Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Final Report of the COSPAR Meeting Series on Knowledge Gaps in Planetary Protection for Crewed Missions to Mars

The international scientific community has, through a Committee on Space Research (COSPAR) meeting series, participated in a seven-year review of knowledge gaps in planetary protection for crewed missions to Mars. This meeting series first identified a prioritized list of knowledge gaps that, if addressed, would permit development of an implementable planetary protection policy for the initial crewed Mars mission. Next, a consideration of the available venues (ground, LEO, deep space, planetary surfaces) yielded a roadmap of potential future investigations needed to close the knowledge gaps. Finally, the meeting series evaluated topic-specific measurements that are essential to establishing the figures of merit needed for hardware engineering design requirements. The three main topic threads considered within the meeting series were: microbial and human health monitoring; natural transport of terrestrial biological contamination on Mars, and; technologies and operations for contamination control (of spacecraft systems). Participants at the meeting series included engineers, scientists, managers and various subject matter experts from space agencies, academic and research institutions, commercial companies, and other government departments. This paper provides a detailed summary review of the findings of the meeting series, including descriptions of the basis for each of the figures of merit (where they were identified), and considerations of how planetary protection implementation and policy for crewed missions may progress from the current state of the art.

J Andy Spry↗

The robotic exploration missions at Mars

A set of robotic missions to Mars are designed to provide information to enable the eventual human exploration of the planet. The strategy of the mission sequence including broad global assessments to specific site certification is described. The exploration and science information gained by each mission is discussed.

Cunningham, Glenn E.↗

The Mars Pathfinder Mission

On July 4th, 1997, Mars Pathfinder became the third spacecraft to successfully land on the planet Mars. The mission's primary objective was to demonstrate a low-cost system for delivering a small science payload to the surface of Mars, and to test the operation of a rover.

composition↗

A study of system requirements for Phobos/Deimos missions. Volume 4: Phase 3 results, combined missions to Mars and its satellites

Combined missions to Mars and Phobos/Deimos were considered in relation to large scientific returns at a low total cost. A matrix of all feasible major combined mission concepts was compiled. The most promising approach was selected from which a nominal mission profile was developed. A systems analysis was performed to trade off performance, configuration, and cost characteristics of candidate mission concepts. Configuration and subsystem optimization analysis were then conducted from which a baseline and an alternate program were selected. Program schedules and cost estimates were prepared for the recommended and alternate program.

Source record↗

Return to the red planet: The Mars Observer Mission

An overview of the Mars Observer Mission is discussed. Highlights include: (1) the spacecraft; (2) the instrumentation and science experiments; (3) the countries involved; (4) the flight teams; and (5) the planet Mars itself (a brief history). Photographs and flow charts are included, along with diagrams of instrumentation and a brief historical narrative of space observation and exploration.

French, Bevan M.↗

Relay Support for the Mars Science Laboratory Mission

The Mars Science Laboratory (MSL) mission landed the Curiosity Rover on the surface of Mars on August 6, 2012, beginning a one-Martian-year primary science mission. An international network of Mars relay orbiters, including NASA's 2001 Mars Odyssey Orbiter (ODY) and Mars Reconnaissance Orbiter (MRO), and ESA's Mars Express Orbiter (MEX), were positioned to provide critical event coverage of MSL's Entry, Descent, and Landing (EDL). The EDL communication plan took advantage of unique and complementary capabilities of each orbiter to provide robust information capture during this critical event while also providing low-latency information during the landing. Once on the surface, ODY and MRO have provided effectively all of Curiosity's data return from the Martian surface. The link from Curiosity to MRO incorporates a number of new features enabled by the Electra and Electra-Lite software-defined radios on MRO and Curiosity, respectively. Specifically, the Curiosity-MRO link has for the first time on Mars relay links utilized frequency-agile operations, data rates up to 2.048 Mb/s, suppressed carrier modulation, and a new Adaptive Data Rate algorithm in which the return link data rate is optimally varied throughout the relay pass based on the actual observed link channel characteristics. In addition to the baseline surface relay support by ODY and MRO, the MEX relay service has been verified in several successful surface relay passes, and MEX now stands ready to provide backup relay support should NASA's orbiters become unavailable for some period of time.

