Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Safety Case”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Finite toroidal flow generated by unstable tearing mode in a toroidal plasma

The neoclassical toroidal plasma viscosity torque and electromagnetic torque, generated by tearing mode (TM) in a toroidal plasma, are numerically investigated using the MARS-Q code [Liu et al., Phys. Plasmas 20, 042503 (2013)]. It is found that an initially unstable tearing mode can intrinsically drive a toroidal plasma flow resulting in a steady state solution, in the absence of the external momentum input and external magnetic field perturbation. The saturated flow is in the order of 0.5%ω{sub A} at the q=2 rational surface in the considered case, with q and ω{sub A} being the safety factor and the Alfven frequency at the magnetic axis, respectively. The generation of the toroidal flow is robust, being insensitive to the given amplitude of the perturbation at initial state. On the other hand, the flow amplitude increases with increasing the plasma resistivity. Furthermore, the initially unstable tearing mode is fully stabilized by non-linear interaction with the self-generated toroidal flow.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Risk-Informed ATF and FLEX Analysis for an Enhanced Resilient BWR Under Design-Basis and Beyond-Design-Basis Accidents

This report documents the activities performed by the Idaho National Laboratory (INL) during fiscal year (FY) 2020 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk-Informed System Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. The purpose of the RISA Pathway research and development is to support plant owner-operator decisions with the aim to improve the economics, reliability, and maintain the high levels of safety of current nuclear power plants over periods of extended plant operations. The concept of ERP refers to the combinations of accident-tolerant fuel (ATF), optimal use of diverse and flexible coping strategy (FLEX), enhancements to plant components and systems, and the incorporation of augmented or new passive cooling systems, as well as improved fuel cycle efficiency. The objective of the ERP research effort is to use the RISA methods and toolkit in industry applications, including methods development and early demonstration of technologies, in order to enhance existing reactors’ safety features (both active and passive) and to substantially reduce operating costs through risk-informed approaches to plant design modifications to the plant and their characterization. One main focus of the FY 2020 efforts documented in this report was to extend the analyses conducted in FYs 2018 and 2019 for a pressurized water reactor (PWR) to a boiling water reactor (BWR). The same analysis process, risk analysis approaches, and analysis tools as in the previous work for PWR were used for a generic BWR with near-term ATF cladding (i.e., Iron-Chromium-Aluminum [FeCrAl] cladding and Chromium [Cr]-coated cladding) designs under the postulated station blackout (SBO) and medium loss-of-coolant (MLOCA) accident scenarios. In addition, a FLEX model was developed and incorporated into a generic BWR probabilistic risk assessment (PRA) model using the INL-developed software tool, Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), to assess the risk impact from FLEX. The other main focus of the FY 2020 efforts was to advance analysis methods, including developing dynamic approach for FLEX human reliability analysis (HRA) using the INL-developed software tool, Event Modeling Risk Assessment using Linked Diagrams (EMRALD), as well as developing a multicriterion benefit evaluation (MCBE) method for evaluating costs and benefits of safety enhancements in nuclear power plants (NPPs). As a case study, the MCBE method was applied to evaluate the costs and benefits brought by FLEX implementation.

99 GENERAL AND MISCELLANEOUS↗

JUSTIFI: Open-Source Software for Identifying and Quantifying Non-Energy Benefits

The integration of Non-Energy Benefits (NEBs) into energy efficiency initiatives is essential for operational excellence in manufacturing. This presentation and software demonstration explore how quantifying NEBs such as improved safety, increased quality, and enhanced productivity, can strengthen business cases for energy investments, leading to better payback periods and alignment with organizational goals. We introduce JUSTIFI, a free, open-source software by the U.S. Department of Energy that aids in the measurement of NEBs and enhances understanding of their impact on Key Performance Indicators (KPIs) and return on investment (ROI). JUSTIFI features an intuitive interface for identifying NEBs, customizable reporting tools, and comprehensive system cataloging, empowering companies to effectively communicate the value of energy efficiency projects. By leveraging this innovative tool, organizations can better navigate energy efficiency assessments and drive support for their energy management initiatives.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Occupational Medical Trends in the 70's from Industrial View

Industrial health measures to ensure worker productivity constitute physical examinations as well as environmental control systems. Considered are automatic record keeping facilities for case histories, preventive medical and mental counselling, development of safety standards, and health insurance and disability benefit plans. Cooperation of industry health programs with community health aspects is required to eliminate the loss of manpower capability through alcoholism or mental disease.

