Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scheduling and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

A Successful Infusion Process for Enabling Lunar Exploration Technologies

The NASA Vision for Space Exploration begins with a more reliable flight capability to the International Space Station and ends with sending humans to Mars. An important stepping stone on the path to Mars encompasses human missions to the Moon. There is little doubt throughout the stakeholder community that new technologies will be required to enable this Vision. However, there are many factors that influence the ability to successfully infuse any technology including the technical risk, requirement and development schedule maturity, and, funds available. This paper focuses on effective infusion processes that have been used recently for the technologies in development for the lunar exploration flight program, Constellation. Recent successes with Constellation customers are highlighted for the Exploration Technology Development Program (ETDP) Projects managed by NASA Glenn Research Center (GRC). Following an overview of the technical context of both the flight program and the technology capability mapping, the process is described for how to effectively build an integrated technology infusion plan. The process starts with a sound risk development plan and is completed with an integrated project plan, including content, schedule and cost. In reality, the available resources for this development are going to change over time, necessitating some level of iteration in the planning. However, the driving process is based on the initial risk assessment, which changes only when the overall architecture changes, enabling some level of stability in the process.

Over, Ann P.↗

Verifying command sequences for satellite systems

We present a formal basis for the design of a Checker used in validating safe schedules and in selecting error recovery schedules for satellite control systems. This design includes a high-level specification of Checker behavior and properties (called flight rules) of safe schedules. Specifications are written in Timed Linear Logic (TLL). Validation of schedules is performed in terms of real-time telemetry and deduction system proof rules. Telemetry (state information for satellite subsystems) serves as input to the Checker. Detection of violation of a flight rule by the Checker results in the selection of a contingency plan (error recovery schedule). The Checker is illustrated in terms of the TOPEX/Poseidon Oceanographic Satellite System.

Peters, James F., III↗

Astrometric Telescope Facility - Status report

The advent of the Space Station Program has provided an unexpected opportunity for the Astrometric Telescope Facility (ATF) study program by providing a potential long-duration on-orbit serviceable platform. It required a concept change for ATF from a free-flyer observatory to a Space-Station-based Observatory. The program was sent in this new direction at the start of fiscal year 1985, and program plans including study schedules and science and technical requirements are being revised and defined. The facility is designed to be versatile and capable of fulfilling the primary goal of planet detection, and to be highly useful for other astrophysics observations. Basically the ATF observing program is a long-duration plan requiring repetitive observations of single stars over a one to two decade period. These repetitive observations are needed to provide data necessary to conclusively determine the existence (or nonexistence) of planets of the Uranus and Neptune class in extrasolar planetary systems.

Nishioka, K.↗

The key to successful management of STS operations: An integrated production planning system

Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

Johnson, W. A.↗

Flight software issues in onboard automated planning: lessons learned on EO-1

This paper focuses on the onboard planner and scheduler CASPER, whose core planning engine is based on the ground system ASPEN. Given the challenges of developing flight software, we discuss several of the issues encountered in preparing the planner for flight, including reducing the code image size, determining what data to place within the engineering telemetry packet, and performing long term planning.

planning↗

NASA management of the Space Shuttle Program

The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.

Peters, F.↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

Automated maneuver planning using a fuzzy logic algorithm

Spacecraft orbital control requires intensive interaction between the analyst and the system used to model the spacecraft trajectory. For orbits with right mission constraints and a large number of maneuvers, this interaction is difficult or expensive to accomplish in a timely manner. Some automation of maneuver planning can reduce these difficulties for maneuver-intensive missions. One approach to this automation is to use fuzzy logic in the control mechanism. Such a prototype system currently under development is discussed. The Tropical Rainfall Measurement Mission (TRMM) is one of several missions that could benefit from automated maneuver planning. TRMM is scheduled for launch in August 1997. The spacecraft is to be maintained in a 350-km circular orbit throughout the 3-year lifetime of the mission, with very small variations in this orbit allowed. Since solar maximum will occur as early as 1999, the solar activity during the TRMM mission will be increasing. The increasing solar activity will result in orbital maneuvers being performed as often as every other day. The results of automated maneuver planning for the TRMM mission will be presented to demonstrate the prototype of the fuzzy logic tool.

