Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Human Mars Surface Science Operations

Human missions to the surface of Mars will have challenging science operations. This paper will explore some of those challenges, based on science operations considerations as part of more general operational concepts being developed by NASA's Human Spaceflight Architecture (HAT) Mars Destination Operations Team (DOT). The HAT Mars DOT has been developing comprehensive surface operations concepts with an initial emphasis on a multi-phased mission that includes a 500-day surface stay. This paper will address crew science activities, operational details and potential architectural and system implications in the areas of (a) traverse planning and execution, (b) sample acquisition and sample handling, (c) in-situ science analysis, and (d) planetary protection. Three cross-cutting themes will also be explored in this paper: (a) contamination control, (b) low-latency telerobotic science, and (c) crew autonomy. The present traverses under consideration are based on the report, Planning for the Scientific Exploration of Mars by Humans1, by the Mars Exploration Planning and Analysis Group (MEPAG) Human Exploration of Mars-Science Analysis Group (HEM-SAG). The traverses are ambitious and the role of science in those traverses is a key component that will be discussed in this paper. The process of obtaining, handling, and analyzing samples will be an important part of ensuring acceptable science return. Meeting planetary protection protocols will be a key challenge and this paper will explore operational strategies and system designs to meet the challenges of planetary protection, particularly with respect to the exploration of "special regions." A significant challenge for Mars surface science operations with crew is preserving science sample integrity in what will likely be an uncertain environment. Crewed mission surface assets -- such as habitats, spacesuits, and pressurized rovers -- could be a significant source of contamination due to venting, out-gassing and cleanliness levels associated with crew presence. Low-latency telerobotic science operations has the potential to address a number of contamination control and planetary protection issues and will be explored in this paper. Crew autonomy is another key cross-cutting challenge regarding Mars surface science operations, because the communications delay between earth and Mars could as high as 20 minutes one way, likely requiring the crew to perform many science tasks without direct timely intervention from ground support on earth. Striking the operational balance between crew autonomy and earth support will be a key challenge that this paper will address.

Bobskill, Marianne R.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Testing of an Arcjet Thruster with Capability of Direct-Drive Operation

Electric thrusters typically require a power processing unit (PPU) to convert the spacecraft provided power to the voltage-current that a thruster needs for operation. Testing has been initiated to study whether an arcjet thruster can be operated directly with the power produced by solar arrays without any additional conversion. Elimination of the PPU significantly reduces system-level complexity of the propulsion system, and lowers developmental cost and risk. The work aims to identify and address technical questions related to power conditioning and noise suppression in the system and heating of the thruster in long-duration operation. The apparatus under investigation has a target power level from 400-1,000 W. However, the proposed direct-drive arcjet is potentially a highly scalable concept, applicable to solar-electric spacecraft with up to 100's of kW and beyond. A direct-drive electric propulsion system would be comprised of a thruster that operates with the power supplied directly from the power source (typically solar arrays) with no further power conditioning needed between those two components. Arcjet thrusters are electric propulsion devices, with the power supplied as a high current at low voltage; of all the different types of electric thruster, they are best suited for direct drive from solar arrays. One advantage of an arcjet over Hall or gridded ion thrusters is that for comparable power the arcjet is a much smaller device and can provide more thrust and orders of magnitude higher thrust density (approximately 1-10 N/sq m), albeit at lower I(sub sp) (approximately 800-1000 s). In addition, arcjets are capable of operating on a wide range of propellant options, having been demonstrated on H2, ammonia, N2, Ar, Kr, Xe, while present SOA Hall and ion thrusters are primarily limited to Xe propellant. Direct-drive is often discussed in terms of Hall thrusters, but they require 250-300 V for operation, which is difficult even with high-voltage solar arrays. The arcjet requires under 100 V, which is more in-line with what is easily possible with a solar array. Direct-drive of an electric propulsion system confers the advantage of reducing or eliminating the power processing unit (PPU) that is typically needed to convert the spacecraft-provided power to the voltage and current needed for thruster operation. Since the PPU is typically the most expensive piece of an electric thruster system, from both a fabrication and qualification standpoint, its elimination offers the potential for major reductions in system cost and risk. The design of the arcjet built for this effort was based on previous low power (1 kW class) arcjets. It has a precision machined 99.95% pure tungsten anode which also serves as the nozzle. The anode constrictor region is 1 mm (0.040-in) diameter and 1 mm (0.040-in) long. The cathode is a tungsten welding electrode doped with LaO2; its tip was precision ground to a 30◦ angle ending in a blunt end. The two electrodes are separated by a boron-nitride insulator which also serves as the propellant injection manifold; it ends in six small holes which introduce the propellant gas in the diverging section of the nozzle, directly adjacent to the cathode. The electrodes and insulator are housed in a stainless-steel outer-body, with a Macor insulator at the mid-plane to provide thermal isolation between the front and back halves of the device. The gas seals were made using Grafoil gaskets. Figure 1A shows the assembled thruster in the vacuum chamber; figure 1B shows the thruster in operation on argon at a flow rate of 676 sccm (20 mg/s). Initial testing was conducted in a 3.5-ft diameter vacuum chamber; the ultimate pressure reached during quasi-steady operation of the thruster was about 330 millitorr. The thruster was powered with a high-current, 0-100A, 15 kW power supply. The discharge was initiated with a high-voltage (approximately 10 kV) spark initiator that was isolated from the supply by a stack of diodes. The testing indicated that an operating point exists within the I-V characteristics that is compatible with direct-drive solar-electric operation; for a flow rate of 20 mg/s (argon) the arc could be sustained at a voltage of about 20 V and a current of 25 A (500W).

