Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Central Appalachian Basin CarbonSAFE Integrated Pre-Feasibility Project (Final Technical Report)

The Central Appalachian Basin-Carbon Storage Assurance Facility Enterprise (CarbonSAFE) (CAB-CS) Integrated Prefeasibility Project identified several “Selected Areas” in eastern Ohio where the Cambrian-Ordovician age sandstones and carbonates show the most promising reservoir potential for carbon capture and storage (CCS). These selected areas are located near depleted oil and gas fields where oil recovery could be improved with enhanced oil recovery. This region has many large carbon dioxide (CO 2 ) point sources that represent a diverse array of industries, including coal-fired power plants, natural gas processing, refineries, chemical plants, and natural gas power. In a carbon-constrained future, one of the most promising ways to make coal a viable fuel option for power generation or industrial processes is to capture and store CO 2 emissions. The project is a pre-feasibility study to mitigate the emissions from 1.67 million metric tons CO 2 per year by developing a storage complex capable of storing 50 million metric tons. The pre-feasibility study identified two candidate locations for a carbon storage hub in the Appalachian Basin, analyzed six source-sink scenarios in the CAB-CS study area with analysis of capture and transport, defined infrastructure needs for a CCS project in the area, conducted an economic, liability, and social assessment, and built a team to evaluate CCS options in the CAB-CS study area. The project was an important step in implementing CCS in the CAB-CS study area. Major accomplishments include experience in investigating CCS projects in the area (learning by doing), adding to National Energy Technology Laboratory (NETL) best practices tools and tool sets, and building the elements of the CCS road map for the region.

20 FOSSIL-FUELED POWER PLANTS↗

2014-2018 Summary of NCAR activities in the Earth Energy Exascale System Model (E3SM) project

NCAR participation in E3SM activities as part of this funded collaborative project has been successful in leveraging the existing atmosphere model development experience from CESM scientists and applying it to initial v1 atmosphere model (EAM) development and analysis. NCAR partners collectively had many decades of experience in parameterization development, running and tuning coupled models and building the required software infrastructure to support ongoing model developments. Furthermore, collaboration between E3SM and CESM developers was of mutual benefit to both modeling endeavors. In the earlier periods of the project, participation in E3SM both complemented core critical path DOE activities and advanced individual parameterization development; including orographic drag, convection parameterization, convective gustiness and cloud and microphysical processes. Significant progress has been made implementing model capabilities for separating out the physics and dynamics grids, and providing the infrastructure for including orographic elevation class communication between the land and atmosphere models. Our activities working with the E3SM workflow and software engineering teams have established efficient protocols and infrastructure for the sharing of CESM and E3SM model codes of interest to both modeling groups, a large component of which is the mutual communication of common code bugs. As well as these specific project tasks all NCAR project members have been regular participants in atmosphere and coupled group telecons, as well as PI meetings. We have been fully engaged with and contributed to decisions regarding v1 atmosphere model developments, coupled model simulations, model tunings, and software engineering infrastructure. NCAR’s contribution to more recent E3SM development activities has centered on analysis of v1 release and pre-release simulations in order to address outstanding systematic biases and communicate climate improvements. Of particularly note is the work in understanding clouds and cloud feedbacks, shortcomings in ENSO and sub-seasonal variability; in particular the Madden Julian Oscillation (MJO). Contributions have been made to a number of papers that are currently published or in preparation detailing model performance in CMIP6-protocal experiments. They outline the simulations of mean climate, clouds and convection processes, convective gustiness, atmospheric blocking coupled climates. The contributions of NCAR’s funded activities to the E3SM atmosphere in the initial years of the project have had a positive impact on many aspects of the model simulations described in these papers.

58 GEOSCIENCES↗

The Vineyard Wind Power Purchase Agreement: Insights for Estimating Costs of U.S. Offshore Wind Projects

