Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Optimization Under Uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

New Tabu Algorithm for Positioning Mining Drillholes with Blocks Uncertainty

This paper proposes a new approach to the mining exploration drillholes positioning problem (DPP) that incorporates both geostatistical and optimization techniques. A metaheuristic was developed to solve the DPP taking into account an uncertainty index that quantifies the reliability of the current interpretation of the mineral deposit. The uncertainty index was calculated from multiple deposit realizations obtained by truncated Gaussian simulations conditional to the available drillholes samplings. A linear programming model was defined to select the subset of future drillholes that maximizes coverage of the uncertainty. A Tabu Search algorithm was developed to solve large instances of this set partitioning problem. The proposed Tabu Search algorithm is shown to provide good quality solutions approaching 95% of the optimal solution in a reasonable computing time, allowing close to optimal coverage of uncertainty for a fixed investment in drilling.

58 GEOSCIENCES↗

Chance-Constrained Optimization for Critical Infrastructure Protection

Stochastic optimization deals with making highly reliable decisions under uncertainty. Chance constraints are a crucial tool of stochastic optimization to develop mathematical optimization models; they form the backbone of many important national security data science applications. These include critical infrastructure resiliency, cyber security, power system operations, and disaster relief management. However, existing algorithms to solve chance-constrained optimization models are severely limited by problem size and structure. In this investigative study, we (i) develop new algorithms to approximate chance-constrained optimization models, (ii) demonstrate the application of chance-constraints to a national security problem, and (iii) investigate related stochastic optimization problems. We believe our work will pave way for new research is stochastic optimization as well as secure national infrastructures against unforeseen attacks.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Robust PET-guided intensity-modulated radiation therapy

Purpose: Functional image guided intensity-modulated radiation therapy has the potential to improve cancer treatment quality by basing treatment parameters such as heterogeneous dose distributions information derived from imaging. However, such heterogeneous dose distributions are subject to imaging uncertainty. In this paper, the authors develop a robust optimization model to design plans that are desensitized to imaging uncertainty. Methods: Starting from the pretreatment fluorodeoxyglucose-positron emission tomography scans, the authors use the raw voxel standard uptake values (SUVs) as input into a series of intermediate functions to transform the SUV into a desired dose. The calculated desired doses were used as an input into a robust optimization model to generate beamlet intensities. For each voxel, the authors assume that the true SUV cannot be observed but instead resides in an interval centered on the nominal (i.e., observed) SUV. Then the authors evaluated the nominal and robust solutions through a simulation study. The simulation considered the effect of the true SUV being different from the nominal SUV on the quality of the treatment plan. Treatment plans were compared on the metrics of objective function value and tumor control probability (TCP). Results: Computational results demonstrate the potential for improvements in tumor control probability and deviation from the desired dose distribution compared to a nonrobust model while maintaining acceptable tissue dose. Conclusions: Robust optimization can help design treatment plans that are more stable in the presence of image value uncertainties.

60 APPLIED LIFE SCIENCES↗

Optimal Estimation Framework for Ocean Color Atmospheric Correction and Pixel-level Uncertainty Quantification

Ocean color remote sensing requires compensation for atmospheric scattering and absorption (aerosol, Rayleigh, and trace gases), referred to as atmospheric correction (AC). AC allows inference of parameters such as spectrally resolved remote sensing reflectance ( R rs )(λ) ; sr 1 ) at the ocean surface from the top-of-atmosphere reflectance. Often, the uncertainty of this process is not fully explored. Bayesian inference techniques provide a simultaneous AC and uncertainty assessment via a full posterior distribution of the relevant variables, given the prior distribution of those variables and the radiative transfer (RT) likelihood function. Given uncertainties in the algorithm inputs, the Bayesian framework enables better constraints on the AC process by using the complete spectral information compared to traditional approaches that use only a subset of bands for AC. This paper investigates a Bayesian inference research method (Optimal Estimation, OE) for ocean color AC by simultaneously retrieving atmospheric and ocean properties using all visible and near-infrared spectral bands. The OE algorithm analytically approximates the posterior distribution of parameters based on normality assumptions and provides a potentially viable operational algorithm with a reduced computational expense. We developed a Neural Network (NN) RT forward model look-up-table-based emulator to increase algorithm efficiency further and thus speed up the likelihood computations. We then applied the OE algorithm to synthetic data and observations from the MODerate resolution Imaging Spectroradiometer (MODIS) on NASA’s Aqua spacecraft. We compared the R rs )(λ) retrieval and its uncertainty estimates from the OE method with in-situ validation data from the SeaWiFS Bio-optical Archive and Storage System (SeaBASS) and Aerosol Robotic Network Ocean Color (AERONET-OC) datasets. The OE algorithm improved R rs )(λ) estimates relative to the NASA standard operational algorithm by improving all statistical metrics at 443, 555, and 667 nm. Unphysical negative R rs )(λ) , which often appear in complex water conditions, was reduced by a factor of 3. The OE-derived pixel-level R rs )(λ) uncertainty estimates were also assessed relative to in-situ data and were shown to have skill.

