Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MONITOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Ecological Monitoring and Compliance Program 2013 Report

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2013. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2013, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

54 ENVIRONMENTAL SCIENCES↗

Nevada National Security Site 2013 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Site

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2013 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2013; 2014a; 2014b). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are close to detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. The 105.8 millimeters (mm) (4.17 inches [in.]) of precipitation at the Area 3 RWMS during 2013 is 30% below the average of 150.3 mm (5.92 in.), and the 117.5 mm (4.63 in.) of precipitation at the Area 5 RWMS during 2013 is 5% below the average of 123.6 mm (4.86 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Automated vadose zone monitoring on Area 5 and Area 3 RWMS cell covers show no evidence of precipitation percolating through the cover to the waste. Moisture from precipitation did not percolate below 60 centimeters (cm) (2 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS, and moisture from precipitation and irrigation did not percolate below 45 cm (1.5 ft) on the 92-Acre Area final cover. Irrigation was applied to this cover for seed germination and plant growth. During 2013, there was no drainage through 2.4 meters (8 ft) of soil from the Area 3 drainage lysimeters that received only natural precipitation. Twenty percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter that received 3-times natural precipitation. All 2013 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Updated Methodology for Enhancing Risk Monitors with Integrated Equipment Condition Assessment

Small modular reactors (SMRs) generally include reactors with electric output of ~350 MWe or less (this cutoff varies somewhat but is substantially less than full-size plant output of 700 MWe or more). Advanced SMRs (AdvSMRs) refer to a specific class of SMRs and are based on modularization of advanced reactor concepts. Enhancing affordability of AdvSMRs will be critical to ensuring wider deployment, as AdvSMRs suffer from loss of economies of scale inherent in small reactors when compared to large (~greater than 600 MWe output) reactors and the controllable day-to-day costs of AdvSMRs will be dominated by operation and maintenance (O&M) costs. Technologies that help characterize real-time risk are important for controlling O&M costs. Risk monitors are used in current nuclear power plants to provide a point-in-time estimate of the system risk given the current plant configuration (e.g., equipment availability, operational regime, and environmental conditions). However, current risk monitors are unable to support the capability requirements listed above as they do not take into account plant-specific normal, abnormal, and deteriorating states of active components and systems. This report documents technology developments towards enhancing risk monitors that, if integrated with supervisory plant control systems, can provide the capability requirements listed and meet the goals of controlling O&M costs. The report describes research results on augmenting an initial methodology for enhanced risk monitors that integrate real-time information about equipment condition and POF into risk monitors. Methods to propagate uncertainty through the enhanced risk monitor are evaluated. Available data to quantify the level of uncertainty and the POF of key components are examined for their relevance, and a status update of this data evaluation is described. Finally, we describe potential targets for developing new risk metrics that may be useful for studying trade-offs for economic operation while maintaining adequate safety margins.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of Pre- and Post- Redevelopment Groundwater Chemical Analyses from LM Monitoring Wells

