Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ROCK DRILLING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Play Fairway Analysis: Structurally Controlled Geothermal Systems in the Eastern Great Basin Extensional Regime, Utah

A research team with membership from the University of Utah/Energy & Geoscience Institute, the University of Utah/Dept. of Geology & Geophysics, and the Utah Geological Survey, undertook a play fairway analysis (PFA) for geothermal resources in the Eastern Great Basin (EGB) extensional tectonic regime of western Utah. This is a high-priority region for geothermal exploration because active Basin and Range (B&R) extension with volcanism having a N-S strike is superimposed upon pre-existing E-W belts of plutonic rocks and large-scale structural lineaments. Cumulative heat flow along the N-S strike of the state totals approximately 5 GWt above background stable interior. Three electricity producing power plants currently exist with substantial potential for increase. Succinctly, our PFA approach aims to resolve potential sources of heat and permeability in the region, which are the two principal criteria for establishing a geothermal resource. An initial Phase 1 was carried out using only existing geoscientific data in the area. Criteria selected for focusing heat potential include direct heat flow measurements in boreholes, magnetotelluric (MT) low resistivity anomalies, fluid/gas geochemistry, and proximity to recent volcanic eruptions. Permeability is established through geological structures (fault density, critically stressed areas, seismicity, gravity), and MT low resistivity anomalies. In Phase II of this PFA project, additional geological, geophysical and geochemical data were acquired and analysis carried out primarily over promising composite common risk (CCR) areas initially identified in Phase I in order to focus prospectivity and prepare for drilling recommendations. These prospects are near the Twin Peaks rhyolite field, high heat flow areas north of the producing Cove Fort system, and geophysical structure beneath the Crater Knoll area off the northeast flank of the Mineral Mountains. Additional data included MT site fill-in, structural mapping and analysis using high-resolution imagery, gravity and on-ground mapping, Nodal 3C passive seismic collection, and passive 3He surveying. Heat source and permeability potential are again expressed in terms of their individual common risk segment (CRS) maps, with a color scheme using green for most favorable (low risk) and red for least favorable (high risk). Diverse data types are united through the technique of probability kriging, which establishes prospectivity thresholds for each data type and then computes probability of exceeding that threshold over the PFA area. Modified CRS and CCRS maps are compared to those of Phase I to highlight tighter prospectivity focus. In doing so, the prospectivity threshold for heat was increased significantly to narrow the targeting. In the final Phase III of this project where a recommended deep thermal gradient hole was sited, additional geophysical, geochemical and geological field collection and analysis was carried out to refine drill hole targeting. This includes prospect-scale MT, gravity, structure, passive seismic deployment (Cove Fort area), and detailed 3He isotope profiling. It was the recommendation of the DOE Technical Monitoring Team (TMT) that one or more holes be sited in the north-ern Cove Fort area where legacy TG gradient holes showed high cumulative heat flow. These were to be of moderate depth, 2000-3000 feet, to reach the geothermal fluid table expected to start in excess of 1000 feet depth. The drilling organization stipulated by the DOE/GTO was that of the USGS Research Drilling Program (RDP) centered in Las Vegas, NV. A detailed well plan, appended to this report, was developed principally by Dr. Ben Barker consulting to University of Utah, Dr. Steve Pye on the DOE TMT, Mr. Steven Crawford of the USGS-RDP, and the project PI Phil Wannamaker. However, temperature and possible H 2 S at the systems lead to cancellation of the drilling last-minute as this appeared outside the experience base of the USGS-RDP. We hope to have the opportunity to revisit the test drilling and expand the Play Fairway Analysis of this region at some point in the future.

