Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIOACTIVE WASTE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Scaled Testing to Evaluate Pulse Jet Mixer Performance in Waste Treatment Plant Mixing Vessels

The Waste Treatment and Immobilization Plant (WTP) at Hanford is being designed and built to pre-treat and vitrify the waste in Hanford’s 177 underground waste storage tanks. Numerous process vessels will hold waste at various stages in the WTP. These vessels have pulse jet mixer (PJM) systems. A test program was developed to evaluate the adequacy of mixing system designs in the solids-containing vessels in the WTP. The program focused mainly on non-cohesive solids behavior. Specifically, the program addressed the effectiveness of the mixing systems to suspend settled solids off the vessel bottom, and distribute the solids vertically. Experiments were conducted at three scales using various particulate simulants. A range of solids loadings and operational parameters were evaluated, including jet velocity, pulse volume, and duty cycle. In place of actual PJMs, the tests used direct injection from tubes with suction at the top of the tank fluid. This gave better control over the discharge duration and duty cycle and simplified the facility requirements. The mixing system configurations represented in testing varied from 4 to 12 PJMs with various jet nozzle sizes. In this way the results collected could be applied to the broad range of WTP vessels with varying geometrical configurations and planned operating conditions. Data for “just-suspended velocity”, solids cloud height, and solids concentration vertical profile were collected, analyzed, and correlated. The correlations were successfully benchmarked against previous large-scale test results, then applied to the WTP vessels using reasonable assumptions of anticipated waste properties to evaluate adequacy of the existing mixing system designs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removing of Core Constructions of the MR and RFT Reactors in NRC 'Kurchatov Institute' - 16054

In frame of the FTP 'Providing nuclear and radiation safety of Russia in 2008 and for the period till 2015' works of a decommissioning of the MR and RFT research reactors are carried out in National Research Center 'Kurchatov Institute'. Within these works, the equipment of 9 loop-back facilities of the MR reactor was dismantled. In the conditions, which are most approached to natural, one researched a heat, hydrodynamic and strength characteristics of elements of cores and the capital equipment of the majority of power reactors at these facilities. In 2014-2015 dismantle of core constructions of the MR reactor was carried out and dismantle of a graphite laying of the RFT reactor is begun. The beryllium blocks, which were constructional elements of the core, and the graphite blocks playing a reactor reflector role were also taken, packed into cases or containers and removed: part on an accumulative platform, and part are placed in storage of high level radioactive waste of the Center for decay and further sending for long storage. Works were performed by remote controlled mechanisms, control of their performance was exercised by means of remote diagnostics: Gammavizor, the scanning spectrometer systems. The following methods and the organizational principles were applied to providing of radiation safety of these works: - the constant radiation control including individual control of a dose of external radiation, control of volume activity of radionuclides in air, annual control of internal radiation doses of the personnel; - dust suppression and fixing of radioactive contamination by dispersion of polymeric structures; - carrying out decontamination on a shift basis rooms with use of detergents; - use of the remote controlled mechanisms equipped with hydraulic scissors, nippers, application of the diamond are sharp that allowed to perform the majority of technological operations remotely, using 'cold' methods of fragmentation; - development on each type of works of the operation project and schedules. As a result, of works of 2011-2014 of the decommissioning of the MR and RFT research reactors more than 630 t of the equipment were dismantled. From them more than 455 t of radioactive waste was. The total activity of radwaste exceeded 300.0 GBq. From the pool of the reactor, about 160 channels of loop-back installations and near 230 beryllium and graphite are taken, fragmented and packed. The total activity on radionuclides {sup 60}Co and {sup 137}Cs of them was near 55 TBq. From the territory of the center about 2550 m{sup 3} of firm and 4600 m{sup 3} of liquid radwaste are removed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Impact of Fast Flow Paths Through Grout Monoliths Used for Radioactive Waste Disposal - 13224