Williamson, S. M.↗

The Advanced Solid Rocket Motor

The paper describes the Advanced Solid Rocket Motor (ASRM) that is being developed to replace, in 1997, the Redesigned Solid Rocket Motor which currently boosts the Space Shuttle. The ASRM will contain features to improve motor safety (fewer potential leak paths, improved seal materials, stronger case material, and fewer nozzle and case joints), an improved ignition system using through-bulkhead initiators, and highly reproducible manufacturing and inspection techniques with a large number of automated procedures. The ASRM will be able to deliver 12,000 lbs greater payloads to any given orbit of the Shuttle. There are also environmental improvements, realized by waste propellant recovery.

Mitchell, Royce E.↗

Using AI/expert system technology to automate planning and replanning for the HST servicing missions

This paper describes a knowledge-based system that has been developed to automate planning and scheduling for the Hubble Space Telescope (HST) Servicing Missions. This new system is the Servicing Mission Planning and Replanning Tool (SM/PART). SM/PART has been delivered to the HST Flight Operations Team (FOT) at Goddard Space Flight Center (GSFC) where it is being used to build integrated time lines and command plans to control the activities of the HST, Shuttle, Crew and ground systems for the next HST Servicing Mission. SM/PART reuses and extends AI/expert system technology from Interactive Experimenter Planning System (IEPS) systems to build or rebuild time lines and command plans more rapidly than was possible for previous missions where they were built manually. This capability provides an important safety factor for the HST, Shuttle and Crew in case unexpected events occur during the mission.

Bogovich, L.↗

The Conference Proceedings of the 2001 Air Transport Research Society (ATRS) of the WCTR Society

The ATRS held its 5th Annual conference at the City University of Hong Kong Campus in July 2001. The conference was a success with nearly 140 participants including 70 presenters. Titles that comprise Volume 2 include: Intelligent Airport Gate Assignment System; A Study on the Effects of the Personality Compatibility to the Job Performance; ITS/CVO Application for Air cargo Transportation in Korea; An Airport as a Logistics and Economic Hub: The Case of Incheon International Airport; The Impact Of Aviation Safety over the Consumer's Behavior; The Integration of China and Taiwan Air Networks for Direct Air Cargo Services; Quality perception and carrier choice in Civil Aviation; Future Trends in Business Travel Decision Making; Cooperation Among German Airports in Europe; Inbound and Outbound Air Passenger Traffic Forecasting between the United States and Selected Asian countries; An Evaluation of Alternative Facilities for Airport Redevelopment using Fuzzy Linguistic Approach; Economic Analysis of Airline Alliances; The Aviation Cooperation between the two Koreas Preparing for the Reunification of the Peninsula; and A Study on the Air Transport Cooperation in Northeast Asia between China, Japan and Korea.

Lee, Yeong-Heok↗

The Success of the River Corridor Closure Project - A Look at the Last 10 Years - 16105

Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office (DOE-RL) to manage the River Corridor Closure Project (RCCP), a 10-year contract in which WCH will clean up 572 km{sup 2} (220 mi{sup 2}) of contaminated land at the Hanford Site in Richland, Washington. Since 2005, WCH has safely and efficiently performed field remediation and building demolition activities along the Columbia River corridor. To date, 99% of the buildings have been demolished and field remediation is 88% complete. These numbers represent work on 323 buildings and 571 waste sites, respectively. From a safety perspective, WCH has experienced an outstanding safety record with a total of 230 first aid cases, 47 recordable only cases, 2 restricted work day cases, and 7 lost work day cases. WCH exceeded 6 million hours worked without a lost time injury on September 30, 2015, for the second time in the contract period. The project has worked a total of 23,217,840 hours. WCH has experienced extensive successes over the last 10 years. These successes include, but are not limited to, explosive demolition, technological applications, and creative land restoration techniques. Efficiencies in work planning, execution, and subcontracting will also be shared. The photographs showing how the landscape has changed are impressive, as is some of the video captured during explosive demolition of a reactor stack in the 100-N Area of the Hanford Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Borehole Disposal Waste Emplacement Mode Cost-Risk Study - 16346