Martin, Adam K.↗

A Vision and Roadmap for Increasing User Autonomy in Flight Operations in the National Airspace

The purpose of Air Transportation is to move people and cargo safely, efficiently and swiftly to their destinations. The companies and individuals who use aircraft for this purpose, the airspace users, desire to operate their aircraft according to a dynamically optimized business trajectory for their specific mission and operational business model. In current operations, the dynamic optimization of business trajectories is limited by constraints built into operations in the National Airspace System (NAS) for reasons of safety and operational needs of the air navigation service providers. NASA has been developing and testing means to overcome many of these constraints and permit operations to be conducted closer to the airspace user's changing business trajectory as conditions unfold before and during the flight. A roadmap of logical steps progressing toward increased user autonomy is proposed, beginning with NASA's Traffic Aware Strategic Aircrew Requests (TASAR) concept that enables flight crews to make informed, deconflicted flight-optimization requests to air traffic control. These steps include the use of data communications for route change requests and approvals, integration with time-based arrival flow management processes under development by the Federal Aviation Administration (FAA), increased user authority for defining and modifying downstream, strategic portions of the trajectory, and ultimately application of self-separation. This progression takes advantage of existing FAA NextGen programs and RTCA standards development, and it is designed to minimize the number of hardware upgrades required of airspace users to take advantage of these advanced capabilities to achieve dynamically optimized business trajectories in NAS operations. The roadmap is designed to provide operational benefits to first adopters so that investment decisions do not depend upon a large segment of the user community becoming equipped before benefits can be realized. The issues of equipment certification and operational approval of new procedures are addressed in a way that minimizes their impact on the transition by deferring a change in the assignment of separation responsibility until a large body of operational data is available to support the safety case for this change in the last roadmap step.This paper will relate the roadmap steps to ongoing activities to clarify the economics-based transition to these technologies for operational use.

Cotton, William B.↗

Unmanned Aircraft Systems Traffic Management (UTM) Safely Enabling UAS Operations in Low-Altitude Airspace

