Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Location”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Radiological Monitoring Plan for the Oak Ridge Y-12 National Security Complex: Surface Water

DOE Order 458.1 requires that dose estimates consider contributions from all facilities. In the Y-12 Radiological Monitoring Plan (RMP), surface water is monitored at points that reflect individual facilities, as well as at points that reflect the combined contributions of all facilities. This monitoring plan does not consider other potential routes (i.e., airborne releases and food chains). Thus, a complete determination of total effective dose (TED) cannot be made based on this plan alone. The other routes from Y-12, and all routes from other DOE facilities on the Oak Ridge Reservation (e.g., Oak Ridge National Laboratory (ORNL) and The Heritage Center), must be considered in order to satisfy DOE Order 458.1 requirements. Determination of TED from all sites and pathways is done through the use of dose-assessment models and is documented in the Annual Site Environmental Report. This monitoring plan provides adequate monitoring goals for Y-12 surface water releases to provide input of sufficient sensitivity and accuracy to reliably determine the Y-12 surface water component of the TED. The routine radiological monitoring program is designed to monitor effluents at four types of locations: (1) treatment facilities, (2) other point and area source discharges, (3) instream locations, and (4) production building roof run-off. With this sampling and analysis program, data will be obtained on primary point sources as well as on locations that represent the composite of other potential sources. This plan will be reviewed periodically to determine necessary modifications to the sampling frequencies, parameters, and locations. Modifications, if any, will be based on the analysis of the previous data and its effectiveness in satisfying the objectives of this plan. Appendix A contains graphs of the sum of the DCS fractions for locations and frequencies contained in a previous version of this plan. The data was collected from January 2009 through December 2019. Each sample was analyzed, and each result was divided by the appropriate DCS to compute a DCS fraction. These fractions were summed for all isotopes. According to DOE –STD-1196-2011, the annual average of these sums should be below 1.

54 ENVIRONMENTAL SCIENCES↗

Alpha Spectrometry Results for Groundwater Samples Collected in Northern Iraq and a Summary of the Environmental Setting of the Adaya Burial Site

The Radiation Protection Center (RPC) of the Iraqi Ministry of Environment continues to evaluate the potential health impacts associated with the Adaya Burial Site, which is located 33 kilometers (20.5 miles) southwest of Mosul. This report documents the radiological analyses of 16 groundwater samples collected from wells located in the vicinity of the Adaya Burial Site and at other sites in northern Iraq. The Adaya Burial Site is a high-risk dump site because a large volume of radioactive material and contaminated soil is located on an unsecure hillside above the village of Tall ar Ragrag. The uranium activities for the 16 water samples in northern Iraq are considered to be naturally occurring and do not indicate artificial (man-made) contamination. With one exception, the alpha spectrometry results for the 16 wells that were sampled in 2019 indicate that the water quality concerning the three uranium isotopes (Uranium-233/234, Uranium-235/236, and Uranium-238) was acceptable for potable purposes (drinking and cooking). However, Well 7 in Mosul had a Uranium-233/234 activity concentration that slightly exceeded the World Health Organization guidance level. Eight of the 16 wells are located in the villages of Tall ar Ragrag and Adaya and had naturally occurring uranium concentrations. Wells in the villages of Tall ar Ragrag and Adaya are located near the Adaya Burial Site and should be sampled on an annual schedule. The list of groundwater analytes should include metals, total uranium, isotopic uranium, gross alpha/beta, gamma spectroscopy, organic compounds, and standard water quality parameters. Our current understanding of the hydrogeologic setting in the vicinity of the Adaya Burial Site is solely based on villager's domestic wells, topographic maps, and satellite imagery. To better understand the hydrogeologic setting, a Groundwater Monitoring Program needs to be developed and should include the installation of twelve groundwater monitoring wells in the vicinity of Tall ar Ragrag and the Adaya Burial Site. Characterization of the limestone aquifer and overlying alluvium is needed. RPC should continue to support health assessments for the villagers in Tall ar Ragrag and Adaya. Collecting samples for surface water (storm water), airborne dust, vegetation, and washway sediment should be conducted on a routine basis. Human access to the Adaya Burial Site needs to be strictly limited. Livestock access on or near the burial site needs to be eliminated. The surface-water exposure pathway is likely a greater threat than the groundwater exposure pathway. Installation of a surface-water diversion or collection system is recommended in order to reduce the potential for humans and livestock to come in contact with contaminated water and sediment. To reduce exposure to villagers, groundwater treatment should be considered if elevated uranium or other contaminants are detected in drinking water. Installing water-treatment systems would likely be quicker to accomplish than remediation and excavation of the Adaya Burial Site. The known potential for human exposure to uranium and metals (such as arsenic, chromium, selenium, and strontium) at the Adaya Burial Site is serious. Additional characterization , mitigation, and remediation efforts should be given a high priority.

