Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

SU-E-T-25: A Dosimetric Comparison of Three-Dimension Conformal and Intensity-Modulated Radiation Therapy in Esophageal Cancer

Purpose: dosimetric comparison of 3DCRT and IMRT in 9 esophageal cancer. The aim of this paper is to know which of these two techniques is dosimetrically more favorable dosimetrically at both the CTV coverage and dose obtained in the relevant organs at risk, in this case, lungs and heart, as the spinal cord received in all cases below 45 Gy. Methods: we chose 9 patients from our center (CHN) with the same type of esophageal cancer and in which the prescribed dose was the same, 54 Gy. For these treatments we have used the same fields and the same angles (AP (0 °), OPD (225°–240°) and OPI (125°–135°)).All plans have been implemented using Eclipse (version 11.0) with AAA( Analytical Anisotropic Algorithm )(Version 11.0.31). Results: To analyze the coverage of the CTV, we have evaluated the D99% and found that the average dose received by 99% of CTV with IMRT is 53.8 ± 0.4 Gy (99.6% of the prescribed dose) and the mean value obtained with 3DCRT is 52.3 ± 0.6 Gy (96.8% of the prescribed dose).The last data analyzed was the D2% of PTV, a fact that gives us information on the maximum dose received by our PTV. D2% of the PTV for IMRT planning is 55.4 ± 0.4 Gy (102.6% of the prescribed dose) and with 3DCRT is 56.8 ± 0.7 Gy (105.2% of the prescribed dose).All parameters analyzed at risk organs (V30, V40, V45 and V50 for the case of heart and V5, V10, V15 and V20 for the case of the lungs) provide us irradiated volume percentages lower in IMRT than 3DCRT. Conclusion: IMRT provides a considerable improvement in the coverage of the CTV and the doses to organs at risk.

60 APPLIED LIFE SCIENCES↗

Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities for Polarized He-3 in RHIC and EIC [Slides]

The workshop on opportunities for polarized He-3 in RHIC and EIC was targeted at finding practical ways of implementing and using polarized He-3 beams. Polarized He-3 beams will provide the unique opportunity for first measurements, i.e, to a full quark flavor separation measuring single spin asymmetries for p + , p - and p 0 in hadron-hadron collisions. In electron ion collisions the combination of data recorded with polarized electron proton/He-3 beams allows to determine the quark flavor separated helicity and transverse momentum distributions. The workshop had sessions on polarized He-3 sources, the physics of colliding polarized He-3 beams, polarimetry, and beam acceleration in the AGS Booster, AGS, RHIC, and ELIC. The material presented at the workshop will allow making plans for the implementation of polarized He-3 beams in RHIC.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Pilot Implementation of a Field Study Design to Evaluate the Impact of Source Control Measures on Indoor Air Quality in High Performance Homes

To improve the indoor air quality in new, high performance homes, a variety of standards and rating programs have been introduced to identify building materials that are designed to have lower emission rates of key contaminants of concern and a number of building materials are being introduced that are certified to these standards. For example, the U.S. Department of Energy (DOE) Zero Energy Ready Home program requires certification under the U.S. Environmental Protection Agency (EPA) Indoor airPLUS (IaP) label, which requires the use of PS1 or PS2 certified plywood and OSB; low-formaldehyde emitting wood products; low- or no-VOC paints and coatings as certified by Green Seal Standard GS-11, GreenGuard, SCS Indoor Advantage Gold Standard, MPI Green Performance Standard, or another third party rating program; and Green Label-certified carpet and carpet cushions. However, little is known regarding the efficacy of the IAP requirements in measurably reducing contaminant exposures in homes. The goal of this project is to develop a robust experimental approach and collect preliminary data to support the evaluation of indoor air quality (IAQ) measures linked to IAP-approved low-emitting materials and finishes in new residential homes. To this end, the research team of Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) developed a detailed experimental plan to measure IAQ constituents and other parameters, over time, in new homes constructed with materials compliant with IAP’s low-emitting material and ventilation requirements (i.e., section 6.1, 6.2, 6.3, and 7.2) and similar homes constructed to the state building code with conventional materials. The IAQ in IAP and conventional homes of similar age, location, and construction style is quantified as the differences in the speciated VOC and aldehyde concentrations, normalized to dilution rates. The experimental plan consists of methods to evaluate the difference between low-emitting and “conventional” materials as installed in newly constructed residential homes using both (1) highly controlled, short-term active samples to precisely characterize the building-related chemical emissions and building contents and (2) a week-long passive sample designed to capture the impact of occupant behavior and related activities on measured IAQ contaminant levels indoors. The combination of detailed short-term measurements with the home under controlled/consistent conditions during pre- and post-occupancy and the week-long passive sampling data provide the opportunity to begin to separate the different emission sources and help isolate and quantify variability in the monitored homes. Between April and August 2014, the research team performed pre-occupancy and post-occupancy sampling in one conventional home and two homes built with low-emitting materials that were generally consistent with EPA’s Indoor airPLUS guidelines. However, for a number of reasons, the full experimental plan was not implemented. The project was intended to continue for up to three years to asses long-term changes in IAQ but the project was limited to one calendar year. As a result, several of the primary research questions related to seasonal impacts and the long-term trends in IAQ could not be addressed. In addition, there were several unexpected issues related to recruiting, availability of home types, and difficulty coordinating with builders/realtors/homeowners. Several field monitoring issues also came up that provide “lessons learned” that led to improvements to the original monitoring plan. The project produced a good experimental plan that is expected to be be useful for future efforts collecting data to support answering these same or similar research questions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-F-T-47: MRI T2 Exclusive Based Planning Using the Endocavitary/interstitial Gynecological Benidorm Applicator: A Proposed TPS Library and Preplan Efficient Methodology