Atmospheric correction↗

Optimizing your options: Extracting the full economic value of transmission when planning under uncertainty

In this study, the anticipated magnitude of needed investments in new transmission infrastructure in the U.S. requires that these be allocated in a way that maximizes the likelihood of achieving society's goals for power system operation. The use of state-of-the-art optimization tools can identify cost-effective investment alternatives, extract more benefits out of transmission expansion portfolios, and account for the huge economic, technology, and policy uncertainties that the power sector faces over the next several decades.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Method for Optimizing Waste Management and Disposal Practices Using a Group-Based Uncertainty Model for the Analysis of Characterization Data - 13191

It is a universal requirement for characterization of radioactive waste, that the consignor shall calculate and report a Total Measurement Uncertainty (TMU) value associated with each of the measured quantities such as nuclide activity. For Non-destructive Assay systems, the TMU analysis is typically performed on an individual container basis. However, in many cases, the waste consignor treats, transports, stores and disposes of containers in groups for example by over-packing smaller containers into a larger container or emplacing containers into groups for final disposal. The current standard practice for container-group data analysis is usually to treat each container as independent and uncorrelated and use a simple summation / averaging method (or in some cases summation of TMU in quadrature) to define the overall characteristics and associated uncertainty in the container group. In reality, many groups of containers are assayed on the same system, so there will be a large degree of co-dependence in the individual uncertainty elements. Many uncertainty terms may be significantly reduced when addressing issues such as the source position and variability in matrix contents over large populations. The systematic terms encompass both inherently 'two-directional' random effects (e.g. variation of source position) and other terms that are 'one-directional' i.e. designed to account for potential sources of bias. An analysis has been performed with population groups of a variety of non-destructive assay platforms in order to define a quantitative mechanism for waste consignors to determine overall TMU for batches of containers that have been assayed on the same system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Towards an Optimal Estimation Retrieval of Cirrus Cloud Optical and Microphysical Properties Using Hyperspectral Shortwave Instruments and A Fast Radiative Transfer Algorithm

Cirrus cloud retrieval products (here, cloud optical depth, effective particle size, and cloud top height) are important inputs into numerical weather and climate models. Uncertainties in such retrieval products, as a matter of course, propagate downstream, impacting model calculations. Improvements in high-quality global cirrus cloud optical and microphysical data products from satellite observations are needed to understand and reduce retrieval uncertainties. Hyperspectral instruments produce high-resolution and information-dense radiance spectra, thus offering the opportunity to reduce uncertainties in retrieval products. An optimal estimation-based cirrus cloud optical and microphysical product retrieval is under development for the NASA Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) and the Earth Surface Mineral Dust Source Investigation (EMIT) instruments, and the forthcoming Climate Absolute Radiance and Refractivity Observatory Pathfinder (CLARREO-Pathfinder). The spectral coverage of all three instruments includes the ultraviolet, visible, and near-infrared. In this study a very fast radiative transfer model, the Principal Component-based Radiative Transfer Model in the solar spectral region (PCRTM-Solar), is used for forward modeling computations. This will reduce the computational burden in the forward radiance and Jacobian calculations as the cost function is minimized, enabling the entire AVIRIS, EMIT, and CLARREO-Pathfinder spectral range to be used in the optimal estimation framework. Using the entire spectrum will maximize the information content, resulting in a more robust and more accurate retrieval. As a first step, the retrieval is being designed for single layer ice clouds over open ocean water. Preliminary results will be shown.

Jeffrey Mast↗

Survey on stochastic distribution systems: A full probability density function control theory with potential applications

Complex systems seen either in general engineering practice or economics are subjected to ever increased uncertainties that are mostly represented as random variables or parameters, and the characteristics of random variables are represented by their probability density functions (PDFs). Controlling their PDFs means to shape their stochastic distributions and in general it would provide a full treatment for system analysis and operational control and optimization. This leads to the development of stochastic distribution control (SDC) systems theory in the past decades, where the original aim of the controller design is to realize a shape control of the distributions of certain random variables in their PDFs sense for some engineering processes. Indeed, once the PDFs of these random variables or parameters are used to describe their distribution characters, the control task is to obtain control signals so that the output PDFs of stochastic systems are made to follow their target PDFs. The subject of SDC was initially originated for non-Gaussian stochastic control systems design but has found a wide spectrum of applications in general systems in terms of data-driven modeling, analysis, signal processing (filtering), data mining via multivariable statistics, decision-making (optimization) for systems subjected to uncertainties and even in economics. In this context, SDC constitutes an effective primer tool for complex system analysis, control and operational optimizations. In this review paper, a detailed survey of the developments on the research of SDC systems will be made together with their wide spectrum applications and future perspectives.