54 ENVIRONMENTAL SCIENCES↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2022 Edition [Slides]

Falling battery prices and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data mined from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and full hybrids that feature co-location and co-control. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2021, there were nearly 300 hybrid plants (>1 MW) operating across the United States, totaling nearly 36 gigawatts (GW) of generating capacity and 3.2 GW/8.1 GWh of energy storage. PV+storage plants are by far the most common, dominating in terms of plant number (140), storage capacity (2.2 GW/7.0 GWh), storage:generator ratio (53%), and storage duration (3.2 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was a breakout year for PV+storage hybrids in particular: 67 of the 74 hybrids added in 2021 were PV+storage. By the end of 2021, there were more GW of battery capacity installed in PV+storage hybrids (2.2 GW) than as standalone storage plants (1.8 GW). The difference is even starker in energy terms, with PV+storage plants hosting twice as much battery capacity as standalone storage plants (7 GWh vs. 3.5 GWh, respectively). Much of the battery capacity added in hybrid form in 2021 was a battery retrofit to a pre-existing PV plant. -Data on plants under development from the interconnection queues of all seven ISOs/RTOs plus 35 individual utilities suggest that these hybridization trends are likely to continue. At the close of 2021, there were more than 670 GW of solar plants in the nation’s queues; 285 GW (~42%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage (PV+storage represented nearly 90% of all hybrid capacity in the queues). For wind, 247 GW of capacity sat in the queues, with 19 GW (~8%) proposed as a hybrid, again most-often pairing wind with storage (wind+storage represented ~4% of all hybrid capacity in the queues). Meanwhile, nearly half of all storage in the queues is estimated to be part of a hybrid plant. While many of these proposed plants will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impulse Noise Sampling at 9965 - Armag

One detonation test was monitored for impulse noise at Thunder Range on November 6, 2020. The TNT equivalency for this shot was 100 lbs. Ground zero for this test was located at an open area of Range 7. The Armag, where MOW were remotely located, was just south of the east end of the TR shock tube The purpose of this sampling event was to characterize the noise attenuation provided by the Armag which will be used as the primary firing location in a future test series. To determine attenuation provided by the Armag, one sound level monitor was placed inside and a second monitor was placed outside the hardened structure at the same distance from ground zero. The Armag was located 1300 feet from ground zero. Essential personnel performing these tests were remotely located inside the Armag and wore hearing protection with a minimum NRR of 23. Members of the Workforce (MOW) who are exposed to noise levels above 140 dBC, regardless of hearing protection worn, are required to be enrolled into the SNL Hearing Conservation Program which includes audiometric testing, online training (HCP100) and wearing hearing protection.

42 ENGINEERING↗

Hawai‘i Play Fairway (Final Report)

Most of Hawai'i's geothermal resources are blind—their manifestations, such as hot springs and steam vents, do not appear on the ground surface because the heated water flows far below. With the exception of $K\bar{i}lauea East Rift Zone$, in most areas of Hawai'i, high lateral permeability in the first kilometer below ground surface prevents surface thermal features from developing. As a methodology for discovering these blind resources, Play Fairway Analysis (PFA) involves finding potential locations of blind hydrothermal systems and describing potential geothermal sources in rift-zone settings. Using the PFA to find Hawai'i's geothermal resources, the University of Hawai'i (UH) conducted the Hawai‘i Play Fairway Project, Hawai'i's first statewide geothermal resource assessment since 1985. Sponsored by the U.S. Department of Energy, the Hawai'i Play Fairway Project provided an updated resource assessment, a roadmap for additional exploration activities, and the identification of areas for further exploration. Benefitting from UH's core competency in earth sciences and experienced geothermal researchers, the project comprised three phases. During the first phase, the team identified, compiled, and ranked existing geologic, groundwater, and geophysical datasets relevant to subsurface heat, fluid and permeability. Using a Bayesian statistical approach, the team developed a statistical methodology to integrate these data into a resource probability map. The team evaluated the confidence in the probability value and considered development viability of areas with geothermal resources. With these analyses, the team identified 10 locations in the Hawaiian Islands for exploration activities. For the second phase, the team collected new groundwater data in 10 locations across the state and new geophysical data on $L\bar{a}na‘i, Maui$, and central Hawai'i Island and modeled topographically induced stress to better characterize subsurface permeability. Analyzing the subsurface stresses, the team evaluated the potential for fracture-induced permeability. The team inverted the MT and gravity data to produce 3D models of resistivity and density, respectively, on $L\bar{a}na‘i$, across $Haleakal\bar{a}'s$ SW rift (Maui), and surrounding Mauna Kea (Hawai‘i Island). The team developed and applied a new method for incorporating depth information about resistivity, density, and potential for fracture-induced permeability into the statistical method for computing resource probability in these three focus areas. The team incorporated the new groundwater results with the new geophysical results and the calculations of potential for fracture-induced permeability to produce updated maps of resource probability and confidence. Through combining data from the first and second phases, the team determined locations for further exploration during the third phase. For MT and gravity surveys, the team recommended $Kaua'i's$ $L\bar{i}hu'e$ $Basin$, the east rift of $Maui's$ $Haleakal\bar{a}$ volcano, and the southwest rift of Hawai'i Island's Mauna Loa volcano. The MT and gravity surveys aimed to enable improved confidence in the resource potential in these locations. For drilling deep groundwater well(s), the team recommended Southeast Mauna Kea and $L\bar{a}na's$ $P\bar{a}l\bar{a}wai$ $Basin$. During the third phase, further exploration involved drilling a groundwater well in $L\bar{a}na's$ $P\bar{a}l\bar{a}wai$ $Basin$ and performing more geophysical surveys. We deepened an existing water well proximal to our target area on $L\bar{a}na'i$ due to funding constraints that precluded us from spudding a new well that would exceed 1km depth. Drilling was preceded by a number of substantial elements including: writing an Environmental Assessment and the subsequent legal process, performance of deviation logging, lowering a camera down the well, coordinating site preparation with $P\bar{u}lama$ $L\bar{a}na'i$, shipping the UH-owned rig interisland, procuring supplies, and leading 3 community meetings on $L\bar{a}na'i$. Drilling occurred 24/7 the entire month of June 2019 over which time $L\bar{a}na'i$ $Well$ 10 was deepened from 427 m to 1057 m, with continuous core collected. We measured a roughly linear temperature gradient averaging 42°C/km and a maximum bottom hole temperature of 66°C. This gradient is more than twice the background for Hawai'i and within a range of gradients measured in this depth range for some exploration wells within KERZ. We consider these results encouraging for $L\bar{a}na'i's$ resource potential and recommend following with a slim hole within $L\bar{a}na'i's$ caldera (our target zone) to ~ 2 km. Further, the positive implications such results have for the island of O‘ahu are substantial - the shield stage of O'ahu's volcanoes ended 1-2 My earlier. However, O'ahu uses more electricity than the rest of the islands combined, and the utility recently called for 500-700MW of firm, dispatchable renewable electricity on O'ahu by 2033. In Phase 3, we also collected limited new encouraging groundwater data, and updated our thoughts on the probabilities of fluid and permeability at resource depths (Pr F = 1; Pr P = mostly unconstrained). Ultimately, we advocate for using our final probability of heat, and confidence in this probability, to drive the next phase of exploration. We contend further development of geothermal in Hawai‘i will enable the state to achieve its 100% renewable policy objective and Hawai'i to transition off of fossil fuels through geothermal discovery and development. The project not only produced a large amount of data and expanded the existing knowledge of Hawai'i's geothermal resources, but also produced publications, theses, presentations, core photos, datasets, media reports, television interviews, community events, and a blog. Students and new professionals benefitted from the project's hands-on research experiences and educational opportunities and earned awards and recognition.