This report analyzes the power purchase agreements (PPAs) between Massachusetts electric distribution utilities (EDC) and Vineyard Wind LLC filed on July 31, 2018, and derives insights for estimating cost of U.S. offshore wind systems and broader cost modeling activities. The documented price for delivery of offshore wind generation and renewable energy certificates under the Vineyard Wind/electric distribution utilities PPA is 74 $/megawatt-hour (MWh) (2022$) for facility 1 (400 MW) and 65 $/MWh (2023$) for facility 2 (400 MW). However, this PPA price does not comprise the complete set of expected revenue sources and tax benefits available to the Vineyard Wind LLC project. A comprehensive accounting of expected revenue sources inclusive of those that are exogenous to the reported PPA is conducted in this study to estimate the project's levelized revenue of energy (LROE). This allows for a more equivalent comparison of the PPA pricing with bottom-up modeled (unsubsidized) levelized cost of energy (LCOE) estimates. LROE from the Vineyard LLC/EDC PPA is estimated to be 98$/MWh (2018$). This LROE estimate for the first commercial-scale offshore wind project in the United States appears to be within the range of LROE estimated for offshore wind projects recently tendered in Northern Europe with a start of commercial operation by the early 2020s. This suggests that a cost and risk premium for the initial set of U.S. offshore wind projects may be less pronounced than anticipated by many industry observers and analysts.

17 WIND ENERGY↗

Collaborative Research: Performance Retargeting of Instrumentation, Measurement, and Analysis Technologies for Exascale Computing: the PRIMA-X Project -- Final Technical Report

The PRIMA-X (Performance Retargeting of Instrumentation, Measurement, and Analysis Technologies for Exascale Computing) project was a collaborative research effort between the University of Oregon (UO) (Malony, PI) and the German Research School for Simulation Sciences GmbH (Wolf, PI) originally, later changed to the Technical University of Darmstadt. Our project aims addressed five areas -- scalability, dynamism, heterogeneity, locality, energy -- that present challenges to performance measurement systems at exascale, with emphasis placed on the first three. In essence, the general goal of the project was to prototype new technologies for performance measurement, analysis, and tuning on future exascale-enable computer systems. Each institution followed its research agena, with periodic coordination and sharing of ideas and results. After the 3-year funding, the PRIMA-X grant was extended beyond the 3-year period at no cost until the end of August 2018. This is the final technical report on the University of Oregon's progress during the entire project scope. Our main focus was to address the PRIMA-X challenges both through technological advancements in the TAU Performance System and their application, as well as prototypes developed in association with other exascale-directed research efforts (prior to the Exascale Computing Project (ECP)). Progress in Years 1 and 2 are summarized and our achievements in Year 3 (plus the extension) are discussed in more detail. This includes specific efforts on power, runtime systems, and monitoring infrastructure.

97 MATHEMATICS AND COMPUTING↗

Ultralight Door Design, Development and Demonstration Project (Final Scientific Report)

The project objectives associated with the Ultralight Door Project were to develop a lightweight driver's side door, 42.5% lighter than a current model year high-volume baseline door, at an incremental cost not to exceed $ \$ $ 5 per pound saved, while maintaining equivalent functionality, safety, corrosion, durability and sound transmission performance of the baseline vehicle. The project approach included the selection of a door architecture, development of a key performance target matrix and incremental cost model. Several unique door structures were developed and evaluated using computer-aided engineering (CAE) and cost modeling tools. The aluminum-intensive door structure was the only design capable of meeting both the performance and cost criteria objectives. The door module, glass, interior trim, latch and electrical subsystems were functionally integrated with the aluminum door structure, enabling additional mass reduction beyond material substitution. The lightweight door design was prototyped, integrated with baseline vehicles and tested to validate equivalent functionality and performance. The project results demonstrate a mass reduction of 15.2 kg (40%) at an incremental cost of $ \$ $2.81 per pound saved, while maintaining functionality and performance of the baseline door. The environmental benefit associated with the Ultralight Door enables a 6g CO 2 eq. per kilometer environmental benefit, for a 4-door vehicle powered by a downsized fuel injected gasoline combustion engine. The project results were presented and published in the 2018 SAE International Conference proceedings and in the Journal of Life Cycle Assessment.