Unmanned Aircraft System (UAS) Traffic Management (UTM) Enabling Civilian Low-Altitude Airspace and Unmanned Aircraft System Operations What is the problem? Many beneficial civilian applications of UAS have been proposed, from goods delivery and infrastructure surveillance, to search and rescue, and agricultural monitoring. Currently, there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. A UAS traffic management (UTM) system for low-altitude airspace may be needed, perhaps leveraging concepts from the system of roads, lanes, stop signs, rules and lights that govern vehicles on the ground today, whether the vehicles are driven by humans or are automated. What system technologies is NASA exploring? Building on its legacy of work in air traffic management for crewed aircraft, NASA is researching prototype technologies for a UAS Traffic Management (UTM) system that could develop airspace integration requirements for enabling safe, efficient low-altitude operations. While incorporating lessons learned from the today's well-established air traffic management system, which was a response that grew out of a mid-air collision over the Grand Canyon in the early days of commercial aviation, the UTM system would enable safe and efficient low-altitude airspace operations by providing services such as airspace design, corridors, dynamic geofencing, severe weather and wind avoidance, congestion management, terrain avoidance, route planning and re-routing, separation management, sequencing and spacing, and contingency management. One of the attributes of the UTM system is that it would not require human operators to monitor every vehicle continuously. The system could provide to human managers the data to make strategic decisions related to initiation, continuation, and termination of airspace operations. This approach would ensure that only authenticated UAS could operate in the airspace. In its most mature form, the UTM system could be developed using autonomicity characteristics that include self-configuration, self-optimization and self-protection. The self-configuration aspect could determine whether the operations should continue given the current andor predicted windweather conditions. NASA envisions concepts for two types of possible UTM systems. The first type would be a Portable UTM system, which would move from between geographical areas and support operations such as precision agriculture and disaster relief. The second type of system would be a Persistent UTM system, which would support low-altitude operations and provide continuous coverage for a geographical area. Either system would require persistent communication, navigation, and surveillance (CNS) coverage to track, ensure, and monitor conformance. What is NASA doing to test the technologies? NASA's near-term goal is the development and demonstration of a possible future UTM system that could safely enable low-altitude airspace and UAS operations. Working alongside many committed government, industry and academic partners, NASA is leading the research, development and testing that is taking place in a series of activities called Technology Capability Levels (TCL), each increasing in complexity. UTM TCL1 concluded field testing in August 2015 and is undergoing additional testing at an FAA site.

UTM Low-altitude↗

Unmanned Aerial Systems Traffic Management (UTM): Safely Enabling UAS Operations in Low-Altitude Airspace

Currently, there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS flight operations. Given this, and understanding that the FAA faces a mandate to modernize the present air traffic management system through computer automation and significantly reduce the number of air traffic controllers by FY 2020, the FAA maintains that a comprehensive, yet fully automated UAS traffic management (UTM) system for low-altitude airspace is needed. The concept of UTM is to begin by leveraging concepts from the system of roads, lanes, stop signs, rules and lights that govern vehicles on the ground today. Building on its legacy of work in air traffic management (ATM), NASA is working with industry to develop prototype technologies for a UAS Traffic Management (UTM) system that would evolve airspace integration procedures for enabling safe, efficient low-altitude flight operations that autonomously manage UAS operating in an approved low-altitude airspace environment. UTM is a cloud-based system that will autonomously manage all traffic at low altitudes to include UASs being operated beyond visual line of sight of an operator. UTM would thus enable safe and efficient flight operations by providing fully integrated traffic management services such as airspace design, corridors, dynamic geofencing, severe weather and wind avoidance, congestion management, terrain avoidance, route planning re-routing, separation management, sequencing spacing, and contingency management. UTM removes the need for human operators to continuously monitor aircraft operating in approved areas. NASA envisions concepts for two types of UTM systems. The first would be a small portable system, which could be moved between geographical areas in support of operations such as precision agriculture and public safety. The second would be a Persistent system, which would support low-altitude operations in an approved area by providing continuous automated coverage. Both would require persistent communication, navigation, and surveillance (CNS) coverage to track, ensure, and monitor conformance. UTM is creating an airspace management tool that allows the ATM system to accommodate the number of UAS that will operate in the low altitude airspace. The analogy is just because we have a car, whether its autonomous or someone is driving, does not diminish the need for a road or road signs or rules of the road.