Conway, D.↗

Progress in Scheduling Algorithms for a Collaborative Distributed System for Flight Planning

This Technical Memorandum describes four contributions made by the authors to a larger team effort toward developing a distributed system for scheduling commercial flights at navigation fixes and/or airport runways. These contributions are as follows: (1) a proof of correctness for a scheduling algorithm published previously by Meyn, (2) an improvement of Meyn's algorithm from quadratic to linear time, (3) two independent implementations of the algorithm with test results identical to those published, and (4) an extension of Meyn's algorithm to support minimum usable time intervals.

arrival scheduling↗

ASTROMAG coil cooling study

ASTROMAG is a planned particle astrophysics magnetic facility. Basically it is a large magnetic spectrometer outside the Earth's atmosphere for an extended period of time in orbit on a space station. A definition team summarized its scientific objectives assumably related to fundamental questions of astrophysics, cosmology, and elementary particle physics. Since magnetic induction of about 7 Tesla is desired, it is planned to be a superconducting magnet cooled to liquid helium 2 temperatures. The general structure of ASTROMAG is based on: (1) two superconducting magnetic coils, (2) dewar of liquid helium 2 to provide cooling capability for the magnets; (3) instrumentation, matter-anti matter spectrometer (MAS) and cosmic ray isotope spectrometer (CRIS); and (4) interfaces to the shuttle and space station. Many configurations of the superconducting magnets and the dewar were proposed and evaluated, since those are the heart of the ASTROMAG. Baseline of the magnet configuration and cryostat as presented in the phase A study and the one kept in mind while doing the present study are presented. ASTROMAG's development schedule reflects the plan of launching to the space station in 1995.

Maytal, Ben-Zion↗

DOE Hanford Tank Side Cesium Removal System (TSCR) Update: Fabrication and Factory Acceptance Testing - 20300

The Tank Side Cesium Removal (TSCR) System is a modular, quickly-deployable, and passively safe system for efficiently removing solids and cesium from alkaline liquid waste raffinate created by fuel processing on the Hanford site. This paper provides an overview of the project with particular emphasis on completion of fabrication and factory acceptance testing (FAT). All TSCR System components are inside three enclosures known as the Process Enclosure, Ancillary Enclosure, and Control Enclosure. The Process Enclosure is seismic design category II (SDC-II) and built to withstand the rigors of transportation and lifting, high winds, volcanic ash fall, and heavy precipitation (snow) over a temperature range of -25 to 115 deg. F. The Process Enclosure and Control Enclosure were fabricated in AVANTech's Columbia, SC facility, while the Ancillary Enclosure was fabricated in AVANTech's Richland, WA facility. The design and preliminary documented safety analysis were completed in December 2019, with all work being performed in accordance with ASME NQA-1 quality assurance requirements. The Process Enclosure, Ion Exchange Columns (IXCs), and several other TSCR components have a nuclear safety function and are designated as safety significant structures, systems, and components (SS-SSCs). The NQA-1 Commercial Grade Dedication (CGD) process was used to identify critical characteristics in order to accept materials and items used for fabrication of several safety significant TSCR components. This paper also addresses unique aspects and challenges of implementing CGD in DOE facilities and systems. After fabrication and preliminary testing, the Process and Control Enclosures were shipped to AVANTech's Richland facility where the complete TSCR System was setup and connected in a represented layout and configuration that will be used on the Hanford site. Test tanks and pumps were put in place and connected to the TSCR Process Enclosure in a manner that mimicked interfacing Double Shell Tanks in the 241-AP Tank Farm. The TSCR System was then tested/operated under conditions equivalent to those planned for onsite operation. Testing was separated into five separate phases as defined below: - Phase 1: Confirmation of TSCR System readiness for the FAT; - Phase 2: Verification of TSCR System operation under standard conditions; - Phase 3: Demonstration of TSCR System operation under non-standard conditions; - Phase 4: Demonstration of ion exchange media removal from an IXC; and - Phase 5: Completion of TSCR System lift plans and site mobilization. The Hanford Tank Operations Contractor, Washington River Protection Solutions (WRPS), participated in all phases of testing. Testing at AVANTech's Richland Facility allowed WRPS personnel to familiarize themselves with TSCR operations in a radiologically clean facility prior to onsite mobilization. Engineering and operations personnel gained valuable experience that allowed them to better refine onsite operational protocols and procedures - including handling and movement of IXCs with a forklift. This paper describes the technologies used by the TSCR System as well as how these technologies are deployed and operated to advance the Hanford mission of safely, efficiently, and effectively treating tank waste. It also provides detailed information on fabrication and FAT, including operational data from simulated tank waste runs. A project schedule for WRPS' planned construction acceptance testing, operational acceptance testing, and actual tank waste treatment is provided. This presentation should be of great interest to parties responsible for the design, testing, and mobilization of modular NQA-1 technologies for the treatment of raffinate and similar liquid wastes containing high concentrations of radioactive cesium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project M: Scale Model of Lunar Landing Site of Apollo 17: Focus on Lighting Conditions and Analysis