15 GEOTHERMAL ENERGY↗

Data Summary Report for Soil and Slab Sampling at Former Building 175

Lawrence Livermore National Security (LLNS) and the U.S. Department of Energy (DOE) are in the process of returning the area where Building 175 existed to beneficial use for future site development. The completed assessment will help LLNS and DOE to outline project scope and costs associated with the removal, characterization, and disposal of materials generated when the concrete slab for the former building and any associated remaining subsurface structures are demolished. Slab removal under the Transition & Disposition process requires full screening for potential site contamination to determine appropriate future land use. Borehole locations and depths were designed to correctly assess DOE’s future liability for characterizing residual vadose zone contamination. If a residual source area is identified at depth, DOE will need to evaluate the additional cost of future subsurface cleanup (with limited access) due to planned development. This is necessary to leave the location in a “ready-to-build” status. As a result, Phase II sampling requirements may in some cases extend beyond the construction zone required for slab removal to ensure the necessary due diligence. To avoid the potential spread of contamination and/or the creation of an environmental release by impacting the integrity of known contamination areas (e.g., pit within room 102 and the east to west boundary seam), these locations were not sampled for this project. During demolition of the slab, these locations and their underlying soils should be further evaluated. The assessment was conducted in accord with the May 2022 Lawrence Livermore National Laboratory Former Building 175 Assessment Soil Sampling and Analysis Plan / Quality Assurance Plan. Thirty-six, direct-push borings were advanced, along with collecting concrete (where present) and soil samples for laboratory analyses. Thirty-two of the borings were advanced to a depth of 25 feet below ground (bgs), and four borings were advanced to a depth of 55 feet bgs. The concrete slab for former Building 175 ranged from approximately 8 inches to over two feet in thickness. Soils encountered during the investigation consisted primarily of clayey silt, with interbeds of sandy gravel and silty sand to the total depth explored of 55 feet bgs. Field photoionization detector readings – checking for volatile organic compound (VOC) vapors in soils, ranged from zero (0) to a peak of 33 parts per million at 25 feet bgs in boring PC-B175- 028. The cause for the peak reading is unknown, however, no visually discolored or odorous soils were encountered during the assessment and all VOC results were below Lawrence Livermore National Laboratory’s (LLNL’s) Soil Screening and Management Plan (SSMP) soil screening levels (SSL). Groundwater was not encountered during the assessment and is expected to occur at roughly 65 feet bgs in the project area. No metals were detected at concentrations of concern in the concrete core samples collected and analyzed. Low gross alpha and beta activity concentrations were detected in the concrete core samples collected and analyzed. The detected activity concentrations would appear to be from naturally occurring radioactive isotopes, i.e., potassium 40, present in the raw materials used to make concrete and not artificially added. Tritium was not detected above the testing laboratory's Method Detection Limit (MDL) in any of the concrete core samples collected and analyzed. The radioactive isotopes - actinium 228, bismuth 214, lead 212, lead 214, potassium 40, radium 226, radium 228, and thallium 208, were detected at low activity concentrations in the concrete core samples analyzed. Based on the detected activity concentrations, the isotopes would appear to be naturally occurring in the raw materials used to make concrete and not artificially added. Acetone – a common laboratory contaminant, was detected in nine of the soil samples collected and analyzed. Concentrations of two other volatile organic compounds (benzene and tetrachloroethene) were detected in five of the soil samples analyzed. All concentrations were below SSLs. Total petroleum hydrocarbons as diesel range organics were detected at 43.9 milligrams per kilogram (mg/kg) in the 20-foot bgs duplicate sample from boring PC-B175-007. Total petroleum hydrocarbons as motor oil were detected at 7.20 mg/kg in the 15-foot bgs routine sample from boring PC-B175-001, and at 20.7 mg/kg in the 20-foot bgs duplicate sample from boring PC-B175-007. The SSL for diesel-range TPHs is 260 mg/kg. LLNL does not have an SSL for motor oil range TPHs. No indications of a release, e.g., visibly stained, or odorous soil, were present at the boring locations. No samples collected contained polychlorinated biphenyls (PCBs) in concentrations above the laboratory reporting limit. Arsenic was detected above its SSL of 8.51 mg/kg in the 25-foot bgs routine sample collected from boring PC-B175-023. Nickel was detected above its SSL of 86.0 mg/kg in the 10-foot bgs routine sample from boing PC-B175-005, the 20-foot bgs routine sample from boring PC-B175-025, and the 25-foot bgs routine sample from boring PC-B175-034. The detected concentrations, however, were well below ten times (10x) their respective STLCs. Gross alpha and/or gross beta were detected above their respective SSL activity concentrations in three routine soil samples. Retesting (two per sample) of the samples showed that the initial reported activity concentrations were anomalous. Tritium was not detected in any of the routine or duplicate soil samples collected and analyzed during the investigation. The radioactive isotopes - actinium 228, bismuth 212 and 214, lead 212 and 214, potassium 40, radium 224, 226 and 228, thallium 208, thorium 234 and uranium, were detected at low activity concentrations in the soil samples analyzed for radioactive constituents. The detected isotopes and their associated activity concentrations are typical of those naturally occurring in the marine-type sedimentary deposits underlying the Livermore Valley. No radiological controls are necessary for the soil evaluated.