Empty HLW handling and storage tanks at SRS and INL contain residual radioactivity; these tanks are being stabilized with cementitious grout during closure operations. The US NRC directed the Center for Nuclear Waste Regulatory Analyses (CNWRA{sup R}) to develop physical analogs of cementitious grout monoliths to investigate their potential to form fast flow pathways such as macro-cracks, separations between grout lifts, and annuli around pipes, supports, and along tank walls. CNWRA developed and tested 15 55-gal-drum-scale specimens and 2 larger specimens of tank-filling cementitious grout, and 9 specimens of pipe-filling grout. These experiments demonstrated that the size of fast flow pathways that develop and the peak temperatures attained during hydration are proportional to the scale of the specimen, and that annular apertures and bulk grout permeability generally increased with time post-placement. Cracks developed overnight following placement of each grout lift in the largest specimen, but developed more slowly in smaller specimens, perhaps due to a ∼20 deg. C difference in peak temperatures, which influence the thermal gradients that can induce cracking. Plastic and drying shrinkage commonly led to poor grout-to-metal and grout-to-grout bonding. Cracks, annular gaps, and grout flow lobe seams transmitted fluids during injection testing. Macro-scale flow pathways such as these are not readily observed in bench-scale specimens of cementitious tank grout. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Documented Safety Analysis for the Waste Storage Facilities

This documented safety analysis (DSA) for the Waste Storage Facilities was developed in accordance with 10 CFR 830, Subpart B, 'Safety Basis Requirements', and utilizes the methodology outlined in DOE-STD-3009-94, Change Notice 3. The Waste Storage Facilities consist of Area 625 (A625) and the Decontamination and Waste Treatment Facility (DWTF) Storage Area portion of the DWTF complex. These two areas are combined into a single DSA, as their functions as storage for radioactive and hazardous waste are essentially identical. The B695 Segment of DWTF is addressed under a separate DSA. This DSA provides a description of the Waste Storage Facilities and the operations conducted therein; identification of hazards; analyses of the hazards, including inventories, bounding releases, consequences, and conclusions; and programmatic elements that describe the current capacity for safe operations. The mission of the Waste Storage Facilities is to safely handle, store, and treat hazardous waste, transuranic (TRU) waste, low-level waste (LLW), mixed waste, combined waste, nonhazardous industrial waste, and conditionally accepted waste generated at LLNL (as well as small amounts from other DOE facilities).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative Canister Processing Operations at an Interim Storage Facility - 16617

The US Department of Energy (DOE) is laying the groundwork for implementing interim storage of spent nuclear fuel (SNF) in response to recommendations by the Blue Ribbon Commission on America's Nuclear Future in their report to the Secretary of Energy published January 2012. These efforts include planning for a Pilot Interim Storage Facility (ISF) and a Larger ISF. In March 2014, the DOE employed the CB and I team to evaluate design alternatives for cask handling operations and storing SNF at an ISF. The report, 'Generic Design Alternatives for Dry Storage of Used Nuclear Fuel', (Alternatives Report) evaluates different aspects of an ISF, including a study on alternative approaches for processing SNF canisters such as different cask handling methods and configurations which might be used to transfer canisters from shipping casks into storage locations at an ISF. The purpose of this paper is to report on the development of alternative cask handling operations that have been evaluated for the receipt and storage of the SNF at an initial Pilot ISF and a Larger ISF. This design study is relevant for host communities considering near-term development of a Pilot ISF. DOE-sponsored system analyses indicate that a processing rate of up to 3,000 MTU/yr (approximately 230 to 300 canisters) would be needed for a single Larger ISF (less if more than one ISF were developed) to remove SNF from commercial nuclear plants in a reasonable amount of time. The study evaluated different canister processing operation methodologies in order to reduce the complexity, cost, and personnel exposure associated with processing operations at an ISF. The conclusions from this design study could help to inform the selection of future canister processing operations for an ISF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Westinghouse Cementation Facility of Solid Waste Treatment System - 13503

During NPP operation, several waste streams are generated, caused by different technical and physical processes. Besides others, liquid waste represents one of the major types of waste. Depending on national regulation for storage and disposal of radioactive waste, solidification can be one specific requirement. To accommodate the global request for waste treatment systems Westinghouse developed several specific treatment processes for the different types of waste. In the period of 2006 to 2008 Westinghouse awarded several contracts for the design and delivery of waste treatment systems related to the latest CPR-1000 nuclear power plants. One of these contracts contains the delivery of four Cementation Facilities for waste treatment, s.c. 'Follow on Cementations' dedicated to three locations, HongYanHe, NingDe and YangJiang, of new CPR-1000 nuclear power stations in the People's Republic of China. Previously, Westinghouse delivered a similar cementation facility to the CPR-1000 plant LingAo II, in Daya Bay, PR China. This plant already passed the hot functioning tests successfully in June 2012 and is now ready and released for regular operation. The 'Follow on plants' are designed to package three 'typical' kind of radioactive waste: evaporator concentrates, spent resins and filter cartridges. The purpose of this paper is to provide an overview on the Westinghouse experience to design and execution of cementation facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Long-term Storage of ILW: Building Stores with the Appropriate Environmental Controls - 20294

