Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Process integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

NASA's Identified Risk of Adverse Outcomes due to Inadequate Human Systems Integration Architecture

The NASA Human System Risk Board (HSRB) is responsible for tracking the evolution of the top ~30 human system risks identified to be associated with human spaceflight. As part of this process, the Board is charged with maintaining a consistent, integrated process to evaluate those risks and developing evidence-based risk posture recommendations. Risks are ranked by likelihood and consequence. Intermediate causal relationships between risk contributing factors and countermeasures that link hazards to outcomes are described using Directed Acyclic Graphs (DAGs). The DAGs are also useful for identifying common factors and countermeasures across the top 30 risks as well as communicating how astronaut exposure to spaceflight hazards leads to meaningful mission-level health and performance outcomes. One of the top risks tracked by the HSRB is The Risk of Adverse Outcomes Due to Inadequate Human-Systems Integration Architecture (HSIA). This risk captures the possibility that due to decreasing real-time ground support during missions beyond LEO, crew will be unable to adequately respond to unanticipated critical malfunctions or detect safety-critical procedural errors. The HSIA risk is ranked red (high) for Lunar surface and Mars missions due to the probability of Loss of Crew and Loss of Mission consequences. This paper describes the evidence that supports the HSIA risk ranking and presents the central narrative of the HSIA risk DAG-- i.e., anomaly detection, diagnosis, intervention, and task performance. Characterizations of the current state of practice for each of the DAG’s central nodes and the future tools needed for successful anomaly response are provided.

human-systems integration architecture↗

NASA’s Identified Risks of Adverse Outcomes Due to Inadequate Human Systems Integration Architecture in Human Spaceflight

The NASA Human System Risk Board (HSRB) has the overall responsibility for tracking the evolution of the top ~30 human system risks that it has identified to be associated with human spaceflight. As part of this process, the Board is charged with maintaining a consistent, integrated process to mitigate those risks, and developing evidence-based risk posture recommendations. One of the identified risks is due to inadequate human systems integration architecture (HSIA) and a driving factor of this risk is that given decreasing real-time ground support for execution of complex operations during future exploration missions, there is a possibility of adverse performance outcomes including that crew are unable to adequately respond to unanticipated critical malfunctions or detect safety critical procedural errors. The HSRB uses Directed Acyclic Graphs (DAGs) as a communication tool for describing how astronaut exposure to spaceflight hazards leads to meaningful mission-level health and performance outcomes and as the basis for understanding intermediate causal relationships between risk contributing factors and countermeasures that link hazards to outcomes. The HSIA risk DAG will be presented and described. Historically, critical malfunctions requiring Crew/MCC management occurred at a rate of 1.7 times per year for ISS averaged over the lifetime and 3-4 times per year in the burn in phase for the vehicle. These averages do not include EVA data, which greatly increases the incident rate. Prior experience from the Apollo program showed 10/11 crewed missions experienced significant anomalies where crew relied heavily on MCC expertise in real-time. These failure patterns are in line with those observed in other complex engineered systems (e.g., oil rigs, launch systems, commercial aviation, etc.) It is likely that general malfunction and error rates are > 10% for short duration missions (<30 days), based on past and current spaceflight operations data. Likelihood of adverse outcomes has the potential to increase as crew conduct work with new, complex systems and with less ground support. For Low Earth Orbit missions and Lunar missions less than 30 days, assuming minimal comm delays, disruptions and bandwidth limitations, malfunctions and errors can affect mission objectives and crew health but may be mitigated by ground support. For Lunar missions greater than 30 days and any potential Mars mission malfunctions and errors can have Loss of Crew and Loss of Mission consequences due to reduced ground support (communication delays, constraints and blackouts) for more complex operations, as well as reduced resupply and evacuation options.

Daniel M Buckland↗

Integration by parts

This paper describes the unique integration and verification challenges associated with the Space Station Freedom and an approach to solve these problems using Data Management Systems (DMS) Kits. These DMS Kits will help alleviate the complex integration problems inherent in building, assembling and testing the Space Station. Particular emphasis has been placed on utilizing the capabilities and services of the on-board DMS to provide the integration and verification tools, not only for the DMS but for the other on-board distributed systems as well. DMS Kits are provided to system/software developers across the program. These DMS Kits provide a common set of integration and verification tools and hardware. Each system developer can then utilize, through the kits, a simulation of the complete data processing environment which will be available on orbit. The paper describes the evolution of the integration process from the system level to the final integration of multiple launch packages. DMS Kits are used throughout this process, which addresses both the ground and on-orbit aspects of the problem.