54 ENVIRONMENTAL SCIENCES↗

Assessment of Potential Dose and Environmental Impacts from Proposed Testing at the INL National Security Test Range

This assessment uses screening-level models to calculate potential environmental impacts from proposed tests at two locations at the Idaho National Laboratory (INL) National Security Test Range (NSTR) site. Proposed tests could be conducted using 11 different radioactive material types that include K 2 O, LaBr 3 , KBr, Cu, Zr, F, Ga, Ga 2 O 3 , NaNO 2 , Ga-68, and Tc-99m. The tests could potentially release radioactive material to the atmosphere and radionuclides and other contaminants to the soil, which could leach into the unsaturated zone and migrate to the aquifer. Atmospheric transport of radionuclides to potential human receptors and time-integrated air concentrations were calculated with a Gaussian plume model and three years of hourly meteorological data. Potential surface-soil impacts were calculated with the computer program mixing-cell model (MCM). Groundwater impacts were calculated with the computer programs MCM and GWSCREEN. Radiological doses from potential atmospheric releases were calculated for public receptors off the INL Site and for workers at nearby INL facilities. Results were compared to regulatory dose limits. Maximum potential groundwater concentrations were estimated in the aquifer below the NSTR site and compared to drinking water standards or risk-based screening levels for resident tap water. Soil concentrations were calculated and compared to risk-based screening levels for workers and potential future residents. All impacts were estimated based on the assumption that 12 tests are conducted annually using all 11 material types for 15 years. This document provides the resources to enable a subject matter expert in the field of environmental assessments to replicate the modeling and calculations. The methodology and parameters are presented in the text. All electronic files, including computer-code input, output, executable files, batch files, scripts, and spreadsheet files, are contained in a zip file that can be accessed by selecting “Additional Information” (select Native File) in the INL Electronic Document Management System (EDMS). It is highly unlikely the test scenarios evaluated in this ECAR will adversely impact human health based on comparisons of calculated dose and concentration against regulatory standards and risk-based screening levels. Conservative estimates of dose to workers and the public from atmospheric transport of possible radionuclide releases are far below federal radiation protection standards. Conservative estimates of potential contaminant concentrations in groundwater are less than federal drinking water standards or screening levels. Predicted radionuclide concentrations in surface soils are below risk-based screening levels, except for Ge-68 (material Ga-68) for the worker. The Ge-68 soil concentration can be made less than the worker PRG, if the number of annual tests using Ga-68 is reduced from 12 to 6. However, the sum of ratios still exceeds one because of the high K-40 ratio. If the EF of the worker (number of days the worker is in the contaminated testing area) is reduced from 225 days/yr (default value for full time worker) to 112 days/yr, the Ge-68 ratio is less than one and the sum of ratios is less than one. Actual radiation doses and groundwater and surface-soil concentrations are likely to be much less than those calculated because of the conservative assumptions and parameters employed in the modeling. For example, atmospheric-transport calculations assume the entire inventory of each material type is readily released to the atmosphere and no plume deposition, depletion, or radioactive decay occurs during transport. The calculations also assume the same meteorological conditions (e.g., wind velocity, wind direction, stability class) that produce the maximum 95th percentile concentration (i.e., concentration representing the 95th percentile of a distribution of concentrations derived from 3 years of hourly meteorological data) at each receptor location are the same for all 12 tests during the year, and each receptor is assumed to be present during all 12 tests. The surface-soil assessment assumes the entire inventory of each test is deposited in the top 5 cm of soil. No atmospheric dispersal is assumed, and the radionuclides are subject only to leaching and radioactive decay. The groundwater-pathway modeling is conservative in that it is one-dimensional in the unsaturated zone (no lateral spreading/dilution) and assumes the entire inventory of contaminants infiltrates into the ground at the same location for every test. This is especially conservative for particulate radionuclides because they would have to dissolve or corrode first and some would be dispersed into the atmosphere. The groundwater receptor is also assumed to consume water directly from a hypothetical well positioned in the location of maximum concentration. In addition, conservative degradation rates were used, and volatilization was not considered for the nonradradioactive chemicals modeled. And finally, the calculations assume all 12 tests will be performed at the same place at both locations, and all 11 radioactive material types will be used for each test. This is conservative because it is anticipated that no more than two material types will be used per test.