In the UK, containers for the storage and disposal of intermediate level radioactive waste (ILW) typically use stainless steel due to its excellent mechanical properties and corrosion resistance. The period of interim storage before a disposal facility is available, however, is longer than available engineering experience with stainless steels in relevant environmental conditions. Additionally, after disposal the ability of ILW containers to withstand further periods of exposure to the environment is expected to provide substantial benefits to the operation of a disposal facility and the safety case underpinning its closure. For these reasons, although there have been no instances of failure of stainless steels in indoor storage conditions, a focused R and D programme has been carried out to identify the environmental envelope over which the material does not significantly degrade. In this study we summarise experimental and modelling studies carried out over the last decade to build a solid mechanistic understanding of the corrosion behaviour of stainless steels in indoor atmospheric conditions. We then identify suitable environmental regimes to minimise the risk of degradation processes and explore approaches to monitoring the storage conditions to gain confidence in the long-term performance of the system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Implementation of Consolidated Dry Fuel Storage at the INL - 19655

An innovative nuclear-fuel storage bucket design provides increased fuel storage capacity at the Irradiated Fuel Storage Facility (IFSF) on the Idaho National Laboratory (INL) Site. The IFSF is a dry storage facility that is at approximately 93% of its fuel storage capacity. This innovative fuel storage bucket provides for higher density packaging, thereby allowing for the receipt of more fuel at the IFSF and subsequent completion of the wet-to-dry fuel transfer scope at the INL's Idaho Nuclear Technology and Engineering Center (INTEC). The subject fuel originates from the Advanced Test Reactor (ATR) at the INL Site. All spent nuclear fuel (SNF) at INTEC is required by the Idaho Settlement Agreement (ISA) to be out of wet storage by December 31, 2023. The ISA is a tri-party agreement between the U.S. Department of Energy, the U.S. Navy, and the State of Idaho. Currently, the INTEC CPP-666 pools contain all of the INL's SNF remaining in wet storage, and INTEC's Spent Fuel Project is on schedule to meet the ISA deadline. Interestingly, the INL Site's environmental cleanup contract awarded to Fluor Idaho in 2016 also initially required the Spent Fuel Project to continue SNF receipts from the ATR into wet storage at the CPP-666 pools. The continued receipts of ATR SNF into the CPP-666 basin were able to be redirected to the IFSF because of the new storage package design, enabling the Spent Fuel Project to meet the ISA requirement to have all SNF out of wet storage by 2023. Complicating the need to redirect ATR receipts from wet storage is the lack of interim storage capacity at the ATR site. This lack of ATR storage capacity threatened to terminate reactor operations if the SNF could not be received at INTEC. The contractual requirement for continued ATR SNF receipts to prevent termination of reactor operations is resolved by the implementation of the innovative consolidated dry storage configuration in the IFSF. Consolidated fuel storage at the IFSF provides increased fuel storage capacity to facilitate meeting the ISA and the Fluor Idaho contract requirements. It provides for the completion of the ATR wet-to-dry fuel transfer scope and supports continued operation of the ATR by allowing the receipt of additional ATR SNF directly into IFSF dry storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotic Solutions for Remote Access and Retrieval of High-Level Radioactive Waste - 19544