Barry, Thomas↗

Streamlining Payload Integration

Payload integration onto space transport vehicles and the International Space Station (ISS) is a complex process. Yet, cargo transport is the sole reason for any space mission, be it for ferrying humans, science, or hardware. As the largest such effort in history, the ISS offers a wide variety of payload experience. However, for any payload to reach the Space Station under the current process, Payload Developers face a list of daunting tasks that go well beyond just designing the payload to the constraints of the transport vehicle and its stowage topology. Payload customers are required to prove their payload s functionality, structural integrity, and safe integration - including under less than nominal situations. They must also plan for or provide training, procedures, hardware labeling, ground support, and communications. In addition, they must deal with negotiating shared consumables, integrating software, obtaining video, and coordinating the return of data and hardware. All the while, they must meet export laws, launch schedules, budget limits, and the consensus of more than 12 panel and board reviews. Despite the cost and infrastructure overhead, payload proposals have increased. Just in the span from FY08 to FY09, the NASA Payload Space Station Support Office budget rose from $78M to $96M in attempt to manage the growing manifest, but the potential number of payloads still exceeds available Payload Integration Management manpower. The growth has also increased management difficulties due to the fact that payloads are more frequently added to a flight schedule late in the flow. The current standard ISS template for payload integration from concept to payload turn-over is 36 months, or 18 months if the payload already has a preliminary design. Customers are increasingly requiring a turn-around of 3 to 6-months to meet market needs. The following paper suggests options for streamlining the current payload integration process in order to meet customer schedule needs and reduce costs for both the integration support teams and the developers, without reducing quality or compromising safety. Issues for the key integration areas of planning, training, verification, and safety are presented in a Root-Cause Analysis study, with plausible solutions provided that involve technology and tools already available to the ISS community. Although based upon the ISS process, the payload integration techniques outlined herein also offer an integration template for any space transport endeavor.

Lufkin, Susan N.↗

An Introduction to Intelligent Processing Programs Developed by the Air Force Manufacturing Technology Directorate

The Air Force has numerous on-going manufacturing and integration development programs (machine tools, composites, metals, assembly, and electronics) which are instrumental in improving productivity in the aerospace industry, but more importantly, have identified strategies and technologies required for the integration of advanced processing equipment. An introduction to four current Air Force Manufacturing Technology Directorate (ManTech) manufacturing areas is provided. Research is being carried out in the following areas: (1) machining initiatives for aerospace subcontractors which provide for advanced technology and innovative manufacturing strategies to increase the capabilities of small shops; (2) innovative approaches to advance machine tool products and manufacturing processes; (3) innovative approaches to advance sensors for process control in machine tools; and (4) efforts currently underway to develop, with the support of industry, the Next Generation Workstation/Machine Controller (Low-End Controller Task).

Sampson, Paul G.↗

Development of an integrated, zero-G pneumatic transporter/rotating-paddle incinerator/catalytic afterburner subsystem for processing human waste on board spacecraft

A baseline laboratory prototype of an integrated, six man, zero-g subsystem for processing human wastes onboard spacecraft was investigated, and included the development of an operational specification for the baseline subsystem, followed by design and fabrication. The program was concluded by performing a series of six tests over a period of two weeks to evaluate the performance of the subsystem. The results of the tests were satisfactory, however, several changes in the design of the subsystem are required before completely satisfactory performance can be achieved.

Fields, S. F.↗

Low-Waste Purification of Silicon

Ultra-high-purity silicon required for solar cells, transistors and integrated circuits can be produced from metallurgical grade silicon by formation and pyrolysis of silane gas in continuous-flow process that maximizes product purity with minimum amount of equipment. Integrated process recycles unreacted and byproduct materials, minimizing material losses and simplifying waste disposal. Ensures effective removal of impurities, including boron.

Breneman, W. C.↗

Semiconductor Cubing

Through Goddard Space Flight Center and Jet Propulsion Laboratory Small Business Innovation Research contracts, Irvine Sensors developed a three-dimensional memory system for a spaceborne data recorder and other applications for NASA. From these contracts, the company created the Memory Short Stack product, a patented technology for stacking integrated circuits that offers higher processing speeds and levels of integration, and lower power requirements. The product is a three-dimensional semiconductor package in which dozens of integrated circuits are stacked upon each other to form a cube. The technology is being used in various computer and telecommunications applications.