99 GENERAL AND MISCELLANEOUS↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2023 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2022, there were 374 hybrid plants (>1 MW) operating across the United States (+25% compared to the end of 2021), totaling nearly 41 GW of generating capacity (+15%) and 5.4 GW/15.2 GWh of energy storage (+69%/+88%). PV+storage plants are by far the most common, dominating in terms of plant number (213), storage capacity (4.0 GW/12.5 GWh), storage:generator capacity ratio (49%), and storage duration (3.1 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was another strong year for PV+storage hybrids in particular: 59 of the 62 hybrids added in 2022 were PV+storage. As of the end of 2022, there was roughly as much storage capacity operating within PV+storage hybrid plants as in standalone storage plants (~4 GW each). In storage energy terms, however, PV+storage edged out standalone storage by ~2 GWh (12.5 GWh vs. 10.4 GWh, respectively). -Interconnection queue data show continued strong developer interest in hybridization. At the close of 2022, there were 51% more hybrid plants—representing 59% more generating capacity—in interconnection queues across the United States than there were at the end of 2021. Solar dominates these proposed plants as well: at the close of 2022, there were 457 GW of solar capacity proposed as a hybrid (representing ~48% of all solar capacity in the queues), most typically pairing PV with battery storage. At the same time, there were 24 GW of wind capacity proposed as a hybrid (representing ~8% of all wind capacity in the queues), again most-often pairing wind with storage. Meanwhile, more than half of all storage in the queues is estimated to be part of a hybrid plant. While many of the plants proposed in the queues will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable, particularly in certain regions. For example, in CAISO, 97% of all solar capacity and 45% of all wind capacity in the queues is proposed as a hybrid. -The report also surveys power purchase agreement (PPA) price data from a sample of operating and proposed PV+storage plants. Though PV+storage PPA prices have fallen over time, “levelized storage adders” have recently increased somewhat to ~$\$ $7000/MW-month, ~$\$ $60/MWh-stored (assuming one full cycle per day), or ~$\$ $15/MWh-PV. Some of the recent price increase could simply reflect a trend towards higher battery:PV capacity ratios over time, which increases costs, all else being equal. The well-publicized impact of inflationary and supply chain pressures on battery prices is no doubt a contributor as well.

25 ENERGY STORAGE↗

Performance Audit Report: Automated Meteorological Monitoring Stations, Lawrence Livermore National Laboratory

The Waste and Air Quality Offices Group at the Lawrence Livermore National Laboratory operates two main meteorological monitoring sites near Livermore, California. The primary met tower (Site 200) is located in the northwest corner of the lab and consists of a fifty-two (52) meter tower with vertical wind speed sensors, horizontal wind speed and direction sensors and air temperature sensors at fifty-two (52) meters, twenty-three (23) meters and ten (10) meters. In addition, there is a temperature and humidity probe at ten (10) meters. At two (2) meters there are upward and downward facing solar and infrared radiation sensors, an air temperature sensor, barometric pressure sensor and a temperature and relative humidity probe. At ground level there is a tipping bucket rain gauge located to the southwest of the tower. The datalogger, communication peripherals and the barometric pressure sensor are housed in a small building near the tower. The Site 300 met site is located approximately 10 miles east of Livermore within the boundary of the LLNL blast test site. This site also consists of a 52-meter tower which is configured the same as the 52-meter tower at Site 200. There is also a building at this site that houses the datalogger, communication peripherals and the barometric pressure sensor. At both Site 200 and Site 300, data are collected by Ethernet with telephone modem collection as a backup. The data collection interval for both sites is fifteen (15) minutes via workstations running Loggernet software located at the main lab facility. The audits of the Lawrence Livermore National Laboratory’s two automated meteorological stations located near Livermore, California were performed on October 24 & 25, 2023. These audits were performed under the guidelines of the Quality Assurance Handbook for Air Pollution Measurement Systems, Volume IV, Version 2 and the On-Site Meteorological Program Guidance for Regulatory Modeling Applications, U.S. EPA.