36 MATERIALS SCIENCE↗

Smart DG Hub Resilient Solar Project Final Report

Hurricanes, unstable fossil fuel supplies and increased energy loads have revealed the vulnerability of America’s electric grids. Renewable energy has emerged as a viable option; however in order for this sector to reach its full potential it needs to be paired with storage. For example, all of the solar installations in New York City in 2014 were wired to automatically shut down during grid outages for safety reasons and lacked battery backup or other means to function during outages. Pairing solar with batteries can provide critical power needs and reduce dependency on delivered fuel. Additionally, resilient solar systems can also provide benefits outside of emergencies such as utility bill savings and grid support services. Solar+Storage needed a pathway through regulatory, policy and financial hurdles, some of which are unique to urban environments. Sustainable CUNY of the City University of New York (CUNY) formed the Smart Distributed Generation (DG) Hub to develop a strategic pathway to a resilient distributed energy system that integrates storage into resiliency planning and provide support to the grid on peak power days. Through the Smart DG Hub Resilient Solar Project, with support from the U.S. Department of Energy (DOE) as well as the New York State Energy Research and Development Authority, the New York Power Authority and private funding, Sustainable CUNY worked with project partners - including the National Renewable Energy Laboratory, Meister Consultant Group (now Cadmus), subject matter experts at utility companies, and authorities having jurisdiction - to develop a roadmap for the greater deployment of solar+storage as well as a toolkit of resources. Ultimately, in addition to the completed deliverables of multiple resources, the project established a baseline of the current policy, financial, and market landscape, and an understanding of which key areas would require further actions. The DG Hub’s collaborative platform and subject matter expertise gained through this project led directly to a new award from the NYS Energy Research & Development Authority to continue CUNY’s work in targeted areas including energy storage permitting and stakeholder education, similar to the way DOE’s prior support had sowed the initial seeds for the growth of the solar market in NYC, to the NYS market. Finally, the Resilient Solar Project helped inform the New York City (NYC) administration, leading to a significant policy development that included Mayor Bill de Blasio setting a city-wide storage goal of 100 MW by 2020, the first of any city in the country.

25 ENERGY STORAGE↗

CSP Systems Analysis - Final Project Report

The CSP Systems Analysis project was a three-year effort supporting the Concentrating Solar Power (CSP) Subprogram within the Solar Energy Technologies Office of the U.S. Department of Energy (DOE). The goal of the CSP Systems Analysis project was to provide timely and accurate CSP cost data to the DOE and predict performance and cost for emerging technologies that may impact research directions and industry investment. The project consisted of six, mostly independent tasks. Major accomplishments over the three-year period of performance were as follows. The NREL team maintained current cost estimates for CSP technologies by annual updates to the cost input parameters within NREL's System Advisor Model (SAM). SAM is a performance and cost simulation software that includes technology models for the primary CSP technologies. During the period from 2016 to 2018, the estimated cost within SAM's default CSP molten-salt power tower technology dropped from 13.0 to 11.1 cent/kWh (real dollars without incentives). Power cycle models for the supercritical carbon dioxide (sCO2) Brayton Cycle were developed and made an option within SAM's molten-salt power tower model. These models were subsequently used to evaluate the cost reduction potential of alternative salts. The partial-cooling model was found to provide the greatest cost-reduction potential due to its combination of efficiency and temperature differential across the turbine and thermal energy storage (TES) system. These studies were documented in two journal articles. NREL's optical modeling software SolTrace and SolarPILOT were made more versatile and released as open-source software to the CSP community. These tools help researchers and developers to model and optimize the optical performance of CSP collector systems. The new features were highlighted in a recorded webinar that can be accessed from the NREL SAM website. New models for solar-thermal systems, that is, applications for solar industrial process heat, were developed, validated, and installed within SAM. The analysis includes a 2018 review of linear collectors in the market that are tailored for solar process heat applications. In 2018 the NREL team also developed an annual simulation for a direct steam generation system integrated with a latent-heat TES system. This analysis was submitted for journal publication. The NREL team continued to support the exchange of information and development of CSP guidelines within the international CSP community of SolarPACES. Much of the work under this project was presented at SolarPACES, including the development of a modeling checklist to help CSP stakeholders standardize the models used for estimating CSP performance and cost. The CSP Systems Analysis project also supported DOE requests for tracking and reporting programmatic targets for the CSP Subprogram.