15 GEOTHERMAL ENERGY↗

Structural investigations of Great Basin geothermal fields: Applications and implications

Because fractures and faults are commonly the primary pathway for deeply circulating hydrothermal fluids, structural studies are critical to assessing geothermal systems and selecting drilling targets for geothermal wells. Important tools for structural analysis include detailed geologic mapping, kinematic analysis of faults, and estimations of stress orientations. Structural assessments are especially useful for evaluating geothermal fields in the Great Basin of the western USA, where regional extension and transtension combine with high heat flow to generate abundant geothermal activity in regions having little recent volcanic activity. The northwestern Great Basin is one of the most geothermally active areas in the USA. The prolific geothermal activity is probably due to enhanced dilation on N- to NNE-striking normal faults induced by a transfer of NW-directed dextral shear from the Walker Lane to NW-directed extension. Analysis of several geothermal fields suggests that most systems occupy discrete steps in normal fault zones or lie in belts of intersecting, overlapping, and/or terminating faults. Most fields are associated with steeply dipping faults and, in many cases, with Quaternary faults. The structural settings favoring geothermal activity are characterized by subvertical conduits of highly fractured rock along fault zones oriented approximately perpendicular to the WNW-trending least principal stress. Features indicative of these settings that may be helpful in guiding exploration for geothermal resources include major steps in normal faults, interbasinal highs, groups of relatively low discontinuous ridges, and lateral jogs or terminations of mountain ranges.

15 GEOTHERMAL ENERGY↗

Orebody Modelling for Exploration: The Western Mineralisation, Broken Hill, NSW

The Western Mineralisation in the Broken Hill deposit was studied to identify the zonation sequence of lithogeochemical haloes along and across the strike of the orebody. Samples used are from 77 drill holes and the samples were assayed for Pb, Zn, Fe, S, Cu, Ag, Cd, Sb, Bi and As. Variogram analyses were calculated for all the elements and kriging was used to construct the 3D block model. Analysis of cross sections along and across the strike of the orebody shows that Bi and Sb form broader halos around sulphide masses and this suggests that they are pathfinder elements for the Pb and Zn elements of this orebody. The threshold concentrations (minimum anomaly) of the 10 elements were determined using the concentration-area analysis. On east-west vertical cross sections, the values of linear productivity, variability gradient and zonality index were calculated for each element. Based on the maximum zonality index of each element, the sequence of geochemical zonation pattern was determined from top to bottom of the orebody. The result shows that S, Pb, Zn and Cd tend to concentrate in the upper part of the mineralisation whereas Ag, Cu, Bi and As have a tendency to concentrate in the lower part of the mineralised rocks. Also, an empirical product ratio index was developed based on the position of the elements in the zonation sequence. The methods and results of this research are applicable to exploration of similar Zn and Pb sulphide ore deposits.

58 GEOSCIENCES↗

Geologic Assessment of the Damage Zone from the Second Test at Source Physics Experiment-Nevada (SPE-N)

The National Center for Nuclear Security, established by the U.S. Department of Energy, National Nuclear Security Administration (NNSA), is conducting a series of explosive tests at the Nevada National Security Site that are designed to increase the understanding of certain basic physical phenomena associated with underground explosions. These tests will aid in developing technologies that might be used to detect underground nuclear explosions in support of verification activities for the Comprehensive Nuclear-Test-Ban Treaty. The initial project is a series of explosive tests, known collectively as the Source Physics Experiment-Nevada (SPE-N), being conducted in granitic rocks. The SPE-N test series is designed to study the generation and propagation of seismic waves. The results will help advance the seismic monitoring capability of the United States by improving the predictive capability of physics-based modeling of explosive phenomena. The first SPE N (SPE-N-1) test was conducted in May 2011, using 100 kg of explosives at the depth of 54.9 m in the U 15n source hole. SPE-N-2 was conducted in October 2011, using 1,000 kg of explosives at the depth of 45.7 m in the same source hole. The SPE-N-3 test was conducted in the same source hole in July 2012, using the same amount and type of explosive as for SPE-N-2, and at the same depth as SPE-N-2, within the damage zone created by the SPE-N-2 explosion to investigate damage effects on seismic wave propagation. Following the SPE-N-2 shot and prior to the SPE-N-3 shot, the core hole U-15n#10 was drilled at an angle from the surface to intercept the SPE-N-2 shot point location to obtain information necessary to characterize the damage zone. The objective was to determine the position of the damage zone near the shot point, at least on the northeast, where the core hole penetrated it, and obtain information on the properties of the damaged medium. Geologic characterization of the post-SPE-N-2 core hole included geophysical logging, a directional survey, and geologic description of the core to document visual evidence of damage. Selected core samples were provided to Sandia National Laboratories (SNL) for measurement of physical and mechanical properties. A video was also run in the source hole after it was cleaned out. A significant natural fault zone was encountered in the angle core hole between 5.7 and 7.5 m from the shot point. However, several of the fractures observed in the core hole are interpreted as having been caused by the explosion. The fractures are characterized by a “fresh,” mechanically broken look, with uncoated and very irregular surfaces. They tend to terminate against natural fractures and have orientations that differ from the previously defined natural fracture sets; they are common starting at about 5.4 m from the shot point. Within about 3.3 m of the shot point to the end of the recovered core at 1.6 m from the shot point, some of the core samples are softer and lighter in color, but do not appear to be weathered. It is thought this could be indicative of the presence of distributed microfracturing.