This report documents the efforts and analyses conducted for the Applied Studies and Technology (AS&T) Ancillary Work Plan (AWP) project titled Evaluation of Pre- and Post- Redevelopment Groundwater Sample Laboratory Analyses from Selected LM Groundwater Monitoring Wells. This effort entailed compiling an inventory of nearly 500 previous well redevelopment events at 16 U.S. Department of Energy Office of Legacy Management (LM) sites, searching the literature for impacts of well redevelopment on groundwater sample quality, and—the focus of this report—evaluating the impacts of well redevelopment on field measurements and sample analytical results. Study Catalyst Monitoring well redevelopment, the surging or high-volume pumping of a well to loosen and remove accumulated sediment and biological build-up from a well, is considered an element of monitoring well maintenance that is implemented periodically during the lifetime of the well to mitigate its gradual deterioration. Well redevelopment has been conducted fairly routinely at a few LM sites in the western United States (e.g., the Grand Junction office site and the Gunnison processing site in Colorado), but at most other sites in this region it is not a routine practice. Also, until recently (2014–2015), there had been no specific criteria for implementing well redevelopment, and documentation of redevelopment events has been inconsistent. A catalyst for this evaluation was the self-identification of these inconsistencies by the Legacy Management Support contractor. As a result, in early 2015 Environmental Monitoring Operations (EMO) staff began collecting and documenting additional field measurements during well redevelopment events. In late 2015, AS&T staff undertook an independent internal evaluation of EMO's well redevelopment records and corresponding pre- and post-well-redevelopment groundwater analytical results. Study Findings Although literature discussions parallel the prevailing industry-wide assumption that well redevelopment is necessary to increase production or to extend the life of a well, no data in the literature indicate that redevelopment affects chemical signatures in monitoring wells. The comprehensive evaluation undertaken for this study also yielded no evidence that redevelopment has any quantifiable or predictable effect on groundwater sample quality. Both short-term and long-term changes in groundwater chemistry were assessed relative to preceding and subsequent well redevelopment events. Although short-term changes in specific conductance or contaminant concentrations likely attributable to well redevelopment were found at some sites, these cases were limited to a small subset of wells in which chemical stratification had been observed. Redevelopment causes mixing of the well water, resulting in short-term impacts, but not in a consistent direction. Long-term groundwater concentration trends of uranium, the primary contaminant of concern at most LM Uranium Mill Tailings Radiation Control Act (UMTRCA) sites, were evaluated for all 16 sites addressed in this study. Based on the data evaluated, there are no apparent impacts of well redevelopment on uranium trends. In most cases where deviations in trends were found, these could be attributed to water level fluctuations or other factors. A few exceptions were found where spikes or marked decreases in uranium concentrations could potentially be related to the preceding well redevelopment, but apparent impacts were neither predictable nor quantifiable. Summary and Recommendations A catalyst for this project was a concern that there was a need for strict criteria for a program-wide approach to well redevelopment at LM sites. There was also an implicit question as to whether well redevelopment was a necessary practice that was being overlooked at some sites. The primary objective of this study was to determine if there are significant differences in laboratory analytical results between pre- and post-redevelopment groundwater samples. Results of this evaluation indicate that this is not the case—groundwater concentrations of uranium, the primary contaminant of concern at most LM UMTRCA sites, generally remained unchanged pre- and post-well-redevelopment. The literature supports redevelopment of monitoring and municipal wells if signs of reduced productivity, biofouling, sediment buildup, or other conditions potentially affecting long-term well integrity are observed. In these cases, use of a downhole camera to examine the condition of the well screen and casing may be useful. However, based on the data sets examined for this study, there is no evidence that well redevelopment is needed in order to obtain samples that have the same chemical concentrations as those in the groundwater. To conclusively demonstrate that point—that is, to define chemical effects—the underlying mechanisms have to be understood. For example, if biofouling is observed in a well and is considered a potential cause of spurious or invalid chemical data, appropriate hypothesis-testing ethodology should be used to test the validity of this claim. Until late 2014, the onset of this project, there was no standard procedure for documenting well redevelopment events; some (perhaps many) had not been captured in the historical record. EMO has made notable progress in this regard since 2015, having established a format for documenting well redevelopment events and associated field measurements, as well as a data repository for capturing those records. This policy should be continued to ensure that all well redevelopment events and associated field observations are recorded and easily tracked.

54 ENVIRONMENTAL SCIENCES↗

Ecological Monitoring and Compliance Program 2015 Report

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2015. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2015, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

54 ENVIRONMENTAL SCIENCES↗

2016 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). These data include direct radiation exposure, as well as radiation from the air, groundwater, meteorology, and vadose zone. This report summarizes the 2016 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports, developed by National Security Technologies, LLC Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show that tritium concentrations in water vapor and americium and plutonium concentrations in air particles are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. During 2016, precipitation at the Area 3 RWMS was 8% below average, and precipitation at the Area 5 RWMS was 8% above average. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation as measured from the bare-soil weighing lysimeter. Vadose zone monitoring on Area 5 and Area 3 RWMS cell covers shows no evidence of precipitation percolating through the covers to the waste. Moisture from precipitation did not percolate below 150 centimeters (cm) (5 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS. During 2016, there was no drainage through 2.4 meters (8 ft) of soil as indicated from the Area 3 drainage lysimeters that received only natural precipitation. Forty-four percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter, which received 3 times the natural precipitation. All 2016 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facilities’ PAs

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ecological Monitoring and Compliance Program 2016 Report

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2016. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2016, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

54 ENVIRONMENTAL SCIENCES↗

Ecological Monitoring and Compliance Program (2018 Report)

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office, monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by Mission Support and Test Services, LLC, during calendar year 2018. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2018, most applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

54 ENVIRONMENTAL SCIENCES↗

Real-time In-situ CO 2 Monitoring (RICO2M) Network for Sensitive Subsurface Areas in CCUS