Purpose: ABS and GEC-ESTRO have recommended MRI T2 for image guided brachytherapy. Recently, a new applicator (Benidorm Template, TB) has been developed in our Department (Rodriguez et al 2015). TB is fully MRI compatible because the Titanium needles and it allows the use of intrauterine tandem. Currently, TPS applicators library are not currently available for non-rigid applicators in case of interstitial component as the TB.The purpose of this work is to present the development of a library for the TB, together with its use on a pre-planning technique. Both new goals allow a very efficient and exclusive T2 MRI based planning clinical TB implementation. Methods: The developed library has been implemented in Oncentra Brachytherapy TPS, version 4.3.0 (Elekta) and now is being implemented on Sagiplan v 2.0 TPS (Eckert&Ziegler BEBIG). To model the TB, free and open software named FreeCAD and MeshLab have been used. The reconstruction process is based on three inserted A-vitamin pellets together with the data provided by the free length. The implemented preplanning procedure is as follow: 1) A MRI T2 acquisition is performed with the template in place just with the vaginal cylinder (no uterine tube nor needles). 2) The CTV is drawn and the required needles are selected using a developed Java based application and 3) A post-implant MRI T2 is performed. Results: This library procedure has been successfully applied by now in 25 patients. In this work the use of the developed library will be illustrated with clinical examples. The preplanning procedure has been applied by now in 6 patients, having significant advantages: needle depth estimation, needle positions and number are optimized a priori, time saving, etc Conclusion: TB library and pre-plan techniques are feasible and very efficient and their use will be illustrated in this work.

60 APPLIED LIFE SCIENCES↗

MO-B-BRB-00: Optimizing the Treatment Planning Process

The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.

60 APPLIED LIFE SCIENCES↗

MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment

The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.

60 APPLIED LIFE SCIENCES↗

MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.

60 APPLIED LIFE SCIENCES↗

MO-B-BRB-03: Systems Engineering Tools for Treatment Planning Process Optimization in Radiation Medicine

The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.

60 APPLIED LIFE SCIENCES↗

National Electric Vehicle Infrastructure Formula Program (ANNUAL REPORT | PLAN YEAR 2023–2024)

The 2021 Infrastructure Investment and Jobs Act, also known as the Bipartisan Infrastructure Law (BIL), invests $\$$7.5 billion to build out a national electric vehicle (EV) charging network and created the Joint Office of Energy and Transportation (Joint Office) to “study, plan, coordinate, and implement issues of joint concern between the two agencies.” The BIL represents a historic effort to electrify the U.S. transportation system, which has significant potential to reduce U.S. greenhouse gas emissions and help tackle the climate crisis. The U.S. transportation sector accounts for one-third of the nation’s greenhouse gas emissions—the largest share of all primary sectors, including electricity production, industry, commercial and residential, and agriculture. The National Electric Vehicle Infrastructure (NEVI) Formula Program, one of the BIL funding programs, was launched in February 2022, providing nearly $\$$5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of EV charging stations beginning with designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with an emphasis on the Interstate Highway System. The funding is made available to the states in allocations each year pending FHWA certification of the state’s annual deployment plan. The NEVI program is in its third year, so there's a lot to celebrate. As of July 2024, 39 states have released solicitations for their NEVI programs and eight states have opened their first NEVI-funded stations (61 ports in total), which have already powered thousands of charging sessions for EV drivers across America. Additional stations are in the pipeline with more than 2,500 additional ports having been awarded or conditionally awarded by the states. All states released their Fiscal Year (FY) 2024 deployment plan updates to reflect the new minimum requirements and guidance, and several states added newly designated EV AFCs in their FY 2024 deployment plan updates, bringing the total AFC network of EV corridors to more than 81,000 miles.