This document captures the research and development of a scale model representation of the Apollo 17 landing site on the moon as part of the NASA INSPIRE program. Several key elements in this model were surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. This model supports development of Autonomous Landing and Hazard Avoidance Technology (ALHAT) and Project M for the GN&C Autonomous Flight Systems Branch. It will help project engineers visualize the landing site, and is housed in the building 16 Navigation Systems Technology Lab. The lead mentor was Dr. Timothy P. Crain. The purpose of this project was to develop an accurate scale representation of the Apollo 17 landing site on the moon. This was done on an 8'2.5"X10'1.375" reduced friction granite table, which can be restored to its previous condition if needed. The first step in this project was to research the best way to model and recreate the Apollo 17 landing site for the mockup. The project required a thorough plan, budget, and schedule, which was presented to the EG6 Branch for build approval. The final phase was to build the model. The project also required thorough research on the Apollo 17 landing site and the topography of the moon. This research was done on the internet and in person with Dean Eppler, a space scientist, from JSC KX. This data was used to analyze and calculate the scale of the mockup and the ratio of the sizes of the craters, ridges, etc. The final goal was to effectively communicate project status and demonstrate the multiple advantages of using our model. The conclusion of this project was that the mockup was completed as accurately as possible, and it successfully enables the Project M specialists to visualize and plan their goal on an accurate three dimensional surface representation.

Vanik, Christopher S.↗

Deep space network resource scheduling approach and application

Deep Space Network (DSN) resource scheduling is the process of distributing ground-based facilities to track multiple spacecraft. The Jet Propulsion Laboratory has carried out extensive research to find ways of automating this process in an effort to reduce time and manpower costs. This paper presents a resource-scheduling system entitled PLAN-IT with a description of its design philosophy. The PLAN-IT's current on-line usage and limitations in scheduling the resources of the DSN are discussed, along with potential enhancements for DSN application.

Eggemeyer, William C.↗

GEOTAIL Spacecraft historical data report

The purpose of this GEOTAIL Historical Report is to document ground processing operations information gathered on the GEOTAIL mission during processing activities at the Cape Canaveral Air Force Station (CCAFS). It is hoped that this report may aid management analysis, improve integration processing and forecasting of processing trends, and reduce real-time schedule changes. The GEOTAIL payload is the third Delta 2 Expendable Launch Vehicle (ELV) mission to document historical data. Comparisons of planned versus as-run schedule information are displayed. Information will generally fall into the following categories: (1) payload stay times (payload processing facility/hazardous processing facility/launch complex-17A); (2) payload processing times (planned, actual); (3) schedule delays; (4) integrated test times (experiments/launch vehicle); (5) unique customer support requirements; (6) modifications performed at facilities; (7) other appropriate information (Appendices A & B); and (8) lessons learned (reference Appendix C).

Boersig, George R.↗

2020 Exascale Computing Project Annual Meeting (Executive Summary Report)

The Exascale Computing Project (ECP) delivers specific applications, software products, and outcomes on DOE computing facilities. Integration across these elements for specific hardware technologies for exascale system instantiations is fundamental to ECP success. The outcome of the ECP is the delivery of a capable exascale computing ecosystem to provide breakthrough solutions addressing our most critical challenges in scientific discovery, energy assurance, economic competitiveness, and national security. This outcome is not a matter of ensuring more powerful computing systems. The ECP is designed to create more valuable and rapid insights from a wide variety of applications (“capable”), which requires a much higher level of inherent efficacy in all methods, software tools, and ECP-enabled computing technologies to be acquired by DOE laboratories (“ecosystem”). The ECP annual meeting provides a unique opportunity for the core technical expertise in the United States focused on achieving this next plateau of computational science and computing performance to engage in direct discussions on project execution. Face-to-face gatherings in technical communities like this are common and needed for the exchange of scientific ideas and technical performance. The ECP annual meeting stands apart from other technical conferences and meetings in the computing community as it is uniquely and solely focused on the execution of the ECP and the integration of technical activities leading to the creation of the exascale computing ecosystem for the future. The direct interaction of key critical technical staff, who are leaders in their respective fields, and the resulting give-and-take between software, applications, and hardware and the technical co-design therein, is unique and essential to the effective execution of the ECP. The first annual meeting was held in Knoxville, Tennessee, January 31 – February 2, 2017 and brought together, for the first time, a diverse collection of researchers from 16 DOE national laboratories as well as university computer and computational science researchers to discuss shared problems and joint solutions for the development of a capable exascale computing ecosystem. These interactions resulted in focused technical plans and an energized community centered on advances for ECP. The second annual meeting was held in Knoxville, Tennessee, February 5–9, 2018. It included 643 individual thought leaders and performers in application development, software research and deployment, and hardware research and integrators, all of whom are part of the multifaceted, billion dollar HPC community. This meeting provided a platform to discuss and disseminate numerous examples where researchers with common goals and synergistic solutions came together for the first time to deliver tangible results. Additionally, at the 2018 meeting, ECP researchers had the opportunity to digest all US HPC vendor R&D product roadmaps pointing to exascale – not only to learn how their research can play a role, but, more importantly, to influence those roadmaps to ensure successful delivery on DOE applications that will contribute to (if not solve) problems of national interest in national security, science, energy, and health, as well as growing security threats. The third annual meeting was held in Houston, Texas, January 14–17, 2019. With a 19% increase in the number of registrations (768 people), and the change in location, the third annual meeting was considered the most impactful of the three at the time. The new website provided a better platform for the dissemination of the content, the new venue as a meeting hotel instead of a conference center facilitated interactions and discussions after event hours, and the addition of an award-winning mobile event conference app (Whova) transformed dramatically the attendee experience at the event. This fourth annual meeting was held in Houston, Texas, February 3-7, 2020. This meeting had an increase in the number of attendees for a total of 824 people registered (782 attendees) and included numerous enhancements based on feedback and lessons learned from previous meetings, some of which are listed here: Improved quality of the sessions, their material and the whole program.; Had more industry participation and addition of external collaborators from overseas.; Published the full agenda earlier to better accommodate attendance and travel plans based on schedule.; Centralized all sessions in one venue.; Provided additional hotels and room blocks for the attendees.; Improved communication with the audience (links, material, directions, notifications, etc.) to go paperless.; Enhanced side meeting scheduling, management and user experience.; Made available additional space and tables for impromptu meetings and side discussions.; Improved IT and A/V solutions for speakers. In addition, our final survey captured the following points as opportunities for improvement in future meetings: consider a different meeting location that is more pedestrian friendly, reduce talks during working meals to allow more collaboration and informal time, adapt the agenda to acknowledge attendees from different timezones, consider recording some of the tutorials and/or sessions to share broadly with the HPC community, have a larger poster room, provide additional power strips, and improve the WiFi.