42 ENGINEERING↗

The Pantheon+ Analysis: Evaluating Peculiar Velocity Corrections in Cosmological Analyses with Nearby Type Ia Supernovae

Separating the components of redshift due to expansion and peculiar motion in the nearby universe (z < 0.1) is critical for using Type Ia Supernovae (SNe Ia) to measure the Hubble constant (H 0 ) and the equation-of-state parameter of dark energy (w). Here, we study the two dominant "motions" contributing to nearby peculiar velocities: large-scale, coherent-flow (CF) motions and small-scale motions due to gravitationally associated galaxies deemed to be in a galaxy group. We use a set of 584 low-z SNe from the Pantheon+ sample, and evaluate the efficacy of corrections to these motions by measuring the improvement of SN distance residuals. We study multiple methods for modeling the large and small-scale motions and show that, while group assignments and CF corrections individually contribute to small improvements in Hubble residual scatter, the greatest improvement comes from the combination of the two (relative standard deviation of the Hubble residuals, Rel. SD, improves from 0.167 to 0.157 mag). We find the optimal flow corrections derived from various local density maps significantly reduce Hubble residuals while raising H 0 by ~0.4 km s -1 Mpc -1 as compared to using CMB redshifts, disfavoring the hypothesis that unrecognized local structure could resolve the Hubble tension. We estimate that the systematic uncertainties in cosmological parameters after optimally correcting redshifts are 0.06–0.11 km s -1 Mpc -1 in H 0 and 0.02–0.03 in w which are smaller than the statistical uncertainties for these measurements: 1.5 km s -1 Mpc -1 for H 0 and 0.04 for w.

79 ASTRONOMY AND ASTROPHYSICS↗

Parallel multiple-chain DRAM MCMC for large-scale geosteering inversion and uncertainty quantification

Geosteering is the proactive control of a wellbore placement based on the downhole measurements, aiming at maximizing economic production from the well. We report the recent development of azimuthal resistivity logging-whiledrilling (LWD) tools have a much larger depth of detection, thus sets higher demands for geosteering inversion as more unknown parameters need to be taken into account in the earth model to be inverted. For complicated nonlinear problems, traditional deterministic inversion methods are more likely to be trapped near local optima. In general, Markov chain Monte Carlo (MCMC) inversion methods are more capable of finding the global optimal solution and providing additional uncertainty analyses by sampling from the target distribution. However, MCMC methods usually have the problem of slow convergence. Even though optimization methods like delayed rejection (DR) and adaptive Metropolis (AM) were proposed to speed up the convergence, using MCMC methods to solve geosteering inversion problems may still incur unacceptable time cost. To reduce the sampling cost of MCMC methods, we use parallel multiple-chain DRAM MCMC methods to solve geosteering inverse problems and estimate the corresponding uncertainty. A clustering method, density-based spatial clustering of applications with noise (DBSCAN), is applied to select the best solution among many results. Lastly, the simulation results show that running many relatively short MCMC chains for one problem can obtain a similar result as running a long single chain. Besides, avoiding communications between multiple Markov chains during the sampling process yields almost linear scalability.

97 MATHEMATICS AND COMPUTING↗

Transfer learning driven design optimization for inertial confinement fusion

Transfer learning is a promising approach to create predictive models that incorporate simulation and experimental data into a common framework. In this technique, a neural network is first trained on a large database of simulations and then partially retrained on sparse sets of experimental data to adjust predictions to be more consistent with reality. Previously, this technique has been used to create predictive models of Omega [Humbird et al., IEEE Trans. Plasma Sci. 48, 61–70 (2019)] and NIF [Humbird et al., Phys. Plasmas 28, 042709 (2021); Kustowski et al., Mach. Learn. 3, 015035 (2022)] inertial confinement fusion (ICF) experiments that are more accurate than simulations alone. Here, in this work, we conduct a transfer learning driven hypothetical ICF campaign in which the goal is to maximize experimental neutron yield via Bayesian optimization. The transfer learning model achieves yields within 5% of the maximum achievable yield in a modest-sized design space in fewer than 20 experiments. Furthermore, we demonstrate that this method is more efficient at optimizing designs than traditional model calibration techniques commonly employed in ICF design. Such an approach to ICF design could enable robust optimization of experimental performance under uncertainty.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Uncertainty-Informed Operation Coordination in a Water-Energy Nexus