33 ADVANCED PROPULSION SYSTEMS↗

Modeling of Lead-210 Data Documents Benefits in Proactively Understanding TENORM Deposition - 18515

Radioactive decay of naturally occurring Radon-222 present in just-produced natural gas can lead to deposition of its radiogenic daughter, Lead-210, and subsequent radiogenic progeny within natural gas handling, treatment, and distribution facilities. Worker safety issues and disposal challenges arise when these accumulate to radiologically problematic activity levels. This is due to the 22.3-year half-life of Lead-210, allowing for multi-decade period of accumulation to occur and to persist, even after facility operations have ceased. Due to the far shorter half-lives of Lead-210 radiogenic progeny, especially that of Polonium-210, secular equilibrium within the Lead-210-Bismuth-210-Polonium-210 decay chain is quickly approached during facility operations and achieved after facility operations end. Lead-210 that accumulates in pipe scale can complicate any subsequent intrusive facility modifications, such as disassembly and dismantlement, potentially exposing workers to adverse radioactivity and impeding recycling and/or disposal of radiologically impacted equipment or other material. Experience has shown it is not strictly the presence of Lead-210 that is problematic but rather its 'unexpected' presence when this Technologically Enhanced Naturally Occurring Radioactive Material (TENORM) is discovered during intrusive work not incorporating radiological health and safety and material handling plans. Conversely, when implementing a program that proactively considers the potential for Lead-210, this form of TENORM simply becomes another 'special waste' that can be safely, efficiently, and effectively addressed during a decommissioning effort, without associated adverse worker exposures, project cost over-runs, and schedule delays. This paper will discuss how proactive radioactive scanning quickly and safely identified Lead-210 and its radiogenic progeny within a natural gas sweetening and compressor station located in northern Montana, a portion of which was undergoing decommissioning, aiding in safe and compliant material handling and recycling. The location of this operation necessitated that the decommissioning program be completed on schedule to prevent weather-related impacts due to the onset of adverse winter conditions. Further, the radioactive data acquired during this project will be shown to provide important insight into historic behavior of Lead-210 in terms of its disposition and its more recent decay. From these data, it became possible to back-model the average activity of Radon-222 within the natural gas being processed during the life of the operation, how the estimated Radon-222 activity within the processed natural gas conformed to measured Radon-222 at various other natural gas fields, and how this information can be leveraged in developing safe and successful plans for future intrusive work at this and companion site operations. This presentation will also note the apparent preferential accumulation of Lead-210 within both rubber-based materials, such as gaskets and seals, and grease-based products found within natural gas flow lines. Thoughts regarding processes that may lead to this finding will be explored. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HANFORD SITE SUSTAINABILITY PROGRAM RICHLAND WASHINGTON - 12464

In support of implementation of Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance, the Hanford Site Sustainability Plan was developed to implement strategies and activities required to achieve the prescribed goals in the EO as well as demonstrate measurable progress in environmental stewardship at the Hanford Site. The Hanford Site Sustainability Program was developed to demonstrate progress towards sustainability goals as defined and established in Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance; EO 13423, Strengthening Federal Environmental, Energy and Transportation Management, and several applicable Energy Acts. Multiple initiatives were undertaken in Fiscal Year (FY) 2011 to implement the Program and poise the Hanford Site as a leader in environmental stewardship. In order to implement the Hanford Site Sustainability Program, a Sustainability Plan was developed in conjunction with prime contractors, two U.S. Department of Energy (DOE) Offices, and key stakeholders to serve as the framework for measuring progress towards sustainability goals. Based on the review of these metrics and future plans, several activities were initiated to proactively improve performance or provide alternatives for future consideration contingent on available funding. A review of the key metric associated with energy consumption for the Hanford Site in FY 2010 and 2011 indicated an increase over the target reduction of 3 percent annually from a baseline established in FY 2003 as illustrated in Figure 1. This slight increase was attributed primarily from the increased energy demand from the cleanup projects funded by the American Recovery and Reinvestment Act (ARRA) in FY 2010 and 2011. Although it is forecasted that the energy demand will decrease commensurate with the completion of ARRA projects, several major initiatives were launched to improve energy efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Real-Time Traffic Information for Emergency Evacuations