An engineering study has developed alternative concepts for waste packaging and for emplacing/retrieving packages in deep boreholes. The study compared costs and risks associated with emplacement using wire-line vs. drill-string technologies. Selection of a method is needed to proceed with demonstration as part of the Deep Borehole Field Test being conducted by the U.S. Department of Energy, Office of Used Nuclear Fuel Disposition. Each emplacement method was described as a series of steps, and each step was analyzed for potential to cause any of four off-normal events including drops and getting stuck. Each such event was supported by a fault tree. The hazard analysis identified a number of improvements including: 1) impact limiters; 2) safety systems; 3) instrumentation; and 4) methods to mitigate casing collapse or borehole debris during operations. Off-normal events were related in a top-level event tree with normal and off-normal outcomes. Costs were estimated for each outcome (including recovery and decontamination). A panel of subject matter experts was convened to review the study and provide key inputs. The wire-line method is less costly for normal operations, while the drill-string method has advantages if waste packages become stuck. The wire-line method has a lower aggregate probability of accidents resulting in waste package breach. The integrated probability of off-normal events is on the order of a few percent per borehole, and engineered measures are quite important to prevent and mitigate accidents, limiting radiological consequences. Development of these measures during design will help to further improve system reliability. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Early implementation of digital upgrades on simulators - 347

An important aspect of successful Nuclear Power Plant (NPP) digital control system upgrade projects is to upgrade the Operator Training Simulator (OTS) or a related Engineering Simulator (ES), prior to installation of the Distributed Control System (DCS) on the plant allowing for early testing of the digital controls/HMI and for early training of the plant operators while maintaining OTS configuration management (i.e. OTS in sync with the plant's current design). Experience has shown that early implementation of digital upgrades on the OTS and/or an ES can reduce plant startup duration (related to digital systems commissioning) and ensure operators are proficient with the new digital systems to ensure safe and reliable plant operation. Including simulators in the design process offers many benefits including early identification of design deficiencies, testing deficiency fixes, developing and validating plant procedures and supporting human factors engineering, to name a few. Implementing digital upgrades on the OTS is also a regulatory requirement driven by the ANSI/ANS-3.5-2009 standard (Nuclear Power Plant Simulators for Use in Operator Training and Examination) if the new DCS affects actions to be taken by the plant operator in the main control room. This paper presents the benefits of implementing digital upgrades on the OTS and/or ES prior to plant implementation. The various simulator implementation strategies (stimulation, emulation, simulation or a hybrid solution) and selection factors are discussed. The paper also covers four (4) case studies demonstrating how digital upgrades can be implemented on simulators. The first case study covers the implementation of a Siemens offgas Programmable Logic Controller (PLC) system on the Enrico Fermi OTS (Michigan). The second case study covers the implementation of a GE main generator excitation system on the Cernavoda OTS (Romania). The third case study covers the implementation of a Siemens main feedwater control system on the Callaway OTS and ES (Missouri). The final case study covers the implementation of the non-safety related and safety related DCS on the Nuclear New Build (NNB) Hongyanhe Phase I dual-purpose OTS/ES (China). (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Assessment at the Edge: Applying NERC CIP to Aggregated Grid-Edge Resources

Distributed energy resources (DERs) promise to deliver benefits for both utilities and consumers by dynamically interoperating utility systems with customer-owned grid-edge technologies. These small energy-consuming devices are increasingly being aggregated for participation in grid markets, planning and operations. A cyber attack penetrating the control system of aggregated DERs could negatively impact the operation of the grid. In the worst case, the power grid could be severely damaged and physical safety compromised. In this paper we analyze cybersecurity risks associated with the aggregation of DERs and develop an approach to mitigating that risk. The approaches to both cyber risk analysis and mitigation were developed during a recent research project that serves as an example of how the approaches could be applied. However, both the risk analysis and mitigation are applicable to the broader domain of all DERs. An important conclusion is that the successful cyber compromise of aggregated DERs could have a significant impact on the bulk power system. This is the case even if each individual DER falls below the threshold of compliance with bulk-grid cybersecurity standards. For this reason, we specifically investigate how National Electricity Reliability Corporation's Critical Infrastructure Protection requirements could flow down to interactions between DER aggregators and the DERs themselves in order to protect the grid from these bulk-scale cyber attack impacts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Steam Pressure-Reducing Station Safety and Energy Efficiency Improvement Project

