Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Building Demand Flexibility: Grid Service Value of Future Market Entrants

The building sector is an important source of demand-side flexibility that is crucial for renewable energy integration in the future power systems. The grid service value of building flexibility, especially that which provides load shifting, has not been analyzed for the United States. We use a technology-agnostic approach based on detailed grid expansion and production cost modeling results to evaluate the capacity, energy, and ancillary service values of a marginal kilowatt-hour (kWh) of daily, shiftable building flexibility as a presumed market entrant in the 2030 U.S. power systems. We find the monthly mean of building flexibility has a range of 0-38 cents/kWh-day, depending on the original usage hour, month, region, building flexibility parameters, and grid scenario. The daily value consists of the highest-value hour each day across all the scenarios has a range of 0-620 cents/kWh-day. The results are provided in an open database for users to obtain the values of specific technologies based on what services can be provided, when, and in what quantities.

30 DIRECT ENERGY CONVERSION↗

Improved Cost Estimates to Boost Pumped Storage Hydropower Construction

Pumped storage hydropower is often overlooked in future grid planning efforts, in part because the cost to build a new facility is not always clear. That's why the National Renewable Energy Laboratory (NREL), along with the U.S. Department of Energy's Water Power Technologies Office, is developing improved cost estimates and cost models to reduce that uncertainty and give developers the data they need to decide where and when to construct new PSH facilities to support the country's evolving energy grid.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Hybrid-Energy-Powered Electrochemical Ocean Alkalinity Enhancement Model: Plant Operation, Cost, and Profitability

Electrochemical ocean alkalinity enhancement is a form of marine carbon dioxide removal, a rapidly growing industry that is powered by efficient onshore or offshore energy sources. As more and larger deployments are being planned, it is important to consider how variable energy sources like tidal energy can impact plant performance and costs. An open-source Python-based generalizable model for electrodialysis-based ocean alkalinity enhancement has been developed that can capture key system-level insights of the electrochemistry, ocean chemistry, acid disposal, and co-product creation of these plants under various conditions. The model additionally accounts for hybrid energy system performance profiles and costs via the National Laboratory of the Rockies’ H2Integrate tool. The model was used to analyze an example theoretical plant deployment in North Admiralty Inlet, including how the plant is impacted by the available energy sources in the region and the scale at which plant costs are covered by the co-products it generates, such as recycled concrete aggregates, without requiring carbon credits. The results show that the example plant could be profitable without carbon credits at commercial scales of 100,000 to 1 million tons of carbon dioxide removal per year, so long as it uses low-cost electricity sources and either sells acid or recovers recycled concrete aggregates with about 1 molar acid concentrations, though more research is needed to confirm these results.

hybrid energy↗

Update of CO2_T_COM and CO2_S_COM Models (CO2 Transport and Storage Costs)

PowerPoint file for presentation made on August 18, 2022 at NETL's Carbon Management Project Review Meeting. The presentation provides an overview of updates and improvements to two techno-economic models. The FECM/NETL CO2 Transport Cost Model (CO2_T_COM) is a model for transport of liquid CO2 by pipeline. CO2_T_COM is a point to point pipeline model. FECM/NETL CO2 Saline Storage Cost Model (CO2_S_COM) is a model for storage of CO2 in deep saline geologic formations.

Morgan, David↗

Estimating The Cost Of Developing Software

Software Cost Estimation Model program, SOFTCOST, developed to provide consistent automated resource-and-schedule mathematical model more formalized than guesswork model. Combines several software-cost models found in open literature into one comprehensive set of algorithms compensating for nearly 50 implementation factors relative to size of task, inherited baseline, organizational and system environment, and difficulty of task. Produces mean and variance estimates of software size, implementation productivity, recommended staff level, probable duration, amount of computer resources required, and amount and cost of software documentation. Written in Microsoft BASIC.