14 SOLAR ENERGY↗

Zero Emission Delivery Vehicle Demonstration Project (Final Technical Report)

The purpose of the project was to demonstrate thirty (30) fully developed, operational, advanced vehicle technology prototypes for on-road delivery applications within the Houston-Galveston-Brazoria Nonattainment Region. After some initial project delays related to difficulties related to financial difficulties from the initial manufacturing partners, the project began to move forward in late 2014 using a fleet-first approach. Ultimately, this project was able to deploy 18 trucks within the Houston region. These vehicles were developed and manufactured by Workhorse and purchased by United Parcel Service (UPS) according to UPS specifications and to be operated out of three different facilities located in the Houston region. Following final delivery of these vehicles during the summer of 2016, the demonstration period began in earnest in December 2016 and continued until the end of November 2018. Once deployed and operating in regular delivery service, the 18 battery electric delivery trucks encountered challenges typical to any new vehicle deployment. In addition to the expected difficulties related to any new vehicle deployments, there were unexpected persistent and ongoing performance issues related to the all-electric technology integrated into the vehicles. This caused significant downtime for many of the project vehicles and lower than anticipated utilization rates over the entire two-year demonstration period.

33 ADVANCED PROPULSION SYSTEMS↗

Exploratory Project: A vegetative facies-based multiscale approach to modeling nutrient transport in the Columbia river Basin

The exploratory project titled “A vegetative facies-based multiscale approach to modeling nutrient transport in the Columbia river Basin” was a collaborative effort between Stanford University (PI: Ilenia Battiato) and University of Southern California (co-PI: Felipe de Barros). The primary objective of this project was to develop a predictive understanding of the impact that submerged vegetation has on flow and transport in riverine systems. This is based on the recognition that vegetation-mediated transport and its temporal and spatial coupling with hydrological and ecological responses is a critical component in achieving a predictive understanding of the future impact of, and the risks associated to, anthropogenic and climate change stressors on nutrient cycling in the Subsurface Interaction Zone (SIZ). Although the full project framework was focused on developing top-down and bottom-up coupling between processes at different scales as outlined in Figure 1, its exploratory counterpart was organized in two major thrusts: the first related to quantifying flow resistance in vegetated rivers (Level II) and the second connected to quantifying and predicting the coupling between vegetation growth and hydrodynamics in riverine systems (Level III). In this regard, we successfully used porous media theory to model flow and transport in vegetated channels at the canopy scale (Level II) and have demonstrated that the aforementioned models have predictive capabilities to model both mean flow and transport at the canopy scale. At Level III, we have developed a computational framework in OpenFOAM, CladoFOAM, that is able to model and predict submerged vegetation growth at the km-scale and to study the impact that climate stressors can have on algae blooms from basic conservation laws at the appropriate scale. In Section 2, we briefly outline the project objectives; in Section 3, we present our scientific findings of all manuscripts already published and in preparation. We conclude in Section 4 with comments about future lines of investigation that may be pursued in the context of a larger-scope project.

54 ENVIRONMENTAL SCIENCES↗

Benchmarking Anticipated Wind Project Lifetimes: Results from a Survey of U.S. Wind Industry Professionals

This paper draws on a survey of wind industry professionals to clarify trends in the expected useful life of land-based wind power plants in the United States. The expected useful life of a project affects expectations about its profitability, the timing of possible decommissioning or repowering, and its levelized costs. We find that most wind project developers, sponsors and long-term owners have increased project-life assumptions over time, from a typical term of ~20 years in the early 2000s to ~25 years by the mid-2010s and ~30 years more recently. Current assumptions range from 25 to 40 years, with an average of 29.6 years. The estimated average levelized cost of energy (LCOE) for new wind projects built in 2018 is $\$ $40.4/MWh (real 2018$\$ $), assuming a 20-year project life. With a 25-year useful life and no change in assumed operations and maintenance (O&M) expenditures or wind plant performance over time, LCOE declines by 10%, to $\$ $36.2/MWh, because capital costs are recovered over five additional years of production. At the now-common 30-year assumed life, levelized costs decrease another 7%, to $\$ $33.5/MWh (under the same unaltered assumptions about O&M and performance). Even longer assumed lifetimes lead to further (but diminishing) LCOE reductions—e.g., to $\$ $31.7/MWh and $\$ $30.3/MWh for 35- and 40-year lives, respectively. The data and trends presented here may inform assumptions used by electric system planners, modelers and analysts. The results may also provide useful benchmarks to the wind industry, helping developers and assets owners to compare their expectations with those of their peers.