This paper describes the ongoing development of robotic solutions for accessing and retrieving high-level radioactive waste from underground storage bins as part of the Calcine Retrieval Project at the INL Site. The waste is in the form of a solid powder, referred to as calcine, stored in a set of stainless steel bins within an underground concrete vault. Due to the radiation field produced by the calcine, all operations must be performed remotely. The Calcine Retrieval Project is currently carrying out proof-of-concept testing of methods for the various stages of calcine retrieval. The bins were designed with no means for access, so retrieval operations will require welding access riser pipes to the bins, followed by cutting through the bin walls from within the risers. These tasks are complicated by the fact that four of the risers must be placed off center on a domed surface, resulting in a weld joint that is curved and tilted relative to the riser axis. The Access Riser Connection robot is being developed to perform these operations using interchangeable welding and plasma cutting attachments. The majority of the calcine will be removed using a vacuum system and pneumatically transferred to storage. This system is not described in this paper. However, the bins contain several internal features that are expected to retain calcine, most notably circumferential stiffening rings on the walls and radial ribs on the floors. One of the solutions being developed for the task of retrieving this residual calcine is a vacuum crawler, a wheeled robot using vacuum to adhere to the interior walls of the bins. The vacuum crawler would use a separate vacuum system to remove residual calcine or would use compressed air to move calcine to a location from which it can be retrieved more easily. While comparable welding and wall-climbing robots have been developed before, this particular application has several constraints that are not satisfied by existing systems. For this reason, both the access riser welder and the vacuum crawler, although still under development, may be of interest to other projects faced with similar constraints. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing work flow and logistic at waste processing facilities using the waste compliance and tracking system - 15392

Work flow and logistics at a busy radioactive waste processing complex or permitted treatment, storage, and disposal facility (TSDF) can pose a monumental challenge. An efficient operation requires good communication between engineering, logistics, and waste operators. The Los Alamos National Laboratory (LANL) has implemented an application that facilitates seamless communication of work flow requirements, between engineering, logistics, and waste operations personnel in the field. The Waste Compliance and Tracking System (WCATS), a comprehensive waste management system designed at LANL, provides four key elements to support logistics: (a) the container work path, (b) directed unit operation requests, (c) notification of pending operations, and (d) real-time status tools for office and field workers. The combination of these elements allows everyone to function as a team, with a shared knowledge of what is needed to accomplish facility objectives. The first element is like a road map indicating which unit operations are needed and in what sequence they should be performed; this is referred to as a 'work path'. It automatically routes a waste item or container from operation to operation. For example, a given work path might indicate that waste items require radiological survey, radioassay, and a technical review, in that order. When the work path is assigned to a container, the system enforces the correct order of operations. Directed unit operation 'requests', the second element, fills a gap between pre-planned, formal 'work path' activities and the need for flexibility to direct preparatory operations or deal with unexpected issues, like staging or mining containers in preparation for a shipment or transferring containers from one storage unit to another to clear a path for building maintenance. Logistics engineers prepare these 'requests', and the system monitors the status and completion of the work. The third element, notifications, allows team members to subscribe to and receive notice that an operation is pending, initiated, or complete. This functionality supports a range of communication options, including e-mail, cell phone, pager, or application in-box messaging. Notifications allow waste operations personnel to multi-task, and remain in the loop on the status of facility-wide activities. Finally, the fourth element provides tools that communicate work path pending operations and directed requests to field workers on their mobile computer, allowing them to mine or pick containers from storage units, and leverage the capabilities of a bar-code scanner to avoid selection mistakes. Oversight and summary tools are provided, allowing logistics personnel to monitor work path and request task status, identify work-flow bottlenecks, and maximize the efficiency of waste operations. The Waste Compliance and Tracking System (WCATS) provides an innovative, comprehensive set of tools that allow large-scale radioactive waste processing facilities to manage logistics, maximize efficient use of the workforce, and create a team environment, where everyone from management to the waste handlers have an understanding of the work load and what needs to be accomplished. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CNL Technologies for Heavy Water Detritiation - 19437

Canadian Nuclear Laboratories (CNL) is responsible for a large amount of heavy water owned by the Government of Canada. A significant portion of this heavy water has been downgraded and is chemically and/or radiologically contaminated (besides tritium). Storage, monitoring and disposal of this water incurs significant costs. Upgrading following chemical purification (including removal of radionuclides other than tritium) of this water is feasible with commercial processes. However, removal of the tritium to the level that would allow the heavy water to be available for non-nuclear applications requires very specialized processes. CNL has developed and demonstrated the Combined Electrolysis and Catalytic Exchange (CECE) detritiation technology to reduce the tritium to the level at which the heavy water can be classified as non-radioactive. The CECE process consists of a Liquid Phase Catalytic Exchange (LPCE) bed, where the transfer of hydrogen isotopes between water and gaseous hydrogen occurs, and an electrolysis cell (E-cell) that produces hydrogen and separates the isotopes of hydrogen, adding to the enrichment achieved in the LPCE catalyst bed. The application of the CECE technology to the tritium-contaminated heavy water would restore its full market value. As part of a project supported by CNL Decommissioning and Waste Management, a business case is being developed to build and operate a facility that will purify and detritiate heavy water to render it commercially attractive. The main goal of the current study is to evaluate the net benefits of detritiation and product sale versus the cost of permanent storage or disposal. Such a facility would not only eliminate the need to store the heavy water as a radioactive waste material and provide revenue, but would also serve as a demonstration of CNL's technology for similar applications elsewhere. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Strategy for a Waste Disposal Facility with Multiple Waste Types and Regulatory Drivers at the Nevada Test Site