54 ENVIRONMENTAL SCIENCES↗

Refueling Infrastructure Deployment in Low-Income and Non-Urban Communities

The U.S. National Blueprint for Transportation Decarbonization identifies the need to invest in infrastructure supporting low- and zero-emission vehicles, especially in low-income and overburdened communities, to eliminate nearly all greenhouse gas emissions from the transportation sector by 2050. The alternative fuel vehicle refueling property tax credit (26 U.S. Code § 30C) includes eligibility criteria intended to encourage investment in underserved communities based on the economic characteristics or urban character of the census tract in which the fueling infrastructure is installed. Eligible census tracts are those that qualify for the New Markets Tax Credit or that are not located within urban areas as defined by the U.S. Census Bureau. This study quantifies how many fueling-related amenities are currently located in census tracts that qualify and do not qualify for the 30C tax credit based on IRS Notice 2024-20. For existing electric vehicle charging stations, 51% of Level 2 and 60% of Direct Current Fast Charging public stations are located in eligible census tracts. 73% of natural gas, propane, and hydrogen fueling stations are in qualifying census tracts and 75% of biodiesel and renewable fuel stations are in qualifying census tracts. This compares with 73% of existing gas stations in eligible census tracts. For deploying the refueling infrastructure to satisfy future demand, this study shows that truck stops (94%), commercial truck stops (92%), and Federal Highway alternative fuel corridors (89%) are predominantly located in eligible locations. Additionally, significant percentages of the population (62%), light-duty vehicle registrations (64%), and medium- and heavy-duty vehicle registrations (68%) fall within eligible areas.

33 ADVANCED PROPULSION SYSTEMS↗

Radiological Impact of 2023 Operations at the Savannah River Site

This report presents the environmental dose assessment methods and the estimated potential doses to the public from 2023 Savannah River Site (SRS) air and liquid radioactive releases. Also documented are potential doses from special-case exposure scenarios, such as the consumption of wildlife or goat milk. Dose to the Offsite Representative Person The 2023 dose to the offsite representative person from SRS liquid releases was 0.14 mrem and from SRS air releases it was 0.016 mrem. To show compliance with the U. S. Department of Energy (DOE) all pathway dose standard of 100 mrem/yr, SRS conservatively adds these two doses for a total representative person dose of 0.16 mrem which is 0.16% of the DOE standard. Sportsman Doses Onsite Hunter: SRS conducts annual hunts to control onsite deer and feral hog populations. The estimated dose from consuming harvested deer or hog meat is determined for every onsite hunter. During 2023, the maximum potential dose an onsite hunter received was 9.42 mrem, or 9.42% of DOE’s 100 mrem/yr all pathway dose standard. Creek Mouth Fisherman: SRS estimated the maximum potential dose from fish consumption at 0.17 mrem from bass collected at the mouth of Lower Three Runs. This dose is 0.17% of the DOE standard. SRS bases this hypothetical dose on the low probability scenario that, during 2023, a fisherman consumed 24 kg (53 lbs) of bass caught exclusively from the mouth of Lower Three Runs. Release of Material Containing Residual Radioactivity SRS did not release any real property (land or buildings) in 2023. SRS unconditionally released a total of 13,324 items of personal property (such as tools) from radiological areas in 2023. Most of these items did not leave the Site. However, all of these items required no additional radiological controls post-survey as they met DOE Order 458.1 release criteria. Radiation Dose to Aquatic and Terrestrial Biota SRS conducts screening evaluations of plant and animal doses for aquatic and terrestrial ecosystems. For 2023, all SRS aquatic system locations passed the initial (Level 1) screenings and no further assessments were required at those locations. For the land-based systems evaluation, SRS performed initial screenings using concentration data from the five onsite radiological soil sampling locations. Typically, SRS collects and analyzes only one soil sample per year from each location. For 2023, all land-based locations passed their initial (Level 1) pathway screenings.

54 ENVIRONMENTAL SCIENCES↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2024 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis.

14 SOLAR ENERGY↗

Acoustic-based monitoring and machine learning of component status for microreactor applications

