Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Tank Farm”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Investigation of Thermolytic Hydrogen Generation Rate in Tank 44 Dissolved Saltcake Samples

Saltcake core samples collected from Tank 44 in 2006 were dissolved to provide material for HGR measurements applicable to F-Area dissolved saltcake material. Additionally, characterization was performed on the Tank 44 saltcake material. The following are key results from the Tank 44 saltcake characterization. The Tank 44 Upper Saltcake Composite, corresponding to the 171 to 285 inch tank level, contained by mass approximately 69% sodium nitrate, 11% sodium carbonate, 8% sodium nitrite, smaller amounts of other salts and components, and 9% unquantified (which includes water, water of hydration, oxygen/hydrogen content of oxides and hydroxides, and uncertainty). The Tank 44 Lower Saltcake Composite, corresponding to the 76 to 114 inch tank level, contained by mass approximately 49% sodium carbonate, 18% sodium nitrate, smaller amounts of other salts, at least 8% sludge, and 9% unquantified (see above). The dissolved saltcake contained free hydroxide less than quantifiable (<0.01 M) due to the limited quantity of material that could be removed from the Shielded Cells based on the sample radioactivity. Measurement by pH paper provided an approximate pH of 12. The following are key results from the Tank 44 HGR testing. During boiling at 106.7 °C, HGR for Tank 44 dissolved saltcake without added glycolate was 7.2×10 -8 ft 3 h -1 gal -1 . During boiling at 106.9 °C, HGR for Tank 44 dissolved saltcake with 1000 mg/L of added glycolate was 8.2×10 -8 ft 3 h -1 gal -1 . For the test without added glycolate, the first several HGR measurements at 70, 85, and 100 °C gave indication of the release of dissolved hydrogen and should not be used to represent the sustained thermolytic HGR for those temperatures. The measurements at boiling are the best representation of thermolysis in this testing. Carbon dioxide was observed at concentrations up to 6 vol% in the flow-system offgas for the test at boiling. Methane generation was observed at 100 °C and boiling. Methane concentration in the total gas generated during testing remained well below the lower flammability limit for methane in air. The addition of 1000 mg/L of glycolate did not have a significant impact on the hydrogen generation rates measured during this testing. The low hydroxide concentration in the Tank 44 dissolved saltcake likely influenced the relatively low thermolytic HGR and high carbon dioxide release observations in this testing. Based on the observation that methane was generated or released upon heating SRS radioactive Tank 44 waste samples to 100 °C and above, we recommend gaining a greater understanding of the cause and mechanism of its generation. First, the applicable literature should be reviewed to reveal the thermolytic methane generation mechanisms of possible methane generating species in the SRS CSTF. If warranted, a plan should be developed for simulant tests with methylated siloxanes and other applicable compounds in order to gain a better mechanistic understanding of methane generation in the SRS CSTF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2020. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2020 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Resource Conservation and Recovery Act↗

Characterization of Infrequent Samples from the Concentration, Storage, and Transfer Facility: H-Area Diversion Box 7 (HDB-7) Sump Sample: December 2021 Sample

In December 2021, SRR-E sent an ~250 mL sample identified as HDB-7 from an H-Area diversion box sump to SRNL for analysis. The sample was clear and colorless and free from any solids. SRNL analysis indicated that the sample contained 2.97E+05 dpm/mL Cs-137, 3.74E+05 dpm/mL total beta activity, 1.04E+03 dpm/mL beta activity following cesium removal, and below detectable levels of alpha activity and alpha activity following cesium removal. In addition, the pH of the sample was 7.32, free hydroxide concentration was 2.09E-07 M, and the density was 0.991 g/mL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Defense Waste Processing Facility Sample: Recycle Collection Tank Sample Batch 4945

The Savannah River National Laboratory (SRNL) was requested by Savannah River Remediation (now Savannah River Mission Completion (SRMC)), through a Technical Task Request, to characterization the “as-received” Recycle Collection Tank (RCT) Sample identified as sample batch 4945 [Sludge Receipt and Adjustment Tank (SRAT) batch 796)], which was delivered to SRNL Shielded Cells on January 28, 2021. The RCT characterization data will be used as input to the Defense Waste Processing Facility (DWPF) Recycle Diversion Project. This RCT report is the first of three sample characterization reports that will be used for this DWPF Project. The other DWPF reports will involve the characterization of the Off-Gas Condensate Tank (OGCT) and the Slurry Mix Evaporator Condensate Tank (SMECT) samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Defense Waste Processing Facility Sample: Off-Gas Condensate Tank Sample Batch 27862