Intelligent Optical Systems (IOS) has developed the Real-Time In-Situ CO 2 Monitoring (RICO2M) system, a fiber optic-based monitoring system capable of the highly sensitive detection of increasing levels of carbon dioxide (CO 2 ) in groundwater. In collaboration with the Bureau of Economic Geology at the University of Texas at Austin, IOS performed multiple field deployments and validation studies of an in-situ real-time monitoring network. We have developed and demonstrated a multi-channel instrument capable of covering up to eight water wells, with a fabrication cost of ~$5,000, which compares very favorably with existing fiber optic monitoring instrumentation for downhole monitoring. Numerous field studies demonstrated the ability of the RICO2M system to detect small leaks of CO 2 reaching aquifers, and the capacity of the sensor probe to operate for at least one year before replacement. The final system design was a sensitive CO 2 leak detector; further development will be necessary to accurately quantify and monitor CO 2 concentrations in real time.

54 ENVIRONMENTAL SCIENCES↗

Status of the Optical Dilatometer Method of Evaluating the Peak Irradiation Temperatures of SiC Passive Monitors

The main objective of this project was to conduct a comparative assessment between the optical dilatometer method and resistivity method, using all 10 SiC temperature monitors provided by two Nuclear Science User Facility experiments: BSU-8242 and General Electric Hitachi. Unfortunately, due to multiple delays in acquiring, shipping, and cleaning the SiC temperature monitors, the project was only able to process one (1) SiC temperature monitor during this period. SiC temperature monitor KGT-3357 was evaluated via the optical dilatometer method to determine its peak irradiation temperature. The KGT-3357 sample was from the BSU-8242 experiment and designed for a temperature of 300°C and an exposure of 1 dpa. The optical dilatometer measurements indicated that the KGT-3357 SiC temperature monitor’s peak irradiation temperature range was 240–267°C, with sensitivity of approximately ±20°C. Additionally, this temperature range falls within the evaluated melt wire temperature range of 238.6–271.5 °C. The remaining six (6) SiC temperature monitors from the BSU-8242 experiment and three (3) from the General Electric Hitachi experiment will be used in the future work to further validate the optical dilatometer method for measuring SiC peak irradiation temperatures.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Embedded sensors integrated into critical components for in situ health monitoring of steam turbines

Operational flexibility is desired in today’s coal-fired power plants to balance power grids by compensating for the variable electricity supply from renewable energy sources and distributed gensets. This demanding requirement accelerates materials degradation and makes in-situ health monitoring essential. Life monitoring of components and subsystems is thus seen as essential in assessing material and mechanical behavior to estimate system reliability, move to a conditionbased maintenance strategy and determine time to failure of the units in their actual operating conditions. Vibration monitoring can be exploited for blade tip timing to measure blade vibration amplitude and tip clearance to detect any deterioration taking place in the condition of steam turbine blades. A failure of a rotating blade can lead to severe turbine damage followed by extensive repairs and loss of power production. A blade vibration monitoring system can help early detection of abnormal blade vibration behavior. In conjunction with a health monitoring system, the vibration characteristics can be analyzed to support a pro-active maintenance and inspection schedule. While the feasibility of this inspection technique has been amply demonstrated, there is a need to install induction probes to magnetize the blade for signal output. Siemens, in partnership with Raytheon Technologies Research Corporation (RTRC), proposes a holistic approach to develop embedded sensors to utilize radio frequency for not only coupling to sensors, but as the sensing modality. The goal of this project is to “embed” the novel sensing approach by using either additively manufactured or extruded waveguides on rotating blades for recording, evaluation and monitoring of blade vibrations in Low Pressure turbines, with applications extending to aero engines

01 COAL, LIGNITE, AND PEAT↗

RESULTS OF TRITIUM TRACKING AND GROUNDWATER MONITORING AT THE HANFORD SITE 200 AREA STATE APPROVED LAND DISPOSAL SITE FY2008