Tausworthe, Robert C.↗

Estimation Model of Spacecraft Parameters and Cost Based on a Statistical Analysis of COMPASS Designs

The Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team at Glenn Research Center has performed integrated system analysis of conceptual spacecraft mission designs since 2006 using a multidisciplinary concurrent engineering process. The set of completed designs was archived in a database, to allow for the study of relationships between design parameters. Although COMPASS uses a parametric spacecraft costing model, this research investigated the possibility of using a top-down approach to rapidly estimate the overall vehicle costs. This paper presents the relationships between significant design variables, including breakdowns of dry mass, wet mass, and cost. It also develops a model for a broad estimate of these parameters through basic mission characteristics, including the target location distance, the payload mass, the duration, the delta-v requirement, and the type of mission, propulsion, and electrical power. Finally, this paper examines the accuracy of this model in regards to past COMPASS designs, with an assessment of outlying spacecraft, and compares the results to historical data of completed NASA missions.

cost modeling↗

Modeling Mycorrhizal Carbon Costs in Temperate Forests: The Impacts of Functional Diversity and Global Change Factors

Mycorrhizal fungi form symbiotic relationships with most plant species, facilitating nutrient acquisition while consuming a significant fraction of the plant's photosynthetic carbon (C), which we define as the mycorrhizal C cost. Drivers of the mycorrhizal C cost, which is crucial for predicting environmental impacts on plant productivity, remain under-explored and difficult to quantify. Ecosystem models that incorporate mycorrhizae can offer insights into mycorrhizal C cost dynamics, but their predictions have rarely been validated against empirical data. Here, in this study, we used the Myco-CORPSE model, which explicitly simulates mycorrhizal processes alongside soil carbon and nitrogen cycling, to investigate the drivers of mycorrhizal C cost in temperate forests. Applying this model to over 1,800 forest inventory plots across the eastern United States, we found that the simulations matched published data, showing higher C allocation to ectomycorrhizal (ECM) fungi (16.0% of net primary production (NPP)) compared to arbuscular mycorrhizal (AM) fungi (5.8% of NPP). Further analysis showed that mixed forests, co-dominated by both AM and ECM trees, allocated less C to mycorrhizal fungi compared to forests dominated by either AM or ECM fungi alone, due to complementary nutrient acquisition strategies. Elevated Nitrogen (N) deposition and higher temperatures reduce mycorrhizal C costs, favoring AM strategies. Conversely, elevated CO 2 (eCO 2 ) increased plant N demand and mycorrhizal C costs, favoring ECM strategies that access organic N sources. These findings underscore the critical role of mycorrhizal functional diversity in plant nutrient acquisition and C dynamics, providing new insights into how mycorrhizal symbioses respond to global change.

Shao, Siya [Dartmouth College, Hanover, NH (United↗

Community Geothermal: Energy, Cost, and Carbon Modeling for District Design - Ann Arbor, MI

This data includes results on an analysis of existing and projected energy, cost, and carbon for the City of Ann Arbor - District Geothermal Design and Deployment to Equitably Decarbonize Low Income Neighborhoods in Ann Arbor project. The scope of the project includes designing and implementing a geothermal district heating and cooling system that reduces thermal heating and cooling load by 75% and greenhouse gas emissions by 40% in the project area (262 households, 6 commercial buildings). The existing neighborhood was modeled using Design Builder, an EnergyPlus software, to understand the current energy load. The energy model was then flipped to reflect the designed district geothermal heating and cooling system to project the effect on energy, carbon, and cost. This dataset includes the analysis files utilized and created for this study. There are 3 categories of data: 1) existing/benchmarking, 2) energy modeling, and 3) post processed calculations. This follows the methodology and process of the project team, which is fully explained in file 00_Technical Economic Environmental Assessment. All uses of data are referenced throughout this assessment to their respective files included below.

15 GEOTHERMAL ENERGY↗

A measurement system for large, complex software programs

This paper describes measurement systems required to forecast, measure, and control activities for large, complex software development and support programs. Initial software cost and quality analysis provides the foundation for meaningful management decisions as a project evolves. In modeling the cost and quality of software systems, the relationship between the functionality, quality, cost, and schedule of the product must be considered. This explicit relationship is dictated by the criticality of the software being developed. This balance between cost and quality is a viable software engineering trade-off throughout the life cycle. Therefore, the ability to accurately estimate the cost and quality of software systems is essential to providing reliable software on time and within budget. Software cost models relate the product error rate to the percent of the project labor that is required for independent verification and validation. The criticality of the software determines which cost model is used to estimate the labor required to develop the software. Software quality models yield an expected error discovery rate based on the software size, criticality, software development environment, and the level of competence of the project and developers with respect to the processes being employed.