Telecommunications↗

Concept for 2033 Crewed Mars Orbital Mission with Venus Flyby

The 2033 Mars launch period provides a unique opportunity for a round trip mission with a total flight time of only 1.6 years. A concept is presented to perform a crewed Mars orbital mission in 2033 that would minimize development and mission risk by using conventional hypergolic in-space propulsion stages with a common design. The Mars mission vehicle would include a Mars transit habitat, an Orion spacecraft, and chemical propulsion stages. It would be launched by a combination of SLS and commercial rockets to be aggregated in high Earth orbit or at the Lunar Gateway. The crew would launch to the mission vehicle in Orion as the final element in the assembly. After transit to Mars, the crew would spend about 30 days in a high Mars orbit and then return to Earth via a Venus flyby and gravity assist. A sunshade would be deployed for thermal control of the mission vehicle inside 1 AU. The crew would return directly to Earth in the Orion crew module, with the transit habitat being expended. The 2033 mission would not be a “one-off”, but could be a pathfinder for crew transport for landing missions to follow, perhaps starting as early as 2037.

Woolley, Ryan↗

The SP-100 space reactor as a power source for Mars exploration missions

This paper argues that many of the power requirements of complex, relatively long-duration space missions such as the exploration of Mars may best be met through the use of power systems which use nuclear reactors as a thermal energy source. The development of such a power system, the SP-100, and its application in Mars mission scenarios is described. The missions addressed include a freighter mission and a mission involving exploration of the Martian surface.

Isenberg, Lon↗

An Alternative Humans to Mars Approach: Reducing Mission Mass with Multiple Mars Flyby Trajectories and Minimal Capability Investments

Mars flyby trajectories and Earth return trajectories have the potential to enable lower- cost and sustainable human exploration of Mars. Flyby and return trajectories are true minimum energy paths with low to zero post-Earth departure maneuvers. By emplacing the large crew vehicles required for human transit on these paths, the total fuel cost can be reduced. The traditional full-up repeating Earth-Mars-Earth cycler concept requires significant infrastructure, but a Mars only flyby approach minimizes mission mass and maximizes opportunities to build-up missions in a stepwise manner. In this paper multiple strategies for sending a crew of 4 to Mars orbit and back are examined. With pre-emplaced assets in Mars orbit, a transit habitat and a minimally functional Mars taxi, a complete Mars mission can be accomplished in 3 SLS launches and 2 Mars Flyby's, including Orion. While some years are better than others, ample opportunities exist within a given 15-year Earth-Mars alignment cycle. Building up a mission cadence over time, this approach can translate to Mars surface access. Risk reduction, which is always a concern for human missions, is mitigated by the use of flybys with Earth return (some of which are true free returns) capability.

Whitley, Ryan J.↗

Robotic missions to Mars - Paving the way for humans

NASA is in the planning stages of a program leading to the human exploration of Mars. A critical element in that program is a set of robotic missions that will acquire information on the Martian environment and test critical functions (such as aerobraking) at the planet. This paper presents some history of Mars missions, as well as results of recent studies of the Mars robotic missions that are under consideration as part of the exploration program. These missions include: (1) global synoptic geochemical and climatological characterization from orbit (Mars Observer), (2) global network of small meteorological and seismic stations, (3) sample returns, (4) reconnaissance orbiters and (5) rovers.

Pivirotto, D. S.↗

Noble Gas Analysis for Mars Robotic Missions: Evaluating K-Ar Age Dating for Mars Rock Analogs and Martian Shergottites

The purpose of this noble gas investigation was to evaluate the possibility of measuring noble gases in martian rocks and air by future robotic missions such as the Mars Science Laboratory (MSL). The MSL mission has, as part of its payload, the Sample Analysis at Mars (SAM) instrument, which consists of a pyrolysis oven integrated with a GCMS. The MSL SAM instrument has the capability to measure noble gas compositions of martian rocks and atmosphere. Here we suggest the possibility of K-Ar age dating based on noble gas release of martian rocks by conducting laboratory simulation experiments on terrestrial basalts and martian meteorites. We provide requirements for the SAM instrument to obtain adequate noble gas abundances and compositions within the current SAM instrumental operating conditions, especially, a power limit that prevents heating the furnace above approx.1100 C. In addition, Martian meteorite analyses from NASA-JSC will be used as ground truth to evaluate the feasibility of robotic experiments to constrain the ages of martian surface rocks.

Park, J.↗

Enabling Innovative Research on the International Space Station to Solve the Challenges of A Human Mission to Mars: Results of the ISS4Mars International Workshops 2020–2021