The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) plans to close the waste and classified material storage cells in the southeast quadrant of the Area 5 Radioactive Waste Management Site (RWMS), informally known as the '92-Acre Area', by 2011. The 25 shallow trenches and pits and the 13 Greater Confinement Disposal (GCD) borings contain various waste streams including low-level waste (LLW), low-level mixed waste (LLMW), transuranic (TRU), mixed transuranic (MTRU), and high specific activity LLW. The cells are managed under several regulatory and permit programs by the U.S. Department of Energy (DOE) and the Nevada Division of Environmental Protection (NDEP). Although the specific closure requirements for each cell vary, 37 closely spaced cells will be closed under a single integrated monolayer evapotranspirative (ET) final cover. One cell will be closed under a separate cover concurrently. The site setting and climate constrain transport pathways and are factors in the technical approach to closure and performance assessment. Successful implementation of the integrated closure plan requires excellent communication and coordination between NNSA/NSO and the regulators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Bentonite Engineered Barrier Performance under Repository Conditions

Nuclear energy has been an important source of power throughout the world for several decades, but with that power comes substantial amounts of waste. The USA alone is projected to produce 77,100 MTHM (34,700 MCi) of commercial spent fuel by the year 2020. There has been a growing sense of urgency to determine a method of disposal for all types of nuclear waste. Underground storage has been proposed as the safest means of long term storage and disposal by both the Academy of Sciences and the Blue Ribbon Commission with a focus on deep geologic disposal. Because deep geological repositories (DGR) pose as the safest method of disposal due to the isolation of the waste and the low-permeability of the surrounding material, it is crucial to understand the science behind these repositories. Many scientists have concern with DGRs because of all the unanswered scientific questions. With a global inventory of 300,000 MTHM, it is imperative to understand how DGRs will retain the nuclear waste over a time span of up to a projected 1 million years. Because of the amount of nuclear waste increases each year, there is an inherent need to study the viability of a repository in order to begin implementation of that repository. Based on the half-lives of each radionuclide in nuclear waste, after approximately 100 years of storage, the heat production from the decay of radionuclides becomes dominated by the long-lived actinides. Because the decay of the nuclear waste results in an elevated temperature within the canister, That mixed with water intrusion can corrode the canister and allow radionuclides to leach into the surrounding environment. In an effort to retain these radionuclides within the repositories, most all deep geologic repository designs incorporate an engineered multi-barrier approach. Once the radionuclides begin to leach out of the canisters, the next barrier to retain them is a layer of compacted clay such as a smectite. A mechanistic understanding of mobility at elevated temperatures is crucial in order to evaluate the performance of the engineered clay barrier system within a deep geological repository. Because the clay barrier is compacted so tightly, the only method of mobility for radionuclides is through molecular diffusion. Assessing the factors that affect the rates at which various radionuclides will diffuse through these clays is important in the performance assessment of the repository system as a whole. Neptunium-237 has been identified as a major actinide of concern for long term storage, dominating the radioactivity emitted from the waste between 10,000 to 100,000 years of storage. Under oxidizing conditions, this radionuclide exists mainly as Np(V). In this oxidation state, the neptunium exists chemically as the NpO{sub 2}{sup +} ion which exhibits enhanced mobility characteristics such as high solubility and low affinity for sorption to surfaces. Because of this, {sup 237}Np(V) has been identified as the most mobile radionuclide in nuclear waste and thus a major radionuclide of concern, motivating research into the mobility of {sup 237}Np(V) through the compacted clay barrier. Bentonite is one of the most common backfill materials used in repositories. This clayey rock's main constituent is the mineral Na-montmorillonite [(Ca{sub 0.06}Na{sub 0.14}K{sub 0.05})(Al{sub 1.57}Fe{sup 3+} {sub 0.17}Mg{sub 0.25})(Al{sub 0.04}Si{sub 3.96}O{sub 10} - (OH){sub 2})] which gives this material the advantageous properties required for a repository such as a high swelling capacity. Because of this high affinity for absorbing water, montmorillonite is the ideal candidate for backfill material in a deep geological repository. Adsorption of radionuclides onto the surface of the compacted clay is a major mechanism for retardation of mobility. Because diffusion and adsorption are integrated into this process, it is important to characterize Np adsorption onto the surface of compacted montmorillonite. Previous studies have quantified the adsorption of Np onto montmorillonite at variable ionic strengths and temperatures. Furthermore, several studies have focused on the diffusion of Np through compacted clay, but no other studies have determined diffusion coefficients at elevated temperatures of up to 80 deg. C. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developments in the Regulatory Framework of Interim Storage of Spent Nuclear Fuel (SNF) in Germany - 18137