Rone, Kyle Y.↗

Machine learning models for maintenance cost estimation in delivery trucks using diesel and natural gas fuels

The maintenance costs can represent about 15%–60% of the cost of produced goods depending on the type of goods transported. To comply with stringent emissions regulations, diesel engines are incorporated with complex after-treatment systems that demand increased maintenance. The availability of alternative fuels such as natural gas and propane has fostered the natural gas and propane powertrain systems as well as electrification options for heavy- and medium-duty vehicles. A critical barrier to adopting alternative fuel vehicles has been the lack of knowledge on comparative vehicle maintenance/repair costs with conventional diesel. Moreover, the region of operation, the type of vehicle operation, and seasonal temperature changes also affect the duty cycle which impacts the maintenance and repair costs. This study focuses on estimating the cost-per-mile for heavy-duty vehicles using machine learning models such as random forest, xgboost, neural networks, and a super-learner model. The super-learner model achieved an error as low as 0.0068 $/mile for mean absolute error and 0.0086 $/mile for root mean square error with a coefficient of determination/R-Squared of 97.28%. Specifically, the paper investigates the data collected from the maintenance and repair costs associated with delivery trucks using diesel and natural gas fuels. Since the availability of data is the major constraint, we leveraged the data collected by West Virginia University and the partnership with fleet companies. This allows for additional information related to maintenance costs and fleet-specific maintenance practices of alternative fuel vehicles. This study promotes clean fuel technologies and enables fleet management companies to adopt alternative fuel vehicles in case of similar or lower cost of maintenance compared to diesel vehicles resulting in reduced emissions and total cost of ownership.

Katreddi, Sasanka↗

Engineering and fabrication cost considerations for cryogenic wind tunnel models

Design and fabrication cost drivers for cryogenic transonic wind tunnel models are defined. The major cost factors for wind tunnel models are model complexity, tolerances, surface finishes, materials, material validation, and model inspection. The cryogenic temperatures require the use of materials with relatively high fracture toughness but at the same time high strength. Some of these materials are very difficult to machine, requiring extensive machine hours which can add significantly to the manufacturing costs. Some additional engineering costs are incurred to certify the materials through mechanical tests and nondestructive evaluation techniques, which are not normally required with conventional models. When instrumentation such as accelerometers and electronically scanned pressure modules is required, temperature control of these devices needs to be incorporated into the design, which requires added effort. Additional thermal analyses and subsystem tests may be necessary, which also adds to the design costs. The largest driver to the design costs is potentially the additional static and dynamic analyses required to insure structural integrity of the model and support system.

Boykin, R. M., Jr.↗

The application of simulation modeling to the cost and performance ranking of solar thermal power plants

Small solar thermal power systems (up to 10 MWe in size) were tested. The solar thermal power plant ranking study was performed to aid in experiment activity and support decisions for the selection of the most appropriate technological approach. The cost and performance were determined for insolation conditions by utilizing the Solar Energy Simulation computer code (SESII). This model optimizes the size of the collector field and energy storage subsystem for given engine generator and energy transport characteristics. The development of the simulation tool, its operation, and the results achieved from the analysis are discussed.

Rosenberg, L. S.↗

Costs and benefits

Two models of cost benefit analysis are illustrated and the application of these models to assessing the economic scope of space applications programs was discussed. Four major areas cited as improvable through space derived information - food supply and distribution, energy sources, mineral reserves, and communication and navigation were - discussed. Specific illustrations are given for agriculture and maritime traffic.

Source record↗

Impact of Detailed Parameter Modeling of Open-Cycle Gas Turbines on Production Cost Simulation: Preprint

Flexible resources are increasingly important as variable renewable energy deployment in the power system increases. Although many systems are transitioning away from fossil fuels, open-cycle gas turbines are likely to play an important balancing role for some time, thus requiring accurate modeling of their operational parameters. This paper explores the impact of detailed representation of three operational parameters - start- up costs, run-up rates, and forced outage rates - in the production cost model of a system as it adopts higher levels of wind and solar. Using PLEXOS simulations of the NREL-118 bus test system, the study examines how more detailed parameter modeling affects outcomes such as the number of start-ups and shutdowns, ramping and total generation costs for open-cycle gas turbines, as renewable energy levels increase. The results suggest the value of detailed parameter modeling and continued research on combustion turbines' ability to provide flexibility.