SPE, Source Physics Experiment, geology↗

Development, Monitoring, and Control of Fracture Thermal Energy Storage in Crystalline Rock Formations (DEMO-FTES) [Abstract]

Approximately half of global energy consumption is used for heating and cooling. Because fossil fuels are used to meet most of this demand, heating and cooling of buildings produces a large portion of global greenhouse gas (GHG) emissions. The proposed project seeks to demonstrate the feasibility of a seasonal thermal energy storage concept called fracture thermal energy storage (FTES), which has the potential to dramatically lower energy requirements for heating and cooling and improve the resilience of building energy systems. FTES is a technique for building a highly efficient heat exchanger by creating a carefully designed set of fractures in the ground below a building. This heat exchanger allows thermal energy to be stored over seasonal timeframes—for example, hot thermal energy that is easily captured in the summer or energy from waste heat sources—to meet heating needs during colder months. FTES offers a solution with a relatively small footprint and lower cost compared to currently operating aquifer thermal energy storage (ATES) systems and could be used in the many areas without aquifers suitable for ATES. If commercialized, FTES systems could exceed the 2.5 TWh of energy storage per year from the more than 2,800 ATES systems in operation worldwide, which range from 0.1 MW to 30 MW. The savings in CO2 emissions per year are also expected to match or exceed individual ATES projects, with the largest, a 30 MW system used to provide heating and cooling to the University of Technology in Eindhoven in the Netherlands, estimated to save 13,000 tons of CO2 emissions per year. FTES utilizes mature drilling and fracturing technology and therefore has the potential to be rapidly commercialized once demonstrated. The ability to construct and establish flow through an FTES heat exchanger has been demonstrated by a previous project and the potential for efficient, large-capacity energy storage has been shown using numerical models. However, no experimental validation of these numerical estimates of thermal energy storage has been made. The first crucial need to advance FTES technology is to identify the sensitivity of key metrics such as thermal energy storage and production rates, capacities, and efficiencies to design parameters such as the number of fractures, depth/temperature of fractures, size of fractures, and circulation rates. The second crucial need is experimental testing of achievable thermal performance with optimized system design parameters. The proposed scope of work seeks to systematically address these two critical needs through a highly complementary international collaboration spanning theory, laboratory, and mesoscale field evaluation. The proposed work plan calls for using dimensional analysis and existing state-of-the-art numerical simulators to design carefully scaled laboratory and 10-meter-scale field tests of the thermal efficiency of FTES. The existing advanced laboratory and intermediate-scale field testbeds that will be used for this project will allow for detailed monitoring of the system performance during the test and of how the performance changes across time and length scales. These results will determine the feasibility of full- scale FTES systems. If the thermal performance is consistent with model predictions, the results will provide a strong economic justification for rapid commercialization of FTES technology in a wide range of geographical areas.