traffic management↗

Real-Time Science Operations to Support a Lunar Polar Volatiles Rover Mission

Future human exploration of the Moon will likely rely on in situ resource utilization (ISRU) to enable long duration lunar missions. Prior to utilizing ISRU on the Moon, the natural resources (in this case lunar volatiles) must be identified and characterized, and ISRU demonstrated on the lunar surface. To enable future uses of ISRU, NASA and the CSA are developing a lunar rover payload that can (1) locate near subsurface volatiles, (2) excavate and analyze samples of the volatile-bearing regolith, and (3) demonstrate the form, extractability and usefulness of the materials. Such investigations are important both for ISRU purposes and for understanding the scientific nature of these intriguing lunar volatile deposits. Temperature models and orbital data suggest near surface volatile concentrations may exist at briefly lit lunar polar locations outside persistently shadowed regions. A lunar rover could be remotely operated at some of these locations for the approx. 2-14 days of expected sunlight at relatively low cost. Due to the limited operational time available, both science and rover operations decisions must be made in real time, requiring immediate situational awareness, data analysis, and decision support tools. Given these constraints, such a mission requires a new concept of operations. In this paper we outline the results and lessons learned from an analog field campaign in July 2012 which tested operations for a lunar polar rover concept. A rover was operated in the analog environment of Hawaii by an off-site Flight Control Center, a rover navigation center in Canada, a Science Backroom at NASA Ames Research Center in California, and support teams at NASA Johnson Space Center in Texas and NASA Kennedy Space Center in Florida. We find that this type of mission requires highly efficient, real time, remotely operated rover operations to enable low cost, scientifically relevant exploration of the distribution and nature of lunar polar volatiles. The field demonstration illustrated the need for science operations personnel in constant communications with the flight mission operators and the Science Backroom to provide immediate and continual science support and validation throughout the mission. Specific data analysis tools are also required to enable immediate data monitoring, visualization, and decision making. The field campaign demonstrated that this novel methodology of real-time science operations is possible and applicable to providing important new insights regarding lunar polar volatiles for both science and exploration.

Moon; Volatiles; Rover; Missions↗

CNS Simulation Tool Development for Increasingly Complex Airspace Operation Evaluation

As unmanned aircraft operations continue to grow and new vehicles such as air taxi, supersonic aircraft and high-altitude long endurance aircraft seek access to the airspace, it is anticipated that National Airspace System (NAS) operations will increase in density and complexity. To manage the influx, demand and safe integration of these new aircraft and missions into the NAS, a careful evaluation of existing and new operational concepts, vehicle characteristics and technology performance is required. Communications, Navigation and Surveillance (CNS) technologies operating in the NAS have evolved to meet changing needs of the Air Traffic Control System and the vehicles operating in the airspace. Today's CNS systems have been architected to deliver critical services to a carefully designed airspace configuration and to serve airborne vehicles equipped with standardized systems that enable global air navigation. The introduction of new vehicles is projected to expand NAS operations beyond today's configuration to include a new breed of aircraft operating from non-conventional aerodromes, resulting in a mix of vehicles operating in the same airspace. To enable this expansion, it is anticipated that modeling and simulation will play an important role in the evaluation of new management concept of operations.In this regard, NASA is developing simulation capabilities that will enable the evaluation of new concepts of operation and CNS technology performance in an increasingly dense, high-tempo operational environment. The NASA Glenn Research Center is working on the development of CNS simulation capabilities intended to support the integrated evaluation of operational concepts and emerging technologies. This presentation describes simulation capability development efforts that, together with other simulation tools, will enable evaluation of new concepts and technologies for the integration of new vehicles and services into the NAS. [Also discussed: NASA Shadow Mode Assessment using Realistic Technologies for the National Airspace System (SMART NAS)]

Surveillance↗

Effectiveness of Redundant Communications Systems in Maintaining Operational Control of Small Unmanned Aircraft

As a part of NASA’s Unmanned Aircraft System (UAS) Traffic Management (UTM) research, a test was performed to evaluate the effectiveness of the redundant Command and Control (C2) communications system for maintaining operational control of small UAS in the airspace over a rural area. In the test, operators set up a primary and a secondary UAS C2 communications system, sent a maneuver command to an Unmanned Aircraft (UA) with and without a functioning primary system, then verified the execution of the sent command to confirm the operator control. Operators reported that the tested redundancy configurations were effective in maintaining operational control in the test airspace over rural locations. Since the next phase of UTM research focuses on operations in an urban area where an increased level of Radio Frequency (RF) activities occur compared to a rural area, four recommendations are provided to sustain the effectiveness of redundancy in urban operations. First, the operator should not include C2 systems that use the industrial, scientific, and medical (ISM) radio bands in redundancy configurations. Second, the operator should verify the RF characteristics of the intended operation area and examine the area’s radio noise floor. Third, the operator should monitor the availability, quality, and reliability of communications services used by a redundant system. Fourth, the small UAS community should adopt a standard set of contingency steps to handle the loss of C2 communications so that such events are managed in a consistent manner across the airspace. The insights from the test will be used to accommodate the FAA’s UAS integration effort.