17 WIND ENERGY↗

Alliance Project: Secure Control Systems for the Energy Sector

The Alliance Project addresses Area of Interest 4: Secure Remote Access for the Energy Sector, by combining physical and cyber access under one cybersecurity access system. The Alliance Project built on the successful completion of the Lemnos and Padlock Project (DOE-Funded Project started in 2007 and 2010) and researched and developed a solution for an Ethernet Security Gateway with the functionality required to integrate the physical access control cyber system and interface with legacy and new proximity card readers used for physical access requests. This project focused on securing and enhancing the cyber system the physical access control system operates on. The team tested and demonstrated the system solution on the SEL campus. Currently the physical access cyber system is completely separate from the cyber access control cyber system. With a single system industry benefits include: (1) Single system to learn and teach employees; (2) Single system that collects and alerts on logs and events simplifying incident response plans and NERC CIP compliance; (3) Unifies trust management to a single system reducing the potential errors in privilege escalation or revocation; (4) Provides a stronger cybersecurity platform the physical access control system operates on. Today they are mostly plain text protocols and little cyber awareness; (5) Integration of physical access awareness allows the cyber system to react and adjust. In some cases, the cyber access can be enhanced with authorized physical access and other cases the cyber access can be more restricted with unauthorized physical access; and (6) Enables the utility to establish as large or as small a physical access control system as they require. One example would be when a utility shares a substation with a neighbor utility and can’t rely on the substation door for the physical access control. The Alliance technology enables them to lock equipment racks simply with no scalability issues because it stands on the cyber security infrastructure which is already highly scalable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Power Plants: Status of Installed and Proposed Projects [Slides]

As battery prices fall and wind and solar generation rises, power plant developers are increasingly combining wind and solar projects with on-site batteries, creating “hybrid” power plants. But hybrid or co-located plants have been part of the U.S. electricity mix for decades, with widely ranging configurations that extend beyond pairing a generator with a battery. This new summary tracks and maps existing hybrid and co-located plants across the United States while also synthesizing data from generation interconnection queues to illustrate developer interest in the next wave of plants. The scope is inclusive of co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and also full hybrids that feature co-location and co-control. The focus is on larger, 1 MW+ systems: smaller (often behind-the-meter) projects are also increasingly common, but are not included in the data synthesis. Based in part on EIA Form 860 data, there were at least 125 co-located hybrid plants (>1 MW) already operating across the United States at the end of 2019, totaling over 14 GW of aggregate capacity. Some of the most common configurations include wind+storage (13 projects, 1,290 MW wind, 184 MW storage), PV+storage (40 projects, 882 MW PV, 169 MW storage), and fossil+storage (10 projects, 2,414 MW fossil, 91 MW storage). Data from interconnection queues demonstrates the considerable commercial interest that exists in hybrid power plants, especially solar co-located with storage. By the end of 2019, there were at least 367 GW of solar plants in the nation’s queues; 102 GW (~28%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage. For wind, 225 GW of capacity sat in the queues, with 11 GW (~5%) proposed as a hybrid, again most-often pairing wind with storage. The proposed solar+storage plants are located throughout the United States, but with California and the non-ISO West being the most prominent areas of commercial interest. Proposed wind+storage and standalone storage plants also center to a degree on these regions of the country.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Phase 1 NuScale SMR FOAK Nuclear Demonstration Readiness Project (Final Scientific/Technical Report)

The overarching objective of the Phase 1 NuScale SMR First-of-a-Kind (FOAK) Nuclear Demonstration Readiness Project was to enhance competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale small modular reactor (SMR). The scope of this Phase 1 project continued to advance the licensing and design maturity, particularly in those areas related to supporting customer readiness, supply chain integration, cost competitiveness, and cost confidence. This investment provided by the Government has accelerated development of these designs and technologies so that the existing domestic fleet of nuclear power plants remains viable and the most mature in the nuclear industry. The intent is to have the new, advanced U.S. designs be deployed as early 2026, and be globally competitive. As a part of the First-of-a-Kind Nuclear Demonstration Readiness Project, NuScale has been developing an advanced reactor design, leading the path for other development projects or complex technology advancements for existing plants that have significant technical and licensing risk. The NuScale Power team (NuScale) is advancing licensing, engineering, supply chain development, testing, and other required activities to enhance the innovation and competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale SMR. Specifically, NuScale is performing the following activities in Phase 1. Fully supporting the NRC review of the NuScale DCA to ensure approval of a final safety evaluation report by the end of 2020. Improving plant cost confidence and cost competitiveness through design and supply chain advancement, incorporation of constructability best practices, and margin recovery to increase plant power output. Accelerating design maturity, technology development, and operational program readiness to support a customer commitment for plant deployment. The Department of Energy (DOE) Office of Scientific and Technical Information (OSTI), a unit of the Office of Science, fulfills agency-wide responsibilities to collect, preserve, and disseminate both unclassified and classified scientific and technical information (STI) emanating from DOE-funded research and development (R&D) activities at DOE national laboratories and facilities and at universities and other institutions nationwide. This scientific and technical report provides summaries of the analyses and research that was performed by NuScale under this project that achieves the objective of disseminating information to the nuclear industry to ensure the innovations realized are shared for the benefit of the industry at large.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