25 ENERGY STORAGE↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

Hero Carbonsafe Phase 2 Project in the Columbia River Basalt Group: Technical Program Overview

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Hermiston is located near the center of the Columbia River Basalt Group (CRBG), which is one of the largest basalt flows in the US. Basalt CO2 storage has potential advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. associated decreases in pressure and CO2 migration risks, 3. reduced long-term monitoring requirements with respect to plume tracking, 4. widespread geographic distribution and, 5. large storage potential due to thickness, porosity, and CO2 interactions with basalt. For locations such as the Pacific Northwest (PNW), Hawaii, Iceland, India and Japan, whose localities are isolated from large sedimentary basins offering conventional saline storage options, basalt may offer the only feasible option for local CO2 storage. However, mineralization/basalt storage still has many uncertainties, as there are limited field-scale assessments of CO2 storage in basalt. There are significant uncertainties hindering the effective implementation of carbon capture utilization and storage (CCUS) in basalt. These include the lack of proven storage capacities, challenges in methodologies for modeling the area of review in igneous formations, limited understanding of mineralization kinetics and timing, and uncertainties in injectivity. Additionally, the domestic availability of specialized services and drilling expertise is constrained, and existing CCUS permitting and regulatory frameworks, originally developed for conventional saline reservoirs, may not adequately address the unique requirements of basalt systems. HERO CarbonSAFE is designed to address major research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts of the CRBG, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts.

58 GEOSCIENCES↗

A Salt Repository Concept for CSNF in 21-PWR Size Canisters

The most straightforward concept for disposal of large, heavy packages containing commercial spent nuclear fuel (CSNF) in a repository in bedded salt, would be to emplace them directly on the floor in emplacement tunnels. In-tunnel axially aligned horizontal emplacement would minimize excavated volume and avoid drilling of large-diameter emplacement boreholes. A similar concept was proposed in Germany for direct disposal of POLLUX ® canisters. The repository would be constructed at a depth of 500 to 1,000 m for isolation from the surface, and for sufficient overburden stress to ensure creep reconsolidation of repository openings. It could entail modular panels of emplacement tunnels arranged on headings oriented in cardinal directions from a central core, to accommodate the estimated 140,000 MTU total U.S. CSNF inventory. To do so, the overall area of the repository layout would be approximately 20 km 2 . Many layouts are possible, but the approach should be modular, excavation should be deferred for as long as possible to avoid maintenance, and the emplacement areas should share support facilities and shafts. Vertical shafts would be used in accordance with mining practice in sedimentary basins. Large diameter shafts would be needed for ventilation exhaust and waste transport, with smaller shafts for waste salt removal, men & materials, and ventilation intake. The spacing between disposal tunnels as estimated from thermal modeling, seeks to limit the maximum average areal thermal load in the panels to 11 W/m 2 to control long-term heat buildup in the host rock. Peak salt temperature would occur within a few years and would be dominated by each waste package locally, simplifying thermal management. There would be some flexibility to decrease the package spacing or increase the emplacement thermal power limit Backfilling emplaced waste packages immediately with mine-run crushed salt would provide shielding and expedite reconsolidation. This arrangement would isolate adjacent waste packages from one another by the intervening backfill, especially after it reconsolidates and its properties approach those of intact salt. After the repository is fully loaded and the performance confirmation program is complete, activities to permanently close the repository would be initiated. During closure operations all openings in the host salt would be backfilled, then shafts would be sealed, and boreholes plugged. Plans for the Waste Isolation Pilot Plant (WIPP) show how sealing and plugging could be done. A monitoring program could continue for 50 years or longer after repository closure. With an emplacement thermal power limit of 10 kW per waste package, nearly all the CSNF that is projected to be produced by the current fleet of reactors in the U.S. could be emplaced over a period of approximately 50 years starting in calendar 2048. No barriers to implementation in a reasonable timeframe have been identified from this generic analysis. Engineering challenges include: 1) shaft construction; 2) a very-large capacity shaft hoist; 3) overpack design; 4) a transport-emplacement-vehicle (TEV) for transporting waste packages once they are underground and emplacing them remotely; and 5) remotely operated equipment for emplacing backfill. The method of shaft construction would depend on site-specific conditions, and could involve freezing the subsurface. A shaft hoist with payload capacity of 175 MT seems technically and economically feasible based on development work in Germany, and it would be the largest hoist of its kind. The function of disposal overpacks would be to provide reliable containment during repository operations, which could be accomplished using a corrosion allowance material such as a low-carbon steel. Development effort would be needed to determine overpack thickness (e.g., 7 to 20 cm) that can resist corrosion and loading from salt creep, to rovide containment throughout the repository operational period. The transport-emplacement vehicle (TEV) would be similar to previous concepts, particularly one option proposed for a Yucca Mountain repository. It would move over a rough salt floor on independently driven and steered wheels, and carry heavy shielding in addition to a waste package. By analogy to the safety case for the WIPP in New Mexico, human intrusion is likely to be the dominant mode of radionuclide release from the repository. Treatment of human intrusion for a CSNF repository in salt could depend on promulgation of site-specific changes in the regulations. Radionuclide release and migration would be quite limited for undisturbed conditions. There may be opportunities for improved understanding of salt performance with waste heating, based on future in situ testing in an underground salt research laboratory. This report also discusses a developing area of salt rock mechanics that involves low-stress, low strain-rate creep that might cause large, heavy waste packages to slowly sink. Site-specific sampling, testing, and modeling would be used to determine if the mechanism is important enough to merit consideration in design, or inclusion in performance assessment. Part of engineering design and postclosure safety assessment for a CSNF repository in salt would be to implement a methodology to show that the probability of a criticality event in the repository, when waste packages eventually breach and are flooded, is less than the probability screening threshold for performance assessment. In the methodology, a criticality analysis would be performed for waste packages in the repository, incorporating measures that could be introduced as needed to limit reactivity, for example using fuel selection and loading rules, and crediting the absorption of thermal neutrons by natural chlorine in the environment. A similar analysis has been underway for CSNF stored in dual-purpose canisters. Ideally the strategy would be developed prior to actually loading SNF assemblies into canisters used in waste packages for disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of laboratory-scale hydraulic fracturing for EGS