Source record↗

Information processing in the primate visual system - An integrated systems perspective

The primate visual system contains dozens of distinct areas in the cerebral cortex and several major subcortical structures. These subdivisions are extensively interconnected in a distributed hierarchical network that contains several intertwined processing streams. A number of strategies are used for efficient information processing within this hierarchy. These include linear and nonlinear filtering, passage through information bottlenecks, and coordinated use of multiple types of information. In addition, dynamic regulation of information flow within and between visual areas may provide the computational flexibility needed for the visual system to perform a broad spectrum of tasks accurately and at high resolution.

Van Essen, David C.↗

Depth Cue Integration in an Active Control Paradigm

Numerous models of depth cue integration have been proposed. Of particular interest is how the visual system processes discrepent cues, as might arise when viewing synthetic displays. A powerful paradigm for examining this integration process can be adapted from manual control research. This methodology introduces independent disturbances in the candidate cues, then performs spectral analysis of subjects' resulting motoric responses (e.g., depth matching). We will describe this technique and present initial findings.

Kaiser, Mary K.↗

Flight Software for the LOFTID Re-Entry Vehicle

NASA’s Low-Earth Orbit Flight Test of an Inflatable Decelerator, or LOFTID, demonstrated re-entry from low-Earth orbit of a 6-meter aeroshell designed to be used as a heat shield that is larger than the rocket shroud, enabling the return of much greater mass. The LOFTID Flight Software was developed in-house and consists of three components: the Power Distribution software, the Data Recorder software, and the Camera Controller software, along with the Ground Software used for testing, operations, data integrity, and data processing. This presentation will discuss issues found in developing the Power Distribution software in cFS on a non-Linux POSIX platform, designing an efficient architecture for recording of high bandwidth data, controlling over a dozen cameras in-flight, and creating the ground support tools to verify data integrity and support the post-processing of flight data.

Paul Brewster↗

Materials, Processes and Manufacturing in Ares 1 Upper Stage: Integration with Systems Design and Development

Ares I Crew Launch Vehicle Upper Stage is designed and developed based on sound systems engineering principles. Systems Engineering starts with Concept of Operations and Mission requirements, which in turn determine the launch system architecture and its performance requirements. The Ares I-Upper Stage is designed and developed to meet these requirements. Designers depend on the support from materials, processes and manufacturing during the design, development and verification of subsystems and components. The requirements relative to reliability, safety, operability and availability are also dependent on materials availability, characterization, process maturation and vendor support. This paper discusses the roles and responsibilities of materials and manufacturing engineering during the various phases of Ares IUS development, including design and analysis, hardware development, test and verification. Emphasis is placed how materials, processes and manufacturing support is integrated over the Upper Stage Project, both horizontally and vertically. In addition, the paper describes the approach used to ensure compliance with materials, processes, and manufacturing requirements during the project cycle, with focus on hardware systems design and development.

Bhat, Biliyar N.↗

Autoplan: A self-processing network model for an extended blocks world planning environment

Self-processing network models (neural/connectionist models, marker passing/message passing networks, etc.) are currently undergoing intense investigation for a variety of information processing applications. These models are potentially very powerful in that they support a large amount of explicit parallel processing, and they cleanly integrate high level and low level information processing. However they are currently limited by a lack of understanding of how to apply them effectively in many application areas. The formulation of self-processing network methods for dynamic, reactive planning is studied. The long-term goal is to formulate robust, computationally effective information processing methods for the distributed control of semiautonomous exploration systems, e.g., the Mars Rover. The current research effort is focusing on hierarchical plan generation, execution and revision through local operations in an extended blocks world environment. This scenario involves many challenging features that would be encountered in a real planning and control environment: multiple simultaneous goals, parallel as well as sequential action execution, action sequencing determined not only by goals and their interactions but also by limited resources (e.g., three tasks, two acting agents), need to interpret unanticipated events and react appropriately through replanning, etc.

Dautrechy, C. Lynne↗

Toward a More Flexible Web-Based Framework for Multidisciplinary Design

In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary design, is defined as a hardware-software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, monitoring, controlling, and displaying the design process. The objective of this research is to explore how Web technology can improve these areas of weakness and lead toward a more flexible framework. This article describes a Web-based system that optimizes and controls the execution sequence of design processes in addition to monitoring the project status and displaying the design results.