Jung, Jaewoo↗

STF-1 Ground Operations - Automating the Planning, Scheduling, Assessment and Data Processing/Reduction for a Small Satellite

On December 16, 2018, a 3-U CubeSat named STF-1 launched as West Virginia's first spacecraft. This event marked the culmination of a run-up to launch involving the production of the spacecraft, creation/configuration of command and control infrastructure, and the evolution of its co-creation, the NASA Operational Simulator for Small Satellites (NOS3). This event also marked the beginning of a new phase: operations. While plans, procedures, and infrastructure were already in place or started for operations, many lessons were learned during the operations phase, especially during early operations (first month/commissioning phase). Additional plans, procedures, and infrastructure, especially related to communication planning and automated data processing, were created and developed to fill needs for the operation of the STF-1 mission.This paper and presentation will overview the STF-1 operations team's solutions to addressing the many needs of operating a low-earth orbiting CubeSat mission with a single ground antenna that is shared and scheduled with several other missions. The STF-1 operations team deployed a combination of virtualization technologies, ground station technology solutions, collaboration software, custom planning software solutions, and existing ground antenna scheduling solutions to create an effective and efficient CubeSat operations environment. The end-solution satisfied the operations stakeholders, which include NASA, its industry partner TMC2 Technologies, and four independent professor-student teams at West Virginia University.

Suder, Mark↗

Conducting Efficient Remote Science and Planning Operations for Ocean Exploration Using Exploration Ground Data Systems (xGDS)

NASA Ames’ Exploration Ground Data Systems (xGDS) supports rapid scientific decision making by synchronizing information in time and space, including video and still images, scientific instrument data, and science and operations notes in geographic and temporal context. We have deployed xGDS at multiple NASA field analog missions over the past decade. In the last two years, we have participated in SUBSEA, a multi-institution collaborative project*. SUBSEA used the research ship E/V Nautilus along with its two remotely operated vehicles (ROVs), Hercules and Argus, to explore deep ocean volcanic vents as an analog for ocean worlds (e.g. Enceladus). This work allowed us to compare the existing oceanographic operations methods and technologies used for ocean exploration with corresponding tools and approaches developed and used at NASA. In the first year of SUBSEA we observed existing remote science operations from the Inner Space Center (ISC)**. In the second year, we deployed xGDS at ISC to complement existing capabilities with xGDS tools designed to support remote Nautilus science operations from the ISC. During operations, video, ROV position and instrument telemetry were streamed from the ship to the ISC. As the science team watched dive operations, they could annotate the data with observations that were relevant to their work domain. Later, the team members could review the data at their own pace to collaboratively develop a dive plan for the next day, which had to be delivered on a fixed daily schedule. The opportunity to compare operations under different conditions enabled us to make several key observations about conducting remote science and planning operations efficiently: (i) Reviewing data collaboratively and interactively with temporal and spatial context was critical for the remote science team’s ability to plan dive operations on the Nautilus. (ii) Science team members were actively engaged with the remote dive operations because they could interact with the collected data and visualize it as they desired. (iii) Being able to replay past events at accelerated speeds, and jump to points in time and spaced based on search results, provided efficient access to critical points of interest in a massive volume of data, so the remote science team could deliver plans on time. * SUBSEA (Systematic Underwater Biogeochemical Science and Exploration Analog) is a multi-institution collaboration supported by NASA, NOAA’s Office of Exploration Research (OER), the Ocean Exploration Trust (OET) and the University of Rhode Island’s Graduate School of Oceanography (GSO).