To investigate the impact of reservoir stimulation by hydraulic fracturing, a series of advanced lab-scale block tests were conducted with multiple measurement methods to characterize the fracture and to assess the operation and the performance of an enhanced or engineered geothermal system (EGS). The stimulation test samples were 330-mm cubic blocks of Sierra White granite with one injection well and four producers drilled into it. Acoustic emissions generated during the fracture initiation and propagation were monitored with twenty AE sensors mounted on all sides of the block to help characterize the fracture initiation and propagation process. The recorded AE signals were analyzed to obtain the event location and the failure mechanism. The localized AE events shows that due to the low viscosity of the fracturing fluid (water), the fracture propagated rapidly and took only about 1.4 s to reach near the block surface. During the fracturing phase, about 47 percent of the events were determined to be shear/mixed mode failure events, 28 percent tensile failure events, and 25 percent compressional failure events. Just after the simulation, a step-rate (constant flowrate) injection test was carried out to investigate the reservoir injectivity enhancement. During this phase additional compressional failure events were observed and the percentages of tensile failure and shear/mixed mode failure decreased. The dramatic increase of the injection rate with small increments of the injection pressure demonstrates the nonlinear response of the fracture to effective normal stress variation with much higher fracture opening increase during the low effective normal stress interval. Hydraulic fracturing tests under different stress levels show that more AE hits/events are recorded when the rock block is under higher applied stress. The reconstructed 3D fracture geometry shows good agreement with the AE monitoring results. After fracturing, a tracer test was carried out and the fracture aperture was estimated to be around 139 μm. The tracer recovery curve shows two linear portions of the tracer tail on a semi-log plot similar to that observed in some field data and predicted by numerical modeling. Laser scanning of the fracture surfaces indicates that the induced fracture has a rough surface with a joint roughness coefficient (JRC) of 12.98 and tortuosity of 1.10, both of which are slightly larger than that from the Brazilian test fracture on the same rock. The thin section and SEM observations show that the fracture follows the weak boundaries between the Quartz and Albite grains or the weak beddings in the grains.