The Facilities and Operations (F&O) Directorate is sponsoring a continuous process improvement (CPI) program. Its purpose is to stimulate, promote, and sustain a culture of improvement throughout all levels of the organization. The CPI program ensures that a scientific and repeatable process exists for improving the delivery of F&O products and services in support of Oak Ridge National Laboratory (ORNL) Management Systems. Strategic objectives of the CPI program include achieving excellence in laboratory operations in the areas of safety, health, and the environment. Identifying and promoting opportunities for achieving the following critical outcomes are important business goals of the CPI program: improved safety performance; process focused on consumer needs; modern and secure campus; flexibility to respond to changing laboratory needs; bench strength for the future; and elimination of legacy issues. The Steam Pressure-Reducing Station (SPRS) Safety and Energy Efficiency Improvement Project, which is under the CPI program, focuses on maintaining and upgrading SPRSs that are part of the ORNL steam distribution network. This steam pipe network transports steam produced at the ORNL steam plant to many buildings in the main campus site. The SPRS Safety and Energy Efficiency Improvement Project promotes excellence in laboratory operations by (1) improving personnel safety, (2) decreasing fuel consumption through improved steam system energy efficiency, and (3) achieving compliance with applicable worker health and safety requirements. The SPRS Safety and Energy Efficiency Improvement Project being performed by F&O is helping ORNL improve both energy efficiency and worker safety by modifying, maintaining, and repairing SPRSs. Since work began in 2006, numerous energy-wasting steam leaks have been eliminated, heat losses from uninsulated steam pipe surfaces have been reduced, and deficient pressure retaining components have been replaced. These improvements helped ORNL reduce its overall utility costs by decreasing the amount of fuel used to generate steam. Reduced fuel consumption also decreased air emissions. These improvements also helped lower the risk of burn injuries to workers and helped prevent shrapnel injuries resulting from missiles produced by pressurized component failures. In most cases, the economic benefit and cost effectiveness of the SPRS Safety and Energy Efficiency Improvement Project is reflected in payback periods of 1 year or less.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Digital Safety Analysis for Small Modular Nuclear Reactors (SMRs)

The licensing process for any nuclear installation generally requires the review and approval of numerous documents by a regulatory body. Alternate approaches are needed where similar nuclear installations are planned to be built and operated at multiple sites around the world. Such is the case for the deployment of small modular nuclear reactors (SMRs) under development by multiple enterprises in multiple countries. As a use case for this paper, the authors propose an alternative to the Documented Safety Analysis (DSA) required by the United States Department of Energy (DOE) for the licensing of its nuclear installations. The DSA is a DOE construct that requires the review and approval of numerous documents. It includes an in-depth description of hazards, safe boundaries, and hazard controls.

Microreactors↗

Spatial and Temporal Deconfliction of Trajectories in the Presence of Uncertainties

Demonstration of conflict-free movement for multi-agent teams in challenging scenarios is crucial in developing trust and trustworthiness in an autonomous transport system. Tolerance verification queries are explored as a mechanism to enforce spatial and temporal deconfliction for a cooperating team of Unmanned Aerial Systems (UAS) with prescribed heterogeneous path-following performance. Obstacles in the environment are modelled as set of polyhedra, whereas each vehicle’s trajectory is represented as a sequence of polynomial curves with C2 continuity, expressed in a Bernstein basis. Each vehicle is modelled as a point mass and a safety distance, informed by the geometry of the UAS and the worst-case path-following error. This defines a tube around the trajectories where each UAS is most likely to fly through. In addition, obstacles in the environment have an associated safety buffer around them to account for the uncertainty in their location and geometric description. The tolerance verification queries explored in this paper combine the safety distance information from each UAS and environmental hazard to compute trajectories that are contained within the safe configuration space. Tolerance verification is also compared with other proximity queries to determine the suitability of each method along the different steps of the trajectory generation algorithm. This paper analyzes the fitness and performance of three proximity queries – collision, tolerance verification, and distance computations – between polyhedral and polynomial curves to ensure deconfliction between obstacles and vehicles, but also between polynomial curves to guarantee safe separation among cooperating UAS.

trajectory generation↗

Model Based Diagnostics and Prognostics Framework for Systems Health Management

In order to tackle and solve the system health prediction problem, it is essential to have awareness of the current state and health of the system, especially since it is necessary to perform condition-based predictions. To be able to accurately predict the future state of any system, it is required to possess knowledge of its current and future operations. Given models of the current and future system behavior, the general approach of model-based prognostics can be employed as a solution to the prior stated prediction problem. In case of electric aircrafts, computing remaining flying time is safety-critical, since an aircraft that runs out of power (battery charge) while in the air will eventually lose control leading to catastrophe. In order to tackle and solve the prediction problem, it is essential to have awareness of the current state and health of the system, especially since it is necessary to perform condition-based predictions. To be able to predict the future state of the system, it is also required to possess knowledge of the current and future operations of the vehicle. This presentation will cover a physics based-modeling approach implemented for case-studies in battery and composite structures for prognostics. Given models of the current and future system behavior, a general approach of model-based prognostics can be employed as a solution to the prediction problem and further for decision making.