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office for Safety of Nuclear Waste Management (BfE). In 1995, a license for storage of spent nuclear fuel (SNF) and vitrified high level waste (HAW) was granted for the interim storage facility in Gorleben. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the nuclear power plant NPP Lingen. Since this time twelve NPPs erected their own storage facilities additionally to the three central storage facilities (Ahaus, Gorleben and Rubenow). In all of these facilities the concept of dry storage in metallic dual purpose casks (DPCs) is implemented. The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2034. In Germany the decision about a repository site will be taken in the year 2031. To enable the utilities to hand over the SNF and HAW to the repository regime while the current licenses are still valid would require a very fast process licensing and construction of the required facilities at this location. As a delay cannot be excluded, necessary preparations have to be taken on the side of the regulator. In the German Atomic Energy Act precautions have already been taken and consulting the German parliament (Bundestag) is mandatory if inevitable events would require an extension of the currently licensed interim storage period. The new structure with the Federal Office BfE, and two companies for final disposal 'Bundesgesellschaft fuer Endlagerung' (BGE mbH) and interim storage 'Bundesgesellschaft fuer Zwischenlagerung' (BGZmbH) was established in 2017. The Federal Office for Safety of Nuclear Waste Management (BfE) is responsible for regulation in the field of nuclear disposal since 30.07.2016. So the package design approval for DPCs and the storage licenses for SNF will be granted by this office. Furthermore, it is the regulator for the repository and will finally grant a license for the German deep geological repository. Site selection and construction and operation of the repository will be the responsibility of BGE. On January 1, 2018, the BGZ will take over all remaining interim storage facilities operating under a license due to article six of the Atomic Energy Act. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 18327

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever, built for radioactive waste processing. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) (collectively referred to as LBL); - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the Pretreatment (PT) Facility; - Resolving the technical issues associated with primarily the PT Facility; - Completing the design and construction of the High-Level Waste (HLW) and PT facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree 1 completion milestones for the Hanford WTP, which generally aligns with DOE's plans for completing the WTP facilities in sequence: - Complete LAW Facility hot commissioning: December 31, 2023; - Complete HLW Facility hot commissioning: December 31, 2033; - Complete PT Facility hot commissioning: December 31, 2033; - Achieve initial plant operations for the WTP: December 31, 2036. Having established milestones for completing the WTP facilities has enabled DOE to formally implement its plans for completing the WTP facilities in sequence, starting with the LAW Facility. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. Significant progress has been made toward completing the design, construction, and planning for commissioning of the facilities needed to enable the DFLAW operations to commence as early as January 2022. In 2012, DOE partially suspended production work on the WTP's PT Facility and to a lesser degree the HLW Facility because of unresolved technical issues associated with those facilities. In September 2017, DOE acknowledged the WTP contractor had met all the criteria for full resumption of engineering, procurement, and construction (EPC) activities for the HLW Facility. By December 2017, DOE had completed the actions needed to resolve the six of the eight primary technical issues associated with the PT Facility, with the remaining two issues expected to be resolved in the first quarter of 2018. Although significant progress has been made to prepare for resuming production activities for the HLW and PT facilities, DOE has made the decision to constrain EPC work on those facilities in the near term based on DOE's higher priority of completing the WTP facilities needed to begin DFLAW operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Encapsulation of Defective Fuel Rods for Transport and Dry Storage - 18190