58 GEOSCIENCES↗

Characterizing the Phyllosilicates and Amorphous Phases Found by MSL Using Laboratory XRD and EGA Measurements of Natural and Synthetic Materials

The Curiosity Rover landed on the Peace Vallis alluvial fan in Gale crater on August 5, 2012. A primary mission science objective is to search for past habitable environments, and, in particular, to assess the role of past water. Identifying the minerals and mineraloids that result from aqueous alteration at Gale crater is essential for understanding past aqueous processes at the MSL landing site and hence for interpreting the site's potential habitability. X-ray diffraction (XRD) data from the CheMin instrument and evolved gas analyses (EGA) from the SAM instrument have helped the MSL science team identify phases that resulted from aqueous processes: phyllosilicates and amorphous phases were measure in two drill samples (John Klein and Cumberland) obtained from the Sheepbed Member, Yellowknife Bay Fm., which is believed to represent a fluvial-lacustrine environment. A third set of analyses was obtained from scoop samples from the Rocknest sand shadow. Chemical data from the APXS instrument have helped constrain the chemical compositions of these secondary phases and suggest that the phyllosilicate component is Mg-enriched and the amorphous component is Fe-enriched, relatively Si-poor, and S- and H-bearing. To refine the phyllosilicate and amorphous components in the samples measured by MSL, we measured XRD and EGA data for a variety of relevant natural terrestrial phyllosilicates and synthetic mineraloids in laboratory testbeds of the CheMin and SAM instruments. Specifically, Mg-saturated smectites and vermiculites were measured with XRD at low relative humidity to understand the behavior of the 001 reflections under Mars-like conditions. Our laboratory XRD measurements suggest that interlayer cation composition affects the hydration state of swelling clays at low RH and, thus, the 001 peak positions. XRD patterns of synthetic amorphous materials, including allophane, ferrihydrite, and hisingerite were used in full-pattern fitting (FULLPAT) models to help determine the types and abundances of amorphous phases in the martian rocks and sand shadow. These models suggest that the rocks and sand shadow are composed of approx 30% amorphous phases. Sulfate-adsorbed allophane and ferrihydrite were measured by EGA to further understand the speciation of the sulfur present in the amorphous component. These data indicate that sulfate adsorbed onto the surfaces of amorphous phases could explain a portion of the SO2 evolution in the Rocknest SAM data. The additional constraints placed on the mineralogy and chemistry of the aqueous alteration phases through our laboratory measurements can help us better understand the nature of the fluids that affected the different samples and devise a history of aqueous alteration for the Sheepbed Member of the Yellowknife Bay Fm. at Gale crater.

Rampe, Elizabeth B.↗

Possible world-wide middle miocene iridium anomaly and its relationship to periodicity of impacts and extinctions

In a study of one million years of Middle Miocene sediment deposition in ODP Hole 689B in the Weddell Sea near Antarctica, a single iridium (Ir) anomaly of 44 (+ or - 10) x 10 to the 12th gram Ir per gram rock (ppt) was observed in core 6H, section 3, 50 to 60 cm, after background contributions associated with manganese precipitates and clay are subtracted. The ODP Hole 689B is 10,000 km away from another site, DSDP Hole 588B in the Tasman Sea north of New Zealand, where a single Ir anomaly of 144 + or - 7 ppt over a background of 11 ppt was found in an earlier study of 3 million years of deposition. From chemical measurements the latter deposition was thought to be impact-related. Ir measurements were made, following neutron activation, with the Iridium Coincidence Spectrometer. The age vs depth calibration curves given in the DSDP and ODP preliminary reports indicate the ages of the Iranomalies are identical, 11.7 million years, but the absolute and relative uncertainties in the curves are not known. Based on the newest age data the age estimate is 10 million years. As the Ir was deposited at the two sites at about the same time and they are one quarter of the way around the world from each other it seems likely that the deposition was world-wide. The impact of a large asteroid or comet could produce the wide distribution, and this data is supportive of the impact relationship deduced for Deep Sea Drilling Project (DSDP) 588B from the chemical evidence. If the surface densities of Ir at the two sites are representative of the world-wide average, the diameter of a Cl type asteroid containing the necessary Ir would be 3 + or - 1 km, which is large enough to cause world-wide darkness and hence extinctions although the latter point is disputed.