97 MATHEMATICS AND COMPUTING↗

Facility Energy Saving and Securing Technology Using Multi-Source Data (FEST) (Final Report)

Facility Energy Saving and Securing Technology (FEST) project focuses on developing algorithmic tools and techniques for analyzing cyber-physical security of DoD’s military site facilities, and optimal scheduling, operation and planning of their Distributed Energy Resources (DER). The project is led by LLNL with the team including University of Michigan-Dearborn and XENDEE. The military site partner providing the energy metering data is White Sands Missile Range (WSMR). This report summarizes the work performed during the project and future directions for follow-on research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Doppler Lidar Motion-Correction Wind Profiles (DLMCPROF-WIND) Value-Added Product Report

Wind speed and direction, together with pressure, temperature, and relative humidity, are the most fundamental atmospheric state parameters. Accurate measurement of these parameters is crucial for numerical weather prediction. Vertically resolved wind measurements in the atmospheric boundary layer are particularly important for modeling pollutant and aerosol transport. The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility currently operates several scanning coherent Doppler lidar (DL) systems that provide accurate height-resolved measurements of wind speed and direction. These instruments operate in the near infrared (IR;1.5 microns) and provide range-resolved measurements of radial velocity, attenuated aerosol backscatter, and signal-to-noise ratio (SNR). The systems are operated using a fixed scan schedule consisting of plan position indicator (PPI) or Doppler Beam-Swing (DBS) scans. PPI scans are performed by scanning the beam in azimuth while maintaining a fixed elevation angle, and DBS scans are similar but typically also include a vertical beam. Radial velocity data from these scans are processed to yield profiles of wind speed direction. For stationary ground-based deployments, the Doppler Lidar Horizontal Wind Profiles (DLPROF-WIND) Value-Added-Product (VAP) provides height- and time-resolved measurements of the winds (Newsom and Krishnamurthy 2022). For operation on a moving platform, modifications to the existing DLPROF-WIND VAP are required to compensate for the effects of the platform motion. This report describes a parallel VAP, DLMCPROF-WIND, that was developed for computing motion-compensated wind profiles from ARM Doppler lidar data acquired during the Multidisciplinary drifting Observatory for the Study of Arctic Climate (MOSAiC) campaign, when the lidar was deployed on the German icebreaker Polarstern.

54 ENVIRONMENTAL SCIENCES↗

Summary of FY 2024 A709 Code Case testing at ANL, INL and ORNL

A collaborative research and development effort in support of the Alloy 709 Code Case qualification in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section III, Division 5, High Temperature Reactors is being carried out at Oak Ridge National Laboratory (ORNL), Idaho National Laboratory (INL), and Argonne National Laboratory (ANL). Key testing data for the Alloy 709 100,000-hr near-term Code Case submittal to ASME is expected to be completed by the end of 2024, with design parameters anticipated to be finalized in FY 2025. This report summarizes the testing results for three commercial heats of Alloy 709 conducted across three laboratories, reviews the current testing status, and outlines the remaining data needed to support the first Alloy 709 Code Case submittal to ASME. The Alloy 709 Code Case plan remains on schedule.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