The widespread deployment of smart heterogeneous technologies and the growing complexity in our modern society calls for effective coordination of the interdependent lifeline networks. In particular, operation coordination of electric power and water infrastructures is urgently needed as the water system is one of the most energy-intensive networks, an interruption in which may quickly evolve into a dramatic societal concern. This paper develops a novel analytic for uncertainty-aware day-ahead operation optimization of the interconnected power and water systems (PaWS). Joint probabilistic constraint (JPC) programming is employed to capture the uncertainties in wind resources and water demand forecasts. The proposed integrated stochastic model is presented as a non-linear non-convex optimization problem, where the non-linear hydraulic constraints in the water network are linearized using piece-wise linearization technique, and the non-convexity is efficiently tackled with a solution methodology to convert the proposed model with JPCs to a tractable mixed-integer linear programming (MILP) formulation that can be quickly solved to optimality. Here, the suggested framework is applied to a 15-node commercial-scale water network jointly operated with a power transmission system using a modified IEEE 57-bus test system. The numerical results demonstrate the of the proposed stochastic framework, resulting in cost reduction (13% on average when compared to the traditional setting) and energy saving of the integrated model under different realizations of uncertain renewable energy sources (RESs) and water demand scenarios. Additionally, the scalability of the proposed model is tested on a modified IEEE 118-bus test system connected to five water networks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Separability of Mesh Bias and Parametric Uncertainty for a Full System Thermal Analysis

When making computational simulation predictions of multiphysics engineering systems, sources of uncertainty in the prediction need to be acknowledged and included in the analysis within the current paradigm of striving for simulation credibility. A thermal analysis of an aerospace geometry was performed at Sandia National Laboratories. Here, for this analysis, a verification, validation, and uncertainty quantification (VVUQ) workflow provided structure for the analysis, resulting in the quantification of significant uncertainty sources including spatial numerical error and material property parametric uncertainty. It was hypothesized that the parametric uncertainty and numerical errors were independent and separable for this application. This hypothesis was supported by performing uncertainty quantification (UQ) simulations at multiple mesh resolutions, while being limited by resources to minimize the number of medium and high resolution simulations. In conclusion, based on this supported hypothesis, a prediction including parametric uncertainty and a systematic mesh bias is used to make a margin assessment that avoids unnecessary uncertainty obscuring the results and optimizes use of computing resources.

42 ENGINEERING↗

Wind-Optimal Cruise Airspeed for a Multirotor Aircraft in Urban Air Mobility

This paper first investigates the effect of wind on the wind-optimal (minimum-energy) cruise airspeed for a NASA-proposed conceptual multirotor aircraft for the urban air mobility environment. Next, energy consumption and flight duration results are compared for flying at the wind-optimal airspeed and best-range airspeed on a great-circle cruise segment under different wind conditions. Finally, the difference in energy consumption when flying to meet the assigned required time of arrival based on actual wind conditions vs. predicted wind conditions are examined and compared for the two airspeed modes (wind-optimal and best-range) for different values of wind magnitude uncertainty. The results show operational benefits of flying at the wind-optimal cruise airspeed compared to the best-range airspeed, especially understrong headwind conditions from both an energy consumption and flight duration perspective.The results also show that flying at wind-optimal airspeed under wind magnitude uncertainty has lower variability and higher predictability of energy consumption than flying at best-range airspeed.

Urban Air Mobility↗

Optimal Power Management for Large-Scale Battery Energy Storage Systems via Bayesian Inference

Large-scale battery energy storage systems (BESS) have found ever-increasing use across industry and society to accelerate clean energy transition and improve energy supply reliability and resilience. However, their optimal power management poses significant challenges: the underlying high-dimensional nonlinear nonconvex optimization lacks computational tractability in real-world implementation, and the uncertainty of the exogenous power demand makes exact optimization difficult. This paper presents a new solution framework to address these bottlenecks. The solution pivots on introducing power-sharing ratios to specify each cell’s power quota from the output power demand. To find the optimal power-sharing ratios, we formulate a nonlinear model predictive control (NMPC) problem to achieve power-loss-minimizing BESS operation while complying with safety, cell balancing, and power supply-demand constraints. We then propose a parameterized control policy for the power-sharing ratios, which utilizes only three parameters, to reduce the computational demand in solving the NMPC problem. This policy parameterization allows us to translate the NMPC problem into a Bayesian inference problem for the sake of 1) computational tractability, and 2) overcoming the nonconvexity of the optimization problem. We leverage the ensemble Kalman inversion technique to solve the parameter estimation problem. Concurrently, a low-level control loop is developed to seamlessly integrate our proposed approach with the BESS to ensure practical implementation. This low-level controller receives the optimal power-sharing ratios, generates output power references for the cells, and maintains a balance between power supply and demand despite uncertainty in output power. We conduct extensive simulations and experiments on a 20-cell prototype to validate the proposed approach.

Battery energy storage systems (BESSs)↗