During the ISS4Mars workshops in 2020–2021, personnel from the International Space Station (ISS) partner agencies convened to reflect on scenarios for how the ISS could be used and its operations possibly modified to simulate aspects of a human mission to Mars. Scientific leaders, operations experts, crewmembers, managers, and flight surgeons discussed the five hazards of human spaceflight—gravity transitions, radiation, isolation and confinement, distance from Earth, and hostile closed environments—and considered how an ISS-based analog of Mars transit could benefit assessments and mitigations of these hazards. A focused writing team then discussed the advantages and disadvantages of each approach identified by the workshop participants before developing a set of eight use cases to consider the feasibility of implementing on the ISS. The writing team also identified the prerequisites needed, including ground analog studies simulating a mission to Mars required to verify measurements and procedures, before testing could begin on the ISS. Five of the use cases were considered feasible to assess in simulations using an ISS-based analog of Mars transit if some ground rules and assumptions were met. These five use cases were Earth-independent medical operations, Earth-independent integrated operations, life support and food for a one year duration, lower-body negative pressure as a countermeasure against the effects of exposure to microgravity, and fitness levels after landing. In addition, three more extensive interventions—extended Mars surface operations, a small-volume transit analog, and artificial gravity—were deemed unfeasible for testing on the ISS. Experience gained from the five use cases executed on the ISS may help answer some of the questions in the deferred scenarios, or it may be possible to complete them on another platform (e.g. commercial space station, lunar habitat). Simulating conditions during a Mars mission on the ISS will afford higher fidelity for assessing multiple integrated hazards of human spaceflight, however, ground analogs of Mars missions can be used to ensure effective measures and experimental design before testing begins on the ISS. The strategic concepts refined as part of these workshops were brought to a multilateral forum, Mulitlateral Human Research Planel for Exploration (MHRPE), where ISS partner agencies are now discussing implementation plans to provide new opportunities to use the ISS to prepare for deep space exploration over the coming decade. In this publication we present a summary of the international strategic plans for future research that will enable operations, software, and countermeasures to be developed that will reduce the risk to humans during future crewed missions to Mars.

Human space exploration↗

The 2012 Moon and Mars Analog Mission

The 2012 Moon and Mars Analog Mission Activities (MMAMA) scientific investigations were completed on Mauna Kea volcano in Hawaii in July 2012. The investigations were conducted on the southeast flank of the Mauna Kea volcano at an elevation of approximately 11,500 ft. This area is known as "Apollo Valley" and is in an adjacent valley to the Very Large Baseline Array dish antenna.

Graham, Lee↗

Updated Human Mars Ascent Vehicle Concept in Support of NASA’s Strategic Analysis Cycle 2021

The NASA Artemis program has brought significant change to the agency’s human exploration strategy over the last several years. The human exploration of Mars remains an ultimate objective of the overall human exploration strategy. However, how the agency intends to execute initial human exploration of Mars has shifted to better align with current policy. These changes find their way into the design of key architecture elements, such as the Mars Ascent Vehicle (MAV). Of the numerous changes in the conceptual human Mars architecture, two in particular have had significant impact on the design of the human MAV: the desire for minimal surface infrastructure for initial human Mars missions, and technology investment timelines in support of initial human missions to Mars. The first leads to a surface mission architecture targeting a 30-day surface duration with two crewmembers. The second drives out in-situ resource utilization (ISRU) from the initial sortie. As a result, the reference MAV design for initial human Mars missions in the Human Exploration and Operations Mission Directorate’s Strategic Analysis Cycle 2021 (SAC21) is based around supporting the return of 2 crew from the surface of Mars, without surface ISRU. This has led to several design changes since 2019, when details of a reference human MAV were last published. The MAV concept for SAC21 consists of a two-stage vehicle capable of supporting two crew for 84 hours. This duration is derived from a baseline ascent trajectory targeting an apoapsis rendezvous with the habitation element in a nominal 5-sol Mars aggregation orbit. With the goal of minimizing technology investments for the initial surface sortie removing ISRU from the trade space, the MAV must now be landed either fully loaded with propellant, or with some portion of the propellant off-loaded. Landing a partially-fueled MAV will require additional surface assets to perform robotic propellant transfer on the surface of Mars from a pre-emplaced propellant depot. Furthermore, cryogenic fluid management and storage for extended duration with no losses represents additional technology investment that would have to be made to support cryogenic-based propellant concepts that have been the baseline in past architectures. As a result, the SAC21 architecture utilizes a storable propellant-based MAV propulsion system to minimize these potential technology investments incurred by cryogenic-based propulsion systems. Recent efforts also focused on evaluating the sensitivity of key design parameters, such as landing site latitude, elevation, and local atmospheric conditions. All play a large role in determining the predicted propellant requirements of the MAV. Understanding their potential impacts is important because of the rippling effects of changes to the MAV design on other architecture elements, such as entry, descent, landing, and transportation systems. Results indicate up to +2% to -4% wet mass variation due to landing site latitude, with higher latitudes greater than 70 degrees North resulting in greater than 6% wet mass increases. The MAV saw reduced impact due to atmospheric design parameters, which only accounting for -0.6% to +0.4% wet mass variation.

Douglas J. Trent↗