The Savannah River National Laboratory (SRNL) was requested by Savannah River Remediation (now Savannah River Mission Completion (SRMC)), through a Technical Task Request (X-TTR-H-00107), to characterize the “as-received” Off-Gas Condensate Tank (OGCT) Sample identified as sample batch 27862, which was delivered to SRNL Shielded Cells on April 30, 2021. This OGCT report is the third of three sample characterization reports dealing with this Defense Waste Processing Facility (DWPF) Recycle Diversion Project. The other two recycling stream characterization reports are the Recycle Collection Tank (RCT) and the Slurry Mix Evaporator Condensate Tank (SMECT) sample report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Defense Waste Processing Facility Sample: Slurry Mix Evaporator Condensate Tank Sample Batch 4638

The Savannah River National Laboratory (SRNL) was requested by Savannah River Remediation (SRR, now Savannah River Mission Completion (SRMC)), through a Technical Task Request, to characterization the “as-received” Slurry Mix Evaporator Condensate Tank (SMECT) sample identified as sample batch 4638, which was delivered to SRNL Shielded Cells on March 19, 2021. The SMECT characterization data will be used as input to the Defense Waste Processing Facility (DWPF) Recycle Diversion Project. This SMECT report is the second of three sample characterization reports that will be used for this DWPF Project. The other two DWPF characterization reports involve the characterization of the Recycle Collection Tank (RCT) sample and the future Off-Gas Condensate Tank (OGCT) characterization report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2021

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2021. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2021 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11

Savannah River Nuclear Solutions has a need to discard spent nuclear fuel (SNF), currently stored in L Basin, to the Defense Waste Processing Facility (DWPF) for vitrification. The Department of Energy (DOE) has approved the Accelerated Basin De-inventory (ABD) Program for discarding SNF via transfers from H-Canyon to the Savannah River Site (SRS) Liquid Waste (LW) system. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. An initial impact evaluation of the LW flowsheet was performed by the Savannah River National Laboratory (SRNL) prior to the approval of the ABD Program. This evaluation addressed the LW downstream facilities based on the current H-Canyon flowsheet sequence for the average ABD discard. The flowsheet evaluation only included aluminum-clad SNF, specifically Materials Test Reactor (MTR) fuel and High Flux Isotope Reactor (HFIR) fuel similar to the planned SB11 discard. Following this evaluation, the flowsheet has been slightly altered to address (i) new nuclear criticality safety controls for DWPF that credit a higher amount of gadolinium as a neutron poison for all of the enriched uranium contained in a SB and (ii) potential additions of the H-Canyon neutralized fuel stream prior to the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51. The early introduction of ABD material into the SB assembly process is being investigated to provide flexibility regarding transfer opportunities for H-Canyon to Tank 51 for SB11 and future sludge batches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11 (Rev. 1)