economic dispatch↗

Smart Meter Data: A Gateway for Reducing Solar Soft Costs with Model-Free Hosting Capacity Maps

Public-facing solar hosting capacity (HC) maps, which show the maximum amount of solar energy that can be installed at a location without adverse effects, have proven to be a key driver of solar soft cost reductions through a variety of pathways (e.g., streamlining interconnection, siting, and customer acquisition processes). However, current methods for generating HC maps require detailed grid models and time-consuming simulations that limit both their accuracy and scalability—today, only a handful out of almost 2,000 utilities provide these maps. This project developed and validated data-driven algorithms for calculating solar HC using data from AMI without the need of detailed grid models or simulations. The algorithms were validated on utility datasets and incorporated as an application into NRECA’s Open Modeling Framework (OMF.coop) for the over 260 coops and vendors throughout the US to use. The OMF is free and open-source for everyone.

14 SOLAR ENERGY↗

Modeling of Marginal Cost for PV Inverter Ancillary Services Considering Inverter Aging under Transactive Energy Framework

PV inverters can provide ancillary services while providing active power. Transactive energy system (TES) incentivizes PV inverter to provide ancillary services and compensates for the cost of additional power losses due to additional reactive power production. However, providing ancillary services can shorten the lifetime of the PV inverter since additional reactive power increases the thermal stress of the PV inverter. This paper theoretically derives the lifetime shortening effect of a PV inverter when providing ancillary services. Based on the lifetime estimation, an improved marginal cost curve for the PV inverter ancillary services is derived. The improved marginal cost quantitively describe the willingness of the PV inverter to provide ancillary services by the given active power production and the ambient temperature. The proposed model is validated by a simulation case study.

Liu, Yunting↗

Software for Tracking Costs of Mars Projects

The Mars Cost Tracking Model is a computer program that administers a system set up for tracking the costs of future NASA projects that pertain to Mars. Previously, no such tracking system existed, and documentation was written in a variety of formats and scattered in various places. It was difficult to justify costs or even track the history of costs of a spacecraft mission to Mars. The present software enables users to maintain all cost-model definitions, documentation, and justifications of cost estimates in one computer system that is accessible via the Internet. The software provides sign-off safeguards to ensure the reliability of information entered into the system. This system may eventually be used to track the costs of projects other than only those that pertain to Mars.

Wong, Alvin↗

Patterns, drivers, and a predictive model of dam removal cost in the United States

Given the burgeoning dam removal movement and the large number of dams approaching obsolescence in the United States, cost estimating data and tools are needed for dam removal prioritization, planning, and execution. We used the list of removed dams compiled by American Rivers to search for publicly available reported costs for dam removal projects. Total cost information could include component costs related to project planning, dam deconstruction, monitoring, and several categories of mitigation activities. We compiled reported costs from 455 unique sources for 668 dams removed in the United States from 1965 to 2020. The dam removals occurred within 571 unique projects involving 1–18 dams. When adjusted for inflation into 2020 USD, cost of these projects totaled $\$1.522$ billion, with per-dam costs ranging from $\$1$ thousand (k) to $\$268.8$ million (M). The median cost for dam removals was $\$157$k, $\$823$k, and $\$6.2$M for dams that were< 5 m, between 5–10 m, and > 10 m in height, respectively. Geographic differences in total costs showed that northern states in general, and the Pacific Northwest in particular, spent the most on dam removal. The Midwest and the Northeast spent proportionally more on removal of dams less than 5 m in height, whereas the Northwest and Southwest spent the most on larger dam removals > 10 m tall. We used stochastic gradient boosting with quantile regression to model dam removal cost against potential predictor variables including dam characteristics (dam height and material), hydrography (average annual discharge and drainage area), project complexity (inferred from construction and sediment management, mitigation, and post-removal cost drivers), and geographic region. Dam height, annual average discharge at the dam site, and project complexity were the predominant drivers of removal cost. The final model had an R 2 of 57% and when applied to a test dataset model predictions had a root mean squared error of $\$5.09$M and a mean absolute error of $\$1.45$M, indicating its potential utility to predict estimated costs of dam removal. We developed a R shiny application for estimating dam removal costs using customized model inputs for exploratory analyses and potential dam removal planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