Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integration and test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

NASA Habitat Demonstration Unit (HDU) Deep Space Habitat Analog

The NASA Habitat Demonstration Unit (HDU) vertical cylinder habitat was established as a exploration habitat testbed platform for integration and testing of a variety of technologies and subsystems that will be required in a human-occupied planetary surface outpost or Deep Space Habitat (DSH). The HDU functioned as a medium-fidelity habitat prototype from 2010-2012 and allowed teams from all over NASA to collaborate on field analog missions, mission operations tests, and system integration tests to help shake out equipment and provide feedback for technology development cycles and crew training. This paper documents the final 2012 configuration of the HDU, and discusses some of the testing that took place. Though much of the higher-fidelity functionality has 'graduated' into other NASA programs, as of this writing the HDU, renamed Human Exploration Research Analog (HERA), will continue to be available as a volumetric and operational mockup for NASA Human Research Program (HRP) research from 2013 onward.

Mars↗

An Integrated Analysis-Test Approach

This viewgraph presentation provides an overview of a project to develop a computer program which integrates data analysis and test procedures. The software application aims to propose a new perspective to traditional mechanical analysis and test procedures and to integrate pre-test and test analysis calculation methods. The program also should also be able to be used in portable devices and allows for the 'quasi-real time' analysis of data sent by electronic means. Test methods reviewed during this presentation include: shaker swept sine and random tests, shaker shock mode tests, shaker base driven model survey tests and acoustic tests.

Kaufman, Daniel↗

POST-TEST EXAMINATIONS OF A LOCA SAMPLE FROM AN IRRADIATED HIGH-BURNUP PWR M5 FUEL ROD

A LOCA integral test with high burnup PWR M5 fuel rod was conducted in the Irradiated Fuel Examination Laboratory through the complete LOCA sequence: heating the LOCA sample to 300ºC and pressurizing the internal pressure to 8.27 MPa, heating at 5ºC/s from 300 to 1200ºC, holding in steam for 90s at 1200ºC, cooling at 3ºC/s to 800ºC, followed by water quench and rapid cooling to 100ºC. After LOCA testing, examinations, such as the fuel fragmentation analysis, burst and ballooning characterization, axial strain measurement, and microstructural examinations were performed. Metallographic examinations of an as-irradiated high burnup sample adjacent to the LOCA test sample revealed a bonding layer between the fuel and cladding. The posttest LOCA examinations indicates the corrosion layer formed during normal operations in the commercial reactor might provide a protection against the steam oxidation at high temperatures for test times performed in this work. The microstructure of the as-irradiated fuel is compared to the microstructure of the post-LOCA test fuel. Posttest LOCA examination on unirradiated post-tests Zr cladding samples was conducted, which served as baseline data for in cell testing with irradiated samples. The results obtained with irradiated PWR high burnup M5 fuel rad were compared to the LOCA test data obtained with irradiated BWR high burnup Zircaloy-2 fuel rod at Argonne national Laboratory.

Yan, Yong↗

TMI-2 – A Case Study for PWR Instrumentation Performance During a Severe Accident

The accident at the Three Mile Island Unit 2 (TMI-2) reactor provided a unique opportunity to evaluate sensors exposed to severe accident conditions. Conditions associated with the release of coolant and the hydrogen burn that occurred during this accident exposed instrumentation to harsh conditions, including direct radiation, radioactive contamination, and high humidity with elevated temperatures and pressures. As part of a program initiated in 2012 by the Department of Energy Office of Nuclear Energy (DOE-NE), a review was completed to gain insights from prior TMI-2 sensor survivability and data qualification efforts. This new effort focussed upon a set of sensors that provided critical data to TMI-2 operators for assessing the condition of the plant and the effects of mitigating actions taken by these operators. In addition, the effort considered sensors providing data required for subsequent accident simulations. Over 100 references related to instrumentation performance and post-accident evaluations of TMI-2 sensors and measurements were reviewed. Insights gained from this review are summarized within this report. For each sensor, a description is provided with the measured data and conclusions related to the sensor’s survivability, and the basis for conclusions about its survivability. As noted within this document, several techniques were invoked in the TMI-2 post-accident evaluation program to assess sensor status, including comparisons with data from other sensors, analytical calculations, laboratory testing, and comparisons with sensors subjected to similar conditions in large-scale integral tests and with sensors that were similar in design but more easily removed from the TMI-2 plant for evaluations. Conclusions from this review provide important insights related to sensor survivability and enhancement options for improving sensor performance. In addition, this document provides recommendations related to the sensor survivability and data evaluation process that could be implemented in upcoming Fukushima Daiichi recovery efforts.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