Removing of the whole inventory of fissile and non-fissile material out of the spent fuel pool is performed when the power plant is about to start its last operation phases or may occur during the extended operating life cycle due to plant storage space limitation. Removal of defective spent fuel is then definitely required for emptying the pool and may in addition also be performed in the course of plant operation for reducing pool contamination. Depending on the general used fuel management solution chosen for post-storage pool operations, specific management of a defective fuel assembly (DFA) and/or a defective fuel rod (DFR) should be implemented accordingly to the regulation requirements to be followed. For meeting these DFA and/or DFR management needs, Framatome together with New AREVA offer wide portfolio of solutions with flexibility and adaptability advantages: - from simple to advanced technologies; - for several types of fuel assemblies and/or defective rods; - for suitable and compatible cask designs; - for compatible solution with both used fuel final management strategies (closed and open fuel cycles). For instance, a technology is jointly proposed and developed by New AREVA and Framatome for implementing dry storage of DFR. It consists in: - encapsulating each DFR by loading the fuel rod in a respective capsule, drying the fuel rod using a process which allows to physically verify with high accuracy the dryness inside the DFR, and seal welding the capsule - assembling the capsules in a capsule canister (a skeleton with external dimensions similar to a respective fuel assembly) and - transferring the capsule canister along with intact spent fuel assemblies in an associated dry transport and storage (dual purpose) cask. Such a project is currently being implemented in Belgium. After successfully obtaining the cask transport and storage license extensions for including the encapsulated DFR content, the first encapsulation campaign has been started in 2017. The purpose of the paper is to present the industrial solutions proposed by Framatome and New AREVA together, for management of DFR, notably the one related to dry storage of encapsulated DFR implemented in Belgium and the perspectives opened by this successful project. The paper presents: - the available solutions for management of DFA and/or DFR depending on applicable requirements - the drying method, welding of a capsule and associated cask as the state of art technology for dry storage of DFR and/or DFA; - lessons learned from project management and encapsulation campaign performed in Belgium; - perspectives for management of DFR and/or DFA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updating the Dry Transfer System - 18110

The Dry Transfer System (DTS) was examined for its ability to be redesigned in order to meet needs associated with repackaging used/spent nuclear fuel (UNF/SNF) from existing storage cask systems into alternative systems, while also incorporating design advances based on some lessons learned from Orano's dry UNF handling facility (T0) located at the La Hague recycling plant. In this redesign, the DTS is envisioned to provide some flexibility through the ability to perform repackaging activities from multiple differently designed cask systems, including those with canisters that will require cutting and welding activities, and potentially with waste packages designed for disposal. The redesigned DTS is also intended to provide some operational flexibility by providing lag storage and include a means for examining UNF/SNF during repackaging, using some features implemented at the T0 facility at La Hague. This paper provides a summary of: the original DTS design, which was evaluated by the NRC and portions of which were cold-tested at Idaho National Lab; the lag storage system designed for the DTS, which is able to flexibly handle different fuel assembly designs while providing structural support for design basis events (e.g., seismic); the incorporation of lessons learned from the La Hague T0 facility into the DTS design to facilitate dry handling of UNF/SNF; and identification of other challenges towards designing a complete system. A revised DTS is envisioned to provide an important tool for the future management of UNF/SNF in preparation for transportation, re-storage, re-transportation, and/or disposal and also provides a means for repackaging UNF/SNF in case recovery from a cask/canister system is necessary (e.g., due to extended storage or a transportation event). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adsorptive Removal of Cs-137 and Sr-90 from Water in the Spent Fuel Pool of Taiwan Research Reactor - 18169

The cleanup of spent fuel pool in Taiwan Research Reactor (TRR) is a significant milestone in the decommissioning project of TRR. Due to the water was polluted by the ruptured spent nuclear fuel rods, the fission products and actinides were required to be removed from the water prior to transporting the water to the radioactive liquid wastes treatment plant. A granular aluminosilicate adsorbent (namely GWC) was loaded into a special designed water submersion adsorber to remove radionuclides from water in consideration of the subsequent retrieving after used. The unit is able to be placed underwater without heavy shield shroud, and easily to be assembled and disassembled. More than 95% of β-emitters had been removed from the 980 m{sup 3} of contaminated water in the SFP and generated about 1.5 m{sup 3} of spent GWC which adsorbed with 4*10{sup 12} Bq of radionuclides. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