidance to calculate the environmental benefits of low-carbon fuels and continuing federal and state investments in research and development to reduce costs relative to fossil fuels will be important steps to take to signal the desire to grow the market for these fuels. State public utility commissions may play a key role in setting regulatory frameworks for low-carbon fuels and ensuring that ratepayer funds, if utilized, are done so to further the public interest. This report is intended to summarize decisions that states have made to date on low-carbon fuels. In the spirit of understanding the current market and sharing information, this report provides success stories, and lessons learned across states as regulators implement varying strategies to achieve decarbonization objectives while maintaining their focus on affordability, safety, and reliability of the energy system. The report begins with an introduction of the role of natural gas in the U.S. economy (Section I) and background information on natural gas use, decarbonization, and low-carbon fuels (Section II). Next, the report describes the current market by discussing the scale of current production, emissions intensity, resource potential, and costs of low-carbon fuels compared to geologic natural gas (Section III). Following these sections, the report describes four strategies states have employed to facilitate low-carbon fuels: opening exploratory dockets, approving voluntary tariffs for customers, approving interconnection tariffs for producers, and considering portfolio-wide procurement targets (Section IV). This section lists states that have taken actions in each category, citing utility filings, commission decisions, stakeholder comments, and other relevant sources. Finally, the report concludes with suggested questions regulators may wish to consider regarding low-carbon fuels, in the interest of preparing to make decisions in the future (Section V). These questions include: Are there existing regulatory or technical barriers to voluntary purchases of low-carbon fuels? Can customers work with utilities to procure low-carbon fuels; are producers able to interconnect projects without significant barriers to entry? Should the infrastructure and/or commodity costs of low-carbon fuels be socialized among all ratepayers, or borne solely by the large commercial and industrial (C&I) customers currently driving the market? Should regulated natural gas and/or electric utilities own and operate low-carbon fuel production? How should regulators consider the unique decarbonization potential of low-carbon fuels, particularly for hard-to-abate sectors, in decision-making? Is additional direction or clarity from state policymakers needed? What no-regrets approaches can help facilitate both near-term RNG development and long-term development of hydrogen and other zero-carbon fuels? We collectively wish to express our gratitude to the U.S. Department of Energy, Office of Fossil Energy and Carbon Management, for supporting this report and other technical assistance resources for state regulators on natural gas topics. State regulators operate under a variety of policy environments, and states have vastly different types of energy resources, infrastructure, and customers. While there is no optimal regulatory, policy, or technological solution that will be successful in every state, state regulators can benefit by exchanging lessons learned with their peers across the country. We look forward to continued engagement with our fellow commissioners, commission staff, NARUC, the U.S. Department of Energy, and other stakeholders to develop sound regulation in the public interest.

03 NATURAL GAS↗

STTR Phase I: Microfluidic Printing of High Performance Microgrids for High Efficiency, Flexible Organic Light Emitting Diodes Technical Report

Electroninks has been approached, and received strong interest from customers including chemical companies, device integrators, and final device producers. We have gained substantial customer traction in diverse markets as detailed in our Phase I report, and are currently sampling customers in the US, as well as Asia which is where the consumer/industry electronics supply chain is primarily positioned. The results reported here combined with our customer traction to date encourage us to apply for the Phase II stage of this work with the goal to advance the commercialization of our metal grids and particle free conductive inks.

LeMieux, PhD, Melbs↗

LA100 Equity Strategies. Chapter 8: Equitable Rooftop Solar Access and Benefits

The LA100 Equity Strategies project integrates community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. This chapter focuses on analysis of customer-sited rooftop solar and storage as a means to reduce electricity bills for low- and moderate-income (LMI) households, multifamily building residents, and renters, who traditionally lack access to bill savings from rooftop solar. Specifically, NREL modeled customer-sited solar and storage adoption using the Distributed Generation Market Demand (dGen™)1 model through 2035 and developed scenarios to identify programs or policies that could support equitable access to bill savings from rooftop solar or solar-plus-storage. Scenarios tested include a direct-install program for LMI customers, net metering for LMI customers, and equitable distribution of benefits from installing solar between owners and renters of renter-occupied buildings. Research was guided by input from the community engagement process, and equity strategies are presented in alignment with that guidance.

14 SOLAR ENERGY↗

Estimates of the Economic Impacts of Long-Duration, Widespread Power Disruptions in Puerto Rico

A typical electricity customer in Puerto Rico experienced nearly 27 hours of power interruptions in 2023–with many customers experiencing extremely long duration outages during a single event (i.e., greater than one month). This project involved conducting state-of-the-art surveying to assess the direct costs of power outages occurring across Puerto Rico, developing customer-specific models to estimate future costs over varying outage durations, and comparing these estimates to FEMA’s Value of Unit Service for Electricity. We estimate that a territory-wide power outage may cost customers $\$1$, $\$5$ and $\$29$ billion during one-, 14-, and 30-day interruptions, respectively. However, these are lower-bound estimates because our study focused on direct economic costs and, by necessity, did not fully incorporate (1) indirect impacts to the economy; (2) costs to repair or replace damaged utility infrastructure; and (3) the broader societal consequences including increased morbidity- and mortality-related costs. The information contained in this study can be used to estimate the direct economic value of past or proposed investments in power system resilience. We conclude with a discussion of this study’s limitations and suggest additional research to improve stakeholder understanding of the impacts of power outages across Puerto Rico.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ICE Calculator 2.0: Final Report for Phase 1 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE 2.0 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE 2.0 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 of the ICE 2.0 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 1 involved 11 customer interruption cost survey activities representing a total of 24 electricity distribution service territories, 23 of them located in the Eastern and Midwestern regions of the U.S. and one located in the Pacific Northwest. ICE 2.0 vs. 1.0 Comparison This memorandum compares customer power interruption costs estimated using the recently updated Interruption Cost Estimate (ICE) Calculator (“ICE 2.0”) to the original ICE Calculator (“ICE 1.0”). ICE 1.0 was developed in 2009 based on 15 independent power interruption cost surveys conducted by 10 electric utilities between 1989 and 2012. ICE 2.0 was developed in 2025 through a national initiative based on a consistent set of power interruption cost surveys and 11 surveying efforts conducted across 24 electric utility service territories between 2022 and 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Incentive-Based Voltage Regulation in Distribution Networks