PSIP For HDF5 Pilot Project (Final Report)

Productivity and Sustainability Improvement Planning (PSIP) is a lightweight, incremental and iterative approach (much in the same spirit as Agile methodologies) for making routine software process improvements in software projects. It is designed to be easily applied in existing development workflows. Quoting from a November 2019 workshop paper describing PSIP. PSIP breaks from classic software process improvement approaches such as CMM(I), SPICE, ISO 9000 or Six Sigma, in that it trades comprehensive standards and certification-driven assessment for self-defined, internally driven goals. It does, however, carry forward such ideas as having staged models of improvement (like CMM(I)) in the form of progress tracking cards. Additionally, PSIP is more aligned with lean and agile methods; it adopts their emphasis on iterative improvement and continuous learning. At its core, PSIP is an instantiation of the Plan-Do-Check-Act management cycle (PDCA, also known as Plan-Do-Study-Adjust) which provides the foundation for much of the modern software process improvement literature. This situates PSIP within a constellation of bottom-up, inductive software process improvement methods. PSIP is designed around the notion that already overburdened teams can define and carry out a series of small, incremental steps of progression towards improvement goals without significant (there will be some, but the goal is to avoid significant) disruption to ongoing development activities. A key enabling tool in PSIP is the use of Progress Tracking Cards (PTCs) which define the steps of progression towards a given improvement goal. This is the theory of PSIP. The PSIP for HDF5 project was aimed at putting PSIP into practice with the purpose of evaluating its effectiveness in planning and facilitating quality and process improvements in a scientific software project as well as its associated artifacts. The HDF5 project was chosen as a use case to evaluate PSIP for several reasons. First, NNSA labs and LLNL in particular have a keen interest in how HDF5 quality impacts its uptake and sustainability as a community adopted and supported code. Next, HDF5 is a foundational library, a key substrate in the HPC/CSE software stack, and any improvements there realized through this contract will have benefits to many DOE applications depending on it. HDF5 also represents an older, legacy code with technical debts to pay down. These characteristics are similar to many NNSA and even some ECP code projects. But, because HDF5 is an I/O library, it represents a simpler use case within which to study PSIP than a full-fledged and significantly more complex PDE simulation code. We believe these attributes make HDF5 an ideal use case for evaluating PSIP.

97 MATHEMATICS AND COMPUTING↗

Early Application Results on Pre-exascale Architecture with Analysis of Performance Challenges and Projections (Milestone PM-AD-1080 WBS 2.2)

This Exascale Computing Project (ECP) Milestone Report summarizes the status of all 30 ECP Applications Development (AD) sub-projects at the end of FY19. In August and September of 2019, a comprehensive assessment of AD projects was conducted jointly by the ECP leadership and a team of external subject matter experts. Reviews took place in person over five days-two at the National Renewable Energy Laboratory and three at Argonne National Laboratory and the University of Chicago. The review committees were tasked with evaluating each sub-project's progress in porting their code(s) to current multi-GPU architectures considered precursors to planned exascale machines. This includes characterizing which modules have been ported to multi-accelerator nodes, initial performance analyses, the status of software integration, and a current vision of successes, obstacles, and next steps. As such this report contains not only an accurate snapshot of each sub-project's current status, but also represents an unprecedentedly broad account of experiences porting large scientific applications to next-generation HPC architectures.