Banerjee, Portia↗

Low- n stability and plasma response to RMP in various STEP scenarios

The low-n (n is the toroidal mode number) magnetohydrodynamic (MHD) stability and plasma response are numerically investigated for various scenarios designed for STEP, that are relevant for the H-mode pedestal analysis. Control of the edge-localized modes (ELMs) with externally applied resonant magnetic perturbations (RMPs) is considered. Optimization of the ELM control coil current configuration, based on the computed plasma MHD response and well-established figures of merit validated on present-day experiments, finds reasonable robustness of a fixed coil phasing (for a given n-number) to control ELMs in all five STEP plasmas considered. Based on certain semi-empirical criteria, the required coil current to achieve ELM suppression is estimated to be about 10–20 kAt with the n = 1 or 2 RMP configuration and about 100–200 kAt for the n = 4 RMP. Systematic linear stability calculations are used to map out stability windows for the low-n kink-peeling modes, in terms of the ideal-wall location and variation of the edge safety factor q 95 with respect to the target design. The kink-peeling stability boundary is found to be generally sensitive to the q 95 variation, which has implications for achieving the quiescent H-mode regime in STEP. Full toroidal quasilinear initial-value simulations for these STEP plasmas find that generation of the edge-harmonic oscillations (EHOs) depends sensitively on the plasma scenario, the initial linear stability of the kink-peeling modes, the initial plasma toroidal flow and q 95 . In general, it is easier (more robust) to access the EHO-regime for two of the cases considered with smaller plasma volume and higher on-axis safety factor. Finally, quasilinear simulations find robust density pumpout due to applied RMPs in these STEP plasmas, but the effect on the plasma toroidal flow varies among different cases.

EHO↗

BayoTech Risk and Modeling Support of NM Gas Site

The BayoTech hydrogen generation system has been evaluated in terms of safety considerations at the NM Gas site. The consequence of a leak in different components in the system was evaluated in terms of plume dispersion and overpressure. Additionally, the likelihood of a leak scenario for different hydrogen components was identified. The worst-case plume dispersion cases, full-bore leaks, resulted in relatively large plumes. However, these cases were noted to be far less likely than the partial break cases that were evaluated. The partial break cases resulted in nearly negligible plume lengths. Similarly, the overpressure analysis of the full-bore break scenarios resulted in much larger overpressures than the partial break cases (which resulted in negligible overpressure at the lot line). There were several cases evaluated in the analysis that represented leak scenarios from both hydrogen and natural gas sources. Generally, the natural gas leak scenarios resulted in a smaller horizontal impact than that of hydrogen leaks. The worst-case consequence from a hydrogen leak resulted from the compressors, storage pods, or dispensing system. To consider the safety features that may isolate the leak, the consequence was evaluated at different times after the leak event to show the reduction of pressure. After 2 seconds, the plume dispersion from this event is contained within the perimeter of the site. The worst-case consequences show that the plume may disperse to adjacent facilities and to the street. When considering both likelihood and consequence, the risk may be considered low because the maximum frequency of a full-bore leak from any component within the hydrogen compound is 8.2 E-5/yr. This means that a full-bore leak is expected to occur less than once every 10,000 years. The risk can be further reduced by implementing mitigative countermeasures, such as CMU walls along the sides of the equipment compound. This would reduce the overall consequence of the worst-case dispersion scenarios (horizontal impact of plume). In terms of siting and safety analysis, the NFPA 2 code was used to provide a high-level evaluation of the current site plan. The most limiting equipment in terms of set-back distance are the compressors/storage units because of the high-pressure hydrogen. The site layout was evaluated for an acceptable location for the compression/storage unit based on NFPA 2 set-back distances. It is important to note that the NFPA 2 set-back distances consider both likelihood and consequence. This is important because the worst-case results evaluated herein also represent the least likely leak scenario. Other site-specific considerations were evaluated, including the parking shade structure with photovoltaic cells and refueling vehicles. These issues were dispositioned and determined to not present a safety risk.

08 HYDROGEN↗

Results of transient /accident analysis for the HEU, first mixed HEU-LEU and for the first full LEU cores of the WWR-SM reactor at INP AS RUZ

The WWR-SM reactor in Uzbekistan is preparing for the conversion from HEU (36%) fuel to LEU (19.8%) fuel. During this conversion, the HEU fuel assemblies (IRT-3M FA) being discharged at the end of each cycle will be replaced by LEU fuel assemblies (IRT-4M FA); this gradual conversion requires 9 cycles. The safety analysis report for this conversion process has been prepared. This paper presents selected results for postulated transient/accidents during this conversion process; results for transient analysis for the HEU core, the 1st mixed (HEU-LEU) core, and for the first full LEU core are presented for the following initiators: control rod motion (2 cases), loss of power, and FA blockage. These results show that safety is maintained for all transients analyzed and that the behavior of all the analyzed cores is essentially the same. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