This paper considers distribution networks fea- turing distributed energy resources, and designs incentive-based mechanisms that allow the network operator and end-customers to pursue given operational and economic objectives, while concurrently ensuring that voltages are within prescribed limits. Two different network-customer coordination mechanisms that require different amounts of information shared between the network operator and end-customers are developed to identify a solution of a well-defined social-welfare maximization prob- lem. Notably, the signals broadcast by the network operator assume the connotation of prices/incentives that induce the end- customers to adjust the generated/consumed powers in order to avoid the violation of the voltage constraints. Stability of the proposed schemes is analytically established and numerically corroborated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design of a high-speed digital processing element for parallel simulation

A prototype of a custom designed computer to be used as a processing element in a multiprocessor based jet engine simulator is described. The purpose of the custom design was to give the computer the speed and versatility required to simulate a jet engine in real time. Real time simulations are needed for closed loop testing of digital electronic engine controls. The prototype computer has a microcycle time of 133 nanoseconds. This speed was achieved by: prefetching the next instruction while the current one is executing, transporting data using high speed data busses, and using state of the art components such as a very large scale integration (VLSI) multiplier. Included are discussions of processing element requirements, design philosophy, the architecture of the custom designed processing element, the comprehensive instruction set, the diagnostic support software, and the development status of the custom design.

Milner, E. J.↗

Control of a heterogeneous two-server exponential queueing system

A dynamic control policy known as 'threshold queueing' is defined for scheduling customers from a Poisson source on a set of two exponential servers with dissimilar service rates. The slower server is invoked in response to instantaneous system loading as measured by the length of the queue of waiting customers. In a threshold queueing policy, a specific queue length is identified as a 'threshold,' beyond which the slower server is invoked. The slower server remains busy until it completes service on a customer and the queue length is less than its invocation threshold. Markov chain analysis is employed to analyze the performance of the threshold queueing policy and to develop optimality criteria. It is shown that probabilistic control is suboptimal to minimize the mean number of customers in the system. An approximation to the optimum policy is analyzed which is computationally simple and suffices for most operational applications.

Larsen, R. L.↗

Information logistics: A production-line approach to information services

Logistics can be defined as the process of strategically managing the acquisition, movement, and storage of materials, parts, and finished inventory (and the related information flow) through the organization and its marketing channels in a cost effective manner. It is concerned with delivering the right product to the right customer in the right place at the right time. The logistics function is composed of inventory management, facilities management, communications unitization, transportation, materials management, and production scheduling. The relationship between logistics and information systems is clear. Systems such as Electronic Data Interchange (EDI), Point of Sale (POS) systems, and Just in Time (JIT) inventory management systems are important elements in the management of product development and delivery. With improved access to market demand figures, logisticians can decrease inventory sizes and better service customer demand. However, without accurate, timely information, little, if any, of this would be feasible in today's global markets. Information systems specialists can learn from logisticians. In a manner similar to logistics management, information logistics is concerned with the delivery of the right data, to the ring customer, at the right time. As such, information systems are integral components of the information logistics system charged with providing customers with accurate, timely, cost-effective, and useful information. Information logistics is a management style and is composed of elements similar to those associated with the traditional logistics activity: inventory management (data resource management), facilities management (distributed, centralized and decentralized information systems), communications (participative design and joint application development methodologies), unitization (input/output system design, i.e., packaging or formatting of the information), transportations (voice, data, image, and video communication systems), materials management (data acquisition, e.g., EDI, POS, external data bases, data entry) and production scheduling (job, staff, and project scheduling).

Adams, Dennis↗

Optimal routing and buffer allocation for a class of finite capacity queueing systems

The problem of routing jobs to K parallel queues with identical exponential servers and unequal finite buffer capacities is considered. Routing decisions are taken by a controller which has buffering space available to it and may delay routing of a customer to a queue. Using ideas from weak majorization, it is shown that the shorter nonfull queue delayed (SNQD) policy minimizes both the total number of customers in the system at any time and the number of customers that are rejected by that time. The SNQD policy always delays routing decisions as long as all servers are busy. Only when all the buffers at the controller are occupied is a customer routed to the queue with the shortest queue length that is not at capacity. Moreover, it is shown that, if a fixed number of buffers is to be distributed among the K queues, then the optimal allocation scheme is the one in which the difference between the maximum and minimum queue capacities is minimized, i.e., becomes either 0 or 1.

Towsley, Don↗

Software synthesis using generic architectures

A framework for synthesizing software systems based on abstracting software system designs and the design process is described. The result of such an abstraction process is a generic architecture and the process knowledge for customizing the architecture. The customization process knowledge is used to assist a designer in customizing the architecture as opposed to completely automating the design of systems. Our approach using an implemented example of a generic tracking architecture which was customized in two different domains is illustrated. How the designs produced using KASE compare to the original designs of the two systems, and current work and plans for extending KASE to other application areas are described.

Bhansali, Sanjay↗