97 MATHEMATICS AND COMPUTING↗

SECARB Regional Project Assessment

The SECARB Cranfield Early Test Project was designed to safely demonstrate large-scale, long-term CO 2 injection and storage in a CO 2 -enhanced oil recovery (EOR) operation and associated saline reservoir. Storage during EOR operations has the potential to offset commercial costs, holding a significant promise for future large-scale deployment in the southeastern United States. Denbury Onshore LLC began CO 2 -EOR operations in July 2008 at the Cranfield oilfield located east of Natchez, Mississippi (Figure 1). The location offered an ideal setting to investigate storage monitoring at a commercial CO 2 -EOR operation. The field team, led by the Gulf Coast Carbon Center of the Bureau of Economic Geology at the University of Texas at Austin, deployed the largest suite of monitoring, verification, accounting (MVA) technologies to collect data to assess long-term CO 2 utilization and storage. The CO 2 injection interval is within the 3,000-meter-deep fluvial lower Tuscaloosa Formation, a large and regionally extensive saline reservoir, at a broad four-way structural closure that defines the Cranfield oilfield. Tests were conducted in the oil-producing area as well as in the non-oil-producing brine aquifer. The CO 2 used during EOR operation was transported via pipeline from the Jackson Dome, a natural source of CO 2 . The study focused on four integrated research areas: (1) the High-Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” CO 2 injection occurred at the HiVIT and the DAS (Figure 2 and Figure 3). The DAS was located down-dip of the oil-water interface of the Cranfield oilfield. The well layout included one injection well and two down-dip observation wells. The team was the first of the regional partnerships to monitor more than 1 million metric tons of CO 2 . At the end of the project, the team monitored more than 11 million metric tons of CO 2 injected and 5 million metric tons of CO 2 stored. The Cranfield Project was the fifth project worldwide, and the first such project in the United States, to reach this CO 2 injection volume while being monitored to demonstrate storage effectiveness.

01 COAL, LIGNITE, AND PEAT↗

Project 57 Air Monitoring Report: January 1 through September 30, 2020, with a Review of the Period of Record Radionuclide Analyses

The DOE Environmental Management Nevada Program (EM NV) identified the Project 57 contaminated area as Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion Site, which consisted of one Corrective Action Site (CAS): NAFR-23- 02, Pu Contaminated Soil (U.S. DOE, 2014). The CAS included several Project 57 operational facilities in addition to the plutonium-contaminated soil. With approval of the State of Nevada Division of Environmental Protection, the DOE closed the Project 57 surface soil contamination site in October 2020. Closure was accomplished by installing a clean soil cap constructed over ground zero and the surrounding areas of the CA that may be entrained with wind-transported soil particles. After completion of the ground zero cap in October 2020, DRI discontinued monitoring of meteorological and associated environmental conditions at the Project 57 site as directed by DOE EM NV. Navarro dismantled air monitoring stations P57-3 and P57-4 and removed the equipment on October 20, 2020. This report presents the meteorological and dust observations and radiological analyses accomplished during the approximately 10 months when the air monitoring data collection equipment was operational during CY2020.

54 ENVIRONMENTAL SCIENCES↗

Recommendations on ILC Project Implementation

The International Linear Collider (ILC) is a next-generation experimental facility to explore fundamental laws of the Universe. The importance of electron-positron linear colliders as a future experimental facility has been long recognized by the worldwide high energy physics community. A global design team, the Global Design Efforts (GDE), was set up under the International Committee for Future Accelerators (ICFA) for design and coordination of R&D activities of the ILC in 2005, and the ILC Technical Design Report (TDR) was completed in 2013. ICFA then established the Linear Collider Collaboration (LCC) and the Linear Collider Board (LCB) and has continued to support the worldwide efforts for realizing the ILC. Meanwhile, in 2012, KEK and the high energy physics community in Japan proposed that Japan should host the ILC, which was welcomed by the worldwide high energy physics community. Implementation of the ILC project will require strong involvements from international partners due to its scientific importance and large scale. Aspects of international cost sharing and governance of the organization carrying out the ILC project will need to be discussed and agreed at the governmental level. Therefore, KEK established an International Working Group (WG) on the ILC Project in May 2019, inviting scientific experts worldwide* , and asking them to study international aspects of the project implementation from viewpoints of researchers. They were requested to create a report on model of international cost sharing for construction and operation, organization and governance of the ILC Laboratory, and international sharing of the remaining technical preparation. The WG report was submitted to KEK on September 25, 2019. After reviewing the content of the report, KEK decided to make it available within this document entitled “Recommendations on ILC Project Implementation”. This document summarizes the deliberations from researchers’ viewpoints; it does not intend to pre-empt governments and funding agencies. It is hoped that it will be helpful for discussions among governments and funding agencies.

43 PARTICLE ACCELERATORS↗