The Hanford Site's 200 Area Effluent Treatment Facility (ETF) processes contaminated aqueous wastes derived from Hanford Site facilities. The treated wastewater occasionally contains tritium, which cannot be removed by the ETF prior to the wastewater being discharged to the 200 Area State-Approved Land Disposal Site (SALDS). During the first 11 months of fiscal year 2008 (FY08) (September 1, 2007, to July 31, 2008), approximately 75.15 million L (19.85 million gal) of water were discharged to the SALDS. Groundwater monitoring for tritium and other constituents, as well as water-level measurements, is required for the SALDS by State Waste Discharge Permit Number ST-4500 (Ecology 2000). The current monitoring network consists of three proximal (compliance) monitoring wells and nine tritium-tracking wells. Quarterly sampling of the proximal wells occurred in October 2007 and in January/February 2008, April 2008, and August 2008. The nine tritium-tracking wells, including groundwater monitoring wells located upgradient and downgradient of the SALDS, were sampled in January through April 2008. Water-level measurements taken in the three proximal SALDS wells indicate that a small groundwater mound is present beneath the facility, which is a result of operational discharges. The mound increased in FY08 due to increased ETF discharges from treating groundwater from extraction wells at the 200-UP-l Operable Unit and the 241-T Tank Farm. Maximum tritium activities increased by an order of magnitude at well 699-48-77A (to 820,000 pCi/L in April 2008) but remained unchanged in the other two proximal wells. The increase was due to higher quantities of tritium in wastewaters that were treated and discharged in FY07 beginning to appear at the proximal wells. The FY08 tritium activities for the other two proximal wells were 68,000 pCi/L at well 699-48-77C (October 2007) and 120,000 pCi/L at well 699-48-77D (October 2007). To date, no indications of a tritium incursion from the SALDS have been detected in the tritium-tracking wells. Concentrations of all chemical constituents were within Permit limits or were below method detection limits when sampled during FY08. A summary of the chemical constituent concentrations or method detection limits is provided in Table 3-2 in the main text discussion. This report presents the results of groundwater monitoring and tritium-tracking samples from the SALDS facility during FY08. Due to the 30-day laboratory turnaround for analysis of proximal well groundwater samples, this report addresses available date extending from August 1, 2007, through September 30, 2008 (August 2007 data were not included in the FY07 report). Updated background information, which is necessary to understand the results of the groundwater analyses, is also provided on facility operations. Interpretive discussions and recommendations for future monitoring are also provided, where possible.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Monitoring and Evaluation of Smolt Migration in the Columbia Basin : Volume XV : Evaluation of the 2007 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolts to Rock Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime.

Program RealTime provided monitoring and forecasting of the 2007 inseason outmigrations via the internet for 26 PIT-tagged stocks of wild ESU Chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, one PIT-tagged wild stock of sockeye salmon to McNary Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville dams. Nineteen stocks are of wild yearling Chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2007 and have at least one year's historical migration data previous to the 2007 migration. These stocks originate in 19 tributaries of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through tag identification and monitored at Lower Granite Dam. Seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling Chinook salmon and the steelhead runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling Chinook, coho, and sockeye salmon, and steelhead forecasted to Rock Island, McNary, John Day, and Bonneville dams.

13 HYDRO ENERGY↗

A Novel, Low-Cost, Reduced-Sensor Approach for Providing Smart Renote Monitoring and Diagnostics for Packaged Air Conditioners and Heat Pumps

This report describes conceptually an approach to providing automated remote performance and conditioning monitoring and fault detection for air conditioners and heat pumps that shows great promise to reduce the capital and installation costs of such systems from over $1000 per unit to $200 to $400 per unit. The approach relies on non-intrusive electric load monitoring (NIELM) to enable separation of the power use signals of compressors and fans in the air conditioner or heat pump. Then combining information on the power uses and one or two air temperature measurements, changes in energy efficiency and occurrence of major faults would be detected. By decreasing the number of sensors used from between ten and twenty in current diagnostic monitoring systems to three for the envisaged system, the capital cost of the monitoring system hardware and the cost of labor for installation would be decreased significantly. After describing the problem being addressed and the concept for performance monitoring and fault detection in more detail, the report identifies specific conditions and faults that the proposed method would detect, discusses specific needs for successful use of the NIELM approach, and identifies the major elements in the path from concept to a commercialized monitoring and diagnostic system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Runtime Monitoring with R2U2 for Aircraft Systems with Neural Networks

R2U2 (Realizable, Responsive, Unobtrusive Unit) is a hardware-supported tool and framework for real-time system monitoring and software health management of cyber-physical systems. During system operation, R2U2 continuously monitors properties about safety, performance, and security of the vehicle and its vital components and can perform diagnostic reasoning. Efficient observers for past-time and future-time Metric Temporal Logic, fast reasoners for Bayesian Networks, and model-based prognostics algorithms are key components of R2U2 and designed for minimal computational footprint. R2U2 has been implemented in software supporting ROS, NASA's cFS/cFE, and Simulink and as an FPGA configuration. The synergistic combination of monitors and observers in R2U2 makes it possible to design powerful models for system runtime monitoring, diagnostics, software health management, prognostics, and security monitoring. In this presentation, I will give a detailed overview of the R2U2 architecture and its features and will discuss the application of R2U2 for safety-monitoring of a neural-network based autonomous centerline tracking system (ACT) for autonomous aircraft.