The Accelerated Basin De-inventory (ABD) program involves discarding spent nuclear fuel that is currently stored in L-Basin to the Defense Waste Processing Facility (DWPF) for vitrification. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. Savannah River Mission Completion has requested that the Savannah River National Laboratory assess the technical gaps related to the increased gadolinium poisoning requirement and the impacts of performing the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51 with H-Canyon discards present. The following summarizes the evaluation of the impacts of increasing the quantity of gadolinium (and related topics) from what was previously evaluated in the SRNL studies of gadolinium-poisoned ABD material solubility, the overall ABD flowsheet review, and increasing the fissile mass loading in glass: 1) Based on literature surveys, there is no indication that organic interactions with gadolinium will be significant at the high pH (typically >13) conditions of the Concentration, Storage, and Transfer Facilities. Any interactions of gadolinium with organics in DWPF are not expected to adversely impact DWPF or downstream facilities. Thus, there is little-to-no residual risk from organic interactions with gadolinium [Gap closed]; 2) Adding depleted uranium to ABD material, targeting 235 U enrichment of 4.90% within each transfer window, will mitigate potential impacts from an increase in soluble 235 U enrichment during sludge washing and LTAD. The plan to take advantage of previous transfers and allow 235 U enrichment of >5% during the final transfer window carries a risk that Tank 51 supernate will have a 235 U enrichment of >5%, which should be evaluated for acceptance; 3) Increasing the gadolinium mass ratio to 3.0:1 Gd: 235 U(eq SLU ) should lead to the same or higher partitioning of gadolinium into the solid phase within the DWPF Chemical Process Cell, resulting in both liquid and solid phases with expected partitioning of Gd consistent with the prior solubility study [Gap closed for SB11]; 4) There are no expected impacts on DWPF melt temperature and melter operations due to the minimal ~0.2 weight percent (wt%) increase in Gd concentration relative to previous sludge batches [Gap closed for SB11]; 5) As observed previously, Gd is expected to enter the off-gas system via physical entrainment, but at a slightly higher concentration than what was observed for SB9 melter off-gas pluggage deposits (0.07 wt%) [Gap closed for SB11] ; 6) There are no expected impacts on DWPF recycle or the Recycle Collection Tank glycolate destruction process. [Gap closed for SB11]; 7) Gd is projected to be a trace component in the SB11 glass (<0.5 wt%) and can be ignored for process control. Trace components do not significantly impact glass durability, thus the conclusions of the previous Product Consistency Test evaluation at a fissile mass loading of 2,500 g fissile/m3 glass still applies to SB11. The ~0.1 wt% increase in Gd2O3 concentration relative to the previous study will not impact the predictability of SB11 glass with the DWPF Product Composition Control System (PCCS) models for durability or the acceptability of glass according to the Waste Acceptance Product Specifications (WAPS) criterion for product consistency [Gap closed for SB11]; 8) No additional Toxicity Characteristic Leaching Procedure testing is necessary for SB11 and the hazardous waste specification of the SB11 DWPF waste form is unchanged after the addition of the ABD stream [Gap closed for SB11]. The following summarizes the evaluation of the impacts of adding two-thirds of the ABD material to Tank 51 prior to LTAD: 1) The addition of two-thirds of the ABD increases overall aluminum mass from 1.39×10 4 kg to 1.64×10 4 kg (15.5% ABD Al). The form of the insoluble portion of the Al resulting from ABD addition should be the more readily dissolved Al(OH) 3 and amorphous forms. The portion of the ABD aluminum that is processed by LTAD is expected to be completely soluble, thus requiring that less of the boehmite in the sludge be dissolved to reach the same Al target in the SB. [Gap closed for SB11]; The expected LTAD impact on other components, as related primarily to the components in ABD, are discussed. Gd is expected to remain insoluble during LTAD and not impact the solubility of other components. [Gap closed for SB11]; The addition of two-thirds of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 13,100 kg (63% ABD U) and the projected plutonium mass from 86.0 kg to 89.5 kg (3.9% ABD Pu). The addition of all of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 16,100 kg (70% ABD U) and the projected plutonium mass from 86.0 kg to 90.4 kg (5.3% ABD Pu). The 235 U enrichment will be ≤5%. The fissile uranium will be adequately poisoned by Gd and the fissile Pu will be adequately poisoned by Fe from the sludge. [Gap closed for SB11]; There is a low risk that ABD addition will impact the rheology or pumpability of the slurry. There is a low but higher risk of ABD addition prior to LTAD impacting the settling rate; Based on the evaluation of adding two-thirds of the ABD material and all of the ABD material prior to the LTAD process, there is no volume or mass limit that would need to be imposed on ABD additions prior to LTAD. [Gap closed for SB11]. Revision 1 of this report addresses a variation on the ABD additions and LTAD strategy where sodium hydroxide additions for LTAD may be performed intermittently or concurrently with an ABD addition window. The proposed change does not alter the conclusions of this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Potential Routes for Titanium and Mercury Concentrations within Salt Waste Processing Facility

Savannah River National Laboratory (SRNL) has been requested by Savannah River Mission Completion (SRMC)/ Salt Waste Processing Facility (SWPF) personnel to investigate the potential routes for titanium and mercury accumulations within the SWPF Flowsheet. The first part of this work examined how various forms of mercury can migrate through the solvent extraction system. This entailed single stage distribution tests, a multi-stage Extraction-Scrub-Strip (ESS) test, and a detailed speciation analysis of several salt batch feed samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 35

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 35 characterization analyses in support of Sludge Batch 11 (SB11) assembly. Two Tank 35 samples were delivered to SRNL and composited into a single sample in April 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 15

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 15 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 15 prior to transfer from Tank 15 to Tank 13 (prior to sending to Tank 51) in order to demonstrate that the transfer is "Low Rem" and ensure the sludge concurs with the estimated transfer mass for the SB11 recipe. A total of 3 sets of Tank 15 samples were delivered to SRNL from December 2022 to August 2023. The individual sets of composite samples were analyzed for density, weight percent solids, chemical composition, radionuclides, and/or supernate corrosion control tests.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sludge Batch 11 Assembly: Tank 26

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 26 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 26 prior to transfer from Tank 26 to Tank 51 that confirms the transfer is "Low Rem" and ensures the sludge concurs with the estimated transfer mass for the SB11 recipe. Two Tank 26 samples were delivered to SRNL and composited into a single sample in September 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite. The slurry was also evaluated for sulfate washing behavior in order to provide knowledge on insoluble sulfate dissolution during Tank 51 sludge washing similar to a previous washing study performed in 2019. The Tank 26 sample results are consistent with and representative of PUREX sludge and the prior usage of Tank 26 as a feed tank for the 1F and 2F Evaporators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 35