TMI-2 - A Case Study for PWR Instrumentation Performance during a Severe Accident

The accident at the Three Mile Island Unit 2 (TMI-2) reactor provided a unique opportunity to evaluate sensors exposed to severe accident conditions. Conditions associated with the release of coolant and the hydrogen burn that occurred during this accident exposed instrumentation to harsh conditions, including direct radiation, radioactive contamination, and high humidity with elevated temperatures and pressures. As part of a program initiated in 2012 by the Department of Energy Office of Nuclear Energy (DOE-NE), a review was completed to gain insights from prior TMI-2 sensor survivability and data qualification efforts. This new effort focused upon a set of sensors that provided critical data to TMI-2 operators for assessing the condition of the plant and the effects of mitigating actions taken by these operators. In addition, the effort considered sensors providing data required for subsequent accident simulations. Over 100 references related to instrumentation performance and post-accident evaluations of TMI-2 sensors and measurements were reviewed. Insights gained from this review are summarized within this report. For each sensor, a description is provided with the measured data and conclusions related to the sensor’s survivability, and the basis for conclusions about its survivability. As noted within this document, several techniques were invoked in the TMI-2 post-accident evaluation program to assess sensor status, including comparisons with data from other sensors, analytical calculations, laboratory testing, and comparisons with sensors subjected to similar conditions in large-scale integral tests and with sensors that were similar in design but more easily removed from the TMI-2 plant for evaluations. Conclusions from this review provide important insights related to sensor survivability and enhancement options for improving sensor performance. In addition, this document provides recommendations related to the sensor survivability and data evaluation process that could be implemented in upcoming Fukushima Daiichi recovery efforts.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Qualification of Daiichi Units 1, 2, and 3 Data for Severe Accident Evaluations - Process and Illustrative Examples from Prior TMI-2 Evaluations

The accidents at the Three Mile Island Unit 2 (TMI-2) Pressurized Water Reactor (PWR) and the Daiichi Units 1, 2, and 3 Boiling Water Reactors (BWRs) provide unique opportunities to evaluate instrumentation exposed to severe accident conditions. Conditions associated with the release of coolant and the hydrogen burn that occurred during the TMI-2 accident exposed instrumentation to harsh conditions, including direct radiation, radioactive contamination, and high humidity with elevated temperatures and pressures. As part of a program initiated in 2012 by the Department of Energy Office of Nuclear Energy (DOE-NE), a review was completed to gain insights from prior TMI-2 sensor survivability and data qualification efforts. This initial review focused on the set of sensors deemed most important by post-TMI-2 instrumentation evaluation programs. Instrumentation evaluation programs focused on data required by TMI-2 operators to assess the condition of the reactor and containment and the effect of mitigating actions taken by these operators. In addition, prior efforts focused on sensors providing data required for subsequent forensic evaluations and accident simulations. To encourage the potential for similar activities to be completed for qualifying data from Daiichi Units 1, 2, and 3, this report provides additional details related to the formal process used to develop a qualified TMI-2 data base and presents data qualification details for three parameters: primary system pressure; containment building temperature; and containment pressure. As described within this report, sensor evaluations and data qualification required implementation of various processes, including comparisons with data from other sensors, analytical calculations, laboratory testing, and comparisons with sensors subjected to similar conditions in large-scale integral tests and with sensors that were similar in design to instruments easily removed from the TMI-2 plant for evaluations. As documented in this report, results from qualifying data for these parameters led to key insights related to TMI-2 accident progression. Hence, these selected examples illustrate the types of activities completed in the TMI-2 data qualification process and the importance of such a qualification effort. These details are documented in this report to facilitate implementation of similar process using data and examinations at the Daiichi Units 1, 2, and 3 reactors so that BWR-specific benefits can be obtained.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

EFRT M12 Issue Resolution: Comparison of PEP and Bench-Scale Oxidative Leaching Results

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed and constructed and is to be operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP; and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to dissolve solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct steam injection to accelerate the leaching process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP1, the 19-M NaOH is added to un-concentrated waste slurry (3 to 8 wt% solids), while for leaching in UFP2, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before the addition of caustic. For wastes that have significantly high chromium content, the caustic leaching and slurry dewatering is followed by adding sodium permanganate to UFP-VSL-T02A, and the slurry is subjected to oxidative leaching at nominally ambient temperature. The purpose of the oxidative leaching is to selectively oxidize the poorly alkaline-soluble Cr(III) believed to be the insoluble form in Hanford tank sludge to the much more alkaline-soluble Cr(VI), e.g., chromate. The work described in this report provides the test results that are related to the efficiency of the oxidative leaching process to support process modeling based on tests performed with a Hanford waste simulant. The tests were completed both at the lab-bench scale and in the PEP. The purpose of this report is to summarize the results from both scales that are related to oxidative leaching chemistry to support a scale factor for the submodels to be used in the G2 model, which predicts WTP operating performance. Owing to schedule constraints, the PEP test data to be included in this report are limited to those from Integrated Tests A (T01 A/B caustic leaching) and B (T02A caustic leaching).