There are many instances in which it is possible to plan ahead for an emergency evacuation (e.g., a chemical processing facility explosion). For those cases, if an accident were to happen, then the best evacuation plan for the prevailing network and weather conditions would be deployed. In other cases (e.g., the derailment of a train transporting hazardous materials), there may not be any previously developed plan to be implemented, and decisions must be made ad-hoc on how to proceed with an emergency evacuation. In both situations, the availability of real-time traffic information plays a critical role in the management of the evacuation operations. Due to cost constraints, only large urban areas have traffic sensor deployments that permit access to some sort of real-time traffic information; an evacuation taking place in other areas of the country would have to proceed without real-time traffic information. In order to improve operations during a vehicular emergency evacuation anywhere, a system of sensors that uses newly developed real-time traffic-information-gathering technologies to assess traffic conditions and to detect incidents on the main evacuation routes is presented in this paper. A series of tests, both in a controlled environment and in the field, were conducted to study the feasibility of such a system of traffic sensors and to assess its ability to provide real-time traffic information during an emergency evacuation. The results of these tests indicated that the prototype sensors are reliable and accurate for the type of application that is the focus of this paper.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Promoting environmental sustainability via an expert elicitation process

Environmental sustainability (ES) planning was applied to the 981-mile, commercially navigable Ohio River. Navigation improvement needs were identified within the broad study along with actions to restore aquatic and riparian ecological resources to a higher state of sustainability. The actions were identified via an Expert Elicitation Process (EEP) involving aquatic and riparian/terrestrial experts knowledgeable of Ohio River resources. The received information was synthesized into goals for the selected resources (Valued Ecosystem Components - or VECs), actions or measures to attain the goals, and monitoring to evaluate conditions. Finally, 26 types of ES actions were identified and classified into three ES alternatives. These alternatives were then evaluated relative to key decision criteria, and such evaluations, based on pertinent decision criteria, were also conducted for four navigation improvement alternatives. Finally, the best combination of ES and navigation alternatives was identified. The key lessons derived from this use of EEP were that: (1) EEP can support the preliminary identification of ES measures; however, more detailed study of specific designs and cost evaluations will be necessary; (2) the method promotes collaboration between key scientists and policymakers from governmental agencies and private sectors, and such collaboration will ultimately provide the foundation for implementation of sustainability actions; and (3) an effective EEP does not occur by accident, it requires careful planning, implementation, and documentation. - Research Highlights: > Use of an Expert Elicitation Process (EEP) is demonstrated in this study. > EEP was used to identify Environmental Sustainability (ES) needs for the Ohio River. > EEP helped develop consensus among resource experts on ES needs. > EEP promotes collaboration to identify and contribute to common resource goals. > EEP may be used in assessing cumulative effects and formulating restoration plans.

54 ENVIRONMENTAL SCIENCES↗

NRC Waste Incidental to Reprocessing Program: Overview of Consultation and Monitoring Activities at the Idaho National Laboratory and the Savannah River Site - What We Have Learned - 12470

In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed on tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Opportunities of Integrating Electric Vehicles in Electricity Distribution Systems

Increased charging needs from widespread adoption of battery electric vehicles (EVs) will impact electricity demand. This will likely require a combination of potentially costly distribution infrastructure upgrades and synergistic grid-transportation solutions such as managed charging and strategic charger placement. Fully implementing such strategic planning and control methods - including business models and mechanisms to engage and compensate consumers - can minimize or even eliminate required grid upgrades. Moreover, there are also opportunities for EV charging to support the grid by helping solve existing and emerging distribution system challenges associated with increasing distributed energy resources (DERs) such as solar generation and battery energy storage. This paper reviews the potential impacts of EV charging on electricity distribution systems and describes methods from the literature to efficiently integrate EVs into distribution systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Simulation-aided occupant-centric building design: A critical review of tools, methods, and applications

Occupants are active participants in their built environment, affecting its performance while simultaneously being affected by its design and indoor environmental conditions. With recent advances in computer modeling, simulation tools, and analysis techniques, topics such as human-building interactions and occupant behavior have gained significant interest in the literature given their premise of improving building design processes and operating strategies. In practice, the focus of occupant-centric literature has been mostly geared towards the latter (i.e., operation), leaving the implications on building design practices underexplored. This paper fills the gap by providing a critical review of existing studies applying computer-based modeling and simulation to guide occupant-centric building design. The reviewed papers are organized along four main themes, namely occupant-centric: (i) metrics of building performance, (ii) modeling and simulation approaches, (iii) design methods and applications, and (iv) supporting practices and mechanisms. Important barriers are identified for a more effective application of occupant-centric building design practices, including the limited consideration of metrics beyond energy efficiency (e.g., occupant well-being and space planning), the limited implementation and validation of the proposed methods, and the lack of integration of occupant behavior modeling in existing building performance simulation tools. Finally, future research directions are discussed, covering large-scale international data collection efforts to move from generic assumptions about occupant behavior to specific/localized knowledge, improved metrics of measuring building performance, and improved industry practices, such as building codes, to promote an occupant-in-the-loop approach to the building design process.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