Cohen, Tamar E.↗

Scheduling and Operations of the ECOSTRESS Mission

This paper describes the development and use of an automated scheduling system for the National Aeronautics and Space Administration’s (NASA) ECOsystem Spaceborne Thermal Radiometer Experiment on Space Station (ECOSTRESS) mission. Key to the success of the ECOSTRESS mission has been the use of automated scheduling in mission analysis pre-launch, and in successful operations where automated scheduling was deployed to address several operational challenges. ECOSTRESS uses an adaptation of the Compressed Large-scale Activity Scheduling and Planning (CLASP) system to automatically select science observations respecting area and point target priorities as well as visibility, illumination, onboard storage, and radiation constraints to satisfy high-level prioritized science campaigns. The ECOSTRESS scheduler was used pre-launch to predict the effectiveness of alternative formulations of science campaign definitions accounting for the impact of data volume, keepout, and orbit/illumination/visibility constraints to derive the initial operational science campaign definitions and priorities. The scheduler was then used after instrument checkout for operations. ECOSTRESS has faced multiple operational challenges relating to instrument firmware and hardware, and the scheduler has been updated several times to address these challenges. The instrument Mass Storage Units (MSUs) had operational issues, requiring the scheduler to plan for and schedule commands to handle intricacies of data management. After many months of operations, both MSUs on the instrument became non-functioning and the firmware of the instrument was updated to bypass the MSUs. A further update to the ECOSTRESS scheduler enabled the scheduler to operate in this new operations mode. The ECOSTRESS scheduler has also been updated to improve handling of along-track uncertainty inherent in International Space Station operations. The flexibility and ease of updating of the automated scheduler has been a significant contributor to successful operations of the ECOSTRESS mission.

Padams, Jordan↗

Implementing a micro-operation cache with compaction

Systems, apparatuses, and methods for compacting multiple groups of micro-operations into individual cache lines of a micro-operation cache are disclosed. A processor includes at least a decode unit and a micro-operation cache. When a new group of micro-operations is decoded and ready to be written to the micro-operation cache, the micro-operation cache determines which set is targeted by the new group of micro-operations. If there is a way in this set that can store the new group without evicting any existing group already stored in the way, then the new group is stored into the way with the existing group(s) of micro-operations. Metadata is then updated to indicate that the new group of micro-operations has been written to the way. Additionally, the micro-operation cache manages eviction and replacement policy at the granularity of micro-operation groups rather than at the granularity of cache lines.

Kotra, Jagadish B.↗

Hybrid electric vehicle and method of operating engine of the same

A hybrid electric vehicle (HEV) for multiple operation modes includes: a gasoline diffusion flame (GDF) combustion engine configured to perform gasoline diffusion flame combustion; a motor-generator operatively connected to the GDF combustion engine and configured to selectively drive the HEV with electric power of a battery or generate electric power to charge the battery; and a multi-mode controller including a processor and configured to receive operating conditions of the GDF combustion engine and the motor-generator and define a plurality of mode operating regions based on the received operating conditions. In particular, the plurality of mode operating regions includes: an electric vehicle (EV) only mode operating region, a GDF mode operating region where the GDF combustion engine operates and drives the HEV while the motor-generator stops, and a GDF+EV mode operating region where the motor-generator assists the operation of the GDF combustion engine to drive the HEV.

Bourcier, Mark↗

Automation Toward Tether-less Robotic Operations in Nuclear Facilities - 17474

Automation capabilities that enable communication-denied nuclear robotic operations have come of age. These layer over tethered operation or enable un-tethered systems for some operations. Tele-operated, tethered devices are traditionally preferred for nuclear remote systems. Tethers provide comm, power, and a means for mechanical extraction. They also restrict mobility and create additional failure points, and in some cases, circumstances preclude mechanical recovery by tether. Tethering has superb advantages where it is viable, but a subset of nuclear EM challenges compel mobile remote systems that forgo tethering. Tethering was essential at a time when autonomy or wireless comm could not accomplish viable operations, but now an emerging class of un-tethered exploration and service robots are compelling for situations where tethers compound waste and exposure, or are not viable. Technical advances in localization, modeling, planning, autonomy, integration and reliability have made it possible to augment tethered operations or operate altogether without tether in selective operations. Tether preclusion technologies include localization, perception, navigation, safeguarding and task prescription. These effectively accomplish tasks like way-point following, wall-following, coverage patterning, navigate-to-goal, next-best view and many others. Although these are not yet general for the broad agenda of the nuclear complex, these are already useful for many operations. These provide a foundational base that can be built upon over time for more complex operations yet to come. As a context and analog study, the technologies are exhibited by robotically (without tether) modeling a coal mine with tracks and train cars. This is analogous to technology and operation that might apply for inspection of waste storage at WIPP or the PUREX tunnels. Autonomous exploration of this nature is within state-of-art and possible with or without tether. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater remediation at the Fernald preserve, Cincinnati, Ohio modeling and resulting 2014 well field operational changes - 15324