Asaro, F.↗

Mineralogy, provenance, and diagenesis of a potassic basaltic sandstone on Mars: CheMin X-ray diffraction of the Windjana sample (Kimberley area, Gale Crater)

The Windjana drill sample, a sandstone of the Dillinger member (Kimberley formation, Gale Crater, Mars), was analyzed by CheMin X-ray diffraction (XRD) in the MSL Curiosity rover. From Rietveld refinements of its XRD pattern, Windjana contains the following: sanidine (21% weight, ~Or 95 ); augite (20%); magnetite (12%); pigeonite; olivine; plagioclase; amorphous and smectitic material (~25%); and percent levels of others including ilmenite, fluorapatite, and bassanite. From mass balance on the Alpha Proton X-ray Spectrometer (APXS) chemical analysis, the amorphous material is Fe rich with nearly no other cations—like ferrihydrite. The Windjana sample shows little alteration and was likely cemented by its magnetite and ferrihydrite. From ChemCam Laser-Induced Breakdown Spectrometer (LIBS) chemical analyses, Windjana is representative of the Dillinger and Mount Remarkable members of the Kimberley formation. LIBS data suggest that the Kimberley sediments include at least three chemical components. The most K-rich targets have 5.6% K 2 O, ~1.8 times that of Windjana, implying a sediment component with >40% sanidine, e.g., a trachyte. A second component is rich in mafic minerals, with little feldspar (like a shergottite). A third component is richer in plagioclase and in Na 2 O, and is likely to be basaltic. The K-rich sediment component is consistent with APXS and ChemCam observations of K-rich rocks elsewhere in Gale Crater. The source of this sediment component was likely volcanic. Finally, the presence of sediment from many igneous sources, in concert with Curiosity's identifications of other igneous materials (e.g., mugearite), implies that the northern rim of Gale Crater exposes a diverse igneous complex, at least as diverse as that found in similar-age terranes on Earth.

58 GEOSCIENCES↗

The EGS Collab Hydroshear Experiment at the Sanford Underground Research Facility – Siting Criteria and Evaluation of Candidate Sites

The objective of the EGS Collab project is to establish a suite of intermediate-scale (~10-20 m) field test beds coupled with stimulation and interwell flow tests to provide a basis to better understand fracture stimulation methods, resulting fracture geometries, and processes that control heat transfer between rock and stimulated fractures. Experiment 1 of the project is being conducted at a depth of ~1.5 km in the Sanford Underground Research Facility (SURF) on the 4850 Level (ft. below the ground surface). The stimulation method planned for Experiment 2 of this project is hydroshearing of an existing natural fracture. In siting this experiment, there are several key geologic criteria that need to be met. These include: 1) the fracture should be least 10 m in length so that it could be intersected by two boreholes that are spaced that far apart; 2) it should be optimally oriented relevant to the stress field so that it is critically stressed; 3) the site should have appropriate stress conditions (not too shallow a depth); 4) the fracture should have sufficient permeability to allow for prestimulation flow testing, but not too high a permeability that would preclude permeability enhancement via shear stimulation; 5) the fracture should not intersect other features (permeable fractures, boreholes, adjacent drifts) that could serve as major leak-off zones; 6) the site should not be complicated by geology (a single lithology would be preferred). In addition, there are logistical criteria that will also influence site selection, including: 1) site availability/access, 2) logistical support, e.g., power, internet, water, operating rail system; 3) drift size and orientation compatible with drilling and site operations; 4) appropriate ground support. There are only two deep levels at SURF that can be accessed by the Yates Shaft: the 4100 and the 4850, so we limited our search to these two levels. Currently, three candidate sites are being evaluated: the existing Experiment 1 site and its surroundings on the West Drift on the 4850 level, and two locations on the 4100 level. This paper will evaluate advantages, disadvantages, and risks associated with these three options at SURF.