This report provides a description and assessment of recent efforts to couple acoustic-based experimental measurements and characterization with machine learning models in order to enhance structural health monitoring capabilities for nuclear microreactors. With resilient embedded sensors in development by others supported by programs funded by the US Department of Energy’s Office of Nuclear Energy, the work described herein builds upon ongoing efforts to improve non-destructive testing technology that relates measured acoustic signatures to component stresses and/or structural defects, using a combination of new experimental measurements and machine learning architectures. The experimental procedure remained similar to that developed for the previous year’s demonstration of damage detection by the authors, with the same damaged sample tested under similar applied stress conditions. Notably, a new mounting fixture was designed and implemented to improve measurement consistency and a more sophisticated laser Doppler vibrometer was employed to make high-fidelity vibration measurements. Two nominally identical sets of training data were collected for each experimental setup to better understand the repeatability of the experiment and to better test the generality of trained neural network models. Additionally, we obtained new high-quality 3D mode shapes of the damaged test article at various stress and excitation levels, providing greater insights into the physical response of the sample during testing. Previously, we demonstrated that a machine learning model based on a convolutional neural network can predict structural details of an artificially introduced interface (intact, rough cut, smooth cut), and the applied torque level. In this study, we have transitioned to graph-based neural network architectures to better develop and test a flexible framework that is more suitable to being transferred away from controlled benchtop experiments and into more applied settings where less-structured data inputs may be expected. In general, performance testing of a graph neural network on frequency-domain representations of the data indicates strong and consistent identification of test conditions for datasets recorded on damaged components. With goals of predicting damage location and other changing experimental conditions using limited datasets, predictive models using a graph neural network architecture correctly predicted the applied torque level with an accuracy of 85% using only a single measurement point and predicted within one torque level in 95% of test windows. Predictions of damage location had limited success due to the symmetry and minimal number of the damage scenarios presented during model training. Results were ambiguous as to whether the model could detect the location of the artificial damage, or if it was instead learning the location of a given measurement point on the part and subsequently detecting which points were closest to the location of the damage. This finding will be factored into upcoming planned work on damaged graphite components, where new experimental tests with a larger number and variety of damage scenarios are expected to provide improved validation of recent developments in monitoring methodology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Gamma Spectrometry Code Rodeo for Uranium Enrichment—FY 2022 Report

In the first two quarters of FY22, data acquisition continued at ORNL and LLNL using uranium sources of known enrichments. This was an FY21 task which could not be completed in FY21 because of problems encountered with the ORNL M400 CZT in Q4 of FY21, and the subsequent repairs. The detector was received back from H3D in the first of September 2021 , and the measurements resumed . Measurements using the repaired detector were completed in Q1 of FY22. The spectra were distributed by ORNL to the analyzing labs. Analysis results were received in Q2 of FY2022. The results from the various codes were intercompared and an ANOVA analysis was performed. Random and systematic uncertainties were established for each code. The ANOVA results and discussions were included in a revised version of FY21Annual Report issued in March 2022. A paper was presented at the INMM 2022Annual Conference, with the analysis results from the various isotopic codes, and the ANOVA table with random and systematic uncertainties. The Project Work Plan (PWP) for FY22 included a task to perform field testing of the M400 CZT and the analysis codes using UF 6 cylinder measurements at the Framatome Fuel Fabrication Facility in Richland, WA. PNNL was the lead for the field testing task. PNNL drafted a Field Test Plan, and refined it based on comments received from the team. PNNL coordinated with Framatome facility, the logistics of carrying out the field testing . A collimator and shield made out of TFlex (tungsten impregnated polymer) was designed and professionally manufactured. The collimators were used in the field test measurements. The measurements at Framatome were completed on April 21, 2022. A total of 34 Type 30B cylinders were measured using three M400 detectors (PNNL, LLNL, and ORNL detectors). Measurements using M400 were taken at two locations on the side of each cylinder and from the end-on bottom location. Additionally, HPGe measurements were taken at the end-on location to establish ground truth. Cylinder wall thickness measurements were also made at all three locations. To gain a better understanding of the effect of background from surrounding cylinders, the same five cylinders measured individually in low background locations were measured again in the cylinder storage yards. Due to inclement weather, manufacturer delays, shipping delays, and equipment failure, the measurement campaign spanned twice as long compared to the original timeline. Gamma-ray spectra from M400 and HPGe detectors, along with the cylinder data and photographs were organized and shared with the collaborators for further analysis. Spectra were analyzed by the participating laboratories. FY22 PWP also consists of tasks related to plutonium source measurements, adapting the codes to analyze plutonium spectra, and inter-comparison of the results from various codes. Plutonium spectra are being acquired at LANL, ORNL, and LLNL. LANL, SNL and LLNL are in the process of modifying FRAM, GADRAS, and CZTU, respectively. The plutonium related tasks will be completed in Q2 of FY23.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Web-Based Tools for Data-Informed Remedy Optimization: Software Theory and User Guide

This report documents the development and application of two web-based decision-support tools for pump-and-treat (P&T) groundwater remediation systems: PTOLEMY (Pump-and-Treat Optimized Location Evaluation to Maximize Yields) and OPTIMA (Optimization for Pump-and-Treat Implementation, Management, & Assessment). These tools enhance remedy design and management by leveraging advanced computational methods – specifically deep learning and multi-objective optimization – within a user-friendly platform. By integrating data-driven models with established hydrogeological knowledge, PTOLEMY and OPTIMA enable more efficient evaluation of well placement and operational strategies, helping site managers balance multiple remediation objectives under complex conditions. Both tools are implemented as modules within the SOCRATES (Suite Of Comprehensive Rapid Analysis Tools for Environmental Sites) web platform, which provides data access, visualization, and analytics to support remedy optimization across sites in the U.S. Department of Energy Office of Environmental Management complex. PTOLEMY is a rapid screening module designed to identify promising locations for new extraction wells. It employs a multi-channel three-dimensional convolutional neural network (MC3D-CNN) trained on high-fidelity simulation data to predict the relative performance (in terms of contaminant mass recovery) of potential well sites. Through an interactive web interface, PTOLEMY visualizes the probability of high performance across a site, highlighting areas where an extraction well is likely to yield above-threshold contaminant removal over a multi-year period. PTOLEMY’s map-based displays and exportable results support transparent communication of screening analyses. By focusing attention on the most favorable candidate locations, the tool augments traditional engineering judgment and physics-based modeling, providing a data informed basis for subsequent detailed evaluations. OPTIMA is a multi objective optimization module designed to find wellfield layouts and operating schedules that meet various cleanup goals. It quickly evaluates thousands of candidate setups – combinations of well locations, timing, and rates – and returns a small set of best trade-off options for comparison. At its core, OPTIMA uses a U-Net-based surrogate model – a deep-learning emulator of a groundwater flow and transport simulator – to dramatically accelerate scenario evaluations. Coupling this fast surrogate with the NSGA-II (Non-dominated Sorting Genetic Algorithm II) evolutionary algorithm, OPTIMA explores a wide decision space of well locations and schedules to identify Pareto-optimal solutions that trade off key objectives (e.g., minimizing cleanup time, maximizing contaminant mass removal, and minimizing plume extent). The tool outputs a family of optimal configurations and visualizes their trade-offs (Pareto frontiers of cleanup metrics and maps of optimized well placements). Site managers can use these results to understand the range of viable strategies and to select candidate designs for more detailed verification. OPTIMA is currently under active development and not yet fully released; this guide provides early documentation to support planning and gather user feedback.