02 PETROLEUM↗

Development of Finite Element Field Solver in Gyrokinetic Toroidal Code

A new finite element (FE) field solver has been implemented in the gyrokinetic toroidal code (GTC) in attempt to extend the simulation domain to magnetic axis and beyond the last closed flux surface, which will enhance the capability the GTC code since the original finite difference (FD) solver will lose its capability in such circumstances. A method of manufactured solution is employed in the unit fidelity test for the new FE field solver, which is then further verified through integrated tests with three typical physical cases for the comparison between the new FE field solver and the original finite difference field solver. The results by the newly implemented FE field solver are in great accord with the original solver.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Pan and Tilt Platform for a Thermal Vacuum Video Camera

The purpose of the Space Simulation Test Engineering (SSTE) Section at NASA Goddard Space Flight Center is "to provide full service test support, engineering expertise, and state-of-the-art facilities to perform simulated space and thermal cycle testing of Earth orbit and deep space flight hardware"(ref. 1). During the Integration & Testing phase of space flight projects, flight hardware must successfully demonstrate its functionality under conditions similar to the actual environment experienced in space. When testing hardware with mechanical components, such as antenna extensions, door openings, or solar panel deployments, visual observation would allow test personnel to verify mechanical operations in real-time. A video camera can supply data that the usual sensors inside a TV chamber cannot provide. Since mechanical functional testing could affect multiple regions of a test item, a camera with a fixed position may not be able to monitor and record the performance of different components of a mechanism, especially for large test items. By mounting the camera to a Pan and Tilt Platform, the camera can cover a larger area and its field-of-view (FOV) will increase significantly. This paper details the design process for the Pan and Tilt Platform.

Lui, Yan↗

Southern Impact Testing Alliance (SITA)

Efforts to form this Alliance began in 2008 to showcase the impact testing capabilities within the southern United States. Impact testing customers can utilize SITA partner capabilities to provide supporting data during all program phases-materials/component/ flight hardware design, development, and qualification. This approach would allow programs to reduce risk by providing low cost testing during early development to flush out possible problems before moving on to larger scale1 higher cost testing. Various SITA partners would participate in impact testing depending on program phase-materials characterization, component/subsystem characterization, full-scale system testing for qualification. SITA partners would collaborate with the customer to develop an integrated test approach during early program phases. Modeling and analysis validation can start with small-scale testing to ensure a level of confidence for the next step large or full-scale conclusive test shots. Impact Testing Facility (ITF) was established and began its research in spacecraft debris shielding in the early 1960's and played a malor role in the International Space Station debris shield development. As a result of return to flight testing after the loss of STS-107 (Columbia) MSFC ITF realized the need to expand their capabilities beyond meteoroid and space debris impact testing. MSFC partnered with the Department of Defense and academic institutions as collaborative efforts to gain and share knowledge that would benefit the Space Agency as well as the DoD. MSFC ITF current capabilities include: Hypervelocity impact testing, ballistic impact testing, and environmental impact testing.

Hubbs, Whitney↗

Lunar Advanced Volatile Analysis Subsystem: Pressure Transducer Trade Study

In Situ Resource Utilization (ISRU) is a key factor in paving the way for the future of human space exploration. The ability to harvest resources on foreign astronomical objects to produce consumables and propellant offers potential reduction in mission cost and risk. Through previous missions, the existence of water ice at the poles of the moon has been identified, however the feasibility of water extraction for resources remains unanswered. The Resource Prospector (RP) mission is currently in development to provide ground truth, and will enable us to characterize the distribution of water at one of the lunar poles. Regolith & Environment Science and Oxygen & Lunar Volatile Extraction (RESOLVE) is the primary payload on RP that will be used in conjunction with a rover. RESOLVE contains multiple instruments for systematically identifying the presence of water. The main process involves the use of two systems within RESOLVE: the Oxygen Volatile Extraction Node (OVEN) and Lunar Advanced Volatile Analysis (LAVA). Within the LAVA subsystem, there are multiple calculations that depend on accurate pressure readings. One of the most important instances where pressure transducers (PT) are used is for calculating the number of moles in a gas transfer from the OVEN subsystem. As a critical component of the main process, a mixture of custom and commercial off the shelf (COTS) PTs are currently being tested in the expected operating environment to eventually down select an option for integrated testing in the LAVA engineering test unit (ETU).