Runtime Monitoring↗

The Effects of Training and Flight Director Use on Pilot Monitoring Performance: A Sensemaking Approach

The need for improved pilot monitoring and awareness has been widely recognized, and training is a possible intervention. Based on our sensemaking-model of monitoring, we identified key properties of monitoring flight path. We designed scenarios with associated behavioral markers that provide measures of monitoring performance and a short training module emphasizing our proactive, anticipatory view of monitoring. Nineteen first officers from a major US airline participated in the training study. Each pilot flew in a simulator pretest, participated in a training session, and flew in a simulator posttest. We found modest but significant improvements in monitoring. The study collected video, simulator, and eyetracking data and also manipulated whether the Flight Director was on or off. Limitations and future directions are discussed.

monitoring↗

Cognitive Engineering in Training: Monitoring and Pilot-Automation Coordination in Complex Environments

This paper reports our investigation of flight path monitoring in aviation. We interviewed experienced pilots to understand the knowledge and skills underlying effective monitoring and we developed an example learning environment to improve these skills. We explore how design of pilot training and learning, like the design of interfaces and of the underlying automation, benefits from cognitive engineering methods and perspective. In aviation, monitoring and managing flight path are critical activities. The influences on flight path are complex and come from the autoflight system, from control actions by the pilot, and from external factors, including weather and Air Traffic Control (ATC). Indeed, inadequate flight path monitoring is a current aviation concern as it has been implicated in accidents and incidents. Effective piloting depends on strategies for noticing, understanding, and anticipating these influences to monitor and manage flight path. Lack of such skills reduces pilots' ability to maintain safety margin and resilience. Although flightdeck automation is intended to aid pilot understanding and prediction, the Fight Management Systems (FMS) can mislead as well as aid the pilot's understanding and projection of what will happen. In dynamic conditions, FMS predictions may be based on old or incomplete information. Understanding such vulnerabilities is an important part of pilot-autoflight coordination. The learning environment we developed is designed to help pilots proactively monitor and manage flight path. We consider how a broad cognitive engineering approach might inform the "what" and "how" of learning in dynamic work domains.

pilot-monitoring↗

Powder Bed Fusion Laser Beam Metals Additive Manufacturing: Process Monitoring Approaches for Qualification and Certification

The use of in-situ process monitoring is of interest to lower the cost of inspection for the qualification of powder bed fusion laser beam metal (PBF-LB/M) additively manufactured (AM) parts. Precise monitoring of the PBF-LB/M AM build process constitutes a multi-scale and multi-discipline task. There are several significant challenges to the in-situ approach: the synchronization of sensor signals to process steps; the physical interpretation and classification of sensor signals; managing very large datasets; and comparing the inputs with the observed monitoring signals. At NASA Langley Research Center, a configurable architecture additive testbed has been developed to monitor the build process with synchronized sensors. The philosophy and method adopted for the synchronization of the cameras with laser power and position throughout a complex PBF-LB/M AM build will be described. The synchronized in-situ monitoring signals are compared with ex-situ nondestructive inspection, x-ray computed tomography (XCT). Such comparisons permit a better understanding of how the sequential process actions of LPBF-AM can affect build quality. The multi-scale and complex process of printing additively manufactured (AM) parts can have unexpected, but predictable, build conditions that result in material microstructure variability. This presentation will describe an additive manufacturing model-based process metric (AM-PM) computational method that is a fully parallel reduced order modeling approach developed to evaluate the evolution of AM processes. This method couples the known sequence of the AM process with a physically informed nearest neighbors’ calculation to map the conditions of a part-scale build. The result is a map of the build that is derived directly from build files or in-situ process monitoring sensors. The methodology of the approach will be described and mapped to the porosity observed from XCT for a complex PBF-LB/M build. Such comparative results develop understanding of how the sequential process actions can affect the PBF-LB/M AM build quality and microstructure variability.

Laser Powder Bed Fusion↗