54 ENVIRONMENTAL SCIENCES↗

A numerical investigation of coal particle modeling for the inlet section of a pressurized oxy-combustion burner

Concerns over climate change have led to numerous efforts to develop low-carbon technologies, and pressurized oxy-combustion (POC) is a promising candidate to reduce carbon emissions in the power industry. Designing an effective burner for such technologies is vital for the development of these and other coal combustion technologies. Because of the high pressure, the volume fraction of coal particles at the fuel inlet of the pressurized oxy-combustor burner is close to or even higher than the maximum limit for commercial CFD codes (e.g., ANSYS FLUENT). At these high particle volume fractions, the interactions among particles, fluid flow and wall need to be re-evaluated. The present computational work is a first step in a systematic analysis of the influence of various parameters, like method of particle release, release location, and particle size, in a pilot-scale POC combustor, developed at Washington University in St. Louis (WUSTL). In the POC process, pulverized coal is burned under elevated pressure in an O2-CO2 environment. Specifically, a 15-bar, 100 kWth, POC combustor is modeled employing Ansys FLUENT commercial sodtware using the Reynolds-Averaged Navier-Stokes (RANS) approach. It is revealed that for this pilot-scale, pressurized burner, velocity profiles in the near-wall region exhibit some anomalies. In order to investigate the influence of particle loading in the near-wall region, particle release location was investigated. The numerical simulations incorporate the coupling between the turbulent flow and the particles. A sensitivity investigation of particle release location found that by tuning the release location, the velocity profile can be consistent with the pure gas flow velocity profile. More importantly, the particle releasing location also affects flame stability. Particle size was also found to have a significant impact on particle trajectory, flame stability and temperature. Finally, Large Eddy Simulations (LES) were performed and compared with the results from two-dimensional RANS.

Li, Lei↗

Automated shaker placement and regularized input estimation for MIMO testing.

Multi-input, multi-output (MIMO) testing is used in component qualification to reproduce operational responses in the laboratory. It is often preferred to single-input and base-shake testing because of the potential for equivalent or better tests using smaller actuators and shorter test suites. Given a target response, two key steps in MIMO test design are selecting actuator locations and solving for input loads. Actuator locations are often manually selected using expert judgment. If an automatic method is used, locations are usually determined by simulating the vibration control problem and minimizing a combination of the input energy and control residuals. To select a configuration, the relative importance of input energy and residuals must be specified. Specifying relative weights is, in general, a manual and subjective process. This paper develops an objective function that compares actuator configurations based on control accuracy and required input energy without any manual parameter tuning. The objective function uses an optimally selected tradeoff parameter for each candidate configuration. To choose actuator locations using the new objective function, a pivoting algorithm for integer programming problems is developed. Starting with an initial configuration (such as the one generated by a greedy algorithm), the pivoting algorithm guarantees an objective function decrease in each iteration until convergence is reached. In a simulation featuring a structure excited by a diffuse acoustic field, electrodynamic shaker locations and regularized inputs are solved for without any analyst-specified parameters. Simulations are performed in MIMO configurations where the number of target responses is less than, equal to, and greater than the number of actuators.

Multi-input multi-output↗

Existing Hydropower Assets (EHA) Puerto Rico Plant Database Extension

This dataset is an extension and subset of the Existing Hydropower Assets (EHA) Plant Database, 2025, released by Oak Ridge National Laboratory through HydroSource covering hydropower plants in Puerto Rico. The extension enhanced EHA to support modeling performed under the Department of Energy Hydropower Office's SECURE Water Act Section 9505 Fourth Assessment (9505). Included is a spatial dataset containing the location of the powerhouse and plant characteristics and a spatial dataset containing the location of the point-of-diversion and plant characteristics. Enhancements made in this dataset from EHA include updating plant’s spatial locations to explicitly represent the location of the powerhouse; identifying a plant’s point-of-diversion (source of water) spatial location; adding additional plants not included in the 2025 EHA, and revising attributes with updated information.

Broman, Daniel P [Pacific Northwest National Labor↗