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 35 characterization analyses in support of Sludge Batch 11 (SB11) assembly. Two Tank 35 samples were delivered to SRNL and composited into a single sample in April 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 11 Assembly: Tank 26 (Rev.1)

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 26 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 26 prior to transfer from Tank 26 to Tank 51 that confirms the transfer is "Low Rem" and ensures the sludge concurs with the estimated transfer mass for the SB11 recipe. Two Tank 26 samples were delivered to SRNL and composited into a single sample in September 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite. The slurry was also evaluated for sulfate washing behavior in order to provide knowledge on insoluble sulfate dissolution during Tank 51 sludge washing similar to a previous washing study performed in 2019. The Tank 26 sample results are consistent with and representative of PUREX sludge and the prior usage of Tank 26 as a feed tank for the 1F and 2F Evaporators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analytical Results of the Tank 51H Sludge Batch 11 As-Received Qualification Sample

Savannah River National Laboratory (SRNL) has been requested by Savannah River Mission Completion (SRMC) to qualify the next sludge batch, Sludge Batch 11 (SB11), for processing at the Defense Waste Processing Facility (DWPF). This report documents the first steps of the qualification process, characterization of the Tank 51H as-received qualification material. SRMC sent SRNL two 200 mL samples received from Tank 51H on the 12th of August 2024. The combined sample, HTF-51-24-85/86, was analyzed for the following: supernate and slurry density, weight percent solids, settling, chemical composition, and radionuclides.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 15H Sample in Support of Preliminary Cease Waste Removal and Closure Mode Determination

The Savannah River National Laboratory (SRNL) was requested by Savannah River Mission Completion (SRMC) to provide sample preparation and analysis of Tank 15H characterization samples. These samples follow an interest in exploring avenues to condense the extensive sampling of the Tank Closure process. One such pathway would be to collect a sample during an earlier waste removal campaign for analysis to determine comparability to the later residual tank inventory determined through Residual Material sampling and characterization prior to grouting. Six Tank 15H samples (HTF-15-24-9, HTF- HTF-15-24-10, HTF-15-24-11, HTF-15-24-12, HTF&#x2;15-24-13, and HTF-15-24-14) were delivered to SRNL in May of 2024. These six Tank 15H samples were taken as close as possible to the solids layer of the Tank 15H. These six Tank 15H samples were combined to form one composite sample for characterization due to the lack of sufficient solids fraction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 9H Annulus Sample in Support of Residual Material Inventory Determinations

The Savannah River National Laboratory (SRNL) was requested by Savannah River Mission Completion (SRMC) to provide sample preparation and characterization of the Tank 9H annulus sample in support of Residual Material Inventory Determinations. One Tank 9H sample in three vials [HTF-9-25-13, HTF-9-25-14 and HTF-9-25-15], with each vial containing approximately 200 mL of the Tank 9H annulus salt solution, were delivered to the SRNL Shielded Cells for sample preparation and characterizations in February 2025. The density of the “as-received” solution contained in each of the three Tank 9H annulus sample vials were determined followed by a solid-liquid separation on each one using 0.45-micron Nalgene® nylon filter membranes. The resulting filtrates were combined to form the Tank 9H annulus sample with a total volume of about 600 mL. The combined wet solid fractions, about a total of 4.8 grams of salt material, remaining on the filter membranes were air-dried in the Shielded Cells for 72 hours. The total weight of the air-dried solids was 2.1 grams. These air-dried solids were washed with deionized water (DI water) at a phase ratio of 60 mL DI water/gram of solids to recover insoluble solids, if any. No visible or measurable quantity of insoluble solids were recovered after DI water washing of the air-dried solids because the air-dried solids completely dissolved in the DI water. The solid fraction-wash water was not combined with the 600 mL of the filtrate solution, and the resulting solution was not screened or analyzed for radionuclides. Aliquot sample volumes of the undiluted Tank 9H annulus sample were sent to the SRNL analytical services groups for radionuclides, elementals, anions and total mercury analysis by various methods including radiochemical separations/counting methods, inductively coupled plasma-atomic emission spectroscopy (ICP-AES), and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) and special preparations. All sample analyses were performed in triplicate. This report presents the analytical characterization results for the Tank 9H annulus sample. The results are also reported where analytical methods yielded additional analytes, other than those requested by SRMC. In the characterization of the Tank 9H annulus sample, the detection limits for all the analytes, as specified in the Technical Task Request (TTR) and Task Technical and Quality Assurance Plan (TTQAP), were met.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