The Fernald Preserve became a US DOE Office of Legacy Management site in November 2006, for long-term surveillance and maintenance following completion (with the exception of completing groundwater cleanup) of the Comprehensive Environmental Response, Compensation, and Liability Act; environmental remediation; and site restoration. When the site was turned over to the Office of Legacy Management, approximately 76 hectares (189 acres) of the Great Miami Aquifer (GMA) remained contaminated with uranium above the final remediation level of 30 micrograms per liter. Uranium contamination is being removed from groundwater in the GMA through a pump-and-treat operation that is predicted by groundwater modeling to continue until 2033. Certifying that cleanup objectives have been met and removing the remediation infrastructure after pump-and-treat (P and T) operations are complete will require a minimum of 3 additional years. The current P and T remedy has operated well. From August 1993 through December 2013 the remedy has been used to remove 5,345 kg (11,784 lb) of uranium from the GMA. A variety of metrics are used to track how the P and T operation is progressing and are reported each year in the Site Environmental Report for the Fernald site. The metrics show that the effectiveness of uranium removal is slowly decreasing (a common observation for P and T remedies) and that operational changes needed to be considered. Several different operational changes were modeled to determine if model-predicted cleanup dates could be shortened and if the effectiveness of the groundwater remediation could be improved. With the concurrence and support of US EPA, Ohio EPA, and site stakeholders, operational changes were agreed upon and implemented in 2014 that are predicted to increase the effectiveness of the ongoing operation and shorten cleanup times for a portion of the aquifer. Although the overall predicted length of the remediation was not shortened, modeling predicts that key areas of the uranium plume will be re-mediated sooner. This paper provides a status of the groundwater remediation under way at the Fernald Preserve near Cincinnati, presents the operational changes that were implemented in 2014, and summarizes the groundwater modeling that supported the changes. This paper also illustrates the potential benefits that can be gained by pro-actively managing a pump-and-treat operation and looking for innovative ways to adjust the operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analytical solutions for quantum walks on 1D chain with different shift operators

In this paper, we study the discrete-time quantum walks on 1D Chain with the moving and swapping shift operators. We derive analytical solutions for the eigenvalues and eigenstates of the evolution operator U{sup -hat} using the Chebyshev polynomial technique, and calculate the long-time averaged probabilities for the two different shift operators respectively. It is found that the probability distributions for the moving and swapping shift operators display completely different characteristics. For the moving shift operator, the probability distribution exhibits high symmetry where the probabilities at mirror positions are equal. The probabilities are inversely proportional to the system size N and approach to zero as N→∞. On the contrary, for the swapping shift operator, the probability distribution is not symmetric, the probability distribution approaches to a power-law stationary distribution as N→∞ under certain coin parameter condition. We show that such power-law stationary distribution is determined by the eigenstates of the eigenvalues ±1 and calculate the intrinsic probability for different starting positions. Our findings suggest that the eigenstates corresponding to eigenvalues ±1 play an important role for the swapping shift operator. - Highlights: • QWs on 1D chain with the moving and swapping operators are studied for the first time. • We derive analytical results for the probability distribution for the two operators. •We compare the dynamics of QWs with two different shift operators. • We find the particular eigenvalues ±1 play an important role for the dynamics. • We use the Chebyshev technique to treat the problem.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Economic optimization of operations for hybrid energy systems under variable markets

We prosed a hybrid energy systems (HES) which is an important element to enable increasing penetration of clean energy. Our paper investigates the operations flexibility of HES, and develops a methodology for operations optimization for maximizing economic value based on predicted renewable generation and market information. A multi-environment computational platform for performing such operations optimization is also developed. In order to compensate for prediction error, a control strategy is accordingly designed to operate a standby energy storage element (ESE) to avoid energy imbalance within HES. The proposed operations optimizer allows systematic control of energy conversion for maximal economic value. Simulation results of two specific HES configurations are included to illustrate the proposed methodology and computational capability. These results demonstrate the economic viability of HES under proposed operations optimizer, suggesting the diversion of energy for alternative energy output while participating in the ancillary service market. Economic advantages of such operations optimizer and associated flexible operations are illustrated by comparing the economic performance of flexible operations against that of constant operations. Sensitivity analysis with respect to market variability and prediction error, are also performed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