Kang, Edward Shinuk↗

A Summary of the NEXT-C Flight Thruster Proto-flight Testing

Aerojet Rocketdyne (AR), under contract to NASA Glenn Research Center, built, tested and delivered the first flight version of the NEXT-C (NASA Evolutionary Xenon Thruster – Commercial) engine system. This system is comprised of a 7 kW thruster and power processing unit which are the commercial variants of the NEXT prototype thruster and power processing unit. In addition to developing the NEXT-C engine system for potential future NASA science missions, AR is dedicated to ensuring that this propulsion system is viable for commercial users and a wider variety of commercial applications. This paper will focus on the performance of the first flight model thruster, SN001, and presents an overview of the proto-flight testing environments and data obtained. For this first flight thruster, the proto-flight test sequence involved characterizing the performance of the thruster, in addition to vibration and thermal vacuum testing of the thruster. Between each of these environmental tests, the performance of the thruster was verified, ensuring that the environmental exposures, i.e. vibration and TVAC, did not affect the thruster performance. Specifically, the proto-flight data obtained included discharge chamber, optics and neutralizer performance. Faraday probe and ExB data obtained in the regions downstream of the thruster are presented and used to calculate thrust, and therefore specific impulse and total efficiency. Lastly, data are presented showing how the centroid of the ion beam, assumed to be indicative of the thrust vector location, varies throughout the entire proto-flight test campaign. The proto-flight testing of the NEXT-C PPU is documented in a previously published paper by Bontempo4. Following the proto-flight testing of the thruster, the thruster and its PPU successfully completed a System Integrated Test (SIT) tailored to the DART Mission. After the completion of the proto-flight testing, the SN001 thruster and SN002 PPU were delivered to APL for use on the DART mission.

Ion thruster↗

Mission Architecture for the Green Propulsion Dual Mode Mission

Current spacecraft propulsion technologies are broadly divided into chemical and electric propulsion modes, each of which has unique advantages. It is common for both systems to have a place in interplanetary spacecraft, but the size, weight, and power required to carry two separate propulsion systems is extremely limiting for small spacecraft such as CubeSats. The upcoming NASA STMD-funded Green Propulsion Dual Mode (GPDM) mission will demonstrate on-orbit a novel dual-mode propulsion system known as the GPDM Propulsion System that uses the AF-M315E/ASCENT green monopropellant to feed both a chemical 100 mN monopropellant thruster and four electrospray thrusters. GPDM will fly a 6U CubeSat in low Earth orbit and perform orbit-raising and lowering maneuvers to characterize the performance of this dual-mode propulsion technology, enabling a new generation of future interplanetary small satellite explorers. The Georgia Institute of Technology Space Systems Design Laboratory (SSDL) is conducting the design, assembly, integration, testing, and mission operations of the GPDM host spacecraft, as well as the integration of the GPDM Propulsion System payload, designed by NASA’s Marshall Spaceflight Center (MSFC). The NASA Marshall Space Flight Center is overseeing the overall GPDM project as well as specific technology development activities of the GPDM Propulsion System, while electrospray thrusters are supplied by the MIT Space Propulsion Lab, with additional components supplied by MMA Design, Blue Canyon Technologies, Quasonix, Xiphos, and Rubicon Space Systems. The GPDM spacecraft will carry the GPDM Propulsion System into orbit and use a high-power S-band radio to enable real-time operations in low Earth orbit (LEO) via the NASA Tracking and Data Relay Satellite System (TDRSS). The mission is working towards a tentative launch readiness date of August 2025, in support of launch and operations commencing in January 2026. This paper describes GPDM’s overall mission concept of operations, spacecraft overview, and subsystem breakdown.

Green Propulsion Dual Mode↗

Cryo-Vacuum Testing of the Integrated Science Instrument Module for the James Webb Space Telescope

With delivery of the science instruments for the James Webb Space Telescope (JWST) to Goddard Space Flight Center (GSFC) expected in 2012, current plans call for the first cryo-vacuum test of the Integrated Science Instrument Module (ISIM) to be carried out at GSFC in early 2013. Plans are well underway for conducting this ambitious test, which will perform critical verifications of a number of optical, thermal, and operational requirements of the IS 1M hardware, at its deep cryogenic operating temperature. We describe here the facilities, goals, methods, and timeline for this important Integration & Test milestone in the JWST program.

Kimble, Randy A.↗