Rogers, J. L.↗

Project Report: Automatic Sequence Processor Software Analysis

The Mission Planning and Sequencing (MPS) element of Multi-Mission Ground System and Services (MGSS) provides space missions with multi-purpose software to plan spacecraft activities, sequence spacecraft commands, and then integrate these products and execute them on spacecraft. Jet Propulsion Laboratory (JPL) is currently is flying many missions. The processes for building, integrating, and testing the multi-mission uplink software need to be improved to meet the needs of the missions and the operations teams that command the spacecraft. The Multi-Mission Sequencing Team is responsible for collecting and processing the observations, experiments and engineering activities that are to be performed on a selected spacecraft. The collection of these activities is called a sequence and ultimately a sequence becomes a sequence of spacecraft commands. The operations teams check the sequence to make sure that no constraints are violated. The workflow process involves sending a program start command, which activates the Automatic Sequence Processor (ASP). The ASP is currently a file-based system that is comprised of scripts written in perl, c-shell and awk. Once this start process is complete, the system checks for errors and aborts if there are any; otherwise the system converts the commands to binary, and then sends the resultant information to be radiated to the spacecraft.

sequencing↗

LANDSAT data and interactive computer mapping

The integration of image processing capabilities with interactive computer mapping systems is discussed. It is noted that the accomplishment of this integration will result in powerful geographic information systems which will enhance the applicatons of LANDSAT and other types of remotely sensed data in solving problems in the resource planning and management domain.

Grady, R. K.↗

Integrated Cryogenic Satellite Communications Cross-Link Receiver Experiment

An experiment has been devised which will validate, in space, a miniature, high-performance receiver. The receiver blends three complementary technologies; high temperature superconductivity (HTS), pseudomorphic high electron mobility transistor (PHEMT) monolithic microwave integrated circuits (MMIC), and a miniature pulse tube cryogenic cooler. Specifically, an HTS band pass filter, InP MMIC low noise amplifier, HTS-sapphire resonator stabilized local oscillator (LO), and a miniature pulse tube cooler will be integrated into a complete 20 GHz receiver downconverter. This cooled downconverter will be interfaced with customized signal processing electronics and integrated onto the space shuttle's 'HitchHiker' carrier. A pseudorandom data sequence will be transmitted to the receiver, which is in low Earth orbit (LEO), via the Advanced Communication Technology Satellite (ACTS) on a 20 GHz carrier. The modulation format is QPSK and the data rate is 2.048 Mbps. The bit error rate (BER) will be measured in situ. The receiver is also equipped with a radiometer mode so that experiment success is not totally contingent upon the BER measurement. In this mode, the receiver uses the Earth and deep space as a hot and cold calibration source, respectively. The experiment closely simulates an actual cross-link scenario. Since the receiver performance depends on channel conditions, its true characteristics would be masked in a terrestrial measurement by atmospheric absorption and background radiation. Furthermore, the receiver's performance depends on its physical temperature, which is a sensitive function of platform environment, thermal design, and cryocooler performance. This empirical data is important for building confidence in the technology.

Romanofsky, R. R.↗

Integrated Modeling of Aerosol, Cloud, Precipitation and Land Processes at Satellite-Resolved Scales

In this talk, I will present recent results from a project led at NASA/GSFC, in collaboration with NASA/MSFC and JHU, focused on the development and application of an observation-driven integrated modeling system that represents aerosol, cloud, precipitation and land processes at satellite-resolved scales. The project, known as the NASA Unified WRF (NU-WRF), is funded by NASA's Modeling and Analysis Program, and leverages prior investments from the Air Force Weather Agency and NASA's Earth Science Technology Office (ESTO). We define "satellite-resolved" scales as being within a typical mesoscale atmospheric modeling grid (roughly 1-25 km), although this work is designed to bridge the continuum between local (microscale), regional (mesoscale) and global (synoptic) processes. NU-WRF is a superset of the standard NCAR Advanced Research WRF model, achieved by fully integrating the GSFC Land Information System (LIS, already coupled to WRF), the WRF/Chem enabled version of the Goddard Chemistry Aerosols Radiation Transport (GOCART) model, the Goddard Satellite Data Simulation Unit (SDSU), and boundary/initial condition preprocessors for MERRA and GEOS-5 into a single software release (with source code available by agreement with NASA/GSFC). I will show examples where the full coupling between aerosol, cloud, precipitation and land processes is critical for predicting local, regional, and global water and energy cycles, including some high-impact phenomena such as floods, hurricanes, mesoscale convective systems, droughts, and monsoons.

Peters-Lidard, Christa↗