EGS Collab, Sanford Underground Research Facility↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Mineralogy, Provenance, and Diagenesis of a Potassic Basaltic Sandstone on Mars: CheMin X-Ray Diffraction of the Windjana Sample (Kimberley Area, Gale Crater)

The Windjana drill sample, a sandstone of the Dillinger member (Kimberley formation, Gale Crater, Mars), was analyzed by CheMin X-ray diffraction (XRD) in the MSL Curiosity rover. From Rietveld refinements of its XRD pattern, Windjana contains the following: sanidine (21% weight, approximately Or(sub 95)); augite (20%); magnetite (12%); pigeonite; olivine; plagioclase; amorphous and smectitic material (approximately 25%); and percent levels of others including ilmenite, fluorapatite, and bassanite. From mass balance on the Alpha Proton X-ray Spectrometer (APXS) chemical analysis, the amorphous material is Fe rich with nearly no other cations-like ferrihydrite. The Windjana sample shows little alteration and was likely cemented by its magnetite and ferrihydrite. From ChemCam Laser-Induced Breakdown Spectrometer (LIBS) chemical analyses, Windjana is representative of the Dillinger and Mount Remarkable members of the Kimberley formation. LIBS data suggest that the Kimberley sediments include at least three chemical components. The most K-rich targets have 5.6% K2O, approximately 1.8 times that of Windjana, implying a sediment component with greater than 40% sanidine, e.g., a trachyte. A second component is rich in mafic minerals, with little feldspar (like a shergottite). A third component is richer in plagioclase and in Na2O, and is likely to be basaltic. The K-rich sediment component is consistent with APXS and ChemCam observations of K-rich rocks elsewhere in Gale Crater. The source of this sediment component was likely volcanic. The presence of sediment from many igneous sources, in concert with Curiosity's identifications of other igneous materials (e.g.,mugearite), implies that the northern rim of Gale Crater exposes a diverse igneous complex, at least as diverse as that found in similar-age terranes on Earth.

Treiman, Allan H.↗

Waterproofing and Strengthening Volcanic Tuff in Waste Repositories

Waste repositories from surface trenches and shafts at Los Alamos to drilled tunnels at Yucca Mountain are being built in volcanic Tuff, a soft compacted material that is permeable to water and air. US Department of Energy documents on repository design identify the primary design goal of 'preventing water from reaching the waste canisters, dissolving the canisters and carrying the radioactive waste particles away from the repository'. Designers expect to achieve this by use of multiple barriers along with careful placement of the repository both well above the water table and well above the ground level in a mountain. Though repositories are located in areas that have a historically dry climate to minimize the impact of rainfall infiltration, global warming phenomena may have the potential to alter regional climate patterns - potentially leading to higher infiltration rates. Conventional methods of sealing fractures within volcanic tuff may not be sufficiently robust or long lived to isolate a repository shaft from water for the required duration. A new grouting technology based on molten wax shows significant promise for producing the kind of long term sealing performance required. Molten wax is capable of permeating a significant distance through volcanic tuff, as well as sealing fractures by permeation that is thermally dependent instead of chemically or time dependent. The wax wicks into and saturates tuff even if no fractures are present, but penetrates and fills only the heated area. Heated portions of the rock fill like a vessel. The taffy-like wax has been shown to waterproof the tuff, and significantly increase its resistance to fracture. This wax was used in 2004 for grouting of buried radioactive beryllium waste at the Idaho National Laboratory, chiefly to stop the water based corrosion reactions of the waste. The thermoplastic material contains no water and does not dry out or change with age. Recent studies indicate that this kind of wax material may be inherently resistant to bio